Professional Documents
Culture Documents
ACKNOWLEDGEMENT
I, of BBA 5th Semester, am having immense pleasure in bringing out the Project Report on the topic WORKING ANALYSIS OF AN ORGANISATION. A department
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA). If u need an original and complete report file in MS Word format + Presentation on this file PPT, Then u may contact vicky88universian@gmail.com
Date:
(Name) ROLL NO
INDEX
CHAPTER 1. 2. 3. 4. 5. 6. CONTENTS INTRODUCTION LITERATURE REVIEW RESEARCH METHODOLOGY WORKING ANALYSIS OF AN ORGANISATION (xyz ltd) SUMMARY BIBLIOGRAPHY PAGE NO. 6 22 33 42 63 67
CHAPTER-1
INTRODUCTION
The data obtained from Ministry of Commerce and Industry, shows high growth obtained since 2001-02 in automobile production continuing in the .. .. MORE.
OBJECTIVES OF STUDY
PROJECT REPORT based university requirement (BBA). If u need an original and complete report file in MS Word format + Presentation on this file PPT, Then u may contact vicky88universian@gmail.com
CHAPTER-2
Literature Review (XYZ ltd.)
The XYZ Group of Industries, a US $40 Million Conglomerate, is a Leading OEM (Original Equipment Manufacturer) catering to leading
auto .
..
..and the stress on the mantra of Perfection in Quality, Cost and Delivery.
10
Components Manufacturing in XYZ ltd: Products for Domestic Market: As an OEM of M/s Hero Honda, TVS, Yamaha and other Auto Majors, the Group supplies the following major parts:
. ..more
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA). If u need an original and complete report file in MS Word format + Presentation on this file PPT, Then u may contact vicky88universian@gmail.com
Financial Performance:
11
Other Interests: The Group also has interests and association, other than its main line of Business: The xyz School: An International School of repute, cocooned inside the commercial hub of Gurgaon. It follows the Primary Years Programme of the International Baccalaureate of Switzerland and the ICSE/ISC programme of the Council for the Indian School Certificate Examination, New Delhi. Website.: www.xyz.com
12
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP An association ofrequirement the xyz Group, which is involved in the design, production university (BBA). Ifsales u need anelectronic original and complete report file in MS and of hi-tech Word format + Presentation on this file PPT, Then u may contact vicky88universian@gmail.com
Flash xyz devices Pvt. Ltd.: energy meters. Had been the largest supplier to the Government of State of Punjab in the Year 2004 05.
13
ABC India Pvt. Ltd.: ABC India, a market leader in the field of children related products, an entirely new collection of futuristic models of tricycles, perambulators, and battery operated cars and cycles etc for new borns to 12 year olds.
14
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA). If u need an original and complete report file in MS Word format + Presentation on this file PPT, Then u may contact vicky88universian@gmail.com
15
CHAPTER-3
RESEARCH METHODOLOGY
16
Research:
Research in common parlance refers to a search of knowledge. Research comprises defining and redefining problems, formulating hypothesis or suggested solutions; collecting, organizing and evaluating data; making deductions and reaching conclusions; and at last carefully testing the conclusions to determine whether they fit the formulating hypothesis. One can also define research as scientific and systematic search for pertinent information on a specific topic.
Objectives of Research:
17
Research Process:
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA). If u need an original and complete report file in MS Word format + Presentation on this file PPT, Then u may contact vicky88universian@gmail.com
. .. ..
18
Research Design: Decisions regarding what, where, when, how much, by what means concerning an inquiry or a research study constitute a research design. A research design is the arrangement of conditions for collection and analysis of data in a manner that aims to combine relevance to the research purpose with economy in procedure.
More explicitly, the designing decisions happen to be in respect of: What is the study about? Why is the study being made? Where will the study be carried out? What type of data is required? Where can the required data be found? What periods of time will the study include? What will be the sample design? What techniques of data collection will be used? How will the data be analyzed? In what style will the report be prepared?
19
Research Approach: Data Collection: TYPES OF DATA 1) PRIMARY DATA: Are those which are collected afresh and for the first time and thus happen to be original in character and known as Primary data. Personal Interview Close observation Survey conduction Group Discussion etc...
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP else and which requirement have already been passed through the statistical process are university (BBA). If u as need an original and complete report file in MS known Secondary data. Word format + Presentation on this file PPT, Then u may contact vicky88universian@gmail.com
2) SECONDARY DATA: Are those which have been collected by someone The data for report has taken from .
20
CHAPTER-4
WORKING ANALYSIS OF AN ORGANISATION(XYZ LTD.)
21
MANUFACTURING PROCESS:
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA). Arranging the Raw material If u need an original and complete report file in MS Word format + Presentation on this file PPT, Then u may contact vicky88universian@gmail.com
Manufacturing dies to make components
..
Dispatch
Production Department: The Production/Manufacturing Department is the back bone of a company. In this the whole process starting from the getting of the order then on to
22
manufacturing Dies then to the Cutting, Parsing, Bending.. Welding then on to Paint & Powder Coating and then Dispatching of the order is done. To reach at a Final Component, the manufacturing process passes through various Sub Departments. These are as follows:
1) Store Department:
The department deals in with the storage of the raw for the
material
p .
2) Tool Room:
This department is one among the major departments, prepares different dies (tools) for the machines which are used in production. Number of
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP machines are given below: university requirement (BBA). If u need an original and complete report file in MS Word format + Presentation on this file PPT, Then u may contact vicky88universian@gmail.com
machines used for this process. The names and working of some major ..
24
Quality assurance, or QA for short, is the set of planned and systematic actions necessary to provide appropriate confidence that a product or service will satisfy the requirements for quality. Quality Assurance is a wide range concept concerning all the matters collectively or individually, which directly
25
affect the quality of product. It controls the quality of a product by doing in-process quality checks, effectively functioning as the brain of an organization. The objective of Quality Assurance is to delight there Customers by involving state of the art, manufacturing techniques and ontime delivery
This is a sample of SUMMER TRAINING with consistent quality. REPORT PROJECT based upon exactly IP university requirement (BBA). After the quality assurance if the component quality is as per the quality If u need an original and complete report file in MS standards set by the organization then further it will sent for PPT, Dispatch. Word format + Presentation on this file Then u may contact vicky88universian@gmail.com The process in Dispatch involves sending the components from
organization to there designated customers. Main Components which are assembeled are as follows: Top Bridge(Handle Plate) Swing Arm Chain Adjuster Battery Case Processes: For Top Bridge: Visual Inspection Reaming Retapping
26
Handle Holder Assembling Dispatch For Swing Arm: Visual Inspection Reaming Retapping Bush Fitting Brake Arm Fitting Dispatch For Chain Adjuster: Size Checking Cap Assembly Dispatch
9) Vendor Development:
27
.. MEANS It is an important department of any ARE industry. THERE. The main purpose of this MORE WORDS
department is to establish contacts with vendors which are able to fulfill the technical and business assistance by means of relevant training, seminars, and workshops.
28
CHAPTER-5
SUMMARY
29
Observations:
..
30
Recommendations:
..
This is a sample of SUMMER TRAINING . PROJECT REPORT based upon exactly IP university (BBA). Companyrequirement should adopt new technology to meet modern business If u need an original and complete report file in MS requirements. Word format + Presentation on this file PPT, Then u may contact vicky88universian@gmail.com
31
Limitations:
Non-cooperative approach and rude behavior of employees The time available for the completion of the project was limited.
Research work was carried out only in the branch of xyz. Therefore it may not be possible to know various methods adopted by other production branches of the company.
32
CHAPTER-5
BIBLIOGRAPHY
33
Bibliography:
.. . Research Methodology ( CR KOTHARI) This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA). If u need an original and complete report file in MS Word format + Presentation on this file PPT, Then u may contact vicky88universian@gmail.com
34