Area Gudang Bahan Baku Tanggal No Pekerjaan Senin 09 Sept 2013 09.00 16.00 Selasa 10 Sept 2013 09.

00 18.00 Rabu 11 Sept 2013 09.00 18.00 Kamis 12 Sept 2013 09.00 18.00 Jumat 13 Sept 2013 09.00 17.00 Sabtu 14 Sept 2013 09.00

Galian Tanah `

Progress Alat Catatan

25% 1 Alat berat

25% 1 Alat berat

30% 2 Alat berat

30% 2 Alat berat

35% 2 Alat berat

35% 2 Alat berat

35% 1 Alat berat

35% 1 Alat berat

35% 1 Alat berat

35% 1 Alat berat

35% 1 Alat berat

Galian P7 lambat disebabkan tanah yang di gali longsor. Galian

Galian P7 lambat disebabkan tanah yang di gali longsor. Galian

Longsor lagi