You are on page 1of 2

CSWIP 3.

1
PERSONAL PARTICULARS
Full Name(As per IC/Passport): Date of Birth : Gender : Nationality : Home Address : Mobile : E-MAIL : I/C OR Passport Number :

ACADEMIC QUALIFICATIONS
NO 1 2 3 4 School/College/University Year Achievement

PROFESSIONAL OR TECHNICAL QUALIFICATIONS


NO 1 2 3 4 Course University / Institute Year Grade

EMPLOYEMENT HISTORIES
Company Position Title Location Duration/year : : : : Company Position Title Location Duration/year : : : : Company Position Title Location Duration/year : : : :

Job Overview :
Tick on appropriate Box Yes or NO ( )

1- Codes and standards Application of the requirements of codes and standards. 2- Parent material identity Verification against documentation and markings of correctness of parent material. 3- Welding consumables identity Verification of correctness of welding consumables (electrodes, filler wires, consumable inserts, gases, fluxes etc). 4- Pre-weld inspection Verification that dimensions, fitup and weld preparations are in accordance with the engineering drawings. 5- Preheating Verification that preheat (where required) is in accordance with specified procedures. 6- Post weld visual inspection Visual inspection and dimensional check of completed weldment against specification requirements and drawings. 7- In-process welding surveillance Surveillance during welding to verify compliance with specified procedure including any preheat, interpass temperature control and post heat requirements. 8- Welding procedures Establishing that a procedure is available, has been approved as required by the appropriate authority and is being employed in production. 9- Witnessing of welder and procedure approval tests Witnessing the preparation of test pieces and destructive tests, and verifying compliance with appropriate standards and specifications.

Yes Yes Yes Yes Yes Yes

NO NO NO NO NO NO

Yes Yes

NO NO

Yes

NO

10- Welder approvals Verification that adequate and valid welder approvals are available, and that only approved welders as required are used in production. 11- Post weld heat treatment Verification that post weld heat treatment has been conducted in accordance with specification requirements. 12- Reports Preparation of inspection reports.

Yes Yes Yes

NO NO NO

VERIFIER
Name : Position : Company : Telephone No : Email Address Signature & Date : Company Stamp

Authenticated Company Stamp

You might also like