Date
26/08/2013
27/08/2013
29/08/2013
30/08.2013
31/08/2013
1/9/2013
2-Sep
Time
(Hrs)
Description
(sampling point)
pH
Conductivity
(s/cm)
Turbidity
(NTU)
Iron
(ppm)
Silica
(ppm)
9.30
9.15
8.50
2.35
0.120
19.30
9.06
9.87
2.32
0.11
9.15
Economiser Inlet
6.90
18.32
2.4
0.02
9:03
8.22
4.14
28.5
1.00
0.06
10.00
8.20
3.05
9.07
0.90
0.06
12.20
9.10
27.00
71.5
1.10
0.08
15.45
Economiser Inlet
9.23
17.60
10.5
1.18
0.261
15.45
9.10
11.69
51.0
0.90
0.124
17.30
Economiser Inlet
9.44
23.75
10.15
10.15
48.90
17.8
0.303
14.00
Economiser Inlet
10.09
50.20
32.2
1.04
0.423
14.00
9.95
54.30
44.5
0.358
16.00
9.79
47.90
59.3
2.12
0.279
19.45
Economiser Inlet
10.15
65.70
34.7
2.45
0.622
20.00
Bottom Drain
10.52
95.30
137
10.5
0.75
22.50
Economiser Inlet
9.20
10.76
25.7
0.486
0.11
23.00
Bottom Drain
10.8
93.50
1.5
9.70
0.71
2.00
Economiser Inlet
9.40
6.64
13.6
1.222
0.06
2.00
Bottom Drain
10.52
75.70
51.7
5.00
0.626
5.00
Economiser Inlet
9.80
10.19
8.24
0.202
0.043
5.00
Bottom Drain
10.50
62.30
34.9
3.73
0.573
7.15
Economiser Inlet
9.72
9.55
8.93
0.274
0.437
7.30
Bottom Drain
10.20
59.10
21.6
1.876
0.421
9.00
9.84
1336.00
8.49
0.64
10.45
9.23
7.30
13.6
0.057
10.45
Economiser Inlet
9.65
10.20
14.0
0.06
10.30
Bottom Drain
10.08
28.90
28.9
10.30
10.21
35.60
40.1
15.00
10.00
34.20
32.7
3.15
0.305
16.45
Bottom Drain
10.10
25.20
23.3
1.54
0.268
16.45
Economiser Inlet
9.54
12.25
9.38
0.52
0.07
20.30
Economiser Inlet
8.46
11.71
1.36
0.138
0.033
20.30
Bottom Drain
10.03
21.72
123
14.32
0.4
23.00
Economiser Inlet
7.49
5.96
1.65
0.168
0.032
23.00
Bottom Drain
10.03
18.24
108
0.42
2.00
Economiser Inlet
6.33
2.52
1.6
0.171
0.032
2.00
Bottom Drain
9.73
20.93
64.4
5.00
Economiser Inlet
6.46
4.38
5.00
Bottom Drain
9.72
17.63
54.7
8.3
0.32
8.00
9.10
13.54
24.3
0.71
0.025
8.00
Economiser Inlet
6.50
1.54
11.00
Economiser Inlet
8.84
7.10
2.35
Remarks
Doubt
6.2
0.36
0.245
0.034
0.25
0.036
14.00
Economiser Inlet
9.07
5.78
15.00
IBD Tank
9.58
9.40
2.3
0.212 0.036
More Turbidity Black colour
17.00
Economiser Inlet
8.42
8.42
1.57
0.175
0.035
17.00
9.09
10.74
95.6
3.0
0.029
20.30
Economiser Inlet
9.06
7.18
0.25
0.025
23.10
Economiser Inlet
8.91
7.97
5.2
0.178
0.028
2.00
Economiser Inlet
9.07
10.12
7.6
0.363
0.053
5.00
2.00
5.00
8.00
11.00
Economiser Inlet
8.98
9.07
8.99
9.02
9.54
14.61
10.12
14.61
7.24
8.24
5.29
7.6
5.3
2.47
1.6
0.37
363
370
176
216
0.056
53
56
45
32
Economiser Inlet
Economiser Inlet
Economiser Inlet
Economiser Inlet
Temperature
degree cent
49
43
75
63
2-Sep
14.00
17.00
20.00
23.45
1.45
4.40
8.00
Economiser Inlet
Economiser Inlet
Economiser Inlet
Economiser Inlet
Economiser Inlet
Economiser Inlet
Economiser Inlet
9.12
9.23
8.60
9.16
9.17
9.10
9.05
6.1
5.81
3.75
5.81
4.86
4.88
5.18
5.35
1.99
0.9
0.6
0.4
0.4
0.58
110
102
142
82
77
77
73
24
26
20
20
19
21
21
11.00
14.00
17.00
Economiser Inlet
9.19
5.32
1.86
102
20
Economiser Inlet
9.16
5.47
1.66
82
24
Economiser Inlet
9.41
6.48
2.59
113
23
IBD sample collected its Black colour and its Filetered except Turbidity analysis
IBD tank
5.54
12.3
124
740
1.38
47
45
42
42
41
41
40
15.20
41
41
43
Shut down the boiler 25 blow out done Drum temp 230 cent steam temp 379 cent pressure 30 kg/cm2
11.00
11-Sep
13-Sep
14-Sep
15-Sep
8.11
13.6
1284
318
19.50
Economiser Inlet
9.17
5.74
2.78
160
41
45
23.00
Economiser Inlet
9.48
7.84
64.4
1000
470
45
1.45
Economiser Inlet
9.11
5.17
21.3
331
53
45
Nearly 54 Blows completed Drum water Temp 280 cent; Main steam 315 cent ;main steam pressure 52 kg/cm2
22:50
1:50
12-Sep
7.99
4-Sep
5-Sep
Economiser Inlet
9.05
14.96
43.3
952
90
66
Economiser Inlet
8.93
7.62
34.6
498
56
51
Economiser Inlet
5:00
9.03
19.2
19.1
360
35
51
Total 85 Blow out complete MS Temp 350 cent Press 52kg/cm2
At 3:40 hrs Temp line MOV problem and again start at 4:40 hrs Target plate was fixed
Ammonia Tank level A 1432 mm & B- 1330 mm Hydrazine Tank level- 1289 mm@5:40 hrs
11:00
Economiser Inlet
8.98
7.48
17:00
Economiser Inlet
8.88
6.3
10.9
281
60
21:00
Economiser Inlet
8.94
5.76
7.27
1040
60
53.8
Ammonia
0:45Tank level A 1401 mm & B- 1330 mm Hydrazine Tank level- 1269 mm@21:00 hrs
Economiser Inlet
8.91
9.9
52.1
1840
59
61.2
Economiser Inlet
8.84
7.4
7.26
233
30
45.3
3:30
BFPM B stopped due to suction DP increase BFPM A started and chemcial injection MOV opened at 3:15 hrs
61 Blow out completed (Total 200)
Ammonia Tank level A 1350 mm & B- 1330 mm Hydrazine Tank level- 1253 mm@6:00 hrs
Chemical dosing pump stopped at 7:00 hrs
Economiser Inlet
16:00
9.5
6.4
3
91
34
Economiser Inlet
17:00
9.51
6.78
Make up water
41
11
20:20
5.49
2.95
Economiser Inlet
20:20
9.3
6.69
8.58
227
36
52.7
Economiser Inlet
23:30
9.01
6.02
19.3
254
56
66.7
Economiser Inlet
2:30
8.98
4.68
6.8
134
32
46.0
Economiser Inlet
4:15
9.18
5.00
2.60
105
10
43.8
60 Blow out completed (Total 260 Blows completed)
Ammonia Tank level A 1308 mm & B- 1330 mm Hydrazine Tank level- 1230 mm@6:00 hrs
2:30
4:15
Eco. Inlet
Eco. Inlet
Eco. Inlet
Eco. Inlet
Eco. Inlet
Eco. Inlet
Make up water
Eco. Inlet
8.98
9.18
9.11
9.24
9.48
9.36
5.26
9.5
4.68
5.00
5.26
5.80
8.11
7.24
4.10
8.48
6.8
2.60
1.93
2.05
1.98
6.38
4.68
134
105
145
110
101
164
0.008
115
32
10
29
31
33
63
65
46.0
43.8
81
77
0:30
Eco. Inlet
9.45
7.63
4.01
145
33
55
5:15
Eco. Inlet
9.35
5.96
2.83
115
34
82
9:15
13:45
16:45
20:00
21:30
21:30
At 1:30hrs Steam blow out stopped due to Temp discharge MOV problem and again Boiler started at 5:00hrs
Upto 7:00 am 19 steam blow completed(Total 281)
Ammonia Tank level A 1308 mm & B- 1330 mm Hydrazine Tank level- 1230 mm@6:00 hrs
8:00
Eco. Inlet
9.54
8.09
3.83
89
36
10:45
Eco. Inlet
9.5
6.84
3.60
86
46
15-Sep
17:00
Eco. Inlet
9.31
6.21
3.32
102
54
22:00
Eco. Inlet
9.51
7.44
9.18
175
59
80
1:30
Eco. Inlet
9.19
6.93
2.31
112
34
61
4:30
Eco. Inlet
9.21
6.77
1.51
54
24
55
Ammonia Tank level A 1209 mm & B- 1330 mm Hydrazine Tank level- 1196 mm@20:00 hrs
Ammonia Tank level A 1145 mm & B- 1330 mm Hydrazine Tank level- 1175 mm@05:45 hrs
Total 58 Blow completed in Night shift
Step 2 Steam Blow out Completed accepted by PB (Total Blow 339 )
8:40
Eco. Inlet
9.33
5.36
2.44
92
28
10:55
Eco. Inlet
9.22
5.37
1.24
81
28
15:10
Eco. Inlet
9.28
5.34
1.24
82
31
16:50
Eco. Inlet
9.28
5.43
1.00
82
31
20:30
Eco. Inlet
9.24
5.22
1.28
75
37
54
0:15
Eco. Inlet
9.48
8.46
12.10
178
85
125
Eco. Inlet
9.36
6.04
4.80
52
37
4:15
Step 3 continous steam blowing completed, Main Steam Temp-320 cent, Pressure-23 kg/cm2
Ammonia Tank level A 1142 mm & B- 1330 mm Hydrazine Tank level- 1175 mm@20:00 hrs
Steap 3 accepted by PB (Aux.Header 20bar)
Ammonia Tank level A 1107 mm & B- 1330 mm Hydrazine Tank level- 1153 mm@05:45 hrs
Eco. Inlet
9.23
4.40
6.20
96
33
8:30
Eco. Inlet
9.18
3.74
3.02
97
35
17:00
Eco. Inlet
9.18
3.78
2.57
108
35
21:00
Eco. Inlet
8.97
4.38
8.90
86
61
1:20
Ammonia Tank level A at 1106mm 22:00hrs & Hydrazine tank level 1152mm at 22:00hrs
Ammonia Tank level A 1102 mm & B- 1330 mm Hydrazine Tank level- 1148 mm@2:00hrs
Steam Blowing Step 4 stopped
Eco. Inlet
9.2
3.86
6.75
82
48
5:00
Eco. Inlet
9.18
4.19
5.86
813
78
10:30
Eco. Inlet
9.15
7.71
5.86
152
157
16:00
79
16-Sep
17-Sep
18-Sep
19-Sep
60
63
60
21:30
Eco. Inlet
9.44
7.97
10.50
139
159
135
2:00
Eco. Inlet
9.26
7.99
7.41
134
102
108
5:20
Eco. Inlet
9.5
8.60
8.00
109
67
107
Ammonia Tank level A 1102 at 22:00hrs & Hydrazine tank level 1148mm at 22:00hrs
Ammonia Tank level A 1076 mm & B- 1330 mm Hydrazine Tank level- 1127 mm@ 6:00hrs
9:00
Eco. Inlet
9.19
6.33
5.38
225
53
16:30
Eco. Inlet
9.21
6.30
3.08
82
54
20:45
Eco. Inlet
9.05
4.23
10.10
122
62
90
0:45
Eco. Inlet
9.17
6.30
13.00
135
47
67
4:45
Eco. Inlet
9.21
5.32
11.70
132
26
150
20-Sep
21-Sep
Eco. Inlet
9.49
7.10
6.20
106
36
15:40
Eco. Inlet
9.32
8.08
2.86
105
38
0:45
Eco. Inlet
9.17
6.30
13.00
135
47
67
4:45
Eco. Inlet
9.21
5.32
11.70
132
26
150
10:45
Eco. Inlet
9.49
7.10
6.20
106
36
15:40
Eco. Inlet
9.32
8.08
2.86
105
38
20:30
Eco. Inlet
9.52
8.63
12.90
159
46
88
38
35
139
160
40
46
43
72
65
100
Eco. Inlet
9.26
6.25
4.16
64
0:30
Eco. Inlet
9.18
5.20
3.20
58
4:30
Step 5& 6 steam blowing completed
Ammonia Tank level A 1015 mm & B- 1330 mm Hydrazine Tank level- 1069 mm@ 5:15hrs
Eco. Inlet
9.12
5.39
5.48
80
11:30
Eco. Inlet
8.98
7.10
1.60
60
16:30
Eco. Inlet
9.13
6.05
1.21
58
20:25
0:15
22-Sep
Eco. Inlet
9.36
8.01
4.81
39
22-Sep
4:15
Eco. Inlet
9.19
5.80
6.54
62
52
94
22-Sep
23-Sep
23-Sep
24-Sep
11:30
Eco. Inlet
8.89
5.4
8.6
146
46
16:30
Eco. Inlet
8.87
6.10
12.40
175
40
21:00
Eco. Inlet
9.28
7.18
10.70
102
72
Eco. Inlet
9.13
9.46
15.10
115
0:15
Eco. Inlet
9.31
7.11
2.18
53
5:00
Ammonia Tank level A 959 mm & B- 1330 mm Hydrazine Tank level- 998 mm@ 6:00hrs
Upto 23:00hrs SCAH steam blow out done.
Step 8 not completed 32 blows done
59
28
97
56
0:15
Eco. Inlet
9.13
9.46
15.10
115
59
97
5:00
Eco. Inlet
9.31
7.11
2.18
53
28
56
10:45
Eco. Inlet
9.28
7.81
1.62
38
16
17:00
Eco. Inlet
9.15
8.01
2.51
47
38
20:00
Eco. Inlet
8.93
5.80
4.31
35
56
0:15
Eco. Inlet
9.13
6.16
2.46
42
35
154
4:30
Eco. Inlet
9.14
6.12
1.61
29
24
85
8:30
Eco. Inlet
8.84
3.68
7.51
97
26
15:50
Eco. Inlet
8.75
3.75
1.71
51
33
21:00
Eco. Inlet
9.57
10.14
3.22
36
49
104
1:00
Eco. Inlet
9.2
6.42
2.15
30
26
143
4:45
Eco. Inlet
9.21
5.66
1.29
24
21
91
22
29
32
25-Sep
9:00
15:00
21:00
Eco. Inlet
Eco. Inlet
Eco. Inlet
27-Sep
21:00
Eco. Inlet
9.35
8.58
3.82
35
27
109
28-Sep
0:30
4:30
Eco. Inlet
Eco. Inlet
9.39
9.36
6.72
6.61
8.22
2.48
48
22
22
25
167
66