LALITPUR POWER GENERATION CO LTD

C.H.P CLEARANCE / INTERIM INSPECTION REPORT


PROJECT PACKAGE LALITHPUR POWER GENERATION CO BTG ( TG Package)

LPGCL/BTG/LOA/02 CONTRACT NO 27.09.2013 & 28.09.2013 INSP. DATE Sl DESCRIPTION OF MATERIAL / TEST
No

CHP NO.: 100420/BHO 02


Date of issue: 07.10.2013
DISP COD E ACPT D Qty Hold/ REJ QTY UNIT

CONTRACTOR MANUFACTURER PLACE Rv 01.


REF. DOCUMENT

M/S.BHELBendJoinstPvtLtd. Bhopal

OFRD Qty

MDCC NO

REMARKS

BHEL Chennai Supplies


(7174 - 060 - 1 - 81 -036. DU - 001 # 1)

Verification of Quality Documentation for the Item Cooling water storage tank and physical inspection at Bend Joints Pvt Ltd.

Nil

No

APPD QAP

Physical verification of the tank, stand pipes and the documents are found in order with the drawing and approved QAP. MDCC can be released. Documents verified and reviewed:1).MQP -7173:QPC:02 REV. 02 DATE - 23/06/2012 2) HT Protocol Dt 22nd .july 2013 3) NDT Reports :- ML/NDTCR/1494/2013-14 DATE- 03/07/2013 : ML/NDTCR/1494/2013-14 DATE17/07/2013 : ML/NDTCR/1494/2013-14 DATE- 18/07/2013 4) Painting protocol:15991/PC/34/0153 DATE- 05/09/2013 5) MTCs reviewed and found in order. It is advised that the name plate should be welded away from the seam weld & circumferential weld of the tank in future.

Stand pipes 2ns for the same tank.

Nil

No

APPD QAP.

M/S. BHEL / PC, Bhopal. FOR CONTRACTOR/SUBCONTRACTOR/

FOR AND ON BEHALF OF LPGCL

NAME :- S RANGARAJAN. DESIGNATION:- GM (FQA)