Test for cement setting time and compressive strength

By making 6 samples from the same clinker and gypsum and lime stone in the small mill (5 kg )
%

G1-3.0%
G2-3.5%
G3-4.0%
G4-4.5%
G5-5.0%
G6-5.5%
G7-6.0%
G8-7.0%
GK-5.0

dedo@dvd4arab

clinker %

Gypsum %

L.S %

code

clinker g

Gypsum g

L.S g

92.0
91.5
91.0
90.5
90.0
89.5
89.0
88.0
95.0

3.0
3.5
4.0
4.5
5.0
5.5
6.0
7.0
5.0

5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0

G1
G2
G3
G4
G5
G6
G7
G8
GK9

4600
4575
4550
4525
4500
4475
4450
4400
5000

150
175
200
225
250
275
300
350
260

250
250
250
250
250
250
250
250
0.0

added water
118.5
120.0
120.0
120.5
121.0
118.5
119.0
120.5
121.5

depth
5
5
5
6
5
6
7
7
7

W/C %
23.70
24.00
24.00
24.10
24.20
23.70
23.80
24.10
24.30

initial time
105
101
96
93
90
90
91
88
80

final time
141
142
142
144
148
146
136
132
130

SO3
2.05
2.23
2.51
2.74
2.99
3.35
3.64
4.35
3.34

Blaine
350
352
352
354
352
350
352
347
350

2-day
12.7
12.7
13.8
15.3
14.3
16.5
15.8
12.2
15.8

28-day
54.8
55.2
55.6
57.1
52.3

G1-3.0
G2-3.5
G3-4.0
G4-4.5
G5-5.0
G6-5.5
G7-6.0
G8-7.0

added water
118.5
120.0
120.0
120.5
121.0
118.5
119.0
120.5

depth
5
5
5
6
5
6
7
7

W/C %
23.70
24.00
24.00
24.10
24.20
23.70
23.80
24.10

initial time
105
101
96
93
90
90
91
88

final time
141
142
142
144
148
146
136
132

SO3
2.05
2.23
2.51
2.74
2.99
3.35
3.64
4.35

Blaine
350
352
352
354
352
350
352
347

2-day
12.7
12.7
13.8
15.3
14.3
16.5
15.8
12.2

28-day
54.8
55.2
55.6
57.1
52.3

26.00
24.00
22.00
20.00
18.00
16.00
14.00
12.00
10.00
8.00
6.00
4.00
2.00
0.00

23.70

24.00

24.00

24.10

24.20

23.70

23.80

24.10

16.5
15.3
12.7

G1-3.0

12.7

G2-3.5

13.8

G3-4.0

15.8

14.3

12.2

G4-4.5

G5-5.0

G6-5.5

G7-6.0

G8-7.0

Intial Time (min) & Compressive strength MPa

W/C

W/C Curve

110

105

Intial Time (min)

105

100

101

95
96
90

91

93

90
90
88

85

80
2.05

2.23

2.51

2.74

SO3 %

2.99

3.35

3.64

4.35

Test for cement setting time and compressive strength


By making 8 samples from the same clinker and gypsum and lime stone in the small mill (5 kg )
%
clinker % Gypsum %
G0113-3.0
92.0
3.0
G0113-3.5
91.5
3.5
G0113-4.0
91.0
4.0
G0113-4.5
90.5
4.5
G0113-5.0
90.0
5.0
G0113-5.5
89.5
5.5
G0113-6.0
89.0
6.0
G0113-7.0
88.0
7.0
GK0115
95.0
5.0

L.S %
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0

added water

118.5
120.0
120.0
120.5
121.0
118.5
119.0
120.5
121.5

W/C %
23.70
24.00
24.00
24.10
24.20
23.70
23.80
24.10
24.30

initial time final time


105
141
101
142
96
142
93
144
90
148
90
146
91
136
88
132
80
130

SO3
2.05
2.23
2.51
2.74
2.99
3.35
3.64
4.35
3.34

Blaine
350
352
352
354
352
350
352
347
350

2-day
12.7
12.7
13.8
15.3
14.3
16.5
15.8
12.2
15.8

28-day
54.8
55.2
55.6
57.1
52.3

W/C

W/C Curve
26.00
24.00
22.00
20.00
18.00
16.00
14.00
12.00
10.00
8.00
6.00
4.00
2.00
0.00

23.70

24.00

24.00

24.10

24.20

23.70

16.5
12.7

G1-3.0

12.7

G2-3.5

13.8

G3-4.0

15.3

G4-4.5

2 Days

14.3

G5-5.0

23.80

24.10

15.8
12.2

G6-5.5

G7-6.0

G8-7.0

2 Days

Intial Time (min) & Compressive strength MPa

Setting Time
120
110
100
90
80
70
60
50
40
30
20
10
0

105

101

12.7

2.05

96

12.7

2.23

93

90

15.3

13.8

2.51

2.74

SO3 %

91

90

14.3

2.99

16.5

3.35

15.8

3.64

Test for cement setting time and compressive strength


By making 6 samples from the same clinker , gypsum , lime stone,and slag in the small mill (5 kg )
%

clinker %

Gypsum %

add%

code

clinker g

Gypsum g

add. g

L1-5.0%
S1-5.0%
S2-10%
S3-15%
S4-20%
S5-25%

90.3
90.3
85.3
80.3
75.3
70.3

4.7
4.7
4.7
4.7
4.7
4.7

5.0
5.0
10.0
15.0
20.0
25.0

L1
S1
S2
S3
S4
S5

4515
4515
4265
4015
3765
3515

235
235
235
235
235
235

250
250
500
750
1000
1250

added water
122.4
124.5
123.5
124.0
124.5
125.0

depth
5
5
7
5
6
6

depth
5
5
7
5
6
6

W/C %
24.40
24.90
24.70
24.80
24.90
25.00

initial time
123
104
132
128
125
138

final time
156
155
160
164
158
169

SO3
2.64
2.76
2.76
2.82
2.70
2.93

Blaine
332
325
325
322
325
320

2-day
14.1
15.6
13.9
13.5
12.4
9.9

28-day
46.6
52.7
48.3
48.6
46.6
38.8

0.9mm
7.8
12.6
14.4
17.4
25.5
27.6

code

L1-5.0%
S1-5.0%
S2-10.0%
S3-15.0%
S4-20.0
S5-25.0%

added water
122.4
124.5
123.5
124.0
124.5
125.0

depth
5
5
7
5
6
6

W/C %
24.40
24.90
24.70
24.80
24.90
25.00

initial time
123
104
132
128
125
138

final time
156
155
160
164
158
169

SO3
2.64
2.76
2.76
2.82
2.70
2.93

Blaine
332
325
325
322
325
320

2-day
14.1
15.6
13.9
13.5
12.4
9.9

28-day
2.64
2.76
2.76
2.82
2.70
2.93

W/C

W/C Curve
28.00
26.00
24.00
22.00
20.00
18.00
16.00
14.00
12.00
10.00
8.00
6.00
4.00
2.00
0.00

24.40

14.1

24.90

24.70

24.80

13.9

13.5

24.90

25.00

15.6
12.4

9.9

L1-5.0%

S1-5.0%

S2-10.0%

S3-15.0%

S4-20.0

S5-25.0%

Test for cement setting time and compressive strength


By making 6 samples from the same clinker and gypsum and lime stone ,and slag in the small mill (5 kg )

%
L1-5.0%
S1-5.0%
S2-10%
S3-15%
S4-20%
S5-25%

clinker % Gypsum %

90.3
90.3
85.3
80.3
75.3
70.3

4.7
4.7
4.7
4.7
4.7
4.7

add%

5.0
5.0
10.0
15.0
20.0
25.0

added water
122.4
124.5
123.5
124.0
124.5
125.0

depth
5
5
7
5
6
6

W/C % initial time final time


24.40
123
156
24.90
104
155
24.70
132
160
24.80
128
164
24.90
125
158
25.00
138
169

SO3
2.64
2.76
2.76
2.82
2.70
2.93

Blaine
332
325
325
322
325
320

5 kg )

2-day
14.1
15.6
13.9
13.5
12.4
9.9

28-day 0.9mm
46.6
7.8
52.7
12.6
48.3
14.4
48.6
17.4
46.6
25.5
38.8
27.6