You are on page 1of 8

Lukman Nul Hakim lukman.nh.st@gmail.

com C: 085-222-850-085

The goal of this portfolio is to give you a deeper insight into the experiences and skills I have gained over my recent history. It is my hope that this insight will allow you to better assess how my skills can be applied to your company. I would be happy to talk in more detail about any items included here, and can be reached using the contact information at the bottom of the page. Integrated Wastewater Treatment Plant Capacity 5000 M3 / Day

Lukman Nul Hakim lukman.nh.st@gmail.com C: 085-222-850-085

Parameter

value

BOD

155,19 ppm

COD

397 ppm

TSS

102 ppm

PH

7,76

Impact Of Textile Waste Water Pollution To The Environment

Qualities And Quantities Of Textile Industry Wastewater in Cimahi

Lukman Nul Hakim lukman.nh.st@gmail.com C: 085-222-850-085

Need Analisys : Waste water treatment textile industry in cimahi is still not optimal so that do not meet quality standards, government and endanger the environment solution: Need to set up an integrated waste water treatment plant in Cimahi

INDUSTRY IN CIMAHI

No.

Parameter

Units

Maksimum Level 69 150 50 100 1 1 15 10 0,1

1
12% 10% 45% 11% 9% TEXTILE FOOD WOOD METAL ETC

pH TSS BOD COD Sulfida Fenol Oil & Fet MBAS Kadmium

mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L

2 3 4 5 7 8 9 10

KINDS OF INDUSTRY IN CIMAHI

Lukman Nul Hakim lukman.nh.st@gmail.com C: 085-222-850-085

Regulation Of The Minister Of Environment No. 03 Year 2010 On Waste Water Quality Standard For Industrial Area

Process: KOAGUALATION FLOKULATION

I-6

S-7 V-3 V-4

I-4

P-68 P-51
Bar Screen
S-10

I-2

P-36
S-1 S-18 S-14 P-20

Bak pengumpul

V-5 I-5

Q10: 4,963 X 106 Kg/h COD : 138,95 kg/h TSS : 95,53 g/h H2O:496,1 X 104 Kg/h Ca(OH)2 : 9,18 Kg/h CaSO4 : 489,15 T: 27,3 0C Ph:9,4
Bak Netralisasi Bak Pengendap

Q9 lumpur: 46230 kg/h


T: 27,30C

H2O: 44081,9 P-71


Thickener

Lumpur : 23201 kg/h


Anaerobic Digester

Lukman Nul Hakim lukman.nh.st@gmail.com C: 085-222-850-085

I-8

Q1 :5 x106 kg/h COD : 1,985 kg/h TSS : 558 kg/h H2O:499,8 X 104 Kg/h T: 25 0C

Bak Ekualisasi

Q1 :5 x106 kg/h COD : 1,985 kg/h TSS : 558 kg/h H2O:499,8 X 104 Kg/h T: 25 0C

Bar Scree n E-38

Q3=499,5 x 104 kg/h COD : 1,985 kg/h TSS : 530 kg/h H2O:499,7 X 104 Kg/h T: 25 0C Ph: 7,76 P-67

I-3

Bak Pencampur Koagulan

Q2 :5599 Kg TSS : 27,9 g/h H2O:532 Kg/h

S-15

Q6: 417.24 kg/h O2 : 97,28 kg/h N2 : 320,04 kg/h


Blower
S-11

Q11 H2SO4: 10,9 kg/h

P-57
Q12 :4,962 X 106 Kg/h COD : 138,95 kg/h TSS : 95,53 g/h H2O:496,1 X 104 Kg/h Ca(OH)2 : 1,11 Kg/h CaSO4 : 503,97 T: 27,4 0C Ph:8,5

Gas :766,6 kg/h

Bak kontrol

Lumpur 1678 kg/h


Drying Bed

I-7

Q420047 kg/h: FeSO4.7H2O: 999,9 kg/h H2O:190.47 kg/h T: 25 0C

Tangki FeSO4

Tangki Ca(OH)2

Q5: 4143 kg/h Ca(OH)2; 272,47 kg/h H2O : 3.936 kg/h Q7: 197,6 kg/h T: 40 0C O2 ; 41,69 kg/h

N2 : 155,95 kg/h
T: 27,3, 0C
P-70

P-60

Bak Flokulasi

Q12 :4,962 X 106 Kg/h COD : 138,95 kg/h TSS : 95,53 g/h H2O:496,1 X 104 Kg/h Ca(OH)2 : 1,11 Kg/h CaSO4 : 503,97 T: 27,4 0C Ph: 8,5

Q8: 5,009 x 106 kg/h E-10 COD : 1,985 kg/h TSS : 530 kg/h H2O:500,6 X 104 Kg/h Ca(OH)2 : 9,18 Kg/h CaSO4 : 489,15 Kg/h Fe(OH)3 : 36,04 kg/h T: 27,3 0C Ph: 9,4

ANALISYS ECONOMY

30,000,000,000

No.
25,000,000,000

DESCRIPTION

VALUE

20,000,000,000 Cumulative cosh position

NPV (Rp.)

2.327.713.529

15,000,000,000

2
PAYBACK PERIOD

IRR (%) Pay Back Period (year) Return of Investment (%) Q BEP (m3 produck/year)

45

10,000,000,000

3
5,000,000,000

4
0 (5,000,000,000) 5 10 15 20 25

21,47

5
Time,year

513.540,69

Conclution
Lukman Nul Hakim lukman.nh.st@gmail.com C: 085-222-850-085

CONCLUTION

Judging from some aspects of the plant is feasible to set up as:

1. strategic location 2. Provision of raw material that is easy 3. Economic feasibility analysis

Lukman Nul Hakim lukman.nh.st@gmail.com C: 085-222-850-085

Lukman Nul Hakim lukman.nh.st@gmail.com C: 085-222-850-085

You might also like