DIAGRAMA DEL POZO

CUY - RW 01
ESTIMATIVO No.

2728

C&P

COMPLETACION ORIGINAL: 06-Agosto-2009

20"CSG.CONDUCTOR@13,12'J-55;106 LBS/FTCONEX,BTC
EMR:

PROOVEDOR : AKIRA

862.5 PIES

ES:

826

RTE:

36.5 PIES

FABRICANTE: WUXI SEAMLESS OIL PIPE

PIES

10 3/4" CSG
11SUPERFICIAL
3/4" CSG
12SUPERFICIAL
3/4" CSG SUPERFICIAL
67 JUNTAS, CONEX, 8RD, 40,5 LBS/FT; K-55; R 03
# DE REQUISICION: S/M # 1153392 / 111231
PROOVEDOR : TENARIS
FABRICANTE: TUBOS DE ACERO DE MEXICO
10" ZAPATA GUIA

3044'

CEMENTADO CON 917 SXS DE CEMENTO TIPO A

7" CSG PRODUCTOR


233 JUNTAS, C-35, BTC, 26 LBS/FT; C-95; R 03
# DE REQUISICION: S/M # 1155700. PPR / 111554
PROOVEDOR : KATHANATY PETROLEUM
FABRICANTE: HUMAN HENG YANG STEEL

3" TUBING
270 TUBOS, N-80, EUE, 9,3 LBS/FT; CLASE "A"
# DE REQUISICION: S/M # 1162086. PPR / 111576
# DE REQUISICION: S/M # 11623162
PROOVEDOR : TENARIS
FABRICANTE: SILCOTUB S.A

ARENA "M-1"
7598' - 7620' (22'), sqz C&P

ARENA "U sup"


8218' - 8224' (6'), sqz C&P

ARENA "U inf"


3" camisa BOT CD-6000

8299' - 8355' (56'), sqz C&P

3" (1) tubo


3" no-go
3" (1) tubo
7"x3"PackerArrowSetIX(CENTRO DE LAS GOMAS)

ARENA "T sup"

7" x 3" Packer Arrow Set IX (TOPE DEL PACKER)

8417' - 8457' (40')

ARENA "T inf"


CAMARA DE CEMENTO

8461' - 8498' (37')

8522'

7" ZAPATO GUIA DE FONDO

PT (D)=8541'
PT(L)= 8541'

CEMENTADO CON 730 SXS DE CEMENTO TIPO G

MEDICION DE TUBERIA (TALLY)

No. MEDIDA

No. MEDIDA

No.

MEDIDA

TUBERIA:

3-1/2" EUE N-80


9.3 lb/ft

62.11

61

62.43

121

60.54

62.82

62

62.45

122

62.45

62.42

63

62.50

123

61.26

62.43

64

61.45

124

61.50

61.17

65

61.94

125

61.31

Descripcion
Med.
TUBERIA
3 " camisa
3.96
3 " (1) Tubo
31.24
3 " no-go con std valv
1.14

61.65

66

60.66

126

62.38

3 " (1) Tubo

62.40

67

62.08

127

62.50

68

62.37

62.10

69

10

61.33

70

3.96
35.20
36.34

Profun.
36.50
40.46
71.70
72.84

31.26 67.60

104.10

62.12

7" x 2" centro packer3.72 71.32

107.82

128

62.38

62.22

129

61.18

7" x 2" tope packer 4.23 75.55


75.55

112.05
112.05

61.45

130

61.24

75.55

112.05

TOTAL 616.36

75.55

112.05

75.55

112.05
112.05
112.05
112.05
112.05
112.05
112.05
112.05
112.05
112.05

TOTAL 620.93 TOTAL 619.55

Acum.

11

61.50

71

61.90

12

61.68

72

62.22

13

62.14

73

62.00

14

62.20

74

62.08

15

62.44

75

62.50

16

62.57

76

62.44

17

61.22

77

62.42

18

60.52

78

62.47

19

62.77

79

62.48

75.55
75.55
75.55
75.55
75.55
75.55
75.55
75.55
75.55

20

59.71

80

62.53

75.55

112.05

TOTAL 616.75 TOTAL 623.04

75.55

112.05

75.55

112.05

21

62.53

81

62.52

75.55

112.05

22

61.64

82

62.68

75.55

112.05

59.94

83

60.62

FONDO

75.55

112.05

24

60.00

84

61.54

TOTAL EQ. FONDO 75.55

25

61.14

85

62.44

26

62.90

86

61.34

27

60.87

87

62.43

28

61.55

88

62.04

29

62.53

89

30

62.90

90

No. a No.

MEDIDA

ACUM.

62.18

01 - 10
11 - 20

0.00
0.00

0.00
0.00

60.70

21 - 30

0.00

0.00

TOTAL 616.00 TOTAL 618.49

31 - 40

0.00

0.00

41 - 50

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

31

62.16

91

62.44

32

62.20

92

61.48

33

62.68

93

61.48

34

62.04

94

62.43

35

62.53

95

62.22

36

62.16

96

60.00

37

62.50

97

62.32

38

62.50

98

62.44

39

62.45

99

62.42

51 - 60
61 - 70
71 - 80
81 - 90
91 - 100
101 - 110
111 - 120
121 - 130
131 - 140

40

62.47

100

61.42

141 - 150

TOTAL 623.69 TOTAL 618.65

151 - 160

0.00

161 - 170

0.00
0.00

41

61.22

101

61.50

171 - 180

42

62.42

102

60.15

M. R.

36.50

36.50

43

61.52

103

61.46

Eq. FONDO

75.55

112.05

44

62.43

104

62.64

45
62.75
105 62.68
46
62.81
106 62.08
47
62.02
107 62.62
48
62.10
108 59.73
49
61.83
109 61.50
50
62.22
110 61.65
TOTAL 621.32 TOTAL 616.01
51
61.50
111 60.63
52
62.51
112 60.38
53
62.17
113 61.11
54
61.87
114 61.48
55
62.16
115 62.87
56
61.83
116 61.47
57
62.15
117 61.64
58
62.20
118 62.64
59
61.90
119 62.07
60
62.41
120 62.05
TOTAL 620.70 TOTAL 616.34

3 lb/ft

centro gomas

You might also like