Professional Documents
Culture Documents
S.NO
DATE
AREA
EQUIPMENT NAME
1 2 3 4 5 6
BANAURY-1 MAIN MOTOR BANAURY-2 MAIN BANBURY MAIN MOTOR MOTOR BANAURY-3 MAIN MOTOR BANAURY-4 MAIN MOTOR
7 8 9
BB#3 &4 SUPPLY MOTOR 2 COOLING TOWER MAKE UP PUMP #2 MOTOR-1 CONDENSOR SUPPLY 1
PLANT-1
WHAT TO DO ? mechanical looseness , check the coupling bearing deterioation started & suspected looseness in electrical connections(check) clean the fan vans mechanical looseness , check the coupling Retighten the foundation bolts of gear box (at output shaft) Excessive clearances (gear box STAGE -1) Do alignment check the rotor bars of rotor (or) change the rotor mechanical looseness
STATUS
NOT DONE DONE DONE DONE NOT DONE
Efficiency :44.4%
OK OK OK OK
OK OK OK OK
OK