PLANT-1

S.NO

DATE

AREA

EQUIPMENT NAME

1 2 3 4 5 6

BANAURY-1 MAIN MOTOR BANAURY-2 MAIN BANBURY MAIN MOTOR MOTOR BANAURY-3 MAIN MOTOR BANAURY-4 MAIN MOTOR

OCT-2013 & NOV 2013

BANBURY GEAR BOX BANBURY DUMP MILL GEAR BOX

MAIN GEAR BOX-3 BANBURY -1 DUMP MILL GEAR BOX

7 8 9

BB#3 &4 SUPPLY MOTOR 2 COOLING TOWER MAKE UP PUMP #2 MOTOR-1 CONDENSOR SUPPLY 1

Yellow colour indicate : Acceptable Red colour indicate: Correction necessary

PLANT-1
WHAT TO DO ? mechanical looseness , check the coupling bearing deterioation started & suspected looseness in electrical connections(check) clean the fan vans mechanical looseness , check the coupling Retighten the foundation bolts of gear box (at output shaft) Excessive clearances (gear box STAGE -1) Do alignment check the rotor bars of rotor (or) change the rotor mechanical looseness

STATUS
NOT DONE DONE DONE DONE NOT DONE

VIBRATION LEVEL NO CHANGE OK NOT OK OK NO CHANGE

NOT DONE NOT DONE NOT DONE DONE

NO CHANGE NO CHANGE NO CHANGE ok

Efficiency :44.4%

ellow colour indicate : Acceptable colour indicate: Correction necessary

MAIN GEAR BOX1

MAIN GEAR BOX2

OK OK OK OK

OK OK OK OK

OK