Proyecto

Hospital Santa Mara del Socorro - Ica


Presupuesto :ESTRUCTURAS
Fecha:
Item Alterno
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
02
02.01
02.02
02.03
02.04
02.05
02.06
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
03.10
03.09
04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.03
04.03.01
04.03.02
04.05
04.05.01
05
05.01
05.01.01
05.01.02
05.02
05.02.01
05.02.02
05.02.03
05.03
05.03.01
05.03.02
05.03.03
05.04
05.04.01
05.04.02
05.04.03
05.04.04
05.05
05.05.01
05.05.02
05.05.03
05.06
05.06.01
05.06.02
05.06.03
05.07
05.07.01
05.07.02
05.07.03
05.08
05.08.01
05.08.03
05.08.04
05.09
05.09.01
05.09.02
05.09.03
05.10
05.10.01
05.10.02
05.10.03
05.10.04
05.10.05
05.11
05.11.01
05.11.02

02/11/2009
Descripcin
OBRAS PROVISIONALES
ALMACEN, OFICINA Y CASETA DE GUARDIANIA
SERVICIOS HIGIENICOS
CARTEL DE OBRA DE 3.0x4.0 M
CERCO PROVISIONAL DE OBRA
AGUA PARA LA CONSTRUCCION
INSTALACION PROVISIONAL DE AGUA Y DESAGUE
INSTALACION PROVISIONAL DE ELECTRICIDAD
TRABAJOS PRELIMINARES
MOVILIZACION DE EQUIPOS Y HERRAMIENTAS
DEMOLICION DE CIMIENTOS CORRIDOS C/EQUIPO
DEMOLICION Y ELIMINACION DE CONSTRUCCIONES EXISTENTES C/EQUIPO
DEMOLICION DE MUROS DE ADOBE
TRAZO Y REPLANTEO PRELIMINAR
TRAZO Y REPLANTEO DURANTE LA OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA
EXCAVACION DE ZAPATAS
EXCAVACION DE ZANJAS
RELLENO COMPACTADO C/EQUIPO, MATERIAL PROPIO
NIVELACION INTERIOR Y APISONADO
ELIMINACION DE MAT. EXCEDENTE C/VOLQUETE 10M3 Y CARGADOR
CONFORMACION Y COMPACTACION DE SUBRASANTE C/MOTONIV. 125 HP
SUB-BASE GRANULAR DE E= 0.15 M
BASE GRANULAR DE E= 0.10 M
BASE GRANULAR DE E= 0.15 M
OBRAS DE CONCRETO SIMPLE
SOLADOS
SOLADO MEZCLA 1:10 C:H ESPESOR=2"
FALSA ZAPATA CONCRETO 1:12 +30%P.G
CIMIENTOS CORRIDOS
CIMIENTOS CONCRETO 1:10 + 30% P.G.
SOBRECIMIENTOS
SOBRECIMIENTOS CONCRETO C:H 1:8 + 25% P.M.
SOBRECIMIENTOS ENCOFRADO Y DESENCOFRADO
FALSO PISO
FALSO PISO MEZCLA C:H 1:8 E=10 cm
OBRAS DE CONCRETO ARMADO
ZAPATAS
CONCRETO EN ZAPATAS f'c=210 Kg/cm2
ACERO DE REFUERZO
VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION f'c=210 Kg/cm2
ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION
ACERO DE REFUERZO
SOBRECIMIENTOS REFORZADOS
CONCRETO EN SOBRECIMIENTO REFORZADO f'c=210 Kg/cm2
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO REFORZADO
ACERO DE REFUERZO
COLUMNAS
CONCRETO EN COLUMNAS f'c=210 Kg/cm2
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
ENCOFRADO Y DESENCOFRADO DE COLUMNAS CIRCULARES
ACERO DE REFUERZO
COLUMNAS DE ARRIOSTRE PARA MUROS
CONCRETO EN COLUMNETAS f'c=210 Kg/cm2
ENCOFRADO Y DESENCOFRADO EN COLUMNETAS
ACERO DE REFUERZO
PLACAS
CONCRETO EN PLACAS f'c=210 Kg/cm2
ENCOFRADO Y DESENCOFRADO DE PLACAS
ACERO DE REFUERZO
VIGAS
CONCRETO PRE MEZCLADO F'c=210 Kg/cm2 EN VIGAS
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO DE REFUERZO
VIGAS DINTELES
CONCRETO EN VIGA SOLERA f'c =210 Kg/cm2
ENCOFRADO Y DESENCOFRADO DE VIGA SOLERA
ACERO DE REFUERZO
LOSAS MACIZAS
CONCRETO PRE MEZCLADO F'c=210 Kg/cm2 EN LOSAS MACIZAS
ENCOFRADO Y DESENCOFRADO DE LOSAS MACIZAS
ACERO DE REFUERZO
LOSAS ALIGERADAS
CONCRETO PRE MEZCLADO F'c=210 Kg/cm2 EN LOSAS ALIGERADAS
ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA
ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA (2 SENTIDOS)
ACERO DE REFUERZO
LADRILLO DE ARCILLA 20X30X30 cm PARA LOSA ALIGERADA
ESCALERAS
CONCRETO PRE MEZCLADO F'c=210 Kg/cm2 EN ESCALERAS
ENCOFRADO Y DESENCOFRADO DE ESCALERAS

Und.

m2
und
und
m
mes
pto
pto

Metrado

Precio (S/.)

144.00
2.00
2.00
477.50
12.00
1.00
1.00

96.62
16,195.68
1,250.34
66.26
763.98
1,493.67
1,493.67

vje
m3
m2
m3
m2
m2

10.00
784.11
4,250.00
10.57
6,438.36
10,573.00

2,000.00
71.17
55.00
10.49
1.44
1.71

m3
m3
m3
m3
m2
m3
m2
m2
m2
m2

813.34
3,936.27
1,143.15
1,441.48
4,507.20
5,611.67
2,157.12
2,157.12
3,022.73
2,157.12

6.99
29.95
29.95
28.72
4.74
22.50
2.87
9.96
7.79
9.56

m2
m3

2,283.24
874.73

18.04
135.24

m3

790.08

177.66

m3
m2

92.14
1,230.48

212.32
25.30

m2

4,405.51

22.29

m3
kg

1,312.09
50,019.11

245.90
3.26

m3
m2
kg

143.88
1,155.31
21,561.92

245.90
29.11
3.26

m3
m2
kg

113.32
755.44
1,705.90

280.63
25.30
3.26

m3
m2
m2
kg

215.65
2,137.70
44.37
42,424.58

336.27
41.16
50.22
3.26

m3
m2
kg

149.43
1,775.03
17,321.64

336.27
41.16
3.26

m3
m2
kg

859.74
7,007.54
94,201.52

336.27
40.36
3.26

m3
m2
kg

808.52
4,930.24
84,205.57

390.07
46.10
3.26

m3
m2
kg

144.06
1,899.95
11,204.57

258.93
42.44
3.26

m3
m2
kg

219.19
955.43
20,730.64

390.27
36.34
3.26

m3
m2
m2
kg
und

1,326.07
2,210.50
7,124.44
128,529.71
62,941.00

390.07
28.97
31.22
3.26
4.74

m3
m2

55.83
425.72

394.43
52.18

Parcial (S/.)
92,599.57
13,913.28
32,391.36
2,500.68
31,639.15
9,167.76
1,493.67
1,493.67
337,017.06
20,000.00
55,805.11
233,750.00
110.88
9,271.24
18,079.83
418,684.89
5,685.25
117,891.29
34,237.34
41,399.31
21,364.13
126,262.58
6,190.93
21,484.92
23,547.07
20,622.07
448,746.87
159,488.14
41,189.65
118,298.49
140,365.61
140,365.61
50,694.30
19,563.16
31,131.14
98,198.82
98,198.82
5,174,638.59
485,705.23
322,642.93
163,062.30
139,303.02
35,380.09
33,631.07
70,291.86
56,474.85
31,800.99
19,112.63
5,561.23
301,036.75
72,516.63
87,987.73
2,228.26
138,304.13
179,777.61
50,248.83
73,060.23
56,468.55
879,026.04
289,104.77
282,824.31
307,096.96
817,173.62
315,379.40
227,284.06
274,510.16
154,462.24
37,301.46
80,633.88
36,526.90
187,845.50
85,543.28
34,720.33
67,581.89
1,521,070.52
517,260.12
64,038.19
222,425.02
419,006.85
298,340.34
59,189.57
22,021.03
22,214.07

Proyecto
Hospital Santa Mara del Socorro - Ica
Presupuesto :ESTRUCTURAS
Fecha:

02/11/2009

Item Alterno
05.11.03
05.12
05.12.01
05.12.02
05.12.03
05.13
05.13.01
05.13.02
05.13.03
05.13.04
05.13.05
05.13.06
05.13.07
05.14
05.14.01
05.14.01.01
05.14.01.02
05.14.02
05.14.02.01
05.14.02.02
05.14.02.03
05.14.02.04
05.14.02.05
05.14.03
05.14.03.01
05.14.03.02
05.14.03.03
05.14.03.04
05.14.04
05.14.04.01
05.15.04.02
05.14.04.03
05.14.04.04
05.14.04.05
05.14.04.06
05.14.04.07
05.14.04.08
05.14.05
05.14.05.01
06
06.01
09
09.01
09.02

Descripcin
ACERO DE REFUERZO
CISTERNA
CONCRETO EN CISTERNA f'c=210 Kg/cm2
ENCOFRADO Y DESENCOFRADO DE CISTERNA
ACERO DE REFUERZO
BASES Y CANALETAS
BASE DE BOMBAS (AGUA CALIENTE Y JOCKEY)
BASE DE BOMBAS (AGUA DURA, AGUA BLANDA Y PETROLEO)
BASE DE BOMBA ACI
BASE DE GRUPO ELECTROGENO
CANALETA DE CONCRETO EN CUARTO DE BOMBAS
CANALETA DE CONCRETO PARA RED SANITARIA
CANALETA DE CONCRETO EN ZONA DE CALDERAS
CERCO PERIMETRAL
TRABAJOS PRELIMINARES
LIMPIEZA MANUAL DE TERRENO
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZAPATAS
EXCAVACION DE ZANJAS
REFINE, NIVELACION Y COMPACTACION DE ZANJAS
RELLENO COMPACTADO C/EQUIPO, MATERIAL PROPIO
ELIMINACION DE MAT. EXCEDENTE C/VOLQUETE 10M3 Y CARGADOR
CONCRETO SIMPLE
SOLADO CONCRETO f'c=100 Kg/cm2 E=10 cm
CIMIENTOS CONCRETO 1:10 + 30% P.G.
SOBRECIMIENTOS CONCRETO C:H 1:8 + 25% P.M.
SOBRECIMIENTOS ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
CONCRETO EN ZAPATAS f'c=210 Kg/cm2
ACERO DE REFUERZO
CONCRETO EN COLUMNAS Y PLACAS f'c=210 Kg/cm2
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
ACERO DE REFUERZO
CONCRETO EN VIGA SOLERA f'c =210 Kg/cm2
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO DE REFUERZO
MUROS Y TABIQUES
MURO DE LADRILLO KK SOGA C:A 1:5
ESTRUCTURAS METALICAS
ESTRUCTURA METALICA EN FACHADA PRINCIPAL
MUROS Y TABIQUES
MURO DE LADRILLO KK SOGA C:A 1:5
MURO DE LADRILLO KK CABEZA C:A 1:5
COSTO DIRECTO

Und.

Metrado

Precio (S/.)

kg

4,587.26

3.26

m3
m2
kg

186.78
1,085.37
7,329.32

289.44
41.16
3.26

und
und
und
und
m
m
m

3.00
9.00
1.00
2.00
15.15
9.00
14.60

55.30
83.42
263.23
2,580.74
243.01
246.21
298.49

m
m

504.43
504.43

2.13
0.85

m3
m3
m2
m3
m3

15.03
424.04
282.69
133.89
768.30

29.95
29.95
4.79
28.72
22.50

m2
m3
m3
m2

8.35
339.23
42.40
565.38

22.31
177.66
212.32
25.30

m3
kg
m3
m2
kg
m3
m2
kg

5.01
89.69
57.60
1,011.84
9,529.00
5.21
69.53
878.86

245.90
3.26
336.27
41.16
3.26
258.93
46.10
3.26

469.90

69.00

m2
kg

1,871.44

8.68

m2
m2

9,642.37
186.50

69.00
114.67
S/.

Parcial (S/.)
14,954.47
122,629.01
54,061.60
44,673.83
23,893.58
16,596.83
165.90
750.78
263.23
5,161.48
3,681.60
2,215.89
4,357.95
254,347.80
1,503.21
1,074.44
428.77
35,636.31
450.15
12,700.00
1,354.09
3,845.32
17,286.75
83,760.37
186.29
60,267.60
9,002.37
14,304.11
101,024.81
1,231.96
292.39
19,369.15
41,647.33
31,064.54
1,349.03
3,205.33
2,865.08
32,423.10
32,423.10
16,244.10
16,244.10
686,709.49
665,323.53
21,385.96
7,174,640.57