Table of Contents
1. Project Summary 2. Scope of Work 3. Project Master Schedule 4. Status of Subcontracting
Public
2013-04-26
Project Summary
P.6058 Gina Krog Topside EPCH Project
Public
Topside Dry Weight: 17,725 ton 1. 2. 3. 4. 5. MSF Process Mod. Utility Mod. LQ Flare : : : : : 10,273 ton 3,510 ton 2,165 ton 1,542 ton 235 ton
Jacket NTE : 24,000 ton Client: Statoil Petroleum AS (Norway) Operation Field: North Sea, Southern part of Norwegian Continental Shelf Process Capacity: Oil Prod. 10,000 Sm3/sd (= 62,900 BPD), Gas Prod. 9 MSm3/sd (= 318 MMSCFD) Water depth : about 116 m Accommodation : 70 beds (LQ)
3
Scope of Work
Overall Scope of Work Activity Topside Module
DSME Subcon. (Aker Solutions) DSME DSME DSME (Flare manufactured by DSSC)
Public
LQ
Project Management Detailed Engineering Construction Engineering Procurement Construction & MC Onshore Commissioning Weighing & Load-out Transportation to site Installation Offshore Hook-up Offshore Commissioning
4
Subcon. (Apply Leirvik) Subcon. (Apply Leirvik) Subcon. (Apply Leirvik) Subcon. (Apply Leirvik)
Statoil (Assisted by DSME) DSME DSME (2 HTV) Subcon. (Apply Leirvik) Statoil (Seafastening by Apply) Statoil Subcon. (Aker MMO) Statoil (Assisted by DSME)
2013-04-26
Public
Status of Subcontracting
Detail Engineering: Aker Engineering Intl
LOA awarded on February 18, 2013 Form & Agreement discussion in Progress Contract to be made within April, 2013
Public
2013-04-26
Q&A