You are on page 1of 6

Tank level control

IS O 9001 –IS O 14001


OHSA S 18001

CEN TR AL T OO L
ROOM A ND
TR AINI NG C EN TR E
(AN I ND O- DANI SH GOVT. OF I NDI A)
BHUB ANE SWA R, O RIS SA
SUBMITTED BY

Name of Candidate: SOUMITA SEN

UN DE R THE G UID ANC E OF


SRIKANTA KUMAR PATI.
This is to certify that Mr.________________________________ has
undergone the live project on “Bottling Plant Simulation” and has
prepared this project report by virtue of his diligence, adherence and
advice.

He has successfully completed every aspect of the project with a


lot of sincerity.

His sincerity and devotion during the project work was very much
appreciating.

We wish him all success for a bright future.

PROJECT CO-ORDINATOR. SR.MANAGER TRAINING.

PROJECT GUIDE
We have the greatest pleasure to offer our profound respect and pleasure and
sincere thanks to Sr. Manager (training) for his support in achieving the objective of
our project work on “Bottling Plant Simulation”.

We also express our sincere thanks to Mr. Srikanta Kumar Pati who
became the source of inspiration for us in completion of the project.

 Name of Candidate/ Candidates


In this growing age of technology, the extent of correctness
is a major point. This correctness and pin pointed guess is
achieved only through hard work, experience and well-guided
practice. As a new comer to this field we required to have
practical knowledge that will help in improving our skills and
efficiency. During training, having a project work on the same
topic increased our interest and made the work simpler.

The most vital part is the presence of a guide whose


knowledge and practical experience built our self confidence and
helping hand by which we finished this project successfully. So
we all are indebted to Mr. Srikanta Kumar Pati who acted as
burning candle and enlightened us about the topic.

 Introduction to Industrial Automation.

 Role of PLC in Industrial Automation.


Block Diagram of PLC.
Working Principle of PLC.
Advantages of PLC over
Hardware logic.

 Objective of the project.


 Electrical Hardware Requirements for
the Project.

 Details of Electrical Hardware.


 Details of PLC used in the Project.
Software of PLC used in the
Project.
 Lad programme for the Project.

 Description of Lad programme.

 Conclusion.

 References.

You might also like