ATT : Current Date : Report Includes : Report Date : April 16, 2008 Cover Page April 15, 2008

PROJECT INFORMATION
PROJECT NAME SCOPE OF WORK

Tuesday
Sunrise 06:25 (MSK) Sunset 20:33 (MSK)

Max / Min

Wind

Humidity

Donstroy-II Multiuse Office and Shopping Complex at 41, Oruzheyny Lane, Moscow Donstroy-II Civil, Architectural, Facade, Electrical, Mechanicalt Works in accordance with "Shell and Core" contract regulations. No. 2/OR-GP-07 / 10.08.2007

7C+

3C+

95 %

CONTRACT NO and AWARD DATE

Actual Start Date

01-Nov-07

Construction Finish Date

18-Dec-09

PROJECT OVERALL PROGRESS


DS-II CUMULATIVE PROGRESS Planned Actual Variance

80%

100%

60.73%

60.73%

9.71%

8.68%

-1.03%

DS-II DAILY PROGRESS Planned Actual Variance

40%

60%

19.72%

17.07%

0.09%

0.03%

-0.06%

20%

0%

0.00% Planned Realized Planned Realized Planned

0.00% Realized

0.00% Planned

0.00% Realized Planned Realized

0.00% Planned

0.00% Realized

0.00% Planned

0.00% Realized

Mob. & Demob. & Health & Safety

Civil Works

Architectural Works

Facade & Roofing Works

External Works

Mechanical Works

Electrical Works

WORK COMPLETE (% COMPLETE) as of 15/04/2008


Mob. & Demob. & Health & Safety inc. Site Cleaning & Snow Removal Civil Works Architectural Works Facade & Roofing Works External Works Mechanical Works Electical Works

TITLE Mobilization Demobilization Health & Safety inc. Site Cleaning & Snow Removal Sub-Foundation Civil Works Foundation Civil Works Substructure (-6;-1) Civil Works Superstructure (+1;+34) Civil Works Flooring Works Ceiling Works Walls & Partitions Works Doors & Gates Installation of Light Enclosures Facade Cladding Roofing Works External Works Mechanical Works Electrical Works

Planned 86.36% 0.00% 19.50%

Executed 86.36% 0.00% 19.50%

Variance 0.00% 0.00% 0.00%

Planned

Executed

Variance

Planned

Executed

Variance

Planned

Executed

Variance

Planned

Executed

Variance

Planned

Executed

Variance

Planned

Executed

Variance

100.00% 100.00% 25.45% 0.00%

100.00% 100.00% 10.60% 0.00%

0.00% 0.00% -14.86% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

BUILDING WORK PROGRESS

######### 60.73%

0.00%

######### #########

-2.64%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%
c"

96.34% 88.10%
83.35%

98.69%

99.82%

100.00%

92.63%

90.00% 80.00%

78.10%
72.59%

70.00%

66.32% 60.45% 55.28% 51.28% 45.70% 39.93%

60.00%
50.00% 40.00% 30.00% 20.00% 10.00%

34.20%
28.30% 16.10% 19.59%

CUMULATIVE PLANNED PROGRESS as of 15-04-08

9,71 %
CUMULATIVE REALIZED PROGRESS as of 15-04-08

23.21%

0.16%
0.00% Nov-07

0.86%

2.16% 2.13%
Jan-08

4.59% 4.42%
Feb-08

8.08%
7.92%
Mar-08

10.99%

13.42%

8,68 %
May-08 Jun-08 Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09 Feb-09 Mar-09 Apr-09 May-09 Jun-09 Jul-09 Aug-09 Sep-09 Oct-09 Nov-09 Dec-09 Jan-10

0.17%

0.85%
Dec-07

Apr-08

PERSONNEL REPORT
Update Date : 15-Apr-08 ENKA Management Office Staff Field Supervision Direct Labor Indirect Labor (Security, Warehouse, Time
Keeper, Machinery Operator etc.)

MAN-HOURS REALIZATION REPORT


Local Total Cumulative Daily
Daily Man-Hours on 15-04-08

MACHINERY & EQUIPMENTS LIST as of 15-04-2008.


Unit
Realization Pct. (%) Isimak Master (Space Heater) BobCAT S175 Putzmeister 1409 Stationary Concrete Pump Putzmeister 2110 Stationary Concrete Pump Wacker Compactor RD7H Compressor Atlas Copco Mobile Crane (30 ton - TADANO) Rebar Twisting Equipment MB 42 Rebar Cutting Equipment MHK 42 Manitaou Forklift Tower Crane Mobile Pump Putzmeister M38Z Dipaz Air Heater 300 pcs pcs pcs pcs pcs pcs pcs pcs pcs pcs pcs pcs pcs 3 1 4 4 1 2 1 2 2 3 1 3 4 1 2 1 1

Turkish

Total
22 2 1 1

OnOperation
22 2 1 1

BrokenDown

Type of Task
3 15 16 103 29 100% 52% 70% 29% 29% 0% 166 32% 14 7 255 70 3 349 0% 48% 30% 71% 71% 100% 68%

Planned 98,000.00 40,000.00 1,508,103.32 1,052,713.42 229,930.75 950.00 497,750.81 503,145.26

Realized as of 15-04-08 72,593.00 30,823.00 253,772.00

3 29 23 358 99 3

100% 100% 100% 100% 100% 100%

Mobilization & Demobilization HSE Civil Works Architectural Works Facade Cladding & Roofing Works External Works Mechanical Works Electrical Works
GRAND TOTAL

227.00 613.00 3,283.00

74.07% 77.06% 16.83% 0.00% 0.00% 0.00% 0.00% 0.00%

First Aid (Doctor, Nurse) General Total

515

100%

3,930,593.55

357,188.00

4,123.00

9.09%

Note: The Installation of Third Tower Crane continues as of April,15. REMARKS

Mmtaz Okan LC

Revision 01 No

Date :

M.C.CELEBIOGLU Prepared by :

O.LC Checked by :

Description

Donstroy II - Planned & Realized Unit Man-Hours and Tasks Efficiency Situation
C1
C11

Below "0" Level Civil Works


Sub-foundation Civil Works
Concrete breaking & cleaning around existing steel colums Natural soil compaction & Site Preparation Works & Removal of Muddy Soil Earthing (Grounding) at Sub-Foundation level Channel opening and laying of gravel for drainage at foundation level Geo-textile laying (1 layer - 250 gr/m) Granite gravel filling (h= 15 cm) Polyethylene sheet laying (1 layer - 100 mic.) Lean concrete wire mesh installation (100 mm x 100 mm - 5 mm)(horizontal) Lean concrete Pouring (B15 - h= 10 cm)(horizontal) Lean concrete wire mesh installation (100 mm x 100 mm - 5 mm)(vertical) Vertical lean concrete formwork Lean concrete Pouring (B15 - t=15 cm)(vertical) Horizontal water insulation (2 layers - Tehnoelast EPP w/ primer - 4mm) Vertical water insulation (2 layers - Tehnoelast EPP w/ primer - 4mm) Water insulation around existing steel columns Protective screed above water insulation (h= 5 cm)

Unit

Planned Unit ManHour

Realized Unit ManHour

Efficiency (%)

pcs m m m m m m m m m m m m m pcs m m ton m

15.00 0.20 0.10 1.20 0.15 0.18 0.12 0.30 1.75 0.35 1.80 1.50 1.50 2.00 25.00 1.50 1.80 35.00 1.40

62.08 0.37 0.05 0.99 0.08 0.25 0.06 0.20 3.12 0.59 3.13 4.50 0.29 0.94 6.99 4.74 2.17 31.70 0.57

24.2% 53.9% 186.0% 121.7% 179.3% 72.1% 210.4% 146.7% 56.2% 59.2% 57.5% 33.4% 525.2% 212.0% 357.7% 31.6% 83.0% 110.4% 246.0%

C12

Foundation R/C Works


Foundation Formwork Foundation Reinforcement Foundation Reinforced Concrete

C19

R/C Demolishing Works


R/C Slab Demolishing Works (-5 Floor) (inc. Cleaning)

5.00

37.45

13.4%

Substructure R/C Works R/C Structural Columns (B50 - 407 kg/m)


Substructure R/C Columns Formwork Substructure R/C Columns Reinforcement Substructure R/C Columns Concrete m ton m m ton m m ton m 1.80 35.00 1.50 1.80 35.00 1.50 1.80 35.00 1.50 6.67 71.38 3.14 5.16 73.20 1.72 1.15 20.06 1.29 27.0% 49.0% 47.8% 34.9% 47.8% 87.2% 157.0% 174.5% 116.6%

R/C Structural Shear Walls (B50 - 270 kg/m)


Substructure R/C Shear-Walls Formwork Substructure R/C Shear-Walls Reinforcement Substructure R/C Shear-Walls Concrete

R/C Structural Slabs (B35 - 332 kg/m)


Substructure R/C Slabs Formwork Substructure R/C Slabs Reinforcement Substructure R/C Slabs Concrete
Substructure R/C Slabs Concrete 116.6% Substructure R/C Slabs Reinforcement 174.5% Substructure R/C Slabs Formwork 157.0% Substructure R/C Shear-Walls Concrete 87.2% Substructure R/C Shear-Walls Reinforcement 47.8% Substructure R/C Shear-Walls Formwork 34.9% Substructure R/C Columns Concrete 47.8% Substructure R/C Columns Reinforcement 49.0% Substructure R/C Columns Formwork 27.0% R/C Slab Demolishing Works (-5 Floor) (inc. Cleaning) 13.4% Foundation Reinforced Concrete 246.0% Foundation Reinforcement 110.4% Foundation Formwork 83.0% Protective screed above water insulation (h= 5 cm) 31.6% Water insulation around existing steel columns Vertical water insulation (2 layers - Tehnoelast EPP w/ primer - 4mm) 212.0% Horizontal water insulation (2 layers - Tehnoelast EPP w/ primer - 4mm) Lean concrete Pouring (B15 - t=15 cm)(vertical) 33.4% Vertical lean concrete formwork 57.5% Lean concrete wire mesh installation (100 mm x 100 mm - 5 mm)(vertical) 59.2% Lean concrete Pouring (B15 - h= 10 cm)(horizontal) 56.2% Lean concrete wire mesh installation (100 mm x 100 mm - 5 mm)(horizontal) 146.7% Polyethylene sheet laying (1 layer - 100 mic.) 210.4% Granite gravel filling (h= 15 cm) 72.1% Geo-textile laying (1 layer - 250 gr/m) 179.3% Channel opening and laying of gravel for drainage at foundation level 121.7% Earthing (Grounding) at Sub-Foundation level 186.0% Natural soil compaction & Site Preparation Works & Removal of Muddy Soil 53.9% Concrete breaking & cleaning around existing steel colums 24.2% 0.0% 100.0%

357.7%
525.2%

200.0%

300.0%

400.0%

500.0%

600.0%

Project Summary Activities

Cumulative Progress

Mob. & Demob. & Health & Safety inc. Site Cleaning & Snow Removal Civil Works Architectural Works Facade & Roofing Works External Works Mechanical Works Electrical Works

Planned Realized Planned Realized Planned Realized Planned Realized Planned Realized Planned Realized Planned Realized

60.73% 60.73% 19.72% 17.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Project Materials Delivered to the Construction Site on April,15, 2008


MATERIAL DESCRIPTION Quantity UNIT Supplier

Concrete B50 P4 F300 W12 Rebar 36 Rebar 8

18.50 16.03 5.13

m3 ton ton

BETONSPECSTROY DIPOS DIPOS

Donstroy-II Project Elevation and R/C Works Progress


.+146,00
Net Slab Area = 484 m

.+146,00 .+142,80 .+34 Floor


Net Slab Area = 484 m

.+34 Floor .+33 Floor .+32 Floor .+31 Floor .+30 Floor .+29 Floor .+28 Floor .+27 Floor .+26 Floor .+25 Floor .+24 Floor .+23 Floor .+22 Floor .+21 Floor .+20 Floor .+19 Floor .+18 Floor .+17 Floor .+16 Floor .+15 Floor .+14 Floor .+13 Floor .+12 Floor .+11 Floor .+10 Floor .+9 Floor .+8 Floor .+7 Floor .+6 Floor .+5 Floor .+4 Floor .+3 Floor .+2 Floor .+1 Floor .-1 Floor .-2 Floor .-3 Floor .-4 Floor .-5 Floor .-6 Floor

.+142,80 .+139,40
Net Slab Area = 484 m

.+139,40 .+33 Floor .+136,00 .+32 Floor


Net Slab Area = 1.005 m

.+136,00 .+131,20
Net Slab Area = 1.005 m

.+131,20 .+31 Floor .+126,40 .+30 Floor


Net Slab Area = 1.373 m

.+126,40 .+121,60
Net Slab Area = 1.373 m

.+121,60 .+29 Floor .+116,80 .+28 Floor


Net Slab Area = 1.373 m

.+116,80 .+112,00
Net Slab Area = 1.373 m

.+112,00 .+27 Floor .+107,20 .+26 Floor


Net Slab Area = 1.373 m

.+107,20 .+102,40
Net Slab Area = 1.704 m

.+102,40 .+25 Floor .+98,20 .+24 Floor


Net Slab Area = 1.704 m

.+98,20 .+94,00
Net Slab Area = 1.704 m

.+94,00 .+23 Floor .+89,80 .+22 Floor


Net Slab Area = 2.070 m

.+89,80 .+85,60
Net Slab Area = 2.070 m

.+85,60 .+21 Floor .+81,40 .+20 Floor .+77,20 .+19 Floor


Net Slab Area = 2.070 m

.+81,40
Net Slab Area = 2.070 m

.+77,20 .+73,00
Net Slab Area = 3.424 m

.+68,00
Net Slab Area = 5.014 m

.+73,00 .+18 Floor , .+68,00 .+17 Floor .+63,80 .+16 Floor

.+63,80
Net Slab Area = 5.014 m

.+59,60
Net Slab Area = 5.014 m

.+59,60 .+15 Floor .+55,40 .+14 Floor


Net Slab Area = 5.014 m

.+55,40 .+51,20
Net Slab Area = 5.126 m

.+51,20 .+13 Floor .+47,00 .+12 Floor


Net Slab Area = 5.715 m

.+47,00 .+42,80
Net Slab Area = 5.928 m

.+42,80 .+11 Floor .+38,60 .+10 Floor


Net Slab Area = 5.928 m

.+38,60 .+34,40
Net Slab Area = 5.928 m

.+34,40 .+9 Floor .+30,20 .+8 Floor


Net Slab Area = 5.928 m

.+30,20 .+26,00
Net Slab Area = 6.633 m

.+26,00 .+7 Floor .+21,80 .+6 Floor


Net Slab Area = 6.633 m

.+21,80 .+17,60
Net Slab Area = 8.337 m

.+17,60 .+5 Floor .+12,60 .+4 Floor


Net Slab Area = 9.418 m

.+12,60 .+8,40
Net Slab Area = 9.040 m

.+8,40 .+3 Floor .+4,20 .+2 Floor


Net Slab Area = 9.035 m

.+4,20 .+0,00
Net Slab Area = 4.900 m Net Slab Area = 5.970 m Net Slab Area = 2.900 m Net Slab Area = 2.900 m Net Slab Area = 2.900 m Net Slab Area = 2.900 m Net Slab Area = 2.900 m 77%
Finish = 14/07/2008

.+0,00 .+1 Floor


Start = 20/05/2008

.-4,80 .-7,95 .-10,95 .-13,95 .-16,95 .-19,95

.-4,80 .-1 Floor


Net Slab Area = 2.300 m
Finish = 25/06/2008

Start = 12/05/2008

.-7,95 .-2 Floor


Net Slab Area = 2.300 m
Finish = 05/06/2008

Start = 30/04/2008

.-10,95 .-3 Floor


Net Slab Area = 2.300 m
Finish = 22/05/2008

Start = 15/04/2008

.-13,95 .-4 Floor


Net Slab Area = 2.300 m Net Slab Area = 2.300 m
Finish = 10/05/2008

4%
Start = 10/04/2008

.-16,95 .-5 Floor


Finish = 24/04/2008

Start = 25/02/2008

.-19,95 .-6 Floor 100%


Finish = 29/03/2008

Raft Foundation

Start = 11/01/2008

Raft Foundation

WEST PART (SOUTH VIEW)

EAST PART (SOUTH VIEW)

Note : The Customer submitted (-6 ; -5) Basement Floor Column Structural Working Drawings on February,21 , 2008 and Shear-Wall, Ramp and Slab Structural Working Drawings on March ,13-14 , 2008. After obtaining necesary design documentation, ENKA commenced (-6 ; -5) R/C Column Works on February,25 , 2008 and (-6 ; -5) R/C Shear-Wall Works on March,15 , 2008 . ENKA commenced (-5) R/ C Slab Scaffolding works on March, 28, 2008. Enka cast first slab concrete on April,05 .

SUBSTRUCTURE

SUPERSTRUCTURE