You are on page 1of 1

ZC

0024

36
S

03

ATM
DE

33

FV
0001
+

6"
FC
TSO

03

30

101CS1P
103CS1P

03

2" V

101-S-0012

3/4"
INST.
PIPING

MIN.

D2

3"x1"

D1

3/4"

MIN.

10"-HCB-101005016-103CS1P-H

25

MIN.

18

103CS1P
101CS1P

HLO
0001

2"-CLD-101005304-101CS1P-N
HLS
0001 C

17

HLS
0001 O

25

16

3825

MIN.

RESET

ZC
0025

12

FV
0002

ATM

6"

11

FC
TSO

3/4"

101CS1P
103CS1P

S
L1B

D1

NOTE 13
1/4"

HH

ZC
0025

103CS1P
101CS1P

2"-CLD-101005305-101CS1P-N

250 MIN.

2"-HCB-101005010-103CS1P-N

ZC
0024

103CS1P
101CS1P

3830

25
3832

TT
0003

2"

10"-HCB-101005003-103CS1P-N

2
1

SIGNAL
FROM FC-0001

DS101-TRJR-480040
3538

PIPING INST.
3/4"

FT
0003

FI
0003

FI
0075

FI
0074

FI
0076

DIESEL FEED
FROM STORAGE
DS101-TRJR-480040
3326

SIGNAL
FROM FC-0002

DS101-TRJR-480040
3540

3/4"-HCB-101005012-103CS1P-P

KEROSENE FEED

STRAIGHT FEED

FROM STORAGE

FROM PROCESS UNITS

DS101-TRJR-480040
3344

DS101-TRJR-480043
3346

SC

1/4"

PIPING
INST.

TYPE 21
NOTE 10
SC-0002

SIGNAL
FROM UNIT 021
(DCU)(FC-0048) ON LLCO
DS101-TRJR-480043

6878

6880

03

6877

LDT
0001

L3A

2"

1/4"

TYPE
HEIGHT
DIAMETER
OP. PRESS.
OP. TEMP.
DES.PRESS.
DES.TEMP.

mm
mm
barg
C
barg
C

03

101-S-0001
HORIZONTAL
4969,0
1220,0
4,60
50,00 NOTE 9
23,30 NOTE 7
186,00

FILTERS
TYPE
DES. CAPACITY
OP. PRESS.
OP. TEMP.
DES. PRESS.
DES. TEMP.

m/h
barg
C
barg
C

101-S-0012
VERTICAL
392,0
4,60
NOTE 9
50,00
23,30
186,00

This document is the property of SATORP and shall not be disclosed to third parties or reproduced without permission of the owner.

21

03

17

LDC
0002

16

LDG
0030

15

INST.

L2A

B2

2"-WWT-101005002-103CS1P-P

14

1/4"

L1A

13

2"
2"

1/4"

2"
D2

LDV
0002

03

1-1/2"x1"

1" 1-1/2"x1"

LPT
2"x1-1/2" 1-1/2"-WWT-101005001-103CS1P-P

2"

3/4"-OSW-101005302-101CS1P-N

1-1/2"-CLD-101005302-101CS1P-P

FC
3/4" D

NOTE 4

NOTE 4

2"x1-1/2"

3/4"

9
8

1/2"

NC

2"-WWT-101005003-103CS1P-N

11
10

3/4"

3/4" D

MIN.

3/4"-WWT-101005003-103CS1P-N

6
5
4

101-SP-0004

SIGNAL
FROM UNIT 061(FCC)
(FC-3038/3040) ON HCN
DS101-TRJR-480043
6879

POS.
DESCRIPTION
1- EACH INSTRUMENT TAG NUMBER IS PREFIXED BY 101 (EX 101-TT-0001). THIS DRAWING IS VALID FOR TWIN LP HDS: UNITS 101 AND 102.
2- FOR GENERAL NOTES, SYMBOLS AND DETAILS SEE DRAWINGS SA-JER-DSAAA-TRJR-480001 THROUGH SA-JER-DSAAA-TRJR-480022.
1
FIRE WATER
3- ALL LINES CONNECTED TO CLOSED DRAINS SYSTEMS SHALL BE GRAVITY FLOW DESIGNED.
2
SERVICE WATER
4- DRAIN VALVE ON EQUIPMENT AND/OR PIPING SHALL BE INSTALLED FLANGE TO FLANGE OR AT MINIMUM DISTANCE FROM THE EQUIPMENT/PIPING TO BE DRAINED.
3
COOLING WATER
NOTES
4
POTABLE WATER
1, 3 DELETED.
5
DEMI WATER
2- BLANK OFF WHEN NOT IN USE.
6
N.A.
4- THE POSITION OF THE VALVE ON THE LOW POINT DRAIN SHALL BE AS CLOSE AS POSSIBLE TO THE EQUIPMENT.
7
N.A.
5- BLOCK VALVE SHALL BE INSTALLED WITH STEM IN OR BELOW THE HORIZONTAL POSITION.
8
N.A.
6- MAKE CONNECTION ON TOP OF PIPE.
7- DES. PRESS: 23.3 barg AT 186 C AND FULL VACUUM (FV) AT 80 C.
9
HP STEAM
8- FOR NOZZLES DETAILS, ALIGNMENT AND HEIGHT OF LEVEL INSTRUMENTS SEE COALESCER VENDOR DRAWING.
10 MP STEAM
9- OPERATIVE TEMP: 50C FOR DIESEL CASE AND 77C FOR KERO CASE.
11 LP STEAM
10- FOR SAMPLE DETAILS, REFER TO DWG. SA-JER-DS101-TRJR-480232.
12 HP CONDENSATE
11- GRATING.
13 MP CONDENSATE
03
12- BOLTED OUTLET BAFFLE.
14 LP CONDENSATE
13- COALESCER MEDIA SHALL BE FIBER GLASS CARTRIDGAS.
15 BFW
14- MECHANICAL LINK.
16 PLANT AIR
17 INSTRUMENT AIR
18 N.A.

NC

12

INST.
PIPING

MIN.

2"-CLD-101005302-101CS1P-N

GENERAL NOTES

8- DELETED.

22

PIPING
INST.

19

101-153
101-152
101-153

101-151

101-151
101-151
101-154
101-154

19
20
21
22
23
24
25
26
27
28
29
30
31
32

DESCRIPTION
N.A.
FUEL OIL
FUEL GAS
N.A.
N.A.
N.A.
CLOSED DRAIN
N.A.
L.P. NITROGEN
H.P. FLARE
L.P. FLARE
SOUR/ACID FLARE
PILOT GAS
AUX COOLING WATER

3837

ORIGINALSIGNEDINPROJECTFILE

03

05-APR-2011

AFC

AFC: APPROVED FOR CONSTRUCTION

VSC / STG

AVS / HPR

HS

02

22-DEC-2010

AFC

AFC: APPROVED FOR CONSTRUCTION

VSC / STG

AVS / HPR

HS

01

18-MAY-2010

AFC

AFC: APPROVED FOR CONSTRUCTION

VSC / STG

RDP / HPR

HS

00

23-DEC-2009

IFD

IFD: ISSUED FOR DESIGN

JCP / FCB

RDP / HPR

HS

REV

DATE

UTILITIES IDENTIFICATION
REF. DWG POS.

3
25

103CS1P
101CS1P

25

HOLDS

23

03

LDT
0002

OSW

SIGNAL
FROM UNIT 011/012
(FC-0119) ON LAGO
DS101-TRJR-480043

SIGNAL
FROM UNIT 011/012
(FC-0118) ON KERO
DS101-TRJR-480043

GENERAL HOLDS

24

20

3833

03

UC

FI
0077

03

03
10"-HCB-101005004-103CS1P-N

TI
0003

PIPING INST.
3/4"

10"-HCB-101005005-103CS1P-H

2"

2"

103CS1P
101CS1P

6
5

MIN.

18

NOTE 11

ZC
0031

25

MIN.

LDI
0001

ZC
0030

2"-CLD-101005301-101CS1P-N

25

INST. PIPING

NC

NC

MIN.

INST.
1/4"

PIPING

25

D 3/4"

L2B

2"

3/4"

MIN.

2"

L3B

10"x6"

2"-HCB-101005019-103CS1P-P
PIPING

101-SP-0002
2"x3/4"
3/4"-HCB-101005009-103CS1P-N

26

3/4"

2"

MIN.

10

101CH2F
103CS1P

3/4" V

03
6"

27

3/4"-HCB-101005011-103CS1P-N

5535

10"x6"

NC

101-SP-0003

P2

3/4" V

12"

MIN.

FYV
0002

13

OSW

03

14

P1

3517

PB

DE

FHSR
0002

15

4734

NOTE 6

NOTE 12

2"

2"

2"

28

29

3/4"-LPF-101005302-101CH2F-N

B1

250 mm MIN.

19

HLC
0001

103CS1P
101CS1P

FB
LC

NOTE 5

29

HPT

FB 101-SP-0079
LO

10"

NOTE 8

1875 MIN.

250 mm MIN.

20

3/4"

3"-HCB-101005006-103CS1P-H

101-S-0001

INST.
PIPING

6" V

27

30

1-1/2"

FB LO

1-1/2"

MIN.

03

2"x3/4"

INST.
PIPING
10"

MIN.

MIN.

21

3/4"

3/4"-HCB-101005008-103CS1P-N
101-SP-0001

MIN.

250 mm MIN.

D
22

2"-CLD-101005306-101CS1P-N

3/4"

MIN.

HLO
0002

3/4"-OSW-101005303-101CS1P-N

23

HLC
0002

101CS1P
103CS1P

24

3/4"-LPN-101005301-101CS1P-N

2"-HCB-101005017-103CS1P-N

HLS
0002 O

NC
NOTE 2

3/4"
D

PDT
0001

NOTE 5

3"x1"

03

NOTE 14

31

4"x2"

03

27

NOTE 6

3/4" V

NOTE 5

33
32

PDI
0001

29
3628

PZV
0018 B

3/4" V

HLS
0002 C

1"E2"
23,30

3/4"
V

10"-HCB-101005007-103CS1P-H

2"

34

NOTE 5 4"-LPF-101005301-101CH2F-N 0.2%


LO
FB

4"x2"

10"-HCB-101005015-103CS1P-H

NC

26

36

3/4"

NC

MIN.

37

35

PZV
0018 A

6"

28

1"E2"
23,30

PDT
0268

3/4"

INST.
PIPING
10"-HCB-101005001-103CS1P-H

HYDROCARBONS
TO 101-S-0002-A/B 3688

10"
29

10"-HCB-101005002-103CS1P-H

MIN.

MIN.

31

10"x6"

V
NOTE 5
FB
LO

38

2"-CLD-101005303-101CS1P-N

10"x6"

PDI
0268

3"-HCB-101005018-103CS1P-H

MIN.

32

MIN.

34

3"x1"

27
5565

250 mm MIN.

39

3/4"-LPN-101005302-101CS1P-N

101CS1P
103CS1P

FYV
0001

35

2"-OSW-101005301-101CS1P-N

37

PZV
0042

3"x2"

40

TRIM: HCB-101005602-103CS1P
INSULATION: H

MIN.

38

TRIM: HCB-101005601-103CS1P
INSULATION: H

MIN.

39

250 mm MIN.

NOTE 5
0.2 % 3"-LPF-101005303-101CH2F-N
29
FB
3/4"
5543
LO
101CH2F
103CS1P NC
TYPE 21
NOTE 10
SC
SC-0001
3/4"

MIN.

RESET
NOTE 6

3/4"-HCB-101005013-103CS1P-N

40

41

101-S-0001
FEED COALESCER

103CS1P
101CS1P

FHSR
0001

101-S-0012
FEED PREFILTER

1"D2"
23,30

PB

103CS1P
101CH2F

41

COMPANY
STATUS

REVISION MEMO

PREPARED BY

CHECKED BY

APPR/AUTH BY

REF. DWG

101-155

JUBAIL EXPORT REFINERY


PIPING AND INSTRUMENT DIAGRAM
101-158

DISTILLATION AND HYDROTREATING


LOW PRESSURE HYDRODESULPHURISATION TRAIN 1
FEED COALESCER

Project:

101-154
101-156
101-155
101-152

Item Tags :

101-S-0001 ; 101-S-0012

Syst./ S-Syst.:

COMPANY
Document N
Contractor/Vendor
Document N

Electronic Filename
SA-JER-DS101-TRJR-480001.pid

Discipline: PRO

SA-JER-DS101-TRJR-480001
2271-101-PID-0021-005

REV: 03

Sheet: 1 of 1

SCALE: NONE
Format:

A1

You might also like