You are on page 1of 1

41

41

XHS
0001 L

ORIGINALSIGNEDINPROJECTFILE

XHS
0001 A

39

XHS
0001 B

38

XYV
0001

37

02
38

02

36

IA

HIXS
0001 A

35

02

OPEN

XLC
0001

XLO
0001

37

XLS
0001 C

HIXS
0001 L

ZC
0003

XLS
0001 O

10"-HCB-101008001-209CS1P-H

ZC
0004

30

35

ZC
0005

34

NOTE 6

33
32

FLC
TSO

3/4" D

ZC
0005

36

NOTE 2
10"

32
31

2"-LPS-101008301-101CS1P-P
MIN.

XV
0001

HIXA
0001

2"-HCB-101008001-209CS1P-H

3/4" V
UC

ATM

02

33

CLOSED

DE

NOTE 3

34

PDI
0026

31
LL

30

PIPING INST.
29

MIN.

NOTE 8

ZHI
0003

HL
0004 A
02
NOTE 7
02

3/4"

FT
0004 A

3/4"

3/4"

FC
0004 A L

MIN.

MIN.

2"x3/4"

02
1-1/2"

3/4"
CL1500
RTJ

MIN.

101-SP-0008
8

209CS1P
101CS1P

14"-HCB-101007003-209CS1P-H
NO POCKETS

250 mm MIN.

HYDROCARBONS
3690FROM 101-D-0001

HOLD 3

2"-CLD-101008303-101CS1P-N

02

02
25
3668

2"-CLD-101008301-101CS1P-N

MIN.

NOTE 5

2"

ZC
0003

MCC

ZC
0041

OSW

101-SP-0067

209CS1P
101CS1P

TYP. 6
MG
0001

ZC
0005
ZC
0003

ZYV
0003

02
2"-CLD-101008302-101CS1P-N

19

FC
TSO

PB

16

ZV
0100
FC
TSO

ZYV
0100

13
12
11

ZLC
0100

ZLS
0100 C

OPEN
ZLO
0100

ZLS
0100 O

POSITIONER
ZYC
0100

OSW

ZY
0100

3
HYDROCARBON
TO 101-E-0001-A-H
DS101-TRJR-480006
3358

1- EACH INSTRUMENT TAG NUMBER IS PREFIXED BY 101 (EX 101-TT-0001). THIS DRAWING IS VALID FOR TWIN LP HDS: UNITS 101 AND 102.
2- FOR GENERAL NOTES, SYMBOLS AND DETAILS SEE DRAWINGS SA-JER-DSAAA-TRJR-480001 THROUGH SA-JER-DSAAA-TRJR-480022.
3- ALL LINES CONNECTED TO CLOSED DRAINS SYSTEMS SHALL BE GRAVITY FLOW DESIGNED.
4- DRAIN VALVE ON EQUIPMENT AND/OR PIPING SHALL BE INSTALLED FLANGE TO FLANGE OR AT MINIMUM DISTANCE FROM THE EQUIPMENT/PIPING TO BE DRAINED.

02

POS.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

DESCRIPTION
FIRE WATER
SERVICE WATER
COOLING WATER
POTABLE WATER
DEMI WATER
N.A.
N.A.
N.A.
HP STEAM
MP STEAM
LP STEAM
HP CONDENSATE
MP CONDENSATE
LP CONDENSATE
BFW
PLANT AIR
INSTRUMENT AIR
N.A.

REF. DWG POS.

101-153
101-152
101-153
101-153

101-151
101-151

101-151
101-151
101-154
101-154

19
20
21
22
23
24
25
26
27
28
29
30
31
32

DESCRIPTION
N.A.
FUEL OIL
FUEL GAS
N.A.
N.A.
N.A.
CLOSED DRAIN
N.A.
L.P. NITROGEN
H.P. FLARE
L.P. FLARE
SOUR/ACID FLARE
PILOT GAS
AUX COOLING WATER

INSTRUMENT LINE
FROM 101-FV-0006

INSTRUMENT LINE
FROM 101-PV-0006

DS101-TRJR-480006

DS101-TRJR-480006

3543

3542

2
1

02

22-DEC-2010

AFC

AFC: APPROVED FOR CONSTRUCTION

JGT / STG

AVS/ HPR

HS

01

18-MAY-2010

AFC

AFC: APPROVED FOR CONSTRUCTION

MVF / STG

RDP/ HPR

HS

00

23-DEC-2009

IFD

IFD: ISSUED FOR DESIGN

MVF / FCB

RDP/ HPR

HS

REV

DATE

COMPANY
STATUS

UTILITIES IDENTIFICATION

GENERAL NOTES

NOTES

This document is the property of SATORP and shall not be disclosed to third parties or reproduced without permission of the owner.

INSULATION: H
NOTE 11
02

m/h
barg
bar
barg
C
kg/m

ZHS
0100

101-G-0001-A
CHARGE PUMP

101-G-0001-A
CENTRIFUGAL
426.0
65.29
63.00
94.50
77.00
750.0

PUMPS
TYPE
THROUGHPUT
DISCH. PRESS.
DIFF. PRESS.
DES. PRESS.
OP. TEMP.
DENSITY AT COND.

MIN.

6901

1- DO NOT CLOSE UNTIL DISCHARGE VALVE IS CLOSED.


2- FOR FUTURE SPARE PUMP INSTALLATION.
3- EMERGENCY SHUTDOWN.
4- BYPASS SWITCH.
5- DISMOUNTABLE PIPING FOR POSSIBLE CLEAN-OUT BY STEAM INJECTION.
6- CONNECTION ON TOP OF LINE.
7- MOKVELD TYPE.
8- FLANGE FOR POSSIBLE PUMP ISOLATION BY BLIND FLANGE.
9- PROVIDE A STRAIGHT LENGTH OF PIPE OF AT LEAST 5 TIMES THE SUCTION NOZZLE DIAMETER INMEDIATELY UPSTREAM OF THE NOZZLE.
10- CHECK VALVE SHALL BE INSTALLED HORIZONTALLY.
11- FOR FURTHER INFORMATION SEE PUMPS AUXILIARY DETAILS DIAGRAM: SA-JER-DS101-TRJR-480223.
02
12- COMMON RESET SHALL BE CONFIGURATED IN BLOCK AND BLEED VALVES CASES.
13- COMMON RESET SHALL BE CONFIGURATED IN SIL 3 VALVES.

10

BY-PASS

NOTE 2

1,2,4 DELETED
3- DELETED
5- DELETED 02

14

6"

HOLDS

15

02

6"-HCB-101008002-101CS1P-P
NO POCKETS

GENERAL HOLDS

18
17

CLOSED

25

3673

HYDROCARBONS

ATM

ZHI
0100

25

2 3691 TO 101-D-0001

21

IA

ZHSR
0003 L

4
3

23

22

NOTE 5
3/4"-OSW-101008302-101CS1P-N

MIN.

101-G-0001-A

2"-HCB-101008003-209CS1P-N
02

10

ZLS
0003 C

RESET

02
02

11

6" 02

2"

UC

PI
0060

209CS1P
101CS1P

02

12

8"

ZLC
0003

ZV
0003

209CS1P
101CS1P

MIN.

13

14"x8"

NOTE 9

PDI
0027

DE

LPT

NOTE 1

3/4"

CL1500
RTJ
10"x6"

02

24

250 mm MIN.

02

3/4"

3/4"-OSW-101008301-101CS1P-N

14

MIN. 3/4"

02

3/4"

209CS1P
101CS1P

2"

NOTE 2
14"

INST.
PIPING

MIN.

15

02
PIPING INST.

02

02

20

209CS1P
101CS1P

250 mm MIN.

PDT
0004

2"-HCB-101008007-209CS1P-N

TT
0004

25

CLOSED

ZHL
0003 L

3/4"
101-SP-0009

16

3/4"-HCB-101008006-209CS1P-N

18
17

NOTES 12,13
RESET
ZHSR
0003

26

PT
0027 A

IA

19

PDI
0004

3/4"

3/4"

27

ZLS
0003 O

TI
0004

FO

PIPING INST.

6"-HCB-101008005-101CS1P-P

20

MIN.

02

3/4"
FT
0004 B

6"
02 TSO

ZY
0003

ZLO
0003

02

6"-HCB-101008004-209CS1P-H

INST. PIPING

21

02

OPEN

02
LL

22

FV
0004

5 MIN.
STRAIGHT RUN

LPT

FI
0004 B

23

28

DE

02

ZYC
0003

ZC
0003

NOTE 4

24

NOTE 10

5 MIN.
STRAIGHT RUN

26

HS
0004

ZHS
0003

POSITIONER

02

25

29

PT
0026 A

10"-HCB-101008001-209CS1P-H

27

3/4"

BY-PASS

02

ATM

28

40
39

UC
0002

101CS1P
209CS1P

40

REVISION MEMO

PREPARED BY

CHECKED BY

APPR/AUTH BY

REF. DWG

101-155

JUBAIL EXPORT REFINERY


PIPING AND INSTRUMENT DIAGRAM
101-158

Project:

101-154
101-156
101-155
101-152

DISTILLATION AND HYDROTREATING


LOW PRESSURE HYDRODESULPHURISATION TRAIN 1
CHARGE PUMP

Item Tags : 101-G-0001

Syst./ S-Syst.:

COMPANY
Document N
Contractor/Vendor
Document N

Electronic Filename
SA-JER-DS101-TRJR-480004.pid

Discipline: PRO

SA-JER-DS101-TRJR-480004
2271-101-PID-0021-008

REV:

02

Sheet: 1 of 1

SCALE: NONE
Format:

A1

You might also like