Bushing Failure
Tony McGrail Doble Engineering Company
Configuration
Coolant KV
D-Y
Mineral Oil 43.8kV 12.47/7.2kV
VA
Manufacturer
15/20/25 MVA
Kulmann
Situation (Continued)
H3 Bushing
Test Procedure
B phase shift
HV Open Circuit Test Results Green: A Blue: B Red: C Image from Doble SFRA for M5200/M5300 V1.3
Test Procedure
Inverse resonant
HV Open Circuit and short circuit Test Results Green and grey: A Red and pink: C
Conclusion
SFRA traces show inconsistencies which indicate possible winding damage.
Excitation current test may also indicate this problem. A follow up Leakage Reactance test may verify this winding damage.