UBICACIN:

FECHA:

CASA - HABITACION

OBRA:

UNIDAD:

META:
CONSTRUCCION

NUMEROS GENERADORES
CLAVE

DESCRIPCION
LIMPIEZA GENERAL DEL PREDIO CON
HERRAMIENTA MANUAL
LIMPIEZA DEL AREA A CONSTRUIR
NIVELACION DEL TERRENO

ALTO

ESCAVACION DE ZAPATAS AISLADAS

LARGO

0.80

ESCAVACION DE SANGRIA DE
CIMENTACION PARA COLOCAR LOS
BLOCKS MASIZO DE 0.10*0.20*0.40 M

1
2
3
4
A
B
C
D
E

TRAMO
A-E
C-E
A-B
B-E
1-3
1-4
1-2
1-2
1-4

PIEZAS

TOTAL

SUBTOTAL
PIEZAS
1.46
0.35
0.74
0.76
3.31
0.85
1.62
0.43
0.43
1.62
4.96

TOTAL

121.38
41.175

1.00

1.00 M3

0.80

0.60
0.60
0.60
0.60

LARGO
6.10
1.45
3.10
3.16

0.60
0.60
0.60
0.60
0.60

3.55
6.75
1.80
1.80
6.75

0.40
0.40
0.40
0.40
0.40

0
UNIDAD
M
M
M
M
M3
M
M
M
M
M
M3
M3

ACERO
ARMADO DE LA ZAPATA DE VARILLA
DE 3/8" Y LOS BASTONES DE 1M
PARA REALIZAR LOS GANCHOSDE
5CM EN AMBOS LADOS

SUBTOTAL

7.14 M2
6.10 M2

0.40
ANCHO
0.40
0.40
0.40
0.40

ALTO

UNIDAD

17.00
6.75

0.6
EJE

ANCHO

0.90

0.90 M

8.27

10 VARILLAS DE 1M * 10 PIEZAS QUE LLEVA CADA ZAPATA


10*1= 10 ML * 12 ZAPATAS = 120 ML / 12M DE VARILLA = 12 VARILLAS DE 3/8"
25 AMARRAS CON ALAMBRE RECOCIDODE 33.33ML= 832.5 ML
CASTILLOS A BASE DE VARILLAS DE 3/8" Y ESTRIBOS DE 1/4
4 VARILLAS DE 4.15 = 166ML
ESTRIBOS DE 8CM + 18CM + 8CM + 18CM= 52 CM
52CM + 5 = 57CM* 20 ANILLOS = 1.140ML DE ALAMBRE DE 1/4
16.6 ML DE VARILLAS DEL 3/8"
4 AMARRAS DE ALAMBRE RECOCIDO *20 ESTRIBOS = 4*33.3*20= 2664ML DE ALAMBRE RECOCIDO

COLADO DE ZAPATA A BASE DE


ARENA, CEMENTO, GRAVA DE 3/4 Y
AGUA (PROPORCION 1:1:5)
CADENA DE DESPLANTE

6.1

1.95

DIMENCIONES
3.1
3.16
3.55
34.96
4 VARILLAS

6.75

1.8

1.8

TOTAL UNIDAD
6.75
34.96 ML
= 139.84 ML

CM DE

139.84 ESTRIBOS
20 CIMENTACION
ESTRIBOS 139.84/20CM DE SEPARACION = 699.2 ESTRIBOS
ESTRIBOS DE 19CM +19CM+ 19CM +19CM = 76CM PARA QUE QUEDE DE 17*17
ALAMBRE RECOCIDO 699.2 *4 =2796.8 AMARRES DE 33.3 DE LARGO = 93,133,44 ML DE ALAMBRE RECOCIDO
CIMBRA
34.16ML = 2.50 ML DE CADA TABLA = 13.9 P/Z * 12 = 27.96 P/Z
27.96 TABLAS DE 2.50 *0.30
34.96ML / 50CM = 69.92 *139.84 PIEZAS DE 1.20*2"*4"
BLOCK 34.96 ML *0.60 = 20.98M2
34.9ML/0.40 = 87.4* 6 HILADAS = 524 PIEZASDE BLOCK DE 0.40 *0.20* 0.10 CM
COLADO DE CADENAS PROPORCION
1:1:5
1M* 0.20*0.20 = 0.04M3
PEGA DE BLOCK MAZISO
MEZCLA
ARENA
CEMENTO

34.96 * 0.12= 4.1952 M3


1.15 * 4.1952 = 4.82448M3
0.360 + 4.1952 = 1.510272*1000= 1510.272/50= 30.20 SACOS

6.992 CANTIDAD

MUROS DE BLOCK DE 10*20*40


COLADO DE CASTILLO
12 CASTILLOS * 3M = 36ML
MUROS DE BLOCK MAZISO DE 10*20*40
EJE
TRAMO
1
A-E
2
C-E
3
A-B
4
B-E
A
1-2
B
1-4
C
1-2
D
1-2
E
1-4

LONGITUD ALTURA
6.10
2.8
1.95
2.8
3.10
2.8
3.16
2.8
3.55
2.8
6.75
2.8
1.80
2.8
1.80
2.8
6.75
2.8

UNIDAD
M
M
M
M
M
M
M
M
M
M2

SUBTOTAL
TOTAL
17.08
5.46
8.68
8.848
9.94
18.9
5.04
5.04
18.9
97.888

DETALLES DE PUERTAS Y VENTANAS


DETALLES DE LAS PUERTAS 0.95+0.95+0.95+0.80= 3.65ML*2.20= 8.03M2
DEATLLES DE VENTANA 1.20+1.20= 2.40*1 = 2.40 M2
VENTANA DE BAO 0.80 *0.40 = 0.32M2
97.88M2-10.75= 87.13 M2
87.13 M2 * 12.5 PIEZAS = 1089.12 PIEZAS DE BLOCK DE 10*20*40
MEZCLA

0.10*0.20*0.1= 0.02
87.13 * 0.02= 17426 M3
1.15 *17426= 2.00399

CADENA DE CERRAMIENTO
87.13ML*4=348.52/12 = 29.04
87.13 ML / 20= 435.65 PIEZAS
ESTRIBOS 10+20+10+20 = 60CM * 435.65PIEZAS= 26.139ML

LOZA
6.75 * 5 = 33.75 ML
3.55 * 4 = 14.12 ML
6.10 * 6 = 36.6 ML
3 * 6 = 18 ML
102.47ML
102.47 ML = 6M = 17.07 PIEZAS
60 CASETON DE 50*50*0.15
20 TABLAS DE 250 * 0.30
CIMBRA 33.04M2 DE CIMBRA
LOZA 41.17 M2 DE LOSA
PLAFON
33.04 M2
MEZCLA
33.04*0.2= 6.608
ARENA
6.608*1.15 = 7.5992
CEMENTO
0.360* 6.608 = 2.3788*1000/50
REPELLO 87.13 ML *2= 174.26 * 3M DE ALTO = 522.78M BULTOS
MEZCLA 522.78*0.02 = 10.4556
ARENA 10.4556* 1.15 = 12.02394
CEMENTO 0.360 *10.4556 =3.7640*1000 = 3,764/50 = 75.28
FIRME
6.75*6.1= 41.175M2
MEZCLA 41.175*5.05= 2.05875
ARENA 2.05875*1.15 = 2.36756
CEMENTO 0.360* 2.05875= 0.74115*1000= 741.15/50= 14.823 BULTOS
PISO DE LOZETA

41.50 M2
30 BOLSAS DE PEGA AZULEJO

INSTALACIONES
INSTALACIONES SANITARIAS

PIEZAS

TEE 4/2"
CODO 45
YEE
PVC 4"

NUM.
6
8
1
15.7

UNIDAD
PZA
PZA
PZA
ML

PVC 2"
LIJA

19.8 ML
120 -

CODOS 90 1/2"
TEE 1/2"
LLAVE DE PASO
TUBO LINEAL
TINACO
LIJA

30
8
2
786
600
120

INSTALACIONES HIDRAULICAS
PZA
PZA
PZA
ML
LTRS
-

INSTALACIONES DE GAS L.P


LINEAL 1/2"
CODO 45
TEE
LLAVE LLENADO
LLAVE CARGA
LLAVE DESCARGA
TANQUE
ESTACIONARIO
LIJA

34 ML
5
1
1
1
1
1
120

INSTALACIONES ELECTRICAS
CABLE DEL N10
POLIFLEX
CONTACTOS
APAGADORES
FOCOS
POTES DE 10*15
CAJAS DE REGISTRO
DE 2*3

72
50
6
6
6
6

ML
ML
PZA
PZA
PZA
PZA

11 PZA