CONSTRUCCION
NUMEROS GENERADORES
CLAVE
DESCRIPCION
LIMPIEZA GENERAL DEL PREDIO CON
HERRAMIENTA MANUAL
LIMPIEZA DEL AREA A CONSTRUIR
NIVELACION DEL TERRENO
ALTO
LARGO
0.80
ESCAVACION DE SANGRIA DE
CIMENTACION PARA COLOCAR LOS
BLOCKS MASIZO DE 0.10*0.20*0.40 M
1
2
3
4
A
B
C
D
E
TRAMO
A-E
C-E
A-B
B-E
1-3
1-4
1-2
1-2
1-4
PIEZAS
TOTAL
SUBTOTAL
PIEZAS
1.46
0.35
0.74
0.76
3.31
0.85
1.62
0.43
0.43
1.62
4.96
TOTAL
121.38
41.175
1.00
1.00 M3
0.80
0.60
0.60
0.60
0.60
LARGO
6.10
1.45
3.10
3.16
0.60
0.60
0.60
0.60
0.60
3.55
6.75
1.80
1.80
6.75
0.40
0.40
0.40
0.40
0.40
0
UNIDAD
M
M
M
M
M3
M
M
M
M
M
M3
M3
ACERO
ARMADO DE LA ZAPATA DE VARILLA
DE 3/8" Y LOS BASTONES DE 1M
PARA REALIZAR LOS GANCHOSDE
5CM EN AMBOS LADOS
SUBTOTAL
7.14 M2
6.10 M2
0.40
ANCHO
0.40
0.40
0.40
0.40
ALTO
UNIDAD
17.00
6.75
0.6
EJE
ANCHO
0.90
0.90 M
8.27
6.1
1.95
DIMENCIONES
3.1
3.16
3.55
34.96
4 VARILLAS
6.75
1.8
1.8
TOTAL UNIDAD
6.75
34.96 ML
= 139.84 ML
CM DE
139.84 ESTRIBOS
20 CIMENTACION
ESTRIBOS 139.84/20CM DE SEPARACION = 699.2 ESTRIBOS
ESTRIBOS DE 19CM +19CM+ 19CM +19CM = 76CM PARA QUE QUEDE DE 17*17
ALAMBRE RECOCIDO 699.2 *4 =2796.8 AMARRES DE 33.3 DE LARGO = 93,133,44 ML DE ALAMBRE RECOCIDO
CIMBRA
34.16ML = 2.50 ML DE CADA TABLA = 13.9 P/Z * 12 = 27.96 P/Z
27.96 TABLAS DE 2.50 *0.30
34.96ML / 50CM = 69.92 *139.84 PIEZAS DE 1.20*2"*4"
BLOCK 34.96 ML *0.60 = 20.98M2
34.9ML/0.40 = 87.4* 6 HILADAS = 524 PIEZASDE BLOCK DE 0.40 *0.20* 0.10 CM
COLADO DE CADENAS PROPORCION
1:1:5
1M* 0.20*0.20 = 0.04M3
PEGA DE BLOCK MAZISO
MEZCLA
ARENA
CEMENTO
6.992 CANTIDAD
LONGITUD ALTURA
6.10
2.8
1.95
2.8
3.10
2.8
3.16
2.8
3.55
2.8
6.75
2.8
1.80
2.8
1.80
2.8
6.75
2.8
UNIDAD
M
M
M
M
M
M
M
M
M
M2
SUBTOTAL
TOTAL
17.08
5.46
8.68
8.848
9.94
18.9
5.04
5.04
18.9
97.888
0.10*0.20*0.1= 0.02
87.13 * 0.02= 17426 M3
1.15 *17426= 2.00399
CADENA DE CERRAMIENTO
87.13ML*4=348.52/12 = 29.04
87.13 ML / 20= 435.65 PIEZAS
ESTRIBOS 10+20+10+20 = 60CM * 435.65PIEZAS= 26.139ML
LOZA
6.75 * 5 = 33.75 ML
3.55 * 4 = 14.12 ML
6.10 * 6 = 36.6 ML
3 * 6 = 18 ML
102.47ML
102.47 ML = 6M = 17.07 PIEZAS
60 CASETON DE 50*50*0.15
20 TABLAS DE 250 * 0.30
CIMBRA 33.04M2 DE CIMBRA
LOZA 41.17 M2 DE LOSA
PLAFON
33.04 M2
MEZCLA
33.04*0.2= 6.608
ARENA
6.608*1.15 = 7.5992
CEMENTO
0.360* 6.608 = 2.3788*1000/50
REPELLO 87.13 ML *2= 174.26 * 3M DE ALTO = 522.78M BULTOS
MEZCLA 522.78*0.02 = 10.4556
ARENA 10.4556* 1.15 = 12.02394
CEMENTO 0.360 *10.4556 =3.7640*1000 = 3,764/50 = 75.28
FIRME
6.75*6.1= 41.175M2
MEZCLA 41.175*5.05= 2.05875
ARENA 2.05875*1.15 = 2.36756
CEMENTO 0.360* 2.05875= 0.74115*1000= 741.15/50= 14.823 BULTOS
PISO DE LOZETA
41.50 M2
30 BOLSAS DE PEGA AZULEJO
INSTALACIONES
INSTALACIONES SANITARIAS
PIEZAS
TEE 4/2"
CODO 45
YEE
PVC 4"
NUM.
6
8
1
15.7
UNIDAD
PZA
PZA
PZA
ML
PVC 2"
LIJA
19.8 ML
120 -
CODOS 90 1/2"
TEE 1/2"
LLAVE DE PASO
TUBO LINEAL
TINACO
LIJA
30
8
2
786
600
120
INSTALACIONES HIDRAULICAS
PZA
PZA
PZA
ML
LTRS
-
34 ML
5
1
1
1
1
1
120
INSTALACIONES ELECTRICAS
CABLE DEL N10
POLIFLEX
CONTACTOS
APAGADORES
FOCOS
POTES DE 10*15
CAJAS DE REGISTRO
DE 2*3
72
50
6
6
6
6
ML
ML
PZA
PZA
PZA
PZA
11 PZA