Following are the list of equipments to be installed in TG building

(Elevation Wise)
TG Building Equipment List @ Elevation 0.0 M
Sl No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

Description
Seal Oil Unit 1 & 2
CPU Unit 1
Duplex Lube Oil Cooler
Duplex Working Oil Cooler
Vacuum Pump A&B
Gas Cylinder Room
HP/LP Drain F/T
Gas Unit
Drain Cooler
Control Fluid Tank, CF Room, Waste
Fluid Tank, Purifier
HP Dozing Pump & Skid
DMCW Pumps A, B & C
Booster Pumps A & B
Hydrazine & Ammonia Dozing Tank
Central Lube Oil Purification System
( Clean & Dirty Oil Tank), Purifier
Panel
Hydraulic Power Supply for LPBV
Turbine F/T, Steam Drain F/T
Turbine F/T, Unit F/T
ACW Trench
Colts Skids
TDBFP Lube Oil Cooler
EOP/MOP 2 / Centrifuge/ JOP
Oil Sludge Pit
AW Submersible Pump
Unloading Tank
Clean/ Dirty Oil Pump
Unit Air Receiver
Cable Spreader Floor
Unit 1 & 2
SWAS Room
Condensate Extraction Unit A, B &
C
Gland Steam Condenser
HP/LP Flash Tank
Condenser
Drain Oil Pump

EL in M
0.1
0.1
0.1
0.1
0.0
0.0
-4.6
0.0
1.7
0.0

Bay
AB
BC
AB
AB
AB
AB
AB
AB
AB
AB

Grid
2-3
3-4
3
3-4
3-5
3-4
4-5
3-4
3-4
8-9

0.1
0.0

BC
AB

4-5
8-9

0.1
0.0

BC
BC

5-6
6-8

0.1
-4.6
-4.6
-1.9
0.0
0.0
0.1
-1.3
-7.0
0.0
0.0
0.0
0.0

AB
AB
AB
AB
AB
AB
AB
AB
A
BC
BC
BC
AB

7
6-7
6-7
6-7
4-7
4-7
6-7, 4-5
5-6
6-7
7-8
6-8
2-3
9-13

0.0
-4.0

BC
AB

10-12
4-5

2.5
0.0
-0.67
-0.3

AB
AB
AB
AB

3-4
4-5
5-6
6-7

TG Building Equipment List @ EL 8.5 M & 12.0 M


Sl No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

Description
Valve Room
LPH 1
LPH 2
LPH 3
MDBFP
PW Cooler
Alkalyser Unit, PW Pump & Filter
Unit
Neutral Grounding Cubicles
PT & SP Cubicles
Air Drier & Press Panel
SV Discharge Flash Tank
Plate Heat Exchanger (A,B & C)
Oil Cooler, Oil Purifier
Main Oil Tank
Air Compressor & Receiver, Gas
Analyzer, Gas Drier,
HPBP Valve
Turbine Drive BFP Exhaust Hood

EL in M
8.0
8.5
8.5
9.5
8.5
8.6
8.6

Bay
AB
AB
BC
BC
AB
AB
AB

Grid
7-8
5-6
4-5
6-7
2,3,4
2-3
2-3

8.5
7.5
7.5
8.5
8.5
9.1
9.1
8.5

AB
AB
AB
BC
BC
AB
AB
AB

4-5
3-4
4
4-5
8-9
8-9
8-9
4-5

8.5
8.5

AB
AB

7-8
4-7

EL in M
17

Bay
BC

Grid
4,5 & 6,7

17
17
17
17
17

AB
AB
AB
BC
DG

4,5 & 6,7


3,4,5,6,7
5,7
1,2
10-11

EL in M
8.5-24
24
24
24

Bay
BC
BC
BC
BC

Grid
3-4, 2-3
6-9
9a-12
2-6, 13-17

31.75
27.5

BC
BC

2
2-6, 13-17

TG Building Equipment List @ EL 17 M


Sl No
1
2
3
4
5
6

Description
High Pressure Heater (6A, 6B,
5A, 5B)
TD BFP A & B
Turbine Generator
Oil Canal (TOP)
Lift Pit
Electrical Equipment Room

TG Building Equipment List @ EL 24 M & 27 M


Sl No
1
2
3
4
5
6

Description
Cable Riser Opening
Air Washer Room
AHU Room
Cable Vault for Boiler MCC
(Unit 1 & 2)
Monorail for Handling Panels
Space for Boiler MCC
(Unit 1 & 2)

TG Building Equipment List @ EL 31.75 M, 36.0 M & 47.5 M


Sl No
1
2
3
4
5
6
7
8
9
10

Description
Space For PRDS Station
Opening For Air Intake Duct
DMCW/ECW Tank (10 m3)
B row, Entire Cladding
Dearator
Service Water Tank
FW Tank
Potable Water Tank
NaOH Tank
CBD Tank

EL in M
31.75
31.75
31.75
31.75
36
36
36
36
36
36

Bay
BC
BC
BC
B
BC
BC
BC
BC
BC
BC

Grid
4-7
7-8, 18-19
8-9, 19-20
1-21
3-7
2-3
3-7
8-9
8-9
3-4