HOT WORK PERMIT (K2C Project)

BEFORE INITIATING HOT WORK, CAN THIS JOB BE AVOIDIED? IS THERE A SAFER WAY WITOUT USING OPEN FLAMES OR PRODUCING SPARK?
This Hot Work Permit is required for any temporary operation involving open flames or producing heat and.or sparks.This includes but is not limited to: brazing, cutting, grinding, soldering, thawing pipe, torch applied roofing and welding.

Date of works:

Area of Works:

Work to be done:

Work Permit No.

THE FOLLOWING PRECAUTIONS HAVE BEEN OBSERVED Sprinkler protection in service / operable Flammable and combustible materials removed minimal 10m (35 ft.) from area Construction checked in the area and precaution taken in case of combustible (instalation materials like PS or PUR Non combustible covers provided on combustible goods and materials Floor and wall openings within minimal 10m (35ft.) covered All hazardous operations discontinued Adequate fire extinguishers provided at site, within Hose reels ready Fire watch provided. Fire watch will be extended work (*) Flammable liquid vessels emptied and vented Equipment used for the hot work activity in good condition Others, namely Personal Protection Equipment (PPE) provided
Location of the nearing alarm box: Name of Contractor:
Time Started: Permit Expires(1): Time completed:

hour(s) afrer completion of the

In Case of Fire, call 8310

Permit issued by: (UENS Project Permit noted by:


Engineer/Manager) (WSO/Construction Safety Manger)

Welder Signature 1st Shift: 2nd Shift: 3rd Shift:


MAX 24 hours Valid

WSO Safety Officer:

(1)

Area Monitord by fire watch

minures after completion of works.(*) By:


Contractor's Safety Personel Signature over printed name

Note : ensure thatall fire protection is in service Area inspected hours after completion of. (**)

WSO Safety Officer Signature: 1st Shift: 2nd Shift: 3rd Shift:

Remarks:
(*) ; Recommended to have a fire watch in the Hot Work area for 1 hour after job is completed (**) ; Recommended to monitor Hot Work area 1 hour after job is completed (e.g by the security) Note:This form must be updated when there are changes in the procedures/process
Retention Period: Active-2 years; Archive - 1 year

Control No.: Retention Period:

K2C - 012 Two Years

Rev. No.:

00

Effective: Page No.:

07-Aug-13 1 of 1