Professional Documents
Culture Documents
ALAMAT: Dusun Koripan Tengah NOMOR: 205/V/CBA/RABPSB/ 2013 NO I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 II III URAIAN PEKERJAAN ACCESORIES TEE/Taping sadel (1,2,3,4) X Double Neplle " Plug Kran " Sock PVC DL " Knee PVC " Pipa PE diameter " Pipa GWI (slubung) 1,5" Knee PVC DD " V Ring " x " Pipa GWI Riser " Elbow GWI " Stop Kran " Flug Kran " Water Meter " Knee GWI " Tee GWI " Flug GWI " Kran Air " Seltipe Lem PVC VOLUME 1 1 1 1 3 8 1.5 1 1 2.5 2 1 1 1 2 1 1 1 5 1 SATUAN Buah Buah Buah Buah Buah Meter Meter Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Roll Ons Rp Rp 15 1 1 % Unit Pcs Rp Rp Rp Rp Rp Rp Rp Rp 15,500.00 Rp 230,000.00 Rp 1,151,700.00 100,000.00 187,755.00 100,000.00 6,000.00 1,545,455.00 154,545.50 1,700,000.50 1,700,000.50 1,700,000.00 77,500.00 HARGA SATUAN HARGA TOTAL
ONGKOS PASANG LAIN LAIN 1 Pemeliharaan instalasi SR 2 Biaya Perencanaan 3 Meterai IV JUMLAH BIAYA PPN 10% V JUMLAH BIAYA TOTAL BIAYA VI Material 1 Pipa PE dia 3/4" 2 Pengembalian Aspal
JUMLAH 5 M M
RP Rp Rp
Ongkos ongkos 1 Ongkos gali Aspal 2 Onkos gali beton/pasang 3 Onkos pasang pipa Biaya Material + Ongkos VIII JASA 15% IX TOTAL JUMLAH X PPN 10% XI TOTAL JUMLAH KELEBIHAN STANDAR
VII
4 1
M" M" M
Rp Rp Rp
TOTAL BIAYA Rp 1,858,678 Catatan: Pemasangan sambungan rumah yang lebih dari standar di hitung per meter X (kali) standar tabel pengambilan beton/Pc menjadi tanggungan konsumen Mengetahui/Menyetujui Direktur Diperiksa Oleh Kabag. Teknik Di buat Oleh Kasie Perenc. Teknik
I GEDE DARSANA, SH
NOMOR I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 II
ACCESORIES Tapping Sadel Double Neplle Diameter 3/4" Plug Kran Diameter 3/4" Sock PVC DL Diameter 3/4" Knee PVC diameter 3/4" Pipa PE diameter 1" Pipa GWI (slubung) diameter 1,5" Knee PVC DD 3/4" V Ring diameter 3/4 x 1/2 Pipa GWI Riser diameter 1/2 Elbow GWI diameter 1/2" Stop Kran diameter 1/2" Flug Kran diameter 1/2" Water Meter diameter 1/2" Knee GWI diameter 1/2" Tee GWI diameter 1/2" Flug GWI daimeter 1/2" Kran Air diameter 1/2" Seltipe Lem PVC Pengembalian Aspal JUMLAH ONGKOS ONGKOS
JUMLAH
TOTAL MATERIAL : (R.A.B.P.S.B) TOTAL UPAH TENAGA KERJA:(R.A.B.P.S.B) JUMLAH MATERIAL + ONGKOS KERJA
: : :
: :
JUMLAH BIAYA :
Semarapura............20.... Mengetahui/Menyetujui Direktur Utama Diperiksa Direktur Teknik
(I GEDE DARSANA)
(I KLETUT NKARNATA,ST.S.IP)
A TERSIER/PIPA DINAS
JUMLAH UANG RP Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00 Rp0.00
Rp0.00
Semarapura............20.... Dibuat Bag.Perenc.Teknik
205/V/CBA/RABPSB/ 2013
/ /
/
/
/
/20
/20
G.D. No
A B I No
/20
/ /20
SEBESAR
Rp
1,858,678
Terbilang: Satu Juta Delapan Ratus Lima Puluh Delapan Ribu Enam Ratus Tujuh Puluh Delapan Rupiah
Apabila saudara menyetujui sebagai tanda bukti, harap membubuhkan tanda tangan di bawah ini, dan menyerahkan kembali lembar asli kepada kami,dalam 10 (sepuluh) hari, selambat lambatnya tanggal Catatan :
Jika ada pemasangan sambungan rumah yang lebih dari standar di hitung per meter X (kali) standar tabel pengambilan beton/Pc menjadi tanggungan konsumen
Disetujui oleh Perusahaan Daerah Air Minum Kabupaten Klungkung Direktur
I WAYAN YASA
tgl
205/V/CBA/RABPSB/ 2013
/20
ujuh Puluh
RSANA, SH.