SHEET
TOTAL SHEETS
N. J.
1. FOR BRIDGE LENGTHS OVER 100 FT. PRE-EXCAVATE HOLES TO A DEPTH OF 8 FT. BELOW THE FINISHED GROUND LINE ELEVATION.
STRUCTURE NO.
STRUCTURE NAME
(SEE DETAIL)
3. BACKFILL HOLES OR, IF CASINGS ARE USED, WITH DESIGNATION I-8 SAND.
IF CIP PILES ARE USED, FILL THE SHELL WITH CONCRETE. 3/8" RECESS
NOTE TO DESIGNER:
4. PLACE THE ABUTMENT STEM CONCRETE TO REQUIRED BRIDGE SEAT ELEVATION.
1 1/4"
5. BACKFILL ABUTMENT STEM TO 6" BELOW THE BRIDGE SEAT ELEVATION AFTER THE ABUTMENT STEM IS CURED.
BE PROVIDED.
4"
NOTES:
9. AFTER THE ABUTMENT CONCRETE IS CURED, POUR DECK IN PROPER SEQUENCE EXCLUDING THE BACKWALL
DIAPHRAGM AND A PORTION OF THE DECK SLAB THAT IS EQUAL TO THE BACKWALL DIAPRAGM WIDTH.
PROTECTED.
10. TIGHTEN THE ANCHOR NUTS AND POUR THE BACKWALL/DIAPHRAGM FULL HEIGHT AND THE REMAINDER OF THE DECK SLAB. THE WINGWALLS MAY ALSO BE POURED CONCURRENTLY.
AND UTILITIES. FORMED JOINT WITH BOND BREAKER #16 BARS @ 1-0" CORROSION PROTECTED (SEE NOTE 1) CONCRETE DECK
REINFORCED CONCRETE RELIEF SLAB 6-0" LAP #13 BARS @ 1-0" (MAX.) CORROSION PROTECTED (SEE NOTE 1) 2 1/2" COVER 0"
A
6"
1-3"
DIAPHRAGM AS
(MINIMUM)
REINFORCEMENT ALTERNATED
BEARING
STIFFENER
BEARING STIFFENER
3" MIN.
KEYWAY (SEE DETAIL) TEMPORARY SUPPORT FOR STEEL GIRDER 1" DIA. (MIN.)
3" MIN.
SEE NOTE
SLOPE PROTECTION
#16 BARS @ 12" 2-0" LAP
(MIN.)
REINFORCEMENT
AS PER DESIGN
SECTION A-A
BDC04MB-01
AS SHOWN
8" PERFORATED CORRUGATED
3"
NOTE:
ABUTMENT STEM IS TO EXTEND TO
12"
12"
12"
CONTROL SECTION
DES. BY DWN. BY EST. CHK. BY CHK.
BY
STEEL SUPERSTRUCTURE - 1 OF 2
JOB NO.
: ROUTE
1-6"
NOTE: { OF BEARINGS & PILE
SECTION :
BDC04MB-01
MUNICIPALITY
COUNTY
BY SPECS.
BY
OR CONSTRUCTION JOINT
SCALE :
NONE
STEEL SUPERSTRUCTURE
BRIDGE
IN CHARGE OF
SHEET NO.
OF