You are on page 1of 84

TECHNICAL SPECIFICATIONS

OF FUEL OIL SYSTEM

A.
a
b
c
B.
a.
b.
c.
d.
e.

f.

g.
h.
i.

j.
k.
l.
m.
n.
o.
p.
q.
r.
B.
a.

LIST OF CODE / REFERENCE USED


Roy L Harrington, Marine Engineering
Class NK, Part D Machinery Installations
Project Guide Wartsilla 9L46 Diesel Engine
CALCULATION ALGORITHM
Calculation of fuel weight
HFO storage tank volume calculations
HFO settling tank volume calculations
HFO service tank volume calculations
Calculation of HFO transfer pump
- Calculation of the HFO transfer pump
- Calculation of installation in the engine room
- Calculation of head at the suction pipe
- Calculation of head at the discharge pipe
- Calculation of total head losses
Calculation of feed pump HFO
- Calculation of the HFO feed pump
- Calculation of installation in the engine room
- Calculation of head at the suction pipe
- Calculation of head at the discharge pipe
- Calculation of total head losses
HSD storage tank volume calculations
HSD service tank volume calculations
Calculation of HSD transfer pump
- Calculation of the HSD transfer pump
- Calculation of installation in the engine room
- Calculation of head at the suction pipe
- Calculation of head at the discharge pipe
- Calculation of total head losses
Calculation of Heating HFO Storage Tank
Calculation of Heating HFO Settling Tank
Calculation of Heating HFO Service Tank
Calculation of HFO Feed Pump ( BOOSTER UNIT)
Calculation of HFO Circulating Pump ( BOOSTER UNIT)
Calculation of HSD Standby Pump
Calculation of HFO Feed Heater
Separator in Transfer Pump
Calculation of Heater (BOOSTER UNIT)
OUTPUT PARAMETER DESIGN
Calculation of fuel weight
W HFO
=
Weight of HFO fuel

b. HFO storage tank volume calculations


Vol HFO =
Volume of storage tank
c. HFO settling tank volume calculations
Vol HFO =
Volume of settling tank
d. HFO service tank volume calculations

Design IV
Doc 4211 100 043 - FO
Muhammad Habib Chusnul Fikri

TECHNICAL SPECIFICATIONS
OF FUEL OIL SYSTEM

Vol HFO

Volume of service tank

e. Calculation of HFO transfer pump


- Calculation of installation in the engine room
hs = Static head pump
hp = Pressure head difference
hv = Velocity head difference
- Calculation of the head tube (hl1)
hl1 = Head in the suction pipe
- Calculation of head at the discharge pipe (hl2)
hl2 = Head in discharge pipe
- Calculation of total head losses (Hl)
Hl = Total head losses
f. Calculation of feed pump HFO
- Calculation of installation in the engine room
hs = Static head pump
hp = Pressure head difference
hv = Velocity head difference
- Calculation of the head tube (hl1)
hl1 = Head in the suction pipe
- Calculation of head at the discharge pipe (hl2)
hl2 = Head in discharge pipe
- Calculation of total head losses (Hl)
Hl = Total head losses
g. HSD storage tank volume calculations
Vol HSD =
Volume of storage tank
h. HSD service tank volume calculations
Vol HSD =
Volume of service tank
i. Calculation of HSD transfer pump
- Calculation of installation in the engine room
hs = Static head pump
hp = Pressure head difference
hv = Velocity head difference
- Calculation of the head tube (hl1)
hl1 = Head in the suction pipe
- Calculation of head at the discharge pipe (hl2)
hl2 = Head in discharge pipe
- Calculation of total head losses (Hl)
Hl = Total head losses
j. Calculation of Heating HFO Storage Tank
kW = Heating Power
k. Calculation of Heating HFO Settling Tank
kW = Heating Power
l. Calculation of Heating HFO Service Tank
kW = Heating Power
m. Calculation of HFO Feed Pump ( BOOSTER UNIT)
n. Calculation of HFO Circulating Pump ( BOOSTER UNIT)

Design IV
Doc 4211 100 043 - FO
Muhammad Habib Chusnul Fikri

TECHNICAL SPECIFICATIONS
OF FUEL OIL SYSTEM

Design IV
Doc 4211 100 043 - FO
Muhammad Habib Chusnul Fikri

o. Calculation of HSD Standby Pump


p. Calculation of HFO Feed Heater
kW = Heating Power
q. Separator in Transfer Pump
Q
= Separator capacity
r. Calculation of Heater (BOOSTER UNIT)
kW = Heating Power
C.

DETAILS OF CALCULATION
Data and ship engines
This estimation is aimed
Engine MCR power
speed
SLOC cylinder oil (g / kWh)
ship's speed
Distance shipping
shipping time (T)
HFO

= 175
= 13940
= 500

g / kWh
Hp =
Rpm

=
=
=
=
=
=

g / kWh
knots
mile
hours; taken:
day =
168 hours
ton/m3

0.5
18
2992
166.22
7
0.991

10395 kW

a. Calculation of fuel weight


HFO mass
= time x SFOC x kW
-6
HFO mass
= 175 x 10395 x 167 x 10
HFO mass
= 305.6 ton
b. HFO storage tank volume calculations
volume of storage tank
= HFO mass / density of the HFO
= 305.6 / 0.991
3
volume of storage tank
= 308.39 m
Designed volume of tank

3
498.63 m

c. HFO settling tank volume calculations


This estimation is aimed
=
175 g / kWh =
0.175 kg / kWh
MCR calculation engine
= 10395 kW
3
HFO
=
991 kg / m
time usage
= 24 hour
(Precipitation in 1 day)
margin
= 2%
Volsettlng
Volsettlng

= 24 hour x SFOC x kW / p HFO


3
= 44.06 m

d. HFO service tank volume calculations


known data is

TECHNICAL SPECIFICATIONS
OF FUEL OIL SYSTEM

=
=
=
=

This estimation is aimed


MCR calculation engine
HFO
time usage
Volservice
Volservice
Volservice

175 g / kWh
10395 kW
3
991 kg / m
8 hour

Design IV
Doc 4211 100 043 - FO
Muhammad Habib Chusnul Fikri

0.175 kg / kWh

= (8 hour x SFOC x kW / HFO)


= ((0,175 x 10395 x 8) / 991)
3
= 14.685 m
3
= 15 m

taken
e. Calculation of HFO transfer pump
Pump is planned move of HFO storage tank to the settling tank for 1 hour
time (t)
= 4 hour
pumping capacity (Q)
= V/t
pumping capacity (Q)
= 44.06
m3/ H = 0.0031 m3/ Second =
pumping capacity (Q)
= 11.01
Flow rate is

= 1

m/s

Based on calculation above, planned pump specification is :


Brands pumps
= SILIPUMP
Base Plate
Type
= KCB 12/0.13
Casing
Rotation
= 1450
rpm
Shafts
m3/ h
Capacity
= 12
Gears
Head
Motor power

= 0.13
= 5.36

183.56 l/min

(According to the project guide Wartsilla)

:
:
:
:

Cast Iron
Cast Iron
Steel or Alloy Steel
Carbon Steel

MPa
hp

4.00

kW

so that the diameter (D) pipeline that will be used can be calculated:
Q = Axv
2
= ( x D / 4) x v

= (4 x Q / v)
= ((4 x 0.0122) / 3.14 x 1)
D =
0.062
m =
2.46
D

mm

Selected types of carbon steel pipe, standard ANSI


Inside diameter
=
62.71
Thickness
=
5.16
Outside diameter
=
73.03
Nominal pipe size
=
2.50

- Calculation of installation in the engine room


static head pump discharge side
=
7.4
static head pump suction side
=
0
static pump head (ha)
=
7.4
difference in pressure head (hp)
=
0

m
m
m
m

mm
mm
mm
inch

2.469
0.203
2.875
sch 40

inch
inch
inch

(Height difference Between storage tanks


and service tanks)

TECHNICAL SPECIFICATIONS
OF FUEL OIL SYSTEM

Design IV
Doc 4211 100 043 - FO
Muhammad Habib Chusnul Fikri

difference in velocity head (HV), the speed of the suction side and out at the pipe
2 2
hv
= (1 -1 ) /2g
=
0 m
- Calculation of head at the suction pipe
On suction head due to friction
o
viscosity n
=
380 at 50 cSt C
=

Rn
Rn

= (Vs x ds) / n
=
165.03

then the flow is

2
0.0004 m / s

= laminer

Because the flow is laminar, to calculate use formula 64/Rn


locations to determine the friction lossess () =
0.388
major losses (hf) = x L x v2 / (D x 2g)
pipe length (L) on the suction side of the =
3 m
(0.388 x 3 x 1^2) / ((62.71/1000) * 2 * 9.8)
major losses (hf1) =
major losses (hf1) =

0.95

minor losses (head for the accessories that exist in the pipe)
no
type
1 Elbow 90o
2 Strainer
3 T joint
4 Gate valve
head losses
head losses
head losses (hl1)

N
3
1

k
nxk
0.5
1.5
0.5
0.5
1 0.5
0.5
1 0.5
0.5
total
3
= k x v2 / (2g)
= 3 x 1/ 2 x 9.8
= 0.1531 m

- Calculation of head at the discharge pipe


Head losses discharge (HLD)
Reynolds number
Reynolds number (Rn) =
o
viscosity n
=
380 at 50 cSt C
=

2
0.0004 m / s

Rn = (Vs x ds) / n
Rn = (1 x 62.71/1000) / 0.00038
Rn = 165.03
then the flow is = laminer
Because the flow is laminar, to calculate use formula 64/Rn
locations to determine the friction losses () =
0.388
major losses (hf) = x L x v2 / (D x 2g)
pipe length (L) on the discharge side of the pipe=
9.50 m
0.388 x 9,5 x 12 / (62.71/1000) x 2 x 9.8
major losses (hf2) =
major losses (hf2) =

2.997 m

TECHNICAL SPECIFICATIONS
OF FUEL OIL SYSTEM

Design IV
Doc 4211 100 043 - FO
Muhammad Habib Chusnul Fikri

minor losses (head for the accessories that exist in the pipe)
no
type
N k
nxk
o
1 Elbow 90
3 0.5
1.5
2 Gate valve
1 0.5
0.5
3 NRV
0 1.5
0
4 T joint
0 0.5
0
total
2
head losses
head losses (hl2)
head losses (hl2)

Total Head
Total Head

Flow

=
=
=

= k x v2 / (2g)
2
= 2 x 1 / 2 x 9.8

0.102 m

hs + hp + hv + (hf1 hf2 + + hl1 + hl2)


11.60 m =
0.1136 MPa
3
m
/
h
11.01

Based on calculation above, total head lossess is 5,99. So pump the pump is qualified as transfer pump.
Brands pumps
= SILIPUMP
Base Plate
:
Cast Iron
Type
= KCB 12/0.13
Casing
:
Cast Iron
Rotation
= 1450
rpm
Shafts
:
Steel or Alloy Steel
3
m
/
h
Capacity
= 12
Gears
:
Carbon Steel
Head
= 0.13
MPa
Motor power
= 5.36
hp
=
4.00 kW

f. Calculation of HFO feed pump


Pump is planned move of HFO settling tank to service tank for 2 hour
time (t)
= 2 hour
pumping capacity (Q)
= Vservice tank / t
pumping capacity (Q)
pumping capacity (Q)
Flow rate is

= 15 m3 / 2 h
m3/ H =
= 7.50
= 1
m/s

3
0.0021 m / Second

Based on calculation above, planned pump specification is :


Brands pumps
= SILIPUMP
Base Plate
Type
= KCB 8/0,33
Casing
Rotation
= 1450
rpm
Shafts
m3/ h
Capacity
= 8
Gears
Head
Motor power

= 0.3
= 4.02

MPa
hp

2.96

7500

l/h

(According to the project guide Wartsilla)

kW

so that the diameter (D) pipeline that will be used can be calculated:
Q = Axv

:
:
:
:

Cast Iron
Cast Iron
Steel or Alloy Steel
Carbon Steel

TECHNICAL SPECIFICATIONS
OF FUEL OIL SYSTEM

Design IV
Doc 4211 100 043 - FO
Muhammad Habib Chusnul Fikri

2
= ( x D / 4) x v
D = (4 x Q / v)
= ((4 x 0.001) / 3.14 x 1)
D =
0.052
m =
2.028 inch

Selected types of carbon steel pipe, standard ANSI


Inside diameter
=
52.50 mm
2.067
Thickness
=
3.91 mm
0.154
Outside diameter
=
60.33 mm
2.375
Nominal pipe size
=
2.00 inchi

inch
inch
inch

Schedule 40
- Calculation of installation in the engine room
static head pump discharge side
=
3.4
static head pump suction side
=
0
static pump head (ha)
=
3.4

m
m
m

difference in pressure head (hp)

(Height difference Between settling tanks and


service tanks)

difference in velocity head (HV), the speed of the suction side and out at the pipe
2 2
hv
= (1 -1 )/2g
=
0 m
- Calculation of head at the suction pipe
dipipa suction head due to friction
o
2
viscosity n
= 380 at 50 cSt C
= 0.0004 m / s
Rn = (Vs x ds) / n
of the project guide
Rn = (1 x 52,5 X 0,001) / 0.00038
Rn = 138.16
then the flow is
= laminer
Because the flow is laminar, to calculate use formula 64/Rn
locations to determine the friction lossess () =
0.463
major losses (hf) = x L x v2 / (D x 2g)
pipe length (L) on the suction side of the =
5.5 m
major losses (hf1) =
(0,463 x 5,5 x 1^2) / ((52,5/1000) * 2 * 9.8)
major losses (hf1) =

2.48

minor losses (head for the accessories that exist in the pipe)
no
1
2
3
4

type
Elbow 90o
Filter
T Joint
Gate valve

N k
3 0.5
1 0.5
1 0.5
3 0.5
total

nxk
1.5
0.5
0.5
1.5
4

TECHNICAL SPECIFICATIONS
OF FUEL OIL SYSTEM

head losses
head losses
head losses (hl1)

Design IV
Doc 4211 100 043 - FO
Muhammad Habib Chusnul Fikri

= k x v2 / (2g)
= 4 x 1^2 /x 2 x9.8
= 0.2041 m

- Calculation of head at the discharge pipe


Head losses discharge (HLD)
Reynolds number
Reynolds number (Rn) =
o
2
viscosity n
= 380 at 50 cSt C
= 0.0004 m / s
Rn = (Vs x ds) / n
Rn = (0.6 x 82.8/1000) / 0.0007
Rn = 138.16
then the flow is = laminer
Because the flow is laminar, to calculate use formula 64/Rn
locations to determine the friction losses () =
0.463
major losses (hf) = x L x v2 / (D x 2g)
pipe length (L) on the discharge side of the pipe=
10.00 m
2
0.902
x
5
x
0.6
/
(82.8/1000)
x
2 x 9.8
major losses (hf2) =
major losses (hf2) =

4.502 m

minor losses (head for the accessories that exist in the pipe)
no
type
N k
nxk
o
1 Elbow 90
3 0.5
1.5
2 Filter
0 0.5
0
3 NRV
1 1.5
1.5
4 T Joint
2 0.5
1
5 Gate valve
2 0.5
1
total
5
head losses
head losses (hl2)
head losses (hl2)
Total Head
Total Head

Flow

=
=
=

= k x v2 / (2g)
2
= 5 x 1 / 2 x 9.8

0.255 m

hs + hp + hv + (hf1 hf2 + + hl1 + hl2)


10.84 m
= 0.1061 MPa
3
7.50 m / h

Based on calculation above, total head lossess is 10,79. So pump the pump is qualified as feed pump.
Brands pumps
= SILIPUMP
Base Plate
:
Cast Iron
Type
= KCB 8/0,33
Casing
:
Cast Iron
Rotation
= 1450
rpm
Shafts
:
Steel or Alloy Steel
m3/ h
Capacity
= 8
Gears
:
Carbon Steel
Head
Motor power

= 0.33
= 4.02

MPa
hp

3.00

kW

TECHNICAL SPECIFICATIONS
OF FUEL OIL SYSTEM

Design IV
Doc 4211 100 043 - FO
Muhammad Habib Chusnul Fikri

g. HSD storage tank volume calculations


volume HSD
volume HSD
volume HSD

= Time x FOC
= 127 x 166 x 3
= 63246 liter
3
= 63.246 m

FOC Genset

Number of Genset
Trip hour

= 127 l / hr
= 3 Genset
= 166 hour

for the tank spare volume, the tank increased 2% HSD from the HSD volume obtained from previous
calculations. So we get the volume of tank =

= HSD vol + 2% x Vol HSD


3
=
64.5 m
Designed HFO storage tank =
126
Vol tank

m3

h. HSD service tank volume calculations


volume HSD = T x FOC
volume HSD = 8 x 127 x 3
volume HSD =
3048 liter
3
= 3.048 m

FOC Genset

Number of Genset
Duration of use

= 127 l / hr
= 3 Genset
= 8 hours

for the tank spare volume, the tank increased 2% HSD from the HSD volume obtained from previous
calculations. So we get the volume of tank =
Vol tank

= HSD vol + 2% x Vol HSD


m3
= 3.109

HSD planned a service tank with dimensions of 3 m x 1.1 m x 1 m

3
3.3 m

i. Calculation of HSD transfer pump


Pump is planned move of HSD storage tank to service tank for 0.5 hour
time (t)
= 0.5 hour
pumping capacity (Q)
= V/t
pumping capacity (Q)
= 3.11/ 0.5
m3/ H = 0.0017 m3/ Second
pumping capacity (Q)
= 6.22
Flow rate is

= 1

m/s

Based on calculation above, planned pump specification is :


Brands pumps
= SILIPUMP
Base Plate
Type
= KCB-8/0,33
Casing
Rotation
= 1450
rpm
Shafts
3
m
/
h
Capacity
= 8
Gears
Head
= 0.33
MPa
Motor power
= 4.023
hp
=
3.0
kW

:
:
:
:

Cast Iron
Cast Iron
Steel or Alloy Steel
Carbon Steel

TECHNICAL SPECIFICATIONS
OF FUEL OIL SYSTEM

Design IV
Doc 4211 100 043 - FO
Muhammad Habib Chusnul Fikri

j. Calculation of heating HFO storage tank (4 hours heating)

m
P
c

HFO mass for each tank @ 50 m


Heater capacity kw
1.7 kJ/kg.K

from 20 C to 40 C

Q = m.C.T
Q = 2E+06 kJ
p = Q / 4 hours
=

117.0 kW

k. Calculation of heating HFO settling tank (20 hours heating)

Q = m.C.T
Q = 741268 kJ

m
P

T
c

=
=

= Q / 20 hours
=
10.3 kW

HFO mass for each tank @ 44m3


Heater capacity kw
from 40oC to 50oC
1.7 kJ/kg.K

l. Calculation of heating HFO service tank (7 hours heating)

Q = m.C.T
Q = 252705 kJ

m
P

T
c

=
=

= Q / 7 hours
=
10.0 kW

HFO mass for each tank @ 15m3


Heater capacity kw
from 50oC to 60oC
1.7 kJ/kg.K

m. Calculation of HFO feed pump (Booster Unit)


depend on engine project guide Wartsilla 9L46, HFO Feed Pump (booster unit) is regulated with
specification :
Capacity
Design Pressure

=
=

3
2.2 m / h
16 bar

36 liters/minute

Its recommended use screw pump as feed pump.


Based on requirements above, planned pump specification is :
Brands pumps
= Allweiler
Type
= SN 40/46
(screw pump)
Rotation
= 1450
rpm
Capacity
= 41
liters/minute
=
2.44
Pressure
= 20
bar
Motor power
= 1.57
kW

m3/ h

n. Calculation of HFO circulating pump (Booster Unit)


depend on engine project guide Wartsilla 9L46, HFO Circulating Pump (booster unit) is regulated
with specification :
3
Capacity
= 8.6 m / h
= 143 liters/minute
Design Pressure
= 16 bar

TECHNICAL SPECIFICATIONS
OF FUEL OIL SYSTEM

0
C
Design Temperature
=
150
Based on requirements above, planned pump specification is :
Brands pumps
= Allweiler
Type
= SN 80/46
(screw pump)
Rotation
= 2900
rpm
Capacity
= 163
liters/minute
=
9.78
Pressure
= 20
bar
Motor power
= 6.38
kW

Design IV
Doc 4211 100 043 - FO
Muhammad Habib Chusnul Fikri

m3/ h

o. Calculation of HSD Circulation pump


depend on Auxiliary engine Specifications, HSD circulating pump is chosen with following

specification :
= 381
l/h
= 16 bar

Total for all AE


Design Pressure

6.4 liter/minute

Its recommended use screw pump as circulating pump.


Based on requirements above, planned pump specification is :
Brands pumps
= Allweiler
Type
= SPF 10-28 (screw pump)
Rotation
= 1140
rpm
Capacity
= 9.3
liters/minute
Pressure
= 20
bar
Motor power
= 0.52
kW

p. Calculation of HFO feed heater


The required minimum capacity of the heater is :

= ( )/1700
=
P =

8600
50.6

l/h
Kw

P
Q
T

= heater capacity (kW)


= Circulating pump flow
= Temperature rise in heater (from 50 to 60 C)

q. Separator in Transfer System


Q (l / h) = P x b x 24 (hr) / ( x t)

max. continuous rating of the diesel engine (s) [kW]


specific fuel consumption + 15% safety margin [g / kWh]
density of the fuel [kg/m3]
daily separating time for self-cleaning separator [h] (usually = 23 h or 23.5 h)

P
b

=
=
=
=

= 10395 x (175 + (15% x 175)) x 24 /(991 x 23.5)


=
2156 liter/hour
3
=
2.16 m /h

TECHNICAL SPECIFICATIONS
OF FUEL OIL SYSTEM

Design IV
Doc 4211 100 043 - FO
Muhammad Habib Chusnul Fikri

So that the separator is used with the following data:


brand
= Alva Laval MAB 206
Power
= 12 kW
capacity
= 10500 l / h
(adjusted with calculation of HFO feed pump)
Main supply
= 3-phase 380 volt
Frequency
= 50 Hz
r. Calculation of HFO Separator Preheater

Q =
p

P =
Q =

7500

= Q X T /1700
=
44.1 kW

T =

Heater capacity kw
Capacity [l/h]
o
o
from 40 C to 50 C

s. Total Power of Heating

P = HFO Heating + LO Heating + HFO Separator Preheater + Estimated accomodation heater


=
= 285
kW
Heater Specification
brand
type
load factor

= GESAB
= TOH 04
=
349
kW
=
0.82

s. Calculating of Steam Consumption


Steam heat capacity = 2.08 kJ/kg.K at temperature 423 K =
Steam coil heat coeff. =
Steam coil conductivity =

Item

2500
360

2o

150 Celcius

W/m C at thickness =
W/m.K

Q required

Heat
Temp
o

HFO storage tank

117.0 kW

40 C

HFO settling tank

10.3

kW

50 C

HFO service tank

10.0

kW

60 C

HFO separator heater =

44.1

kW

50 C

HFO feed heater

50.6

kW

o
60 C

LO separator heater

38.2

kW

95 C

Accomodation heater =

15.0

kW

o
25 C

o
o
o

2 mm

SPESIFIKASI TEKNIS SISTEM BAHAN BAKAR

Project : Desain IV
Doc. No. 09 - 42 11 043 - FO
Rev. No.
Page : 13

Design IV

Design IV

Design IV

tsilla)

Design IV

Design IV

Design IV

ed as transfer pump.

tsilla)

Design IV

Design IV

Design IV

60 3.3
5 0.3

HSD transfer
1.8

Design IV

113
13
4.2
Ar 6.2
L
D

318
127

P 342
torque
36033
x2
72066

HFO
1.1 inch

Design IV

HSD
0.5 inch

Design IV

Outside Diameter, Identification, Wall Thickness, Inside Diameter


Pipe Size
(inches)

Outside
Diameter

Wall
Thickness

Identification

Inside
Diameter

Iron Pipe
Size

Schedule
No.

Stainless
Steel
Schedule
No.

.
40
80

10S
40S
80S

.049
.068
.095

.307
.269
.215

(inches)

Steel

-t-

-d-

(inches)

(inches)

For all pipe sizes the outside diameter (O.D.) remains relatively
constant. The variations in wall thickness affects only the inside
diameter (I.D.).
Welded and Seamless Wrought Steel Pipe
To distinguish different weights of pipe, it is common to use the
Schedule terminology from ANSI/ASME B36.10 Welded and
Seamless Wrought Steel Pipe:

0.13

1/8

0.405

.
STD
XS

0.25

1/4

0.540

.
STD
XS

.
40
80

10S
40S
80S

.065
.088
.119

.410
.364
.302

0.38

3/8

0.675

.
STD
XS

.
40
80

10S
40S
80S

.065
.091
.126

.545
.493
.423

0.5

1/2

0.840

.
.

.
.

5S
10S

.065
.083

.710
.674

STD

40

40S

.109

.622

XS
.
XXS

80
160
.

80S
.
.

.147
.187
.294

.546
.466
.252

.
.

.
.

5S
10S

.065
.083

.920
.884

STD

0.75

1.25

1.5

2.5

3/4

1 1/4

1 1/2

2 1/2

3 1/2

1,050

1,315

1,660

1,900

2,375

2,875

40

40S

.113

.824

XS

80

80S

.154

.742

.
XXS

160
.

.
.

.219
.308

.612
.434

5S

.065

1,185

.
STD
XS

.
40
80

10S
40S
80S

.109
.133
.179

1,097
1,049
.957

.
XXS

160
.

.
.

.250
.358

.815
.599

5S

.065

1,530

.
STD

.
40

10S
40S

.109
.140

1,442
1,380

XS

80

80S

.191

1,278

.
XXS

160
.

.
.

.250
.382

1,160
.896

5S

.065

1,770

.
STD

.
40

10S
40S

.109
.145

1,682
1,610

XS

80

80S

.200

1,500

.
XXS

160
.

.
.

.281
.400

1,338
1,100

5S

.065

2,245

.
STD

.
40

10S
40S

.109
.154

2,157
2,067

XS

80

80S

.218

1,939

.
XXS

160
.

.
.

.344
.436

1,687
1,503

5S

.083

2,709

.
STD
XS

.
40
80

10S
40S
80S

.120
.203
.276

2,635
2,469
2,323

.
XXS

160
.

.
.

.375
.552

2,125
1,771

5S

.083

3,334

.
STD

.
40

10S
40S

.120
.216

3,260
3,068

3,500

XS
.
XXS

80
160
.

80S
.
.

.300
.438
.600

2,900
2,624
2,300

4,000

.
.
STD
XS

.
.
40
80

5S
10S
40S
80S

.083
.120
.226
.318

3,834
3,760
3,548
3,364

4,500

.
.
STD
XS
.
.
XXS

.
.
40
80
120
160
.

5S
10S
40S
80S
.
.
.

.083
.120
.237
.337
.438
.531
.674

4,334
4,260
4,026
3,826
3,624
3,438
3,152

5,563

.
.
STD
XS
.
.
XXS

.
.
40
80
120
160
.

5S
10S
40S
80S
.
.
.

.109
.134
.258
.375
.500
.625
.750

5,345
5,295
5,047
4,813
4,563
4,313
4,063

6,625

.
.
STD
XS
.
.
XXS

.
.
40
80
120
160
.

5S
10S
40S
80S
.
.
.

.109
.134
.280
.432
.562
.718
.864

6,407
6,357
6,065
5,761
5,501
5,187
4,897

5S

.109

8,407

8,625

Light Wall
Schedule 10 (Sch/10, S/10)
Schedule 20 (Sch/20, S/20)
Schedule 30 (Sch/30, S/30)
Schedule 40 (Sch/40, S/40)
Standard Weight (ST, Std)
Schedule 60 (Sch/60, S/60)
Extra Strong (Extra Heavy, EH, XH, XS)
Schedule 80 (Sch/80, S/80)
Schedule 100 (Sch/100, S/100)
Schedule 120 (Sch/120, S/120)
Schedule 140 (Sch/140, S/140)
Schedule 160 (Sch/160, S/160)
Double Extra Strong (Double extra heavy, XXH, XXS)

Stainless Steel Pipe


For stainless steel pipes thru 12-inch, schedule numbers from
Schedule 5S to schedule 80S are used as published in ANSI/ASME
36.19M Stainless Steel Pipe.
Schedule 5S (Sch/5S, S/5S)
Schedule 10S (Sch/10S, S/10S)
Schedule 40S (Sch/40S, S/40S)
- Schedule 80S (Sch/80S, S/80S)
-

STD, XS and XXS


To distinguish different weights of pipe, three long standing
traditional designations are used:
- standard wall - STD
- extra strong wall - XS
- double extra strong wall - XXS
The last two designations are sometimes referred to as extra heavy
wall (XH), and double extra heavy wall (XXH).

6.2.1. The bilge pumping units, or pumps, required by 6.1 may also
be used for ballast, fire or general service duties of an intermittent
nature, but they are to be immediately available for bilge duty when
required, see also SOLAS 1974 as amended Reg. II

8,625

10S

.148

8,329

20

.250

8,125

30

.277

8,071

STD
.

40
60

40S
.

.322
.406

7,981
7,813

XS

80

80S

.500

7,625

.
.

100
120

.
.

.594
.719

7,437
7,187

140

.812

7,001

XXS
.

.
160

.
.

.875
.906

6,875
6,813

10

12

14

16

18

20

22

10,750

12.75

14.00

16.00

18.00

20.00

22.00

5S

.134

10,482

10S

.165

10,420

.
.

20
30

.
.

.250
.307

10,250
10,136

STD

40

40S

.365

10,020

XS
.

60
80

80S
.

.500
.594

9,750
9,562

.
.
.
.

100
120
140
160

.
.
.
.

.719
.844
1,000
1,125

9,312
9,062
8,750
8,500

.
.

.
.

5S
10S

.156
.180

12,438
12,390

.
.

20
30

.
.

.250
.330

12,250
12,090

STD
.

.
40

40S
.

.375
.406

12,000
11,938

XS
.

.
60

80S
.

.500
.562

11,750
11,626

80

.688

11,374

.
.
.
.

100
120
140
160

.
.
.
.

.844
1,000
1,125
1,312

11,062
10,750
10,500
10,126

.
.

.
.

5S
10S

156
.188

13,688
13,624

.
.

10
20

.
.

.250
.312

13,500
13,376

STD
.
XS

30
40
.

.
.
.

.375
.438
.500

13,250
13,124
13,000

.
.

60
80

.
.

.594
.750

12,812
12,500

.
.
.
..

100
120
140
160

.
.
.
.

.938
1,094
1,250
1,406

12,124
11,812
11,500
11,188

.
.

.
.

5S
10S

.165
.188

15,670
15,624

10

.250

15,500

20

.312

15,376

STD

30

.375

15,250

XS
.

40
60

.
.

.500
.656

15,000
14,688

.
.
.

80
100
120

.
.
.

.844
1,031
1,219

14,312
13,938
13,562

.
.

140
160

.
.

1,438
1,594

13,124
12,812

5S

.165

17,670

10S

.188

17,624

.
.
STD
.
XS
.
.
.
.
.
.
.

10
20
.
30
.
40
60
80
100
120
140
160

.
.
.
.
.
.
.
.
.
.
.
.

.250
.312
.375
.438
.500
.562
.750
.938
1,156
1,375
1,562
1,781

17,500
17,376
17,250
17,124
17,000
16,876
16,500
16,124
15,688
15,250
14,876
14,438

5S

.188

19,624

.
.
STD
XS
.
.
.
.
.
.
.

.
10
20
30
40
60
80
100
120
140
160

10S
.
.
.
.
.
.
.
.
.
.

.218
.250
.375
.500
.594
.812
1,031
1,281
1,500
1,750
1,969

19,564
19,500
19,250
19,000
18,812
18,376
17,938
17,438
17,000
16,500
16,062

.
.
.
STD
XS

.
.
10
20
30

5S
10S
.
.
.

.188
.218
.250
.375
.500

21,624
21,564
21,500
21,250
21,000

22

24

26

28

30

32

34

36

42

22.00

60

.875

20,250

80

1,125

19.75

100

1,375

19.25

.
.
.

120
140
160

.
.
.

1,625
1,875
2,125

18.75
18.25
17.75

.
.

.
10

5S
10S

.218
.250

23,564
23,500

STD

20

.375

23,250

XS
.

.
30

.
.

.500
.562

23,000
22,876

40

.688

22,624

60

.969

22,062

.
.

80
100

.
.

1,219
1,531

21,562
20,938

120

1,812

20,376

24.00

.
.

140
160

.
.

2,062
2,344

19,876
19,312

10

.312

25,376

26.00

STD
XS

.
20

.
.

.375
.500

25,250
25,000

10

.312

27,376

STD
XS
.

.
20
30

.
.
.

.375
.500
.625

27,250
27,000
26,750

28.00

30.00

5S

.250

29,500

10

10S

.312

29,376

STD
XS
.

.
20
30

.
.
.

.375
.500
.625

29,250
29,000
28,750

10

.312

31,376

STD
XS

.
20

.
.

.375
.500

31,250
31,000

.
.

30
40

.
.

.625
.688

30,750
30,624

10

.344

33,312

STD

.375

33,250

XS
.
.

20
30
40

.
.
.

.500
.625
.688

33,000
32,750
32,624

.
STD

10
.

.
.

.312
.375

35,376
35,250

36.00

XS
.
.

20
30
40

.
.
.

.500
.625
.750

35,000
34,750
34,500

42.00

STD
XS
.
.

.
20
30
40

.
.
.
.

.375
.500
.625
.750

41,250
41,000
40,720
40,500

32.00

34.00

Area of Metal,
Internal Area, Moment
External Surface, Elastic Section Modulus
AreaTransverse
of
Moment ofof Inertia, Weight Pipe, Weight
ExternalWater,Elastic
Pipe Size
(inches)

Metal
(square
inches)

Transverse Internal Area


-a-A(square
(square
inches)
feet)

Inertia
-l4

(inches )

Weight
Weight
(poundsPipe
per
foot)
Waterper
(pounds
foot)

Surface
(square
feet
per foot of

Section
3
(in )

1/8

.0548
.0720
.0925

.0740
.0568
.0364

.00051
.00040
.00025

.00088
.00106
.00122

.19
.24
.31

.032
.025
.016

.106
.106
.106

.00437
.00523
.00602

1/4

.0970
.1250
.1574

.1320
.1041
.0716

.00091
.00072
.00050

.00279
.00331
.00377

.33
.42
.54

.057
.045
.031

.141
.141
.141

.01032
.01227
.01395

3/8

.1246
.1670
.2173

.2333
.1910
.1405

.00162
.00133
.00098

.00586
.00729
.00862

.42
.57
.74

.101
.083
.061

.178
.178
.178

.01736
.02160
.02554

1/2

.1583
.1974
.2503
.3200
.3836
.5043

.3959
.3568
.3040
.2340
.1706
.050

.00275
.00248
.00211
.00163
.00118
.00035

.01197
.01431
.01709
.02008
.02212
.02424

.54
.67
.85
1.09
1.31
1.71

.172
.155
.132
.102
.074
.022

.220
.220
220
.220
220
.220

.02849
.03407
.04069
.04780
.05267
.05772

.2011
.2521
.3326
.4335

.6648
.6138
.5330
.4330

.00462
.00426
.00371
.00300

.02450
.02969
.03704
.04479

.69
.86
1.13
1.47

.288
.266
.231
.188

.275
.275
.275
.275

.04667
.05655
.07055
.08531

3/4

.5698
.7180

.2961
.148

.00206
.00103

.05269
.05792

1.94
2.44

.128
.064

.275
.275

.10036
.11032

.2553
.4130
.4939
.6388
.8365
10,760

11,029
.9452
.8640
.7190
.5217
.282

.00766
.00656
.00600
.00499
.00362
.00196

.04999
.07569
.08734
.1056
.1251
.1405

.87
1.40
1.68
2.17
2.84
3.66

.478
.409
.375
.312
.230
.122

.344
.344
.344
.344
.344
.344

.07603
.11512
.1328
.1606
.1903
.2136

1 1/4

.3257
.4717
.6685
.8815
11,070
1,534

1,839
1,633
1,495
1,283
1,057
.630

.01277
.01134
.01040
.00891
.00734
.00438

.1038
.1605
.1947
.2418
.2839
.3411

1.11
1.81
2.27
3.00
3.76
5.21

.797
.708
.649
.555
.458
.273

.435
.435
.435
.435
.435
.435

.1250
.1934
.2346
.2913
.3421
.4110

.3747
.6133

2,461
2,222

.01709
.01543

.1579
.2468

1.28
2.09

1,066
.963

.497
.497

.1662
.2598

1 1/2

1 1/2

2 1/2

3 1/2

10

12

14

.7995

2,036

.01414

.3099

2.72

.882

.497

.3262

1,068

1,767

.01225

.3912

3.63

.765

.497

.4118

1,429
1,885

1,406
.950

.00976
.00660

.4824
.5678

4.86
6.41

.608
.42

.497
.497

.5078
.5977

.4717
.7760

3,958
3,654

.02749
.02538

.3149
.4992

1.61
2.64

1.72
1.58

.622
.622

.2652
.4204

1,075
1,477

3,355
2,953

.02330
.02050

.6657
.8679

3.65
5.02

1.45
1.28

.622
.622

.5606
.7309

2,190
2,656

2,241
1,774

.01556
.01232

1,162
1,311

7.46
9.03

.97
.77

.622
.622

.979
1,104

.7280

5,764

.04002

.7100

2.48

2.50

.753

.4939

1,039

5,453

.03787

.9873

3.53

2.36

.753

.6868

1,704
2,254

4,788
4,238

.03322
.02942

1,530
1,924

5.79
7.66

2.07
1.87

.753
.753

1,064
1,339

2,945
4,028

3,546
2,464

.02463
.01710

2,353
2,871

10.01
13.69

1.54
1.07

.753
.753

1,638
1,997

.8910

8,730

.06063

1,301

3.03

3.78

.916

.7435

1,274

8,347

.05796

1,822

4.33

3.62

.916

1,041

2,228

7,393

.05130

3,017

7.58

3.20

.916

1,724

3,016
4,205
5,466

6,605
5,408
4,155

.04587
.03755
.02885

3,894
5,032
5,993

10.25
14.32
18.58

2.6
2.35
1.80

.916
.916
.916

2,225
2,876
3,424

1,021
1,463

11,545
11,104

.08017
.07711

1,960
2,755

3.48
4.97

5.00
4.81

1,047
1,047

.9799
1,378

2,680
3,678

9,886
8,888

.06870
.06170

4,788
6,280

9.11
12.50

4.29
3.84

1,047
1,047

2,394
3,140

1,152

14.75

.10245

2,810

3.92

6.39

1,178

1,249

1,651
3,174
4,407

14.25
12.73
11.50

.09898
.08840
.07986

3,963
7,233
9,610

5.61
10.79
14.98

6.18
5.50
4.98

1,178
1,178
1,178

1,761
3,214
4,271

5,595

10.31

.0716

11.65

19.0

4.47

1,178

5,178

6,621
8,101

9.28
7.80

.0645
.0542

13.27
15.28

22.51
27.54

4.02
3.38

1,178
1,178

5,898
6,791

1,868

22.44

.1558

6,947

6.36

9.72

1,456

2,498

2,285
4,300

22.02
20.01

.1529
.1390

8,425
15.16

7.77
14.62

9.54
8.67

1,456
1,456

3,029
5,451

6,112

18.19

.1263

20.67

20.78

7.88

1,456

7,431

7,953
9,696
11,340

16.35
14.61
12.97

.1136
.1015
.0901

25.73
30.03
33.63

27.04
32.96
38.55

7.09
6.33
5.61

1,456
1,456
1,456

9,250
10,796
12,090

2,231
2,733

32.24
31.74

.2239
.2204

11.85
14.40

7.60
9.29

13.97
13.75

1,734
1,734

3,576
4,346

5,581
8,405
10.70

28.89
26.07
23.77

.2006
.1810
.1650

28.14
40.49
49.61

18.97
28.57
36.39

12.51
11.29
10.30

1,734
1,734
1,734

8,496
12.22
14.98

13.32
15.64

21.15
18.84

.1469
.1308

58.97
66.33

45.35
53.16

9.16
8.16

1,734
1,734

17.81
20.02

2,916

55.51

.3855

26.44

9.93

24.06

2,258

6,131

3,941

54.48

.3784

35.41

13.40

23.61

2,258

8,212

6.57

51.85

.3601

57.72

22.36

22.47

2,258

13.39

7.26

51.16

.3553

63.35

24.70

22.17

2,258

14.69

8.40
10.48
12.76

50.03
47.94
45.66

.3474
.3329
.3171

72.49
88.73
105.7

28.55
35.64
43.39

21.70
20.77
19.78

2,258
2,258
2,258

16.81
20.58
24.51

14.96
17.84

43.46
40.59

.3018
.2819

121.3
140.5

50.95
60.71

18.83
17.59

2,258
2,258

28.14
32.58

19.93
21.30
21.97

38.50
37.12
36.46

.2673
.2578
.2532

153.7
162.0
165.9

67.76
72.42
74.69

16.68
16.10
15.80

2,258
2,258
2,258

35.65
37.56
38.48

4.36
5.49
8.24

86.29
85.28
82.52

.5992
.5922
.5731

63.0
76.9
113.7

15.19
18.65
28.04

37.39
36.95
35.76

2,814
2,814
2,814

11.71
14.30
21.15

10.07
11.90

80.69
78.86

.5603
.5475

137.4
160.7

34.24
40.48

34.96
34.20

2,814
2,814

25.57
29.90

16.10
18.92
22.63

74.66
71.84
68.13

.5185
.4989
.4732

212.0
244.8
286.1

54.74
64.43
77.03

32.35
31.13
29.53

2,814
2,814
2,814

39.43
45.54
53.22

26.24
30.63
34.02

64.53
60.13
56.75

.4481
.4176
.3941

324.2
367.8
399.3

89.29
104.13
115.64

27.96
26.06
24.59

2,814
2,814
2,814

60.32
68.43
74.29

6.17
7.11
9.82
12.87
14.58

121.50
120.57
117.86
114.80
113.10

.8438
.8373
.8185
.7972
.7854

122.4
140.4
191.8
248.4
279.3

20.98
24.17
33.38
43.77
49.56

52.65
52.25
51.07
49.74
49.00

3,338
3,338
3,338
3,338
3,338

19.2
22.0
30.2
39.0
43.8

15.77
19.24
21.52
26.03
31.53
36.91
41.08
47.14

111.93
108.43
106.16
101.64
96.14
90.76
86.59
80.53

.7773
.7528
.7372
.7058
.6677
.6303
.6013
.5592

300.3
361.5
400.4
475.1
561.6
641.6
700.5
781.1

53.52
65.42
73.15
88.63
107.32
125.49
139.67
160.27

48.50
46.92
46.00
44.04
41.66
39.33
37.52
34.89

3,338
3,338
3,338
3,338
3,338
3,338
3,338
3,338

47.1
56.7
62.8
74.6
88.1
100.7
109.9
122.6

6.78
8.16
10.80
13.42
16.05
18.66
21.21
24.98

147.15
145.78
143.14
140.52
137.88
135.28
132.73
128.96

10,219
10,124
.9940
.9758
.9575
.9394
.9217
.8956

162.6
194.6
255.3
314.4
372.8
429.1
483.8
562.3

23.07
27.73
36.71
45.61
54.57
63.44
72.09
85.05

63.77
63.17
62.03
60.89
59.75
58.64
57.46
55.86

3,665
3,665
3,665
3,665
3,665
3,665
3,665
3,665

23.2
27.8
36.6
45.0
53.2
61.3
69.1
80.3

14

16

18

20

22

31.22

122.72

.8522

678.3

106.13

53.18

3,665

98.2

38.45

115.49

.8020

824.4

130.85

50.04

3,665

117.8

44.32

109.62

.7612

929.6

150.79

47.45

3,665

132.8

50.07
55.63

103.87
98.31

.7213
.6827

1027.0
1117.0

170.28
189.11

45.01
42.60

3,665
3,665

146.8
159.6

8.21

192.85

13,393

257.3

27.90

83.57

4,189

32.2

9.34
12.37

191.72
188.69

13,314
13,103

291.9
383.7

31.75
42.05

83.08
81.74

4,189
4,189

36.5
48.0

15.38

185.69

12,895

473.2

52.27

80.50

4,189

59.2

18.41
24.35

182.65
176.72

12,684
12,272

562.1
731.9

62.58
82.77

79.12
76.58

4,189
4,189

70.3
91.5

31.62

169.44

11,766

932.4

107.50

73.42

4,189

116.6

40.14

160.92

1,175

1155.8

136.61

69.73

4,189

144.5

48.48
56.56

152.58
144.50

10,596
10,035

1364.5
1555.8

164.82
192.43

66.12
62.62

4,189
4,189

170.5
194.5

65.78
72.10

135.28
128.96

.9394
.8956

1760.3
1893.5

223.64
245.25

58.64
55.83

4,189
4,189

220.0
236.7

9.25

245.22

17,029

367.6

31.43

106.26

4,712

40.8

10.52

243.95

16,941

417.3

35.76

105.71

4,712

46.4

13.94
17.34

240.53
237.13

16,703
16,467

549.1
678.2

47.39
58.94

104.21
102.77

4,712
4,712

61.1
75.5

20.76
24.17
27.49

233.71
230.30
226.98

16,230
15,990
15,763

806.7
930.3
1053.2

70.59
82.15
93.45

101.18
99.84
98.27

4,712
4,712
4,712

89.6
103.4
117.0

30.79
40.64

223.68
213.83

15,533
14,849

1171.5
1514.7

104.67
138.17

96.93
92.57

4,712
4,712

130.1
168.3

50.23
61.17

204.24
193.30

14,183
13,423

1833.0
2180.0

170.92
207.96

88.50
83.76

4,712
4,712

203.8
242.3

71.81
80.66
90.75

182.66
173.80
163.72

12,684
12,070
11,369

2498.1
2749.0
3020.0

244.14
274.22
308.50

79.07
75.32
70.88

4,712
4,712
4,712

277.6
305.5
335.6

11.70
13.55

302.46
300.61

21,004
20,876

574.2
662.8

39.78
46.06

131.06
130.27

5,236
5,236

57.4
66.3

15.51

298.65

20,740

765.4

52.73

129.42

5,236

75.6

23.12
30.63
36.15

290.04
283.53
278.00

20,142
19,690
19,305

1113.0
1457.0
1703.0

78.60
104.13
123.11

125.67
122.87
120.46

5,236
5,236
5,236

111.3
145.7
170.4

48.95
61.44

265.21
252.72

18,417
17,550

2257.0
2772.0

166.40
208.87

114.92
109.51

5,236
5,236

225.7
277.1

75.33
87.18
100.33
111.49

238.83
226.98
213.82
202.67

16,585
15,762
14,849
14,074

3315.2
3754.0
4216.0
4585.5

256.10
296.37
341.09
379.17

103.39
98.35
92.66
87.74

5,236
5,236
5,236
5,236

331.5
375.5
421.7
458.5

12.88
14.92

367.25
365.21

25,503
25,362

766.2
884.8

43.80
50.71

159.14
158.26

5,760
5,760

69.7
80.4

17.08
25.48

363.05
354.66

25,212
24,629

1010.3
1489.7

58.07
86.61

157.32
153.68

5,760
5,760

91.8
135.4

33.77
58.07
73.78

346.36
322.06
306.35

24,053
22,365
21,275

1952.5
3244.9
4030.4

114.81
197.41
250.81

150.09
139.56
132.76

5,760
5,760
5,760

117.5
295.0
366.4

89.09

291.04

20,211

4758.5

302.88

126.12

5,760

432.6

104.02

276.12

19,175

5432.0

353.61

119.65

5,760

493.8

118.55
132.68

261.59
247.45

18,166
171,840

6053.7
6626.4

403.00
451.06

113.36
107.23

5,760
5,760

550.3
602.4

16.29

436.10

30,285

1151.6

55.37

188.98

6,283

96.0

18.65

433.74

30,121

1315.4

63.41

187.95

6,283

109.6

27.83
36.91

424.56
415.48

29,483
28,853

1942.0
2549.5

94.62
125.49

183.95
179.87

6,283
6,283

161.9
212.5

41.39
50.31
70.04

411.00
402.07
382.35

28,542
27,921
26,552

2843.0
3421.3
4652.8

140.68
171.29
238.35

178.09
174.23
165.52

6,283
6,283
6,283

237.0
285.1
387.7

87.17

365.22

25,362

5672.0

296.58

158.26

6,283

472.8

24

108.07
126.31
142.11
159.41

344.32
326.08
310.28
292.98

23,911
22,645
21,547
20,346

6849.9
7825.0
8625.0
9455.9

367.39
429.39
483.12
542.13

149.06
141.17
134.45
126.84

6,283
6,283
6,283
6,283

570.8
652.1
718.9
787.9

26

25.18
30.19
40.06

505.75
500.74
490.87

35,122
34,774
34,088

2077.2
2478.4
3257.0

85.60
102.63
136.17

219.16
216.99
212.71

6,806
6,806
6,806

159.8
190.6
250.5

28

27.14
32.54
43.20
53.75

588.61
583.21
572.56
562.00

40,876
40,501
39,761
39,028

2601.0
3105.1
4084.8
5037.7

92.26
110.64
146.85
182.73

255.07
252.73
248.11
243.53

7,330
7,330
7,330
7,330

185.8
221.8
291.8
359.8

23.37
29.10

683.49
677.76

47,465
47,067

2585.2
3206.3

79.43
98.93

296.18
293.70

7,854
7,854

172.3
213.8

30

34.90
46.34
57.68

671.96
660.52
649.18

46,664
45,869
45,082

3829.4
5042.2
6224.0

118.65
157.53
196.08

291.18
286.22
281.31

7,854
7,854
7,854

255.3
336.1
414.9

32

31.06
37.26
49.48
61.60
67.68

773.19
766.99
754.77
742.64
736.57

53,694
53,263
52,414
51,572
51,151

3898.9
4658.5
6138.6
7583.4
8298.3

105.59
126.66
168.21
209.43
230.08

335.05
332.36
327.06
321.81
319.18

8,378
8,378
8,378
8,378
8,378

243.7
291.2
383.7
474.0
518.6

34

36.37
39.61
52.62
65.53
72.00

871.55
868.31
855.30
842.39
835.92

60,524
60,299
59,396
58,499
58,050

5150.5
5599.3
7383.5
9127.6
9991.6

123.65
134.67
178.89
222.78
244.77

377.67
376.27
370.63
365.03
362.23

8,901
8,901
8,901
8,901
8,901

303.0
329.4
434.3
536.9
587.7

34.98
41.97
55.76

982.90
975.91
962.11

68,257
67,771
66,813

5569.5
6658.9
8786.2

118.92
142.68
189.57

425.92
422.89
416.91

9,425
9,425
9,425

309.4
369.9
488.1

36

36

42

69.46
83.06

948.42
934.82

65,862
64,918

10868.4
12906.1

236.13
282.35

417.22
405.09

9,425
9,425

603.8
717.0

49.08

1336.3

10627

167

579.3

10.99

506.1

65.18
81.28
97.23

1320.2
1304.1
1288.2

.
.
.

14037
17373
20689

222
276
330

572.3
565.4
558.4

10.99
10.99
10.99

668.4
827.3
985.2

A.
a
b
c
B.
a.
b.
c.
d.
e.

f.

g.
h.
i.

j.
k.
l.
m.
n.
o.
p.
q.
r.
B.
a.

LIST OF CODE / REFERENCE USED


Roy L Harrington, Marine Engineering
Machinery Outfitting Design Manual Vol. I
Project Guide Wartsilla 7L32 Diesel Engine
CALCULATION ALGORITHM
Calculation of fuel weight
HFO storage tank volume calculations
HFO settling tank volume calculations
HFO service tank volume calculations
Calculation of HFO transfer pump
- Calculation of the HFO transfer pump
- Calculation of installation in the engine room
- Calculation of head at the suction pipe
- Calculation of head at the discharge pipe
- Calculation of total head losses
Calculation of feed pump HFO
- Calculation of the HFO feed pump
- Calculation of installation in the engine room
- Calculation of head at the suction pipe
- Calculation of head at the discharge pipe
- Calculation of total head losses
MDF storage tank volume calculations
MDF service tank volume calculations
Calculation of MDF transfer pump
- Calculation of the MDF transfer pump
- Calculation of installation in the engine room
- Calculation of head at the suction pipe
- Calculation of head at the discharge pipe
- Calculation of total head losses
Calculation of Heating HFO Storage Tank
Calculation of Heating HFO Settling Tank
Calculation of Heating HFO Service Tank
Calculation of HFO Feed Pump ( BOOSTER UNIT)
Calculation of HFO Circulating Pump ( BOOSTER UNIT)
Calculation of MDF Standby Pump
Calculation of HFO Feed Heater
Separator in Transfer Pump
Calculation of Heater (BOOSTER UNIT)
OUTPUT PARAMETER DESIGN
Calculation of fuel weight
W HFO
=
Weight of HFO fuel

b.

HFO storage tank volume calculations


Vol HFO
=
Volume of storage tank

c.

HFO settling tank volume calculations


Vol HFO
=
Volume of settling tank

d.

HFO service tank volume calculations


Vol HFO
=
Volume of service tank

e.

f.

g.

Calculation of HFO transfer pump


- Calculation of installation in the engine room
hs
=
Static head pump
hp
=
Pressure head difference
hv
=
Velocity head difference
- Calculation of the head tube (hl1)
hl1
=
Head in the suction pipe
- Calculation of head at the discharge pipe (hl2)
hl2
=
Head in discharge pipe
- Calculation of total head losses (Hl)
Hl
=
Total head losses
Calculation of feed pump HFO
- Calculation of installation in the engine room
hs
=
Static head pump
hp
=
Pressure head difference
hv
=
Velocity head difference
- Calculation of the head tube (hl1)
hl1
=
Head in the suction pipe
- Calculation of head at the discharge pipe (hl2)
hl2
=
Head in discharge pipe
- Calculation of total head losses (Hl)
Hl
=
Total head losses
MDF storage tank volume calculations
Vol MDF
=
Volume of storage tank

h.

MDF service tank volume calculations


Vol MDF
=
Volume of service tank

i.

Calculation of MDF transfer pump


- Calculation of installation in the engine room
hs
=
Static head pump
hp
=
Pressure head difference
hv
=
Velocity head difference
- Calculation of the head tube (hl1)
hl1
=
Head in the suction pipe
- Calculation of head at the discharge pipe (hl2)
hl2
=
Head in discharge pipe
- Calculation of total head losses (Hl)
Hl
=
Total head losses
Calculation of Heating HFO Storage Tank
kW
=
Heating Power
Calculation of Heating HFO Settling Tank
kW
=
Heating Power
Calculation of Heating HFO Service Tank
kW
=
Heating Power
Calculation of HFO Feed Pump ( BOOSTER UNIT)
Calculation of HFO Circulating Pump ( BOOSTER UNIT)
Calculation of MDF Standby Pump
Calculation of HFO Feed Heater
kW
=
Heating Power

j.
k.
l.
m.
n.
o.
p.

q.
r.

C.

Separator in Transfer Pump


Q
=
Separator capacity
Calculation of Heater (BOOSTER UNIT)
kW
=
Heating Power
DETAILS OF CALCULATION
Data and ship engines
This estimation is aimed
Engine MCR power
speed
SLOC oil system
SLOC cylinder oil (g / kWh)
ship's speed
Distance shipping
shipping time (T)

=
=
=
=
=
=
=
=
=
=
=

HFO
volume expansion
a.

b.

c.

Calculation of fuel weight


HFO mass
HFO mass
HFO mass

HFO storage tank volume calculations


volume of storage tank

This estimation is aimed x T x MCR (kWh) x FG x 10-6


144 x 182 x 3500 x 1.5 x 10-6
137.6

ton

volume of storage tank


volume increase
volume increase
volume increase

=
=
=
=
=
=

HFO settling tank volume calculations


This estimation is aimed
MCR calculation engine
HFO
time usage
margin

=
=
=
=
=

Volsettlng
Volsettlng
d.

=
=
=

=
=

HFO mass / density of the HFO


137.6 / 0.991
138.84
mass of HFO / HFO + Vol HFO stor
(137.6/0.991) + (138.84 x 0.02)
141.62

182
3500
991
24
2%

(This estimation is aimed x T x MCR / HFO) x (1 + 0.02)


m3
15.74

HFO service tank volume calculations


known data is
This estimation is aimed
MCR calculation engine
HFO
time usage

=
=
=
=

182
3500
991
8

=
=
=
=

Volservice
Volservice
Volservice
taken
e.

(This estimation is aimed x T x MCR / HFO) x (1 + 0.02)


((0,182 x 3500 x 8) / 991) x (1 +0.02)
m3
5.245
5.4

m3

Calculation of HFO transfer pump


Pump is planned move of HFO storage tank to the settling tank for 1 hour
time (t)
=
1
pumping capacity (Q)
=
V/t
pumping capacity (Q)
=
15.74/1
pumping capacity (Q)
=
15.74
Flow rate is
=
0.6

hour

Based on calculation above, planned pump specification is :


Brands pumps
=
IRON PUMP
Type
=
ON-V 8
Rotation
=
850
Capacity
=
18.5
Head
=
20
Motor power
=
2.9

rpm
m3/ h
m
hp

so that the diameter (D) pipeline that will be used can be calculated:
Q
=
Axv
( x D2 / 4) x v
=
D
D

=
=
=

(4 x Q / v)
((4 x 0.0044) / 3.14 x 0.6)
0.096

m =

Selected types of carbon steel pipe, standard ANSI


Inside diameter
Thickness
Outside diameter
Nominal pipe size
minimum thickness (class requirement)
Schedule 80

96.33

=
=
=
=

97.18
8.56
114.30
4.00

- Calculation of installation in the engine room


static head pump discharge side
static head pump suction side
static pump head (ha)
difference in pressure head (hp)
difference in velocity head (HV), the speed of the suction side and out at the pipe
(0.62-0.62) X 1/2g
hv
=
=
- Calculation of head at the suction pipe
dipipa suction head due to friction
viscosity n
=

700

at 50 cStoC

Rn
=
(Vs x ds) / n
Rn
=
(0.6 x 97.18) / 0.0007
Rn
=
83.30
Because the flow is laminar, to calculate use formula 64/Rn
locations to determine the friction lossess () =
major losses (hf) = x L x v2 / (D x 2g)
pipe length (L) on the suction side of the =
major losses (hf1) =

then the flow is

(0768 x 9 x 0.62) / ((97.18/1000) * 2 * 9.8)

major losses (hf1) =

1.31

minor losses (head for the accessories that exist in the pipe)
no
1
2
3

type

N
4
1
2

Elbow 90o
Strainer
Gate valve

k
0.9
0.58
0.6

nxk
3.6
0.58
1.2
7.18

total
head losses
head losses
head losses (hl1)

=
=

k x v2 / (2g)
7.18 x 0.62/ 2 x 9.8

0.131877551

- Calculation of head at the discharge pipe


Head losses discharge (HLD)
Reynolds number
Reynolds number (Rn) =
at 50 cStoC
viscosity n
=
700
Rn
=
(Vs x ds) / n
Rn
=
(0.6 x 97.18/1000) / 0.0007
Rn
=
83.30
Because the flow is laminar, to calculate use formula 64/Rn
locations to determine the friction losses () =
major losses (hf) = x L x v2 / (D x 2g)
pipe length (L) on the discharge side of the pipe=
0.768 x 5 x 0.62 / (97.18/1000) x 2 x 9.8
major losses (hf2) =
major losses (hf2) =

0.726

minor losses (head for the accessories that exist in the pipe)
no
type
o
Elbow 90
1
2
3
4

Safety valve
SDNRV
Gate valve

N
4
1
1
1

k
0.9
2.5
2
0.6

nxk
3.6
2.5
2
0.6
9.9

total
head losses
head losses (hl2)
head losses (hl2)

=
=

k x v2 / (2g)
9.9 x 0.62 / 2 x 9.8
0.182

=
=
=

Total Head
Total Head
Total Head

hs + hp + hv + (hf1 hf2 + + hl1 + hl2)


2.5 + 0 + 0 + (1.31 + 0,131 + 0,726 + 0,182)
4.85
m

Based on calculation above, total head lossess is 4.85. So pump the pump is qualified as transfer pump.

=
=
=
=
=
=

Brands pumps
Type
Rotation
Capacity
Head
Motor power
f.

IRON PUMP
ON-V 8
850
18.5
20
2.9

Calculation of HFO feed pump


Pump is planned move of HFO settling tank to service tank for 1 hour
time (t)
=
1
pumping capacity (Q)
=
V/t
pumping capacity (Q)
=
5.4/1
pumping capacity (Q)
=
5.40
Flow rate is
=
0.6
Based on calculation above, planned pump specification is :
Brands pumps
=
IRON PUMP
Type
=
ON-V 6
Rotation
=
1150
Capacity
=
5.5
Head
=
15
Motor power
=
1.2

rpm
m3/ H
m
hp

hour

rpm
m3/ h
m
hp

so that the diameter (D) pipeline that will be used can be calculated:
Q
=
Axv
( x D2 / 4) x v
=
D
D

=
=
=

(4 x Q / v)
((4 x 0.00294) / 3.14 x 0.6)
0.056

Selected types of carbon steel pipe, standard ANSI


Inside diameter
Thickness
Outside diameter
Nominal pipe size
minimum thickness (class requirement)
Schedule 40
- Calculation of installation in the engine room
static head pump discharge side
static head pump suction side
static pump head (ha)

m =

56.43

=
=
=
=

82.80
3.05
88.90
3.00

difference in pressure head (hp)


difference in velocity head (HV), the speed of the suction side and out at the pipe
(0.62-0.62) X 1/2g
hv
=
=
- Calculation of head at the suction pipe
dipipa suction head due to friction
at 50 cStoC
viscosity n
=
700
Rn
=
(Vs x ds) / n
Rn
=
(0.6 x 97.18) / 0.0007
Rn
=
70.97
Because the flow is laminar, to calculate use formula 64/Rn
locations to determine the friction lossess () =
major losses (hf) = x L x v2 / (D x 2g)
pipe length (L) on the suction side of the =
major losses (hf1) =

then the flow is

(0.902 x 3 x 0.62) / ((82.8/1000) * 2 * 9.8)

major losses (hf1) =

0.60

minor losses (head for the accessories that exist in the pipe)
no
1
2
3
4

type

N
4
1
2
2

Elbow 90o
Strainer
AT
Gate valve

k
0.9
0.58
1.8
0.6

nxk
3.6
0.58
3.6
1.2
8.98

total
head losses
head losses
head losses (hl1)

=
=

k x v2 / (2g)
8.98 x 0.62/ 2 x 9.8
0.164938776

- Calculation of head at the discharge pipe


Head losses discharge (HLD)
Reynolds number
Reynolds number (Rn) =
at 50 cStoC
viscosity n
=
700
Rn
=
(Vs x ds) / n
Rn
=
(0.6 x 82.8/1000) / 0.0007
Rn
=
70.97
Because the flow is laminar, to calculate use formula 64/Rn
locations to determine the friction losses () =
major losses (hf) = x L x v2 / (D x 2g)
pipe length (L) on the discharge side of the pipe=
0.902 x 5 x 0.62 / (82.8/1000) x 2 x 9.8
major losses (hf2) =
major losses (hf2) =

2.000

minor losses (head for the accessories that exist in the pipe)
no
type
Elbow 90o
1
2
3
4
5

Safety valve
SDNRV
AT
Gate valve

N
4
1
3
1
3

k
0.9
2.5
2
1.8
0.19

nxk
3.6
2.5
6
1.8
0.57
14.47

total
head losses
head losses (hl2)
head losses (hl2)

=
=
=
=
=

Total Head
Total Head
Total Head

k x v2 / (2g)
14.47 x 0.62 / 2 x 9.8
0.266

hs + hp + hv + (hf1 hf2 + + hl1 + hl2)


2.5 + 0 + 0 + (1.31 + 0,131 + 0,726 + 0,182) + 10.08
5.03
m

Based on calculation above, total head lossess is 5.03. So pump the pump is qualified as feed pump.

=
=
=
=
=
=

Brands pumps
Type
Rotation
Capacity
Head
Motor power
g.

IRON PUMP
ON-V 6
1150
5.5
15
1.2

rpm
m3/ h
m
hp

MDF storage tank volume calculations

=
=
=
=

volume MDF
volume MDF
volume MDF

T x FOC
(4 x 24 x 6) x 38
21888
21.888

liter
m3

Because of the expansion of the fuel, the tank must be increased 2% MDF from the MDF volume obtained from previou
Vol tank

=
=
=

MDF vol + 2% x Vol MDF


21.88 + (2% x 21.88)
m3
22.32576

h. MDF service tank volume calculations


volume MDF
=
volume MDF
=
volume MDF
=

T x FOC
(4 x 8) x 38
1216
1.216

liter
m3

Because of the expansion of the fuel, the tank must be increased 2% MDF from the MDF volume obtained from previou

=
=
=

Vol tank

MDF vol + 2% x Vol MDF


1.216 + (2% x 1.216)
m3
1.24032

MDF planned a service tank with dimensions of 1.5 m x 1 m x 1 m


i.

Calculation of MDF transfer pump


Pump is planned move of MDF storage tank to service tank for 0.5 hour
time (t)
=
0.5
pumping capacity (Q)
=
V/t
pumping capacity (Q)
=
1.5 / 0.5
pumping capacity (Q)
=
3.00
Flow rate is
=
0.6
Based on calculation above, planned pump specification is :
Brands pumps
=
IRON PUMP
Type
=
ON : 2
Rotation
=
1150
Capacity
=
4
Head
=
15
Motor power
=
0.8

j.

=
=
=

(M x C x T)/t

(19 x 1717 x 45)/(3600*6)


49.1
kW

=
=
=

(M x C x T)/t

(11 x 1717 x 25)/(3600*3)


26.2
kW

Calculation of heating HFO service tank


Q

m.

m
hp

Calculation of heating HFO settling tank


Q

l.

(gear pump)
rpm
m3/ h

Calculation of heating HFO storage tank


Q

k.

hour

=
=
=

(M x C x T)/t

(1 x 1717 x 50)/(3600*3)
4.8
kW

Calculation of HFO feed pump (Booster Unit)


depend on engine project guide Wartsilla 7L32, HFO Feed Pump (booster unit) is regulated with specification :

Capacity
=
Design Pressure
=
Static pressure
=
Its recommended use screw pump as feed pump.

1
16
30

m3/ h
bar
kPa

Based on requirements above, planned pump specification is :


Brands pumps
=
Allweiler
Type
=
SPF 40/38
Rotation
=
1450
Capacity
=
19.5
Pressure
=
20
Motor power
=
1.14
n.

rpm

liters/minute
bar
kW

Calculation of HFO circulating pump (Booster Unit)

depend on engine project guide Wartsilla 7L32, HFO Circulating Pump (booster unit) is regulated with specification :
Capacity
Design Pressure
Design Temperature

=
=
=

4.5
16
150

Based on requirements above, planned pump specification is :


Brands pumps
=
Allweiler
Type
=
SPF 40/46
Rotation
=
2900
Capacity
=
83.7
Pressure
=
20
Motor power
=
3.61
o.

m3/ h
bar
0
C

rpm

liters/minute
bar
kW

Calculation of MDF standby pump


depend on engine project guide Wartsilla 7L32, MDF standby pump is regulated with specification :
Capacity
Design Pressure
Design Temperature
Its recommended use screw pump as standby pump.

=
=
=

Based on requirements above, planned pump specification is :


Brands pumps
=
Allweiler
Type
=
SPF 40/46
Rotation
=
2900
Capacity
=
83.7
Pressure
=
20
Motor power
=
3.61

4.5
16
50

m3/ h
bar
0
C

rpm

liters/minute
bar
kW

p.

Calculation of HFO feed heater


The required minimum capacity of the heater is :

q.

=
=

(5500 x (98-60))/1700
122.9411765
Kw

Separator in Transfer System


Q (l / h)
=

P x b x 24 (hr) / ( x t)

P
b

=
=
=
=

max. continuous rating of the diesel engine (s) [kW]


specific fuel consumption + 15% safety margin [g / kWh]
density of the fuel [kg/m3]
daily separating time for self-cleaning separator [h] (usually = 23 h or 23.5 h)

=
=

3500 x (182 + (15% x 182)) x 24 /(991 x 23.5)


754.9305451
liter/hour

So that the separator is used with the following data:


brand
=
Alva Laval
type
=
SA 820
capacity
=
1200
Volume
=
1.8
pressure
=
2-6 bar
Main supply
=
3-phase 220 volt
r.

Calculation of heater (Booster Unit)

s.

l/h
m3

=
=

((4.5 x 1000 + 15%) x (130-100))/1700


79.41441176
kW

Total Power of Heating

P = Heating HFO Tank + HFO Feed Heater + Heater BOOSTER UNIT


= (49.1 + 26.2 + 4.8) + 122.941 + 79.41
=
282.5
kW

Heater Specification
brand
type

=
=

GESAB
TOH 03

182
4771.642808
126.05
1.8
0.5
13
761
58.53846154
6
0.991
0.02

g / kWh
Hp
=
Rpm
kg/Cyl. 24 hours
g / kWh
knots
mile
hours; taken:
day
=
ton/m3

3500

kW

144 hours

T x MCR (kWh) x FG x 10-6


Addition of fuel constant = 1.3-1.5

HFO mass / density of the HFO


137.6 / 0.991
m3
138.84
mass of HFO / HFO + Vol HFO storage tank * adding vol.
(137.6/0.991) + (138.84 x 0.02)
m3
141.62

182
3500
991
hour

g / kWh
kW
kg / m3

0.182

kg / kWh

0.182

kg / kWh

(Precipitation in 1 day)

HFO) x (1 + 0.02)

182
3500
991
hour

g / kWh
kW
kg / m3

margin

x T x MCR / HFO) x (1 + 0.02)

m3/ H =

0.0044

m3/ Second

m/s

(According to the project guide Wartsilla)

2.133

kW

mm

mm
mm
mm
inch

=
=
=

3.83
0.34
4.50

inch
inch
inch

2.9

mm

=
=
=
=

2.5
0
2.5
0

m
m
m
m

0.0007

m2/ s

of the project guide

then the flow is

laminer
0.768

) / ((97.18/1000) * 2 * 9.8)

nxk
3.6
0.58
1.2
7.18

0.0007

m2/ s

then the flow is = laminer


0.768
5.00
/ (97.18/1000) x 2 x 9.8

nxk
3.6
2.5
2
0.6
9.9

mp is qualified as transfer pump.

2.133

m3/ H =

kW

0.0015

m3/ Second

m/s

(According to the project guide Wartsilla)

0.882

kW

mm

mm
mm
mm
inch

=
=
=

=
=
=

3.26
0.12
3.50

inch
inch
inch

2.6

mm

2
0
2

m
m
m

(Height difference Between settling tanks and service tanks)

m2/ s

0.0007

of the project guide

then the flow is

laminer
0.902

62) / ((82.8/1000) * 2 * 9.8)

nxk
3.6
0.58
3.6
1.2
8.98

0.0007

m2/ s

then the flow is = laminer


0.902
10.00
/ (82.8/1000) x 2 x 9.8

nxk
3.6
2.5
6
1.8
0.57
14.47

+ 0,726 + 0,182) + 10.08

mp is qualified as feed pump.

0.882

kW

FOC Genset

Number of Genset

F from the MDF volume obtained from previous calculations. So we get the volume of tank =

FOC Genset

Number of Genset
Duration of use

F from the MDF volume obtained from previous calculations. So we get the volume of tank =

m3/ H =

0.0008

m3/ Second

m/s

(According to the project guide Wartsilla)

(gear pump)

1.5

0.588

kW

C
M
t

=
=
=

heat specific of Heavy fuel oil

Temperature of fuel from 15 0C to 60 0C

C
M
t

=
=
=

heat specific of Heavy fuel oil

Temperature of fuel from 35 0C to 60 0C

C
M
t

=
=
=

heat specific of Heavy fuel oil

Temperature of fuel from 50 0C to 100 0C

r unit) is regulated with specification :

mass of fluid
time to increase temperature

mass of fluid
time to increase temperature

mass of fluid
time to increase temperature

16.66667 liters/minute

(screw pump)

liters/minute

booster unit) is regulated with specification :


=

75 liters/minute

75 liters/minute

(screw pump)

liters/minute

gulated with specification :

(screw pump)

liters/minute

P
Q
T

=
=
=

heater capacity (kW)


capacity of the separator feed pump (l/h)
Temperature rise in heater ( C)

h] (usually = 23 h or 23.5 h)

=
=

heater capacity (kW)


total fuel consumption at full output + 15% margin (l / h)
Temperature rise in heater ( C)

2%

(According to the project guide Wartsilla)

(According to the project guide Wartsilla)

nks and service tanks)

=
=

38

l / hr

Genset

=
=
=

38

l / hr

4
8

Genset
hours

m3

(According to the project guide Wartsilla)

15% margin (l / h)

You might also like