You are on page 1of 7

N

DATA SHEET
CUSTOMER: SHEET:

1 of 4
PROJECT:

PVC PLANT
TITLE:

"PVC PLANT"

NDICE DE REVISIONES
REV.

DESCRIPCIN Y/U HOJAS AFECTADAS EMISIN ORIGINAL

DATE PROYECTO EJECUCIN VERIFICACIN APROBACIN

REV. 0 24/03/14

REV. A

REV. B

REV. C

REV. D

REV. E

REV. F

REV. G

REV. H

1 of 4

REV. H

DATA SHEET
PROJECT:

REV.

SHEET:

POLYCHLORURE DE VINYLE PLANT


TITLE:

POLYCHLORURE DE VINYLE PLANT DATA SHEET


CUSTOMER: Project No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 17 18 19 20 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 55 56 57 58 59 60 61 62 63 64 65 66 67 NOTES: SHELL: BOOT DOMO: SIT/SKIRT: BODY : HEAD THINKNESS HEAT EXCHANGER (TEG/TEG) TYPE: SIZE (H x Dia.): QUANTITY CONFIGURATION LOCATION CAPACITY OTHER FEATURES: x in x in DESIGN PRESURE: MINIMUM DESIGN TEMPERATURE: ALLOWANCE CORROSION: DESIGN CODE DESIGN CODE STAMP 740 50 psig @ F 0.0625 (Note 4) YES 250 @ 740 Net Butene-1 Conversion Reactor Temperature Reactor Pressure Net Ethylene Conversion Comonomer Catalyst Catalyst productivity VCM Organic Cobalt (III) 4000 lb of polymerfib of catalyst 190 300 99% (97,5% with losses) 90.60% (89,3 with losses) F PSIA OPERATIONAL PRESSURE: OPERATIONAL TEMPERATURE: INLET PROCESS INFORMATION 300 190 TYPE INTERNAL PAINT: EXTERNAL PAINT: INSULATION: TRACING: FIRE TEST: CUSTOMER SPECIFICATION: PVC (POLYCHLORURE DE VINYLE) NO YES BY VENDOR N/A N/A (note 1 and note 4) INFORMATION TO BE COMPLETED BY:
DESIGNER MANUFACTURER MANUFACTURER/DESIGNER

YPFB "POLYCHLORURE DE VINYLE PLANT" PETROCHEMICAL SYSTEM

DISCIPLINE: TAG NUMBER: LOCATION: QUANTITY:

PROCESS

PLANT / UNIT: SERVICE: APPLICABLE TO:

One (1)

(NOTE 3)

Diseo

Fabricacin

Como Construido

MANUFACTURER / SUPLIDOR: MODEL / TYPE AND SIZE:

GENERAL
Process SYSTEM Comonomer TYPE OF INSULATION INSULATION THINKNESS INLET TEMPERATURE OTHER: VINNOLIT VCM By Vendor By Vendor 83 (Estimado) in F

OPERATING CONDITIONS
psig F Polyethylene Density (aprox) Comonomer Content Production 0.911 8% (by weight) 600000 TMA g/cm3 OUTLET FLUID INFORMATION

DESIGN CONDITIONS
F psig in STRESS RELIEF: X-RAY: NACE MR-01-75: SPECIAL REQUIREMENTS: BASIC DESIGN LOADS: Bomba de TEG TYPE SIZE Volt/Phase/Hz ENCLOSURE RPM HP OTHERS 380/3/50 EXPLOTION PROOF BY VENDOR BY VENDOR BY VENDOR CENTRIFUGAL Per code 100 NO NO %

MINIMUM EQUIPMENT INCLUDED IN THE SYSTEM

OUTLET DEBUGGER
OD OD OD H tb tc in in in x x x ft S/S ft S/S ft S/S in in in

OTHER FEATURES
INSTALED INSTRUMENTS: REQUIRED STEPS/ PLATFORM INSTALLED: OTHER: Note 3 NO

1. The manufacturer shall specify the characteristics of the Comonomer to be used in the process 2. The manufacturer must complete list of features and equipment that includes their system to get the outlet conditions process 3. The manufacturer should list all the system's instrument. 4. The equipments must be designed according to the API 12J and ASME VIII Div 1

DATA SHEET
PROJECT:

0
SHEET:

REV.

INGENIERIA, REHABILITACIN Y OPTIMIZACIN DE PROCESOS

TITLE:

POLYCHLORURE DE VINYLE PLANT DATA SHEET


CUSTOMER: YPFB Project No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 NOTES: N 1 2 3 4 5 6 7 8 9 10 11 MAINTENANCE WORKSHOPS STORAGE FOR MAINTENANCE AND OPERATING SUPPLIES LABORATORIES FOR PROCESS CONTROL FIRE STATIONS AND OTHER EMERGENCY SERVICES UTILITIES: STEAM BOILERS, COMPRESSED AIR, POWER GENERATION, REFRIGERATION, TRANSFORMER STATIONS FEFFLUENT DISPOSAL PLANT OFFICES FOR GENERAL ADMINISTRATION CANTEENS AND OTHER AMENITY BUILDINGS SUCH AS MEDICAL CENTERS CAR PARKS CHARGE AND DISCHARGE PRODUCT AREA TAG QUANT. MOD. RATING TAG QUANT.
By Vendor By Vendor REACTOR By Vendor By Vendor ETHYLENE DRYER By Vendor By Vendor BUTENE DRYER By Vendor By Vendor ACETHYLENE DRYER By Vendor By Vendor RECYCLE COMPRESSOR By Vendor By Vendor GAS COMPRESSOR By Vendor By Vendor PUMPS By Vendor By Vendor RECYCLE COOLER By Vendor By Vendor GAS COOLER By Vendor By Vendor CATALYST STORAGE By Vendor By Vendor POLYMER DISCHARGE By Vendor By Vendor POLYMER PURGE By Vendor By Vendor SURGE VESSEL By Vendor By Vendor KNOCKOUT VESSEL By Vendor By Vendor BUTENE-1 STORAGE

DISCIPLINE: TAG NUMBER:

PROCESS

MATERIALS
SHELL AND HEAD: PIPES: FLANGE: ACCESORIES: BOLTS: NUTS: GASKET: SIT/SKIRT: LIFTING LUGS: CS/SS CS/SS CS/SS CS/SS CS/SS CS/SS SPIRAL METALIC 304 SS CS/SS INTERNOS: BAFFLE: DIFUSOR DE ENTRADA: VORTEX BREAKER: WEIR BAFFLE: MIST ELIMINATOR COALESCENT FILTER: INTERNAL SUPPORTS BOLTS: ESPIRAL:

EQUIPMENT LIST INCLUDED IN THE SKID SYSTEM


DESCRIPCION WIDE LARGE HEIGHT WEIGHT REF. DOC. NOTES

INSTRUMENTS INCLUDED IN THE SKID


DESCRIPTION NOTE 2 NOTAS

AUXILIARY BUILDINGS
DESCRIPTION STORAGE FOR RAW MATTERIALS AND PRODUCTS: TANK FARMS AND WAREHOUSES

1. Provision shall include all de auxiliar buildings (campament, material storage, workshops, fire systems, Laboratory, Canteen, recreational areas, offices, consumption water, industry water, etc.) 2. Manufacturer must complete the features of the equipments and instruments included in the skid 3. This list of equipments is consider as preeliminar 4. The manufacturer shall provide the system in a Skid (Poliethylene Plant)
5. After dehydration plant, the gas will be treated in a Dew Point Plant

A SHEET

NOTES

NOTAS

ONS

, Laboratory, Canteen,

DATA SHEET
PROJECT

0
SHEET:

REV.

INGENIERIA, REHABILITACIN Y OPTIMIZACIN DE PROCESOS

TITLE

POLYCHLORURE DE VINYLE PLANT DATA SHEET


CUSTOMER: PROJECT No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 (*) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 System description and Data sheet Settlement system. Mechanical calculation memory Plan of construction details. Manufacturing schedule. Testing and inspection schedule. Exceptions to the specification. Document list Inspection, Operating and Maintenance manual. Data Book. Spare list for two years 3 3 2 Weeks 3+T 3+T 3+T 3+T 2 Weeks 2 Weeks 2 Weeks 2 Weeks 3 No. DOCUMENT A Quotation Copies quantity 3 3 (*) Copies quantity for Aprobacin 3+T 3+T 3+T 3+T 3 3 B Emission from the purchase order 2 Weeks 2 Weeks 2 Weeks 4 Weeks 2 Weeks 2 Weeks Certificate copies quantity 3+T 3+T 3+T 3+T C Emission from the delivery 2 Weeks 2 Weeks 2 Weeks 2 Weeks YPFB DISCIPLINE TAG NUMBER PROCESS

DOCUMENTS AND DATA REQUIERED


1. The following documents must be subject to approval by the customer. 2. Column "A" indicates the documents to be included in the offer. 3. Column "B" shall be subject to approval by the client during the development of the project, after purchase order 4. Column "C" indicates construction documents or certificates, if these documents are not delivered, it must be considered incomplete 5. All documents must be issued in Spanish.

NOTAS: The manufacturer must provide mechanical, hydraulic and process warranty. 2. All equipment and accessories must be according to the list of GTLI vendor
1.

Preliminar T Digital Copy

A SHEET

C Emission from the delivery 2 Weeks 2 Weeks 2 Weeks 2 Weeks

2 Weeks 2 Weeks 2 Weeks 2 Weeks