You are on page 1of 93

1.

2.
3.
4.
5.

, , Maxim 7
-15.90

3 King Post Platform


Hydraulic Jack Strut


-
-
-
- Landscape
- Interior

:ORIENTAL RESIDENCE, WIRELESS ROAD


: 110

.
:
-
-


-
-
-
-

ABACUS DESIGN CO., LTD.

31 , 4.5
- B1-B4.5
- 1-5
- 6-21

( Bore Pile )

22-31
-- 22
-

SITE LAY-OUT PLAN

Bottom up

CONSTRUCTION TIP

1.
Cost
Budget

1.1

1.1 4-6 Pile


wall
(Pile wall) Pile wall
2-3
* Cap-beam, Pile wall
*

1.2 Pile cut off -16 m.


()

* , *

1.3 Concrete (Wale Bracing) Pile


wall Preload
24 .
* - Lean
Concrete*

1.4 .

Layer
-16.00 m. 5-6 Test

* Test
, *
1.5 Pile wall Seismic Test

2)

2.1

2.1 Cap-beam ,
Sheet Pile Cap-beam,
Pile Wall Cap-beam
Strut Cap - beam
Cap-beam

2.2 Cap-beam
Cap-beam Pile wall




Cap-beam Strut
Pre-load Strut Layer

2.3 Cap-beam
Cap-beam Pile cut off
Pile wall
Pile wall , ,
Ground Hard Scape Pile cut off Pile
Wall

2.4 Pre-load Strut


Pre-load Strut Strut Pre-load
Pre-load
4-6 ./
Pre-load 10 //Strut
1
. ()
Pre-load Pre-load

2.5 Plat-form
Temporary Platform
- Lay-out Plan ,
- Platform
Platform Bracing King Post
- Platform
( Mat foundation 3,000-5,000 m3
One Way)
-

2.6 , H-beam Strut

King Post, Strut - ,

Tower crane -

Strut 1.00 m.

2.7 Strut Layer



Strut

3)

Platform
(m.)
0 - 4.00 m.
(
, )
4.00 - 13.00 m.
(
, )
13.00 - 16.00
(

)

PC.200
PC. 200 Long
Boom
( 22.00 m.)
PC. 40
PC. 200 Long
Boom
( 22.00 m.)
PC. 60
PC. 40

(Ea)

(m3/Day)

900

2
450
2
2
2
1

350

-
Platform & Strut & Pre-load = 470 m3/Day
-
24
10.00 -15.00 . 22.00-05.00 . (
12 /) 09.00 -16.00 . 21.00-05.00
.
( 15 /)

Site Lay Out Plan

Pile Wall

Static Pile Load Test

Bracing

Pile Cut-out

Platform

Platform

Preload

Inclinometer

Inclinometer

Inclinometer

Inclinometer

Inclinometer

Learning is a lifelong journey.

Two ways of learning.


1.Learning by experience = BUY
2.Learning from others = BORROW

The wise learns from his mistakes.


The wiser learns from the mistakes of others.
The wisest learns from the successes of others.

- John C. Maxwell