No.: RTD/Tech/12/
Date :- 22/01/08
To,
The Superintending Engineer (TR)
GETCO
Circle Office,
Nadiad
Sub. :- Submission of failure report of equipment 66 kv CT of 66 kv Khanpur
Dehgam line no:2 at 220 kv Khanpur s/s.
Ref. :- CE/SE(TR)/III/D2/1121 dtd. 21/08/07.
Please find here with failure report of ITC make 66 kv CT at 220 kv Khanpur
sub station:
(1)

(3)

Complete name plate details


a) Make
b) Sr. No.
c) Model No
d) Rating
e) STC
f) Y.O. M.
g) D.O.C.
Location
a) Name of sub station
b) Location
Order no. And Date:

(4)
(5)

Date of Expiry of guarantee period


Date of commissioning

(6)
(7)

(9)

Date of last over hauling


Date of details of previous
maintanence carried out
Last test results:
a) IR Value
a) b) Oil DS(BDV) value
Describe the occurance indetails

(10)

Protection relay operated / facia

(11)

Tripping of connected equipments

(2)

(8)

:
:
:
:
:
:
:

ITC
6886-54
DRGNO: ITC/6886/GETCO/66KVCT/GA
72.5 Kv
31.5 KA
2006
23/06/2007
220 KV Khanpur
: 66 kv KhanpurDehgam line no:2
: phase)
: VP(P)/Proc/1017/I/ITC/250/
dtd.9/01/06
: With in GP
: 23/06/07

(B

: -NA: 28/09/07- Cloth cleaning and jumpie


checking work.
: More than 10,000 M-ohm 2.5 KV
: Hand operated megger:
: 66 kv Khanpur Dehgam line
tripped on dtd. 21/01/2008 at 21.02
Hrs. Simultaneously 220/66 kv x
mer no. 2 tripped from LV side only.
Load on line was @13 MW at the
tripping of line.
During yard
checking: -B phase of ITC make
found fail.
: Relay indication: B Phase O/C &
E/F relay, Facia: O/C & E/F
: 100 MVA Xme no. 2: -Relay: E/F
Facia: O/C & E/F.

(12)

Suspected cause of failure


(In details)

(13)
(14)
(15)

No. of operations:
Nos. of Trippings
Load on the equipment at time of
failure
Maximum load observed during
the year
Weather this equipment required /
New / reinstalled

(16)
(17)
(18)

(19)

If any chronic problem is there


with this equipmenta) Describe
b) Any correspondance made
with party, if yes submit
copy
Any other remark

: Maybe manufacturing defct as fault


has damaged steel below and
bottom tank. (Photographs
attached)
: Not taken
: Only One
: 13 MW
: 26 MW
: Yes, at present available/dismental
Live tank CT of 3 MVA station
transformer of Ranasan s/s
: NO
:
; Latter is informed vide letter no: to
replace CT by New one
immediatelly.

EXECUTIVE ENGINEER [TR]


RANASAN.