PARTIDA

DESCRIPCION

UNID

METRADO

REND.

TIEMPO

N CUAD

TIEMPO

TIEMPO

SECUENCIA

UNIT. (Tu)

(f)

REAL (Tr)

PROG. (Tp)

LOGICA

REHABILITACION DE REDES Y CONEXIONES DOMICILIARIAS DEAGUA POTABLE Y ALCANTARILLADO


OBRA SANITARIO DEL JR. JUAN VARGAS CUADRAS 02 Y 03, DISTRITO DE TARAPOTO, PROVINCIA DE SAN
MARTIN -SAN MARTIN
1 REDES DE AGUA POTABLE
1.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 4.80 X 3.60 mt.
1.02 TRABAJOS PRELIMINARES

1.00

1.00

1.00

1.00

1.00

1.00

01.02.01 TRAZO Y REPLANTEO EN OBRAS DE SANEAMIENTO


01.02.02 LIMPIEZA DE TERRENO MANUAL

163.88

50.00

3.28

1.00

3.28

3.00

m2

163.88

50.00

3.28

1.00

3.28

3.00

163.88

50.00

3.28

1.00

3.28

3.00

01.03.02 REFINE/NIVELACION DE ZANJA A= 0.60TN


01.03.03 CAMA DE APOYO/PROTECCION C/MAT. SELECTO A=0.60 T.N TUB. =110 mm

163.88

50.00

3.28

1.00

3.28

1.00

163.88

40.00

4.10

1.00

4.10

4.00

01.03.04 RELLENO COMPACT. C/ VIBR. TIPO SALTARIN A=0.60 m H= 1.20 m T.N. TUB. D 110 mm
01.03.05 PROTECCION DE TUBERIA TN C/MAT. PRESTAMO A=0.60, H=0.20m

163.88

40.00

4.10

2.00

2.05

2.00

16

163.88

20.00

8.19

2.00

4.10

4.00

17

01.03.06 ELIMINACION DE MATERIAL EXCEDENTE


1.04 TUBERIAS

m3

24.58

15.00

1.64

1.00

1.64

2.00

19

01.04.01 SUMINIST. TUBERIA PVC - UF C-10, D=110mm


01.04.02 PRUEBA HIDRAULICA + DESINFECCION TUB. PVC - UF D=110mm. A ZANJA TAPADA

163.88

50.00

3.28

1.00

3.28

3.00

163.88

50.00

3.28

1.00

3.28

1.00

18

4.00

10.00

0.40

1.00

0.40

1.00

1.03 MOVIMIENTO DE TIERRAS


01.03.01 EXCAVAC. DE ZANJA C/RETRO 58 HP A=0.60m H=1.20 TN

1.05 ACCESORIOS
01.05.01 SUM/INST. CODO PVC - UF D=110mm X 22.5
01.05.02 SUM/INST. UNION REPARACION PVC - UF D=110mm

4
5

4.00

10.00

0.40

1.00

0.40

1.00

01.05.03 DADO DE C (0.40X0.40X0.30) FC=175 KG/CM2, P/TUB.D=110mm A 160mm


01.05.04 SUM/INST. TEE PVC - UF D=110 X 110 mm

5.00

10.00

0.50

1.00

0.50

1.00

10

1.00

10.00

0.10

1.00

0.10

1.00

11

01.05.05 SUM/INST. TRANSICION PVC - UF A ASBESTO CEMENTO D=110 mm


01.05.06 SUM/INST. DE ACCESORIOS PARA REINSTALACION DE HIDRANTE PVC - UF D=110 mm

3.00

1.00

3.00

1.00

3.00

3.00

12

1.00

1.00

1.00

1.00

1.00

1.00

13

01.05.07 SUM/INST. TAPON PVC-SAP D=110 mm


1.06 VALVULAS

2.00

5.00

0.40

1.00

0.40

1.00

14

01.06.01 SUM/INST VALVULA DE CONTROL TIPO MAZZA D=110 mm. INC. CAJA
1.07 IMPREVISTOS

2.00

1.00

2.00

1.00

2.00

2.00

15

01.07.01 ROT. TUB. CONEX. A/P. PVC-SAP 1/2"-3/4", EN EXCAVACION DE ZANJA


2 CONEXIONES DOMICILIARIAS DE AGUA POTABLE

15.00

10.00

1.50

1.00

1.50

2.00

132.00

50.00

2.64

1.00

2.64

3.00

20

132.00

10.00

13.20

3.00

4.40

4.00

21

132.00

40.00

3.30

1.00

3.30

3.00

22

02.02.03 RELLENO COMP. C/ VIBR. TIPO SALTARIN A=0.50m. H= 1.00 TN. P/CONEX. DOM.
02.02.04 CONEXION DOMICILIARIA - RED DE AGUA L=6.00 m. EN MATRIZ DE 110mm

132.00

40.00

4.40

2.00

2.20

2.00

25

22.00

5.00

4.40

1.00

4.40

4.00

23

02.02.05 REHABILITACION DE CONEXION DOMICILIARIA - RED DE AGUA L=6.00m


02.02.06 PROTECCION DE TUBERIA TN C/MAT. PRESTAMO A=0.50, H=0.20m.

1.00

1.00

1.00

1.00

1.00

1.00

24

132.00

40.00

3.30

2.00

1.65

2.00

26

02.02.07 ELIMINACION DE MATERIAL EXCEDENTE


3 MICROMEDIDORES

m3

16.43

15.00

1.10

1.00

1.10

1.00

27

3.01 SUMINISTRO DE MICROMEDIDORES


03.01.01 SUM/INST. MICROMEDIDORES

22.00

10.00

2.20

1.00

2.20

2.00

28

4 REDES DE DESAGUE
4.01 TRABAJOS PRELIMINARES
04.01.01 TRAZO, NIVELES Y REPLANTEO REDES DE DESAGUE

2.71

2.01 TRABAJOS PRELIMINARES


02.01.01 TRAZO Y REPLANTEO EN CONEXIONES
2.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION DE ZANJA MANUAL A=0.50 , H=1.00 TN
02.02.02 REFINE /NIVELACION ZANJA A= 0.50TN

135.44

50.00

1.00

2.71

3.00

30

04.01.02 LIMPIEZA DE TERRENO MANUAL


04.01.04 DEMOLICION DE PAVIMENTO ASFALTICO DE 3"

m2

135.44

50.00

2.71

1.00

2.71

3.00

29

m2

6.00

2.00

3.00

1.00

3.00

3.00

31

04.01.05 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8"


04.01.06 DEMOLICION DE ESTRUCTURA ANTIGUA(INGRESO SALIDA-BUZON)

m2

12.01

1.00

12.01

3.00

4.00

4.00

32

3.00

1.00

3.00

2.00

1.50

2.00

33

04.01.07 RETIRO DE TUBERIA EXISTENTE DE DESAGUE CSM 8"


04.01.08 DEMOLICION DE BUZONES EXISTENTES

129.04

50.00

2.58

1.00

2.58

3.00

34

m3

5.87

1.00

5.87

2.00

2.94

3.00

35

42.35

50.00

0.85

1.00

0.85

1.00

36

42.67

50.00

0.85

1.00

0.85

1.00

37

4.02 MOVIMIENTO DE TIERRAS


04.02.01 EXCAVACION DE ZANJA C/RETRO 58 HP A= 0.80 m H=1.75m. TN
04.02.02 EXCAVACION DE ZANJA C/RETRO 58 HP A= 0.80 m H=2.00m. TN
04.02.03 EXCAVACION DE ZANJA C/RETRO 58 HP A= 0.80 m H=2.50m TN
04.02.04 REFINE /NIVELACION DE ZANJA A= 0.80TN

43.82

40.00

1.10

1.00

1.10

1.00

38

128.84

40.00

3.22

2.00

1.61

2.00

39

04.02.05 CAMA DE APOYO COMPACTADO CON MATERIAL SELECTO A=0.80 T.N


04.02.06 RELLENO COMPACT. C/ VIBR. TIPO SALTARIN 0.80 x 1.75 TN.

128.84

40.00

3.22

2.00

1.61

2.00

41

42.35

35.00

1.21

1.00

1.21

1.00

46

04.02.07 RELLENO COMPACT. C/ VIBR. TIPO SALTARIN 0.80 X 2.00 TN


04.02.08 RELLENO COMPACT. C/ VIBR. TIPO SALTARIN 0.80 X 2.50 TN

42.67

30.00

1.42

1.00

1.42

1.00

47

43.82

25.00

1.75

1.00

1.75

1.00

48

04.02.09 ENTIBADO ZANJA C/MADERA


04.02.10 PROTECCION DE TUBERIA TN C/MAT. PRESTAMO A=0.80, H=0.20m

86.49

15.00

5.77

3.00

1.92

2.00

40

128.84

40.00

3.22

2.00

1.61

2.00

49

04.02.11 ELIMINACION DE MATERIAL EXCEDENTE


04.02.12 ELIMINACION DE MATERIAL SATURADO CONTAMINADO

m3

230.35

45.00

5.12

2.00

2.56

3.00

51

m3

30.92

25.00

1.24

1.00

1.24

1.00

52

4.03 TUBERIAS
04.03.01 SUM/INST. TUBERIA PVC-UF D=200mm S-25

130.24

40.00

3.26

2.00

1.63

2.00

42

04.03.02 PRUEBA HIDRAULICA TUB.PVC - UF D=200mm. DSG. A ZANJA TAPADA


4.04 BUZONES DE CONCRETO SIMPLE FC=175 KG/CM2

130.24

50.00

2.60

1.00

2.60

3.00

50

04.04.01 BUZON T-NORMAL =1.20 m HASTA H=1.26 m


04.04.02 BUZON T-NORMAL =1.20 m HASTA H=2.00 TN

1.00

0.50

2.00

1.00

2.00

2.00

42

1.00

0.50

2.00

1.00

2.00

2.00

43

04.04.03 BUZON T-NORMAL =1.60 HASTA H=2.50 TN


4.05 OBRAS DE CONCRETO

1.00

0.50

2.00

1.00

2.00

2.00

44

04.05.01 DADO DE CONCRETO 0.50X0.50X0.50 ENTRADA/SALIDA DE BUZON


04.05.02 REPOSICION DE CONCRETO ASFALTICO E=3"

9.00

10.00

0.90

1.00

0.90

1.00

45

m2

6.00

5.00

1.20

1.00

1.20

2.00

53

04.05.03 REPOSICION DE CONCRETO SIMPLE F'C= 175 KG/CM2, E=20CM.


4.06 VARIOS

m3

2.40

3.00

0.80

1.00

0.80

2.00

54

04.06.01 LIMPIEZA FINAL DE OBRA


4.07 REDES CONDOMINIAL

m2

974.69

80.00

12.18

3.00

4.06

4.00

55

04.07.01 TRABAJOS PRELIMINARES


04.07.01.01 TRAZO, NIVELACION Y REPLANTEO REDES CONDOMINIAL

29.00

30.00

0.97

1.00

0.97

1.00

56

04.07.01.02 LIMPIEZA DE TERRENO MANUAL


04.07.01.03 DEMOLICION DE VEREDAS DE 0.10 m

m2

29.00

80.00

0.36

1.00

0.36

1.00

57

m2

10.64

5.00

2.13

1.00

2.13

2.00

58

04.07.01.04 DEMOLICION DE CAJA DE CONCRETO SIMPLE EXISTENTE


04.07.02 MOVIMIENTO DE TIERRAS

m3

1.40

0.50

2.80

1.00

2.80

3.00

59

04.07.02.01 EXCAVACION DE ZANJA MANUAL A=0.50 , H=1.00 TN


04.07.02.02 EXCAVACION DE ZANJA MANUAL A=0.50 , H=1.20 TN

25.00

10.00

2.50

2.00

1.25

1.00

60

2.50

8.00

0.31

1.00

0.31

1.00

61

04.07.02.03 REFINE/NIVELACION DE ZANJA A= 0.50TN


04.07.02.04 CAMA DE APOYO COMPACTADO CON MATERIAL SELECTO A=0.50 T.N

29.10

40.00

0.73

1.00

0.73

1.00

62

29.00

40.00

0.73

1.00

0.73

1.00

63

04.07.02.05 RELLENO COMP. C/ VIBR. TIPO SALTARIN A=0.50m. H= 1.00 TN.


04.07.02.06 RELLENO COMPACT. C/ VIBR. TIPO SALTARIN 0.70x2.0 TN.

26.60

40.00

0.67

1.00

0.67

1.00

69

2.50

15.00

0.17

1.00

0.17

1.00

70

04.07.02.07 PROTECCION DE TUBERIA TN C/MAT. PRESTAMO A=0.50, H=0.10m.


04.07.02.08 ELIMINACION DE MATERIAL EXCEDENTE

29.10

20.00

1.46

1.00

1.46

2.00

71

m3

2.90

15.00

0.19

1.00

0.19

1.00

73

29.00

30.00

0.97

1.00

0.97

1.00

64

04.07.03.02 PRUEBA A ZANJA TAPADA P/TUBERIA DESAGUE 6"


04.07.04 BUZONETAS Y CAJAS DE INSPECCION

29.00

50.00

0.58

1.00

0.58

1.00

72

04.07.04.01 BUZONETAS CONCRETO D=0.60, H=1.20 M


04.07.04.02 CAJA DE REGISTRO DE 12"X24" TAPA METALICA, H=0.80M.

1.00

5.00

0.20

1.00

0.20

1.00

65

4.00

5.00

0.80

1.00

0.80

1.00

66

04.07.04.03 DADO DE CONCRETO FC=175 KG/CM2


04.07.05 IMPREVISTOS

2.00

10.00

0.20

1.00

0.20

1.00

67

04.07.05.01 ROT. TUB. CONEX. A/P. PVC-SAP 1/2"-3/4", EN EXCAVACION DE ZANJA P/RED DE DESAGUE
5 CONEXIONES DOMICILIARIAS DE DESAGUE

9.00

20.00

0.45

1.00

0.45

1.00

68

108.00

50.00

2.16

1.00

2.16

1.00

74

05.02.01 EXCAVACION DE ZANJA MANUAL TN 0.70X1.50M


05.02.02 EXCAVACION DE ZANJA MANUAL TN 0.70X1.75M

24.00

6.00

4.00

2.00

2.00

1.00

75

84.00

5.00

16.80

4.00

4.20

4.00

76

05.02.03 REFINE Y NIVELACION DE ZANJA A=0.70 TN


05.02.04 CAMA DE APOYO COMPACTADO CON MATERIAL SELECTO A=0.70 T.N

108.00

40.00

2.70

1.00

2.70

3.00

77

108.00

40.00

2.70

1.00

2.70

3.00

78

05.02.05 RELLENO COMP. C/ VIBR. TIPO SALTARIN 0.70"1.50"


05.02.06 RELLENO COMP. C/ VIBR. TIPO SALTARIN 0.70 X 1.75

24.00

25.00

0.96

1.00

0.96

1.00

81

84.00

20.00

4.20

2.00

2.10

2.00

82

05.02.07 PROTECCION DE TUBERIA TN C/MAT. PRESTAMO A=0.70, H=0.20m


05.02.08 CONEXION DOMICILIARIA - RED DSG. DIRECTO A RED L=6.00 m

108.00

20.00

5.40

2.00

2.70

3.00

83

18.00

5.00

3.60

1.00

3.60

4.00

80

05.02.09 ELIMINACION DE MATERIAL EXCEDENTE


5.03 IMPREVISTOS

m3

15.12

15.00

1.01

1.00

1.01

1.00

84

05.03.01 ROT. TUB. CONEX. A/P. PVC-SAP 1/2"-3/4", EN EXCAVACION DE ZANJA.


6 SEALIZACION

4.25

5.00

0.85

1.00

0.85

1.00

79

6.01 SEALIZACION ,DESVIO DE TRANSITO Y PROTECCION DE OBRA


6.02 TRANQUERAS DE MADERA 1.20X1.10 m PARA DESVIO TRANSITO VEHICULAR

4.00

5.00

0.80

1.00

0.80

1.00

1'

2.00

1.00

2.00

1.00

2.00

2.00

2'

6.03 CONO FIBRA DE VIDRIO FOSFORESCENTE PARA DESVIO DE TRANSITO (PROV. DURANTE LA OBRA)
6.04 CINTA PLASTICA P/SEAL DE PELIGRO LIMITE DE OBRA INC/POSTES

8.00

10.00

0.80

1.00

0.80

1.00

3'

200.00

100.00

2.00

1.00

2.00

2.00

4'

6.05 PUENTE DE MADERA PARA PASE PEATONAL S/ZANJA (PROV. DURANTE LA OBRA)
6.06 SERVICIOS HIGIENICOS PROVISIONALES PARA OBRA

4.00

1.00

4.00

1.00

4.00

4.00

1.00

0.50

2.00

1.00

2.00

2.00

6'

glb
km

1.00
0.20

1.00
0.10

1.00
2.00

1.00
1.00

1.00
2.00

1.00
2.00

84'
85'

04.07.03 TUBERIAS
04.07.03.01 SUM/INST. TUBERIA PVC-UF D=160mm S-25

5.01 TRABAJOS PRELIMINARES


05.01.01 TRAZO, NIVELES Y REPLANTEO EN CONEXIONES DOMICILIARIAS
5.02 MOVIMIENTO DE TIERRAS

7 CAPACITACION Y MITIGACION AMBIENTAL


7.01 CAPACITACION TECNICA
7.02 RIEGO DE ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION (Polvo)

5'

Mes 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Mes 2
20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60