COST ESTIMATING
I NTRODUCTI ON LEARN
Presented by
Nunung Haryanto
Bandung, Maret 2005 Bandung, Maret 2005
DEFINISI ESTIMASI
PERHITUNGAN PERKIRAAN BIAYA
YANG DAPAT DIPERTANGGUNG
J AWABKAN AKURASINYA.
Bandung, Maret 2005 Bandung, Maret 2005
PERBEDAAN COST ESTIMASI
DENGAN APRAISAL
COST ESTIMATING : PERKIRAAN BIAYA
UNTUK SEBUAH AKTIFITAS YANG BELUM
DIKERJ AKAN
APPRAISAL : PENILAIAN BARANG DAN J ASA
YANG SUDAH ADA.
Bandung, Maret 2005 Bandung, Maret 2005
TUJUAN COST ESTIMATING
MEMPERKIRAKAN BIAYA YANG
DIGUNAKAN UNTUK
MENYELENGGARAKAN SEBUAH
KEGIATAN SEHINGGA DAPAT
DITENTUKAN ANGGARAN YANG
DIPERLUKAN
Bandung, Maret 2005 Bandung, Maret 2005
PARAMETER COST ESTIMATING
ENGINEERING DOCUMENT
MTO
ARRANGEMENT DRAWING
PLANT LAYOUT
SOIL INVESTIGATION
DLL
WBS
J ADUAL KEGIATAN
LOKASI KEGIATAN
DAFTAR HARGA SUPPLIER
Bandung, Maret 2005 Bandung, Maret 2005
COST ESTIMASTING EPC PROJECT
ENGINEERING
WBS
DURATION
EXISTING FEED ENGINEERING
PROCUREMENT
WBS
MTO
SPECIFICATION
LOCATION
FINANCE SHCEME
CONSTRUCTION & COMMISSIONING
WBS
PEP
Bandung, Maret 2005 Bandung, Maret 2005
ENGINEERING COST ESTIMATING - 1
PROCESS
PROCESS FLOW DIAGRAM AND MATERIAL&ENERGY BALANCE
PIPING AND INSTRUMENTATION DIAGRAM
PLOT PLANT
PROCESS DATA SHEET
MANUAL
PROCEDURE
OTHER
CIVIL
GENERAL DOCUMENT
SPECIFICATION
STANDARD DRAWING
DETAIL DRAWING
CALCULATION SHEET
BILL OF QUANTITY
REQUESITION
Bandung, Maret 2005 Bandung, Maret 2005
ENGINEERING COST ESTIMATING - 2
MECHANICAL
GENERAL ARRANGEMENT
DRAWING FOR LOADING DATA
STANDARD DRAWING
DETAIL DRAWING
PIPING
PLOT PLANT
DRAWING AREA INDEX
ISOMETRIC DRAWING
STRESS & FLEXIBILITY ANALYSIS
TEST BLOCK DIAGRAM
SPECIFICATION
STANDARD & PROCEDURE
REQUISITION
Bandung, Maret 2005 Bandung, Maret 2005
ENGINEERING COST ESTIMATING - 3
ELECTRICAL
ONE LINE DIAGRAM
ELECTRICAL SYSTEM DATA AND ANALYSIS
DATA SHEET
STANDARD DRAWING
MOTOR LIST
GENERAL SPECIFICATION
CONSTRUCTION SPECIFICATION
REQUISITION
DETAIL ENGINEERING DOC.
INSTRUMENTATION
INSTRUMENT DETAIL DESIGN DRAWING
ANALYTICAL
Bandung, Maret 2005 Bandung, Maret 2005
PROCUREMENT AND CONSTRUCTION
COST ESTIMATING-1
CIVIL WORK
LAND PREPARATION
STRUCTURAL WORK
ARCHITECTURAL
FINISHING WORK
MECHANICAL WORK
HEAVY LIFT EQUIPMENT
ROTATING EQUIPMENT
STATIC EQUIPMENT
MISCELLANEOUS
Bandung, Maret 2005 Bandung, Maret 2005
PROCUREMENT AND CONSTRUCTION
COST ESTIMATING-2
PIPING WORK
LINE PIPE
FITTING AND VALVE
PIPE SUPPORT
INSULATION AND WRAPING
ACCESORIES
ELECTRICAL AND INSTRUMENT WORK
BULK MATERIAL
ELECTRICAL EQP & FIXTURE
INSTRUMENT EQUIPMENT
MISCELLANEOUS
Bandung, Maret 2005 Bandung, Maret 2005
TERIMA KASIH