WW ALL S 04 007

Rev 0 Jan 2010



PETRONAS CARIGALI SDN BHD














PETRONAS CARIGALI
VESSEL CREW SCREENING
GUIDELINE
PETRONAS CARIGALI
FUEL BUNKERING
PETRONAS CARIGALI SDN BHD
GUIDELINE
Fuel Bunkering Guideline WW ALL S 04 007
Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD Preliminary
Page i


PETRONAS CARIGALI FUEL BUNKERING GUIDELINE

Main Contents




Foreword
Distribution List
Amendment Summary
Preface
Abbreviation and Acronyms
Referenced Documents

Section 1 Scope and Objective
Section 2 Roles and Responsibilities
Section 3 Bunkering Process
Section 4 HSE Requirement






Appendices Appendix 1 Glossary
Appendix 2 Bunker Preloading Plan
Appendix 3 Safety Checklist Bunker
Appendix 4 Letter / Note of protest (LOP)
Appendix 5 Resource Person
Fuel Bunkering Guideline WW ALL S 04 007
Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD Preliminary
Page iii

DISTRIBUTION LIST


Copy No. Title Location
01 MD/CEO MD KL
02 CBD MD KL
03 SCM MD KL
04 SP MD KL
05 TMU MD KL
06 HSE MD KL
07 HSE/1 MD KL
08 HSE/2 MD KL
09 HSE/3 MD KL
10 HSE/4 MD KL
11 XD XD KL
12 XSE SD KL
13 DD DD KL
14 DSE DD KL
15 PD PMO
16 PSE PMO
17 SD SBO
18 SSE SBO
19 BD SKO
20 BSE SKO
21 VSE PC(V)SB, Vietnam
22 PO HSE PC(O)Ltd, Pakistan
23 TO HSE PC(O)SB, Turkmenistan
24 MO HSE PC(O)SB, Myanmar
25 INO HSE PC(O)Ltd, Indonesia
26 UO HSE PC(O)SB, Uzbekistan




Fuel Bunkering Guideline WW ALL S 04 007
Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD Preliminary
Page vi

Abbreviations and & Acronyms

AB Able Seaman
AHT Anchor Handling Tug
COQ Certificate Of Quality
CSR Company Site Representative
ERP Emergency Response Plan
FSV Field Support Vessel
GRT Gross Registered Tonnage
IMO International Maritime Organisation
IOPP International Oil Pollution Prevention
ISM International Safety Management
LSA Life Saving Appliance
LOP Letter of Protest
Master UL Master Unlimited Voyages
MGO Marine Gas Oil
MOB Man Overboard Board
MOPO Matrix of Permitted Operation
OIM Offshore Installation Manager
OSV Offshore Support Vessel
POB Personnel on Board
PPE Personnel Protective Equipment
ROB Remaining on Board
SMS Safety Management System
SOLAS International Convention for the Safety of Life Sea
STCW International Convention on Standards of Training, Certification and Watch
Keeping for Seafarers
VHF Very High Frequency
WKOUL Watch keeping Officer Unlimited






Fuel Bunkering Guideline WW ALL S 04 007
Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD Preliminary
Page vii

Referenced Documents

Doc. No. Title
PTS 60.0110 Logistic

MY ALL S 05 003 Charterer Instruction to Master of Marine Vessel MARCH 08

MARPOL International Convention for the Prevention of Pollution from
Ships, 1973, as modified by the Protocol of 1978 relating thereto


TP 7920E Standards Respecting Standby Vessel Transport Canada
Marine Safety

AMSA Australian Offshore Support Vessel Code of Safe Working
Practice

Washington State Procedures for Safe Bunkering
http://www.ecy.wa.gov/programs/spills/prevention/Bunkering (cited
2/04/2009)





Fuel Bunkering Guideline WW ALL S 04 007
Scope and Objective Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 1
Page 1

Section 1
SCOPE AND OBJECTIVE
Contents
Paragraph Page
1 SCOPE. 2
2 OBJECTIVE 2


















Fuel Bunkering Guideline WW ALL S 04 007
Scope and Objective Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 1
Page 2

1. SCOPE

This guideline describes the normal operation for bunkering of
Marine Gas Oil (MGO) / Diesel Oil from supply base to vessel,
vessel to vessel, vessel to / from Offshore Installation including
drilling rig and barge.

It covers the activities performed by PETRONAS Carigali and or
its agent personnel and vessels personnel from requisition of
bunker to confirmation of receipt of the bunker.

2. OBJECTIVE

This guideline is to provide a proper procedure for the safe and
efficient bunkering of Marine Gas Oil (MGO) or Diesel Oil at all
locations.



Fuel Bunkering Guideline WW ALL S 04 007
Roles and Responsibility Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 2
Page 1

Section 2
ROLES AND RESPONSIBILITY
Contents
Paragraph Page
1 ROLES AND RESPONSIBILITY. 2
1.1 Base Superintendent 2

1.2 Offshore Installation Manager (OIM) / CSR / Drilling Supervisor.. 2

1.3 Marine Field Operator / PETRONAS Carigali Representative...................... 2

1.4 Bunker Supplier.. 3

1.5 Vessel Master ..... 3

Fuel Bunkering Guideline WW ALL S 04 007
Roles and Responsibility Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 2
Page 2

1. ROLES AND RESPONSIBILITY
The following details the Roles and Responsibilities of the
principal personnel associated with fuel bunkering.

1.1 Base Superintendent
The person in charge or his / her designate shall:

Coordinate the execution of bunkering activities as per this
guideline among marine personnel, vessel crew and bunker
supplier.

Ensure bunker delivery receipt is issued to the vessels Master
or Chief Engineer upon completion of bunkering operation and
record keeping.

1.2 Offshore Installation Manager (OIM) / Company Site Representative (CSR) / Drilling
Supervisor
The person in charge or his / her designate shall:

Coordinate the execution of bunkering activities among
installation personnel and vessel crew.

Issue or confirm receipt of bunkers loaded / supplied to / from
vessels upon completion of bunkering operation.

Issue note or letter of protest (LOP- Appendix 4) to vessel in the
event of quantity discrepancy.

1.3 Marine Field Operator / PETRONAS Carigali Representative.
Stand-by at Jetty during the bunker loading operation.

Liaise with supplier via agreed channel of radio trunking or radio
VHF.

Ensure pre-transfer tool box meeting take place onboard the
vessel before bunkering operation begin.

Completion and signed off bunkering pre-loading plan (Appendix
2) and safety checklist (Appendix 3).

To witness task of independent surveyor if any.




Fuel Bunkering Guideline WW ALL S 04 007
Roles and Responsibility Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 2
Page 3

1.4 Bunker Supplier
Establish proper and effective communication for the bunkering
operation.

Operate loading pump for starting and stopping bunker
operation and to agree on emergency shutdown execution.

It is recommended that the Certificate of Quality (COQ) is
provided by the supplier prior bunkering operation.

It is recommended that supplier to provide a surveyor to
witnesses the shore tanks gauging prior bunkering.

1.5 Vessel Master
Report daily Remaining on Board (ROB) of MGO to Base
Superintendent, Platform Superintendent or contract holder and
request for bunker in advance (24 hours) if required.

Ensure pre-transfer tool box meeting take place onboard before
bunkering operation begin.

Ensure pre-loading plan completed and posted near point of
transfer.

Ensure safety checklist is to be completed and complied before
bunkering operation begins.

Ensure sufficient and trained personnel involved in the
operation.

Monitor throughout the operation for any abnormality in ensuring
smooth bunkering operation.

Calculate the quantity supplied and sign the bunker delivery
receipt upon completion of bunkering.

Issue note or letter of protest (LOP - Appendix 4) to supplier in
the event of quantity discrepancy.

In all cases each Master remains responsible for the safety of
his own ship, its crew and cargo, and shall not permit such
safety to be prejudiced by the action of others.


Fuel Bunkering Guideline WW ALL S 04 007
Bunkering Process Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 3
Page 1
Section 3
BUNKERING PROCESS
Contents
Paragraph Page
1 ADMINISTRATIVE.. 2
2 BUNKERING PROCESS. 5

3 COMMUNICATION AND REPORTING.. 9

4 DOCUMENTATION 11

Figure

3.1 Sample of Bunker Requisition (Supply Base). 3

3.2 Sample of Bunker Request Form (Supply Base / Offshore)...... 4

3.3 Sample of R.O.B Reporting. 10

3.4 Sample of Bunker Delivery Receipt (Supply Base)12

3.5 Sample of Bunker Delivery Receipt (Supply Base / Offshore).13

3.6 Sample of Bunker Delivery Receipt (Offshore)14













Fuel Bunkering Guideline WW ALL S 04 007
Bunkering Process Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 3
Page 2
1. ADMINISTRATIVE

1.1 Requisition for bunker

Requisition for bunker has to be made to logistic department via
agreed communication means.

Logistic Department will send a bunker requisition to the
Supplier by fax or Email or using appropriate document.

Request by vessel or installation shall be made at least 24 hrs if
required prior to the supply. However, base superintendent has
the right to set the actual supply date subject to the situation and
with respect to the bunker remaining onboard.


Fuel Bunkering Guideline WW ALL S 04 007
Bunkering Process Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 3
Page 3



Figure 3.1 Sample of Bunker Requisition (Supply Base)
Fuel Bunkering Guideline WW ALL S 04 007
Bunkering Process Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 3
Page 4



Figure 3.2 Sample of Bunker Request Form (Supply Base / Offshore)











Fuel Bunkering Guideline WW ALL S 04 007
Bunkering Process Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 3
Page 5
1.2 Hoses
The hoses used for bunker transfer should be specially
designed, constructed, certified for handling petroleum products
and be of strength and size suitable for actual operation.

The hoses should be of adequate length to allow movement of
vessel and jetty / installation due to swell.

Hose end coupling to be properly marked to avoid mixed up with
other hoses.

Vessel to provide 2 lengths x 60 ft x 3 size reinforced rubber
hoses complete with camlock couplings. Various sizes of
reducers; 2 to 3 and 3 to 4 are required. It must be fitted
with self-sealing and quick shut off valve mechanism at the end
of the hose to prevent spillage. A highly visible colour floatation
collar shall be fitted along the hose section.

1.3 Operation Readiness
The vessel securely moors at the jetty / installation and
permission is given to conduct the operation.

Proper requisition for bunkering is submitted and in order.

Receiving tanks to be identified prior loading and gauging to be
conducted as per item 2.1.

Independent surveyor is recommended to conduct tank gauging
witnessed by PETRONAS Carigali representative (for vessel at
supply base, ship to ship and ship to platform).

Tool box / tool box meeting, bunkering plan (Appendix 2) and
checklist (Appendix 3) are completed.


2. BUNKERING PROCESS

2.1 Tank Gauging and Sampling
Prior bunkering, Master to ensure the tank is acceptable and
ready to receive bunker. The tank shall be free of water and
contamination.

The vessel shall be provided with water and gasoline finding
paste to aid the accuracy of sounding.


Fuel Bunkering Guideline WW ALL S 04 007
Bunkering Process Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 3
Page 6
Tank gauging for all nominated and non-nominated tanks shall
take place prior commencement and completion of each
bunkering operation.

Tank gauging and sampling are recommended to be conducted
by independent surveyor and shall be witnessed by PETRONAS
Carigali representative.

If there is substantial amount of water or contamination found in
the tank, then it has to be reported to supply base immediately.
The bunkering shall not commence and water and contaminants
shall be drained / removed on instruction / confirmation of Base
Superintendent until found satisfactory.

Whilst calculating the Remaining On Board (ROB), the vessel
shall apply trim correction and interpolate to ascertain actual
quantity. In the event of the trim and list correction tables are not
tabulated for the maximum values, the Master shall ensure that
the vessel is even keel and upright or within the tabulated
correction limit prior gauging process.

All ROB shall be declared prior each operation.

Vessels that are used for supply of MGO that do not have
segregation between delivery tank and engine room tank, are
not encouraged to be used for this purpose.

In event of rolling and pitching, due diligence shall be exercised
in determining the quantity on board.

Sampling of MGO / diesel oil should be done on
commencement, during and upon completion of bunkering
process.

2.2 Delivering and Receiving Of Bunker (All Locations)
Pre-Loading Plan

Prior bunkering, the Pre-Loading Plan (Appendix 2) must
be completed by the Person in Charge and posted near
the point of transfer.

Pre-Transfer Tool Box Meeting

The Pre-Transfer Tool box meeting must take place
onboard, in person, between the Person in Charge, before
bunkering operation begins and must cover the following:


Fuel Bunkering Guideline WW ALL S 04 007
Bunkering Process Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 3
Page 7

A review of each item on the Bunker Safety Checklist
(Appendix 3) and flow metre calibration records.

A discussion on the initial flow rate and maximum
allowable flow rate, emergency shutdown procedures
and topping off.

Communication procedures between shore and vessel
involved.

Startup and Shutdown Criteria

Bunkering shall not commence unless the following criteria
are met:

All the conditions of the Pre-Transfer Tool box
meeting are met.

All the conditions of the Bunker Checklist are met.

Either visual, voice or radio contact must be
maintained by both parties.

Topping off is discussed.

The bunkering activities shall be suspended if there is
substantial amount of water or contamination found in
tank. It needs to be reported to supply base immediately.

Duties of personnel during bunker

Personnel to be involved in the bunkering operation must
have no other tasks, and must remain at their work stations
during bunkering and be able to observe the hose and
connection for any leaks.

Regular sounding shall be conducted during bunkering.

The master shall take necessary measures to avoid
overflow of fuel during simultaneous operation.

If the weather or sea conditions deteriorate to such an
extent that there is any doubt regarding the safe operation,
it should be terminated.

If any oil spills or other incidental pollution occur, the
contingency plan should be brought into operation which
Fuel Bunkering Guideline WW ALL S 04 007
Bunkering Process Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 3
Page 8
includes immediate reporting to Supply Base on agreed
communication system

The hose should be drained and blinded before being
brought back to the jetty.

2.3 Delivering and Receiving Of Bunker (Offshore)
In addition to items specified in 2.2 the following shall be
observed:

The amount to be transferred shall be determined by Base
Superintendent / OIM on schedule basis.

Any variance of bunker received and supply shall be recorded
and letter of protest (LOP) is to be issued.

The bunkering activity shall be witnessed by PETRONAS
Carigali representative or its appointed independent surveyor.

Upon completion of each bunkering operation, authorised
representative of PETRONAS Carigali should acknowledge
receipt for the quantity delivered and agreed by vessel Master /
Chief Engineer.

No bunker delivery receipt shall be signed before the completion
of the fuel transfer.

Night bunkering activities at offshore installation shall not be
permitted. However due to prevailing circumstances such
requirement cannot be avoided. If it is required, prior to
performing night bunkering activities, joint risk assessment shall
be conducted by OIM and Master of the vessel. Additional
lighting shall be provided and only single operation is to be
permitted.

Vessel to vessel transfer / bunkering activity during the period of
darkness (sunset to sunrise) shall not take place unless
required or during emergency, in such case the vessels Master
shall request the same through Base Superintendent and risk
assessment is to be conducted.


Fuel Bunkering Guideline WW ALL S 04 007
Bunkering Process Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 3
Page 9
3. COMMUNICATION AND REPORTING
Master of the vessel shall report ROB on daily basis to Base
Superintendent / Logistic Controller at 2400 hrs in the format
provided (Figure 3.3).

The report should be available to Base Superintendent / Logistic
Controller by 1400 hrs every day.

The vessel owner shall ensure these reports are sent to
respective base on daily basis.

In addition, the following report should be sent to Base
Superintendent / Logistic Controller:

any interruption or incident during bunker transfer
operation e.g. bunker transfer is abandoned due to bad
weather or for any reason whatsoever; oil spill, flow metre
malfunction, etc.

Fuel Bunkering Guideline WW ALL S 04 007
Bunkering Process Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 3
Page 10


Figure 3.3 Sample of R.O.B reporting
Fuel Bunkering Guideline WW ALL S 04 007
Bunkering Process Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 3
Page 11
4. DOCUMENTATION AND RECORD KEEPING

Pre-loading plan (Appendix 2) must be retained onboard with
bunker safety checklist (Appendix 3) and letter of protest
(Appendix 4) if any for the duration of contract.

The vessel Master or deck officer in charge must make an
entry in the vessel deck log book stating that the Pre-Transfer
Tool box meeting was conducted by the Person in Charge of
bunkering.

Upon completion of bunkering, vessel Master or his/her
designee to sign Bunker Delivery Receipt issued by supplier
and retains one copy onboard.

All fuel transfer carried out is to be entered into sounding book,
Oil Record Book Part 1 - Machinery Space Operations (All
Ships of 400 grt and above) and engine room as well as deck
log book.






























Fuel Bunkering Guideline WW ALL S 04 007
Bunkering Process Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 3
Page 12



Figure 3.4 Sample of Bunker Delivery Receipt (Supply Base)


Fuel Bunkering Guideline WW ALL S 04 007
Bunkering Process Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 3
Page 13


Figure 3.5 Sample of Bunker Delivery Receipt (Supply Base / Offshore)


Fuel Bunkering Guideline WW ALL S 04 007
Bunkering Process Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 3
Page 14


Figure 3.6 Sample of Bunker Delivery Receipt (Offshore)
Fuel Bunkering Guideline WW ALL S 04 007
HSE Requirements Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 4
Page 1

Section 4
HSE REQUIREMENTS
Contents
Paragraph Page
1 HSE REQUIREMENTS.. 2
1.1 Precautions During Bunkering. 2

1.2 Emergency Stop. 3

1.3 Training. 3


Fuel Bunkering Guideline WW ALL S 04 007
HSE Requirements Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 4
Page 2

1. HSE REQUIREMENT

1.1 Precautions during Bunkering
a) Vessel shall be securely moored alongside jetty / vessel /
facilities.

b) The vessels crew shall be responsible to ensure hoses
connection / disconnection is properly executed and
cleaned up of any spill.

c) Any spill overboard shall be reported immediately to the
Marine Base duty personnel / OIM.

d) The sequence of tanks to be bunkered must be agreed
upon by the responsible vessel officer and Marine Base /
platform personnel.

e) Before commencing fuel transfer, at least two (2)
appropriate portable fire extinguishers are to be available
near the fuel transfer manifolds.

f) Flag BRAVO shall be hoisted to indicate that fuel transfer
is in progress.

g) At night, a single all round red light, is to be displayed.

h) The duty officer onboard vessel, platform and / or in charge
personnel at supply base must be in attendance at all
times during the fuel transfer. A regular sounding of each
tank is to be carried out to ensure no overflowing.

i) Fuel transfer must be suspended in the event of thunder
and lightning within the vicinity.

j) Hot work is not permitted onboard vessel during fuel
transfer activities.

k) Vessels shall have oil spill kit onboard.

l) Bunkering activities shall not be carried out in adverse
weather or sea condition or if the master feels it is unsafe
to do so. (Refer to CIMMV Marine MOPO).






Fuel Bunkering Guideline WW ALL S 04 007
HSE Requirements Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD SECTION 4
Page 3

1.2 Emergency Stop
It shall be possible to stop bunkering supply immediately upon
request. Delivering station emergency shutdown point is to be
manned at all time.

1.3 Training
The person in charge on the delivering of bunker to the vessel at
jetty, base or platforms shall be trained to follow this guideline
with an emphasis on the Pre-transfer Tool box meeting and
items for which the personnel is responsible.

This training session must include all crew members who are
likely to assist in the bunkering operation.

The following must be included in the training:

Bunker Pre-Loading Plan (as per Appendix 2)
Bunker Safety Checklist (as per Appendix 3)
Tank gauging / sampling
Deck watch requirement to monitor for oil spills.
Shutdown procedures which allow personnel to
immediately shutdown the bunkering operation.
Action in case of spillage.
Communication procedures.

The vessel Master or the Masters designee, must attend an
entry in training log book noting that training was conducted by
the Person in charge and recording the names of crew of those
who attended.
Fuel Bunkering Guideline WW ALL S 04 007
Glossary Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD APPENDIX 1
Page 1

Appendix 1
GLOSSARY

Master Vessel Captain. The person who is in charge on the vessel
solely responsible for the safety of the crew and the vessel at all
times. While onboard, he / she is the ship-owner representative
and accountable for safe manoeuvering of the vessel.

Chief Engineer Responsible for the well being of the operation of vessel
machinery and he / she is the most senior personnel in the
engine department on the vessel.

Oil Record Book This record is a valuable means of providing proof that the ship
has complied with the anti pollution regulations. It applies to all
OSV of 400 GRT and above.

GRT Gross Registered Tonnage represents the total internal volume
of a vessel, with some exemptions for non-productive spaces
such as crew quarters.






Fuel Bunkering Guideline WW ALL S 04 007
Bunker preloading plan Rev 0 Jan 2010
_____________________________________________________________________________________________________

PETRONAS CARIGALI SDN BHD APPENDIX 2
Page 1
Appendix 2 - Bunker Preloading Plan
BUNKER PRE-LOADING PLAN

VESSEL / FACILITIES NAME :____________________ Date:________________
Person-In-Charge:__________________________

Fuel Delivery Rate: By gr avit y / pump Product Name:_____________________
Total Bunkers to be taken:___________________litres

Fill
Sequence
TANK INNAGE /ULLAGE
(In metres & tenth)
METER READING
Number /
Name
Total Capacity
Units in Liters
@ ____% full

Starting Planned
Final
Percent Full
at Planned
Final
Starting Final Quantity







Notes and Special Instructions (crew assignments, monitoring procedures, valve alignment, etc.)

1) Collect sample (0.5 litres) for retention (3 months)
______________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________
Fuel Bunkering Guideline WW ALL S 04 007
Safety Checklist Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD APPENDIX 3
Page 1

Appendix 3 - SAFETY CHECKLIST - BUNKERING

This safety check list is to be completed before the commencement of any bunkering operations. One
copy is to be retained onboard the vessel.

The checklist is to be completed and signed by both party i.e. the supplying and the receiver.
Please note: the declaration at the end of the checklist needs to be signed. Adequate supervision of the
bunkering operation is to be maintained at all times by both parties. On completion of bunkering
operations, hose is to be drained and blanks/cover fitted before transfer to the jetty/ facilities. No fuel
tanks are to be filled above 98% capacity. In the event of any following answer is NO, do not proceed with
bunkering activities.

No Description Supplying
(Y/N)
Receiving
(Y/N)
1 Are weather conditions suitable for bunkering operation?
2 The vessel securely moored?
3 Pre-planned toolbox meeting conducted?
4 Is there an agreed communication system?
5 Are there adequate NO SMOKING signs positioned and being
observed?

6 No Hot work carry out onboard vessel.
7 Are there adequate fire fighting (extinguisher) appliances
available?

8 Are drip trays in position?
9 Are scuppers / drains effectively plugged?
10 Have emergency shutdown procedures been agreed?
11 Is there a supply of counter oil pollution equipment nearby?
12 Are proper gaskets / o rings employed?
13 Is bunker hoses safely secured at the connections?
14 Are all bunker hoses properly rigged and free from twist?
15 Have all unused valves in the bunker system been checked closed
and lashed.

16 Are tanks high level alarms (if fitted) in good working condition?

Type of bunkers delivered ________________ Quantity of bunkers delivered _________

Declaration
We have checked the items on the checklist and are satisfied that the answers given are correct to
the best of our knowledge.

For Bunker Supplier For Bunker Receiver

Name: _______________________ Name: ______________________

Signature: ____________________ Signature: ___________________

Time and Date: ________________ Time and Date: _______________

Fuel Bunkering Guideline WW ALL S 04 007
Letter / Note of Protest Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD APPENDIX 4
Page 1

Appendix 4 - Letter / Note Of Protest



BUNKER NOTE OF PROTEST

Form No. : __________________________ Date : ______________

To : ____________________________
____________________________
____________________________

Ref No. : ___________________________

Dear Sir,

NOTE OF PROTEST FOR BUNKERING ON THE ____________________________________

I, the Operation Supervisor of the __________________________, short received _________
liters of MDO / MGO out of the _______________ liters requested on the
____________________________The bunkers were supplied by the
________________________________________________on the ____ / ____ / _______ at
______________________________________________________.


Yours faithfully, Acknowledged by,

_____________________ _____________________
(Signature) (Signature)

_____________________ _____________________
(Designation) (Designation)

c.c.
Supply Boat / Bunker Barge / Bunker Supplier
Operation Department
Charterer Management Office

ACKNOWLEDGED RECEIPT

___________________________________________________________
(Signature of Master/Cargo Officer of Supply Boat/Bunker Barge/Supplier)

____________________________________________________________________________
(Name of Master/Cargo Officer of Supply Boat/Bunker Barge/Supplier) (Date)
*** In Block Letters
Fuel Bunkering Guideline WW ALL S 04 007
Resource Person Rev 0 Jan 2010
____________________________________________________________________________________

PETRONAS CARIGALI SDN BHD APPENDIX 5
Page 1

Appendix 5 - Resource Person

1. Capt M Halim A Rais. Manager Marine Safety, CHSE (Team Leader)
2. Capt Hanafi M Ali Marine Coordinator, CHO
3. Capt Paul Aeria Marine Coordinator, dfin
4. Capt Manoj Menon Marine Executive, BPD-L
5. Syed Mohd Nasir Head Safety, PMO
6. Hj Idris M Yusof Manager, PPL-PMO
7. Tay Hock Beng OIM, BUK-PMO
8. Mohd Nazli Hashim Senior Executive, PPL-PMO
9. Md Mazlan Tamyis OIM, Angsi-PMO
10. Capt A Nasir Ramli Marine Superintendent, KSB-PMO
11. George Lam Senior Executive, PPL-SBO