Professional Documents
Culture Documents
DRILLING DIVISION
JOB EVALUATION / PERFORMANCE TRACKER
Job Type: Service Provider :
Rig Name: Well No:
Job
Duration:
Period
from/to(Date):
ADMA Rep: Contractor Rep:
6. 5. 4. 3. 2. 1.
Excellent V. Good Good Satisfactory Fair Poor
A Equipment
1 Equipment Condition
2 Equipment Operational Condition
3 Down Time / NPT
B Crew Personnel Performance
1 Personal Performance
2 Communication Skills
3 Adherence to Safety
4 Attitude
C Data Collection
1 Job objectives were achieved
2 Date report on Time
3 Clarity of data collected
D HSE
1 Housekeeping during the job
2 Housekeeping after the job
3 Valuable near miss reporting
4 Personnel awareness of safety
aspects
5 Overall compliance with HSE aspects
E Comments
ADMA Rep Signature: Date: .
Contractors Rep Signature: Date: .
This form should be submitted with job invoice.