24 th of April Completed brief and negotiated brief
28 th of April Written down different ideas for advert and chose what one to concentrate on, made a mood board
29 th of April Mock up Advert, Contingency plan, created rough storyboard, constraints, costs, target audience, resources, research into market, research into competition. 30 th of April Done a production Schedule indicating the times, who is going to be there and where we are needed to be. 01/5/14 I have research BMW health and safety, brochure articles, I have also written a confirmation email. I have also done the crew members and their roles and responsibilities.
02/5/14 We had started to do our proposal; we had looked at our target audience, our resources, market competitors, our budget, cast and crew, content outline, personal requirements.
05/5/14 Finished off proposal we made it look more professional and had added about cast and crew, content outline, personal requirements. We also made a contents page and had written about our initial ideas.
06/5/14 We started off our pitch, looking at making it creative and what we could do to make it interactive. Started making a title page and a contents page, before adding about our target audience, content audience, why my idea is better than my market competitors, filled in our mood board, budget and cast and crew, storyboard, mock up, production schedule, music and initial ideas.
11/5/14 Today I started to film, in the day time I did shots of the car in action, I did various short footage but I did different angles to make sure I had a variety for my advert. I had also done a few close up shots of the miles per hour, the wheel and the gear stick and the different modes. In the night for the second half of the shoot, I had filmed the headlights going on and off using different close up angles. 15/5/14 I started to edit my actual advert, I first put the music together, cutting down a three minute clip to thirty seconds making sure that it flowed together nicely; I then started to mark where I wanted it to cut to the beat before putting the actual chosen footage into the timeline/track. I filmed it all with Steve OConnor, I had problems filming on the roads due to making sure that I do not get run over both ways of traffic, since on some shots I was filming in the middle of the road, and other problems I had faced, were that other cars sometimes interfered with the footage, and so when I was filming, I had to do close ups to ensure that it was the right BMW I was filming. 16/5/14 I started to edit and fit my footage together in the slow part of the music; I had changed the contrast settings, and made a border around the footage to make it look more professional. With the leopard footage, because I could not find any snow leopard footage like I had originally planned, I had to change the settings and make some of it black and white with a hint of colour using the setting leave colour in the effect controls panel. 19/5/14 I started to complete my first draft of my advert, making sure everything fit nicely next to one another and that each of the shots were changing on the right beat. I had also started to finish off my production booklet, doing a dual log script and a final storyboard. I had also added the logo and slogan in, with some other words to bring more impact into the advert 20/5/14 Today I finished off my final version of the advert, I had done four versions over all, tweaking a few things like the saturation and contrast and changing the fonts at the end.