You are on page 1of 3

STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

NTPC REF NO: SIM/1/TS/ /


SHEET 1 OF 3
PLANT AREA : ELECTRICAL SYSTEM
TESTING SCHEDULE : LT SWITCHGEAR
1. PLANT DETAILS
THIS SYSTEM CONSISTS OF 1 POWER CONTROL
CENTRE,NUMBER OF MOTOR CONTROL CENTRES AND AUX.
CONTROL PANELS (TYPICAL EXCEPT CURRENT RATING &
PROTECTION ENVISAGED)
NAME PLATE DETAILS
MAKE:CONTROL & SWITCHGEARS LTD CB TYPE:ACB
RATINGS VOLTAGE: 1! V "PHASE !# H$ AC
CURRENT:1## A,%!# A,## A,&"# A,1###
A,1&## A,%### A,%!## A,"###
A(VARIES FROM PANEL TO PANEL)
%. TESTING OB'ECTIVE
TO TEST THE FITNESS OF LT SWITCHGEAR PANEL FOR
CHARGING AND THE WITHSTANDING CAPACITY FOR FULL LOAD
".PROPOSAL
THE FOLLOWING TESTS MUST BE CARRIED OUT IN THE PANEL
I) INSULATION RESISTANCE MEASUREMENT OF BUS
BAR(POWER,CONTROL),ACB
II) BUSBAR,CONTACT RESISTANCE MEASUREMENT
I) HIGH VOLTAGE TEST
III) PRIMARY IN'ECTION TEST
IV PROTECTION! INTERLOC"S AND METERING CIRCUITS
.SERVICES RE(UIRED
!##V INSULATION TESTER, " PHASE 1! AC !O H)
SYSTEM, DC CONTROL SUPPLY, HI POT AC*DC
SOURCE,MEASUREMENT KIT, CURRENT IN'ECTION KIT,MICRO OHM
METER
!.# SAFETY PRECAUTIONS
I) FIRE EXTINGUISHER SYSTEM+S READINESS
II) OVERLOAD TRIP LEVER IS PROVIDED
III) 1! V AC PANEL CHARGED*CAUTION BOARD TO BE FIT
IV) MEN & MATERIALS TO BE KEPT AWAY FROM LT PCC,MCC*ACP
&. EMERGENCY PROCEDURE
,) TRANSFORMER & CONTROL POWER SUPPLY SHOULD BE
ISOLATED
,,) EMERGENCY TRIP COMMAND MAY BE GIVEN
-. STATE OF THE PLANT
ALL THE PANELS ARE ERECTED. TESTING OF PANELS ARE
GOING ON. UNUSED OPEN SPACES IN & AROUND PANELS ARE YET
TO BE COVERED WITH CHECKERED PLATES. REMOTE MONITORING -
CONTROL POINTS ARE TO BE DONE.
/#$%/&&&/$''(/)*+#,%(-*+/./'/()%$.)013/23230588645*)
STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-
NTPC REF NO: SIM/1/TS/ /
SHEET 2 OF 3
PLANT AREA : ELECTRICAL SYSTEM
TESTING SCHEDULE : LT SWITCHGEAR
.. COMMISSIONING PROCEDURE
,) INSPECT ANY PHYSICAL DAMAGE IN THE BUSBAR,
INSULATION, PANEL DOORS, POWER & SLIDING
CONTACTS ETC. AND TO BE RECTIFIED IF FOUND
,,) MAKING THE PANEL INSIDE DUSTFREE & FREE FROM
FOREIGN MATERIALS
,,,) CHECKING THE TIGHTNESS ALIGNMENT & CLEARANCE OF
BUS BARS ,SMOOTHNESS IN RACKING IN & RACKING
OUT OF MODULES,PROPER MAKING OF SLIDING
CONTACTS, TIGHTNESS OF INPUT POWER CABLES AND
MODULE POWER CONTROL O*PS & CONTROL INTERNAL
WIRINGS
,/) INSPECT ALL RELAYS AND MAKE SURE THAT ANY
BLOCKING USED FOR SHIPPING PURPOSE IS REMOVED
AND THE ARMATURE MOVES FREELY.
/) CHECK ALL DOORS FOR PROPER MOUNTING WITH
RESPECT TO THE SWITCH HANDLE.
/,) CHECK DOOR INTERLOCK MECHANISM
/,,) TEST THE PT0,CT0 & RELAYS INVOLVED. KEEP THE
RECOMMENDED SETTINGS FOR THE RELAYS LIKE
OVERCURRENT, UNDERVOLTAGE & OVERLOAD
PROTECTIONS, CALIBRATE THE METERS (AMMETERS,
VOLTMETERS, POWER METERS & ENERGY METERS ETC)
/,,,) TEST THE INSULATION OF BOARDS WITH !## V DC
MEGGER & THE VALUE SHOULD BE AS PER THE RELEVANT
IS SPECIFICATION (MORE THAN ! MEGA OHMS)
,1) CHECK CLOSING & TRIPPING INTERLOCKS,OVERLOAD
RELEASE SETTIONG OF ALL ACB0 IN THE PANEL
1) MEASURE BUSBAR RESISTANCE,ACB0 CONTACT
RESISTANCE (SHOULD BE LESS THAN !# MILLI OHMS),
CLOSING & TRIPPING TIME IF TEST REPORT IS NOT
AVAILABLE AT SITE.
1,) CHECK THE PROTECTION CIRCUIT WIRING CONNECTIONS
BY CONDUCTING PRIMARY IN'ECTION CURRENT
1,,) CARRY OUT HIPOT TEST FOR -!2 OF VOLTAGE
MENTIONED IN THE TEST REPORT AND FIND OUT THE
LEAKAGE CURRENT
1,,,) CHECK THE INPUT POWER CABLE TERMINATIONS
FROM TRANSFORMER SECONDARY
1,/) ENSURE THE PHASE SE(UENCE AND CIRCUIT CLOSING
OF CT0 ARE PROPER BEFORE CHARGING THE PANEL.
1/) CHECK CLOSING & TRIPPING MECHANISM OPERATES
SMOOTHLY BOTH MANUALLY AND ELECTRICALLY
1/,) SPACE HEATERS & THERMOSTAT SHALL BE IN GOOD
CONDITION
/#$%/&&&/$''(/)*+#,%(-*+/./'/()%$.)013/23230588645*)
STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-
NTPC REF NO: SIM/1/TS/ /
SHEET 3 OF 3
PLANT AREA : ELECTRICAL SYSTEM
TESTING SCHEDULE : LT SWITCHGEAR
3. COMPLETION CRETERIA
RESPECTIVE LT POWER TRANSFORMER & 1! V SWITCHGEAR
PANEL ARE CHARGED. VOLTAGE SUPPLY EXTENDED TO ALL
OUTGOING FEEDERS ARE FOUND POSITIVE PHASE SE(UENCE. AND
PANEL IS DELIVERING FULL LOAD WITH NO INTERRUPTION.
1#. APPENDICES
DRAWINGS : SLD OF ELECTRICAL SYSTEM 4AUX POWER
DISTRIBUTION
SCHEMATIC DIAGRAM OF LT SWITCHGEARS
MANUALS : O & M MANUAL FOR LT SWITCHGEAR (PE5OM51.&5
!#&5#"%.)
DATA FOR LT SWITCHGEAR (PE5OM51.&5!#&5
#"%-)
LOG SHEETS : I) IR VALUES,BUS BAR RESISTANCE VALUES
OF LT SWITCHGEAR
II) TEST REPORT OF RELAYS,PT0,CT0
INCLUDED IN THE SYSTEM
III) UNDERVOLTAGE,OVERCURRENT& EARTHFAULT
SETTINGS RECOMMENDED*KEPT
/#$%/&&&/$''(/)*+#,%(-*+/./'/()%$.)013/23230588645*)