This document provides a recapitulation of work volumes and prices for the construction of the central administration building of STAIN Sorong in 2010. It includes six sections of work: concrete work, stone masonry, walls, landfill under the floor, septic tank and absorption field work, and gate construction. The total budget was Rp. 14,675,781,000 with a 5% retention of Rp. 733,789,050 and the amount to be paid was Rp. 13,941,991,950, rounded to Rp. 13,941,000,000.
This document provides a recapitulation of work volumes and prices for the construction of the central administration building of STAIN Sorong in 2010. It includes six sections of work: concrete work, stone masonry, walls, landfill under the floor, septic tank and absorption field work, and gate construction. The total budget was Rp. 14,675,781,000 with a 5% retention of Rp. 733,789,050 and the amount to be paid was Rp. 13,941,991,950, rounded to Rp. 13,941,000,000.
This document provides a recapitulation of work volumes and prices for the construction of the central administration building of STAIN Sorong in 2010. It includes six sections of work: concrete work, stone masonry, walls, landfill under the floor, septic tank and absorption field work, and gate construction. The total budget was Rp. 14,675,781,000 with a 5% retention of Rp. 733,789,050 and the amount to be paid was Rp. 13,941,991,950, rounded to Rp. 13,941,000,000.
K E G I A T A N : PENYIAPAN SARANA & PRASARANA PERGURUAN TINGGI AGAMA
P E K E R J A A N : PEMBANGUNAN GEDUNG ADMINISTRASI PUSAT STAIN SORONG
L O K A S I : KM. 17 - SORONG TAHUN ANGGARAN : 2 0 1 0 P E R I O D E : 26 Juni - 10 Juli 2010 N O O P N A M E : 0 4 I PEKERJAAN BETON Lantai I 1 . Pasang Stek Tambahan 864.58 1,500.00 Kg 2 . Begisting Kolom Baru 53.90 30,000.00 M 2 3 . Begisting Kolom Rekondisi 140.14 20,000.00 M 2 4 . Cor Beton Kolom 16.98 170,000.00 M 3 II PASANGAN BATU GUNUNG SALURAN BANGUNAN 3.76 110,000.00 Dan Pondasi Tangga III PEKERJAAN DINDING 1 . Pasangan Batu Bata Merah 1/2 Bata 36.50 20,000.00 M 2 IV PEKERJAAN TIMBUNAN TANAH BAWAH LANTAI 142.58 10,000.00 M 3 V PEKERJAAN SEPTICTANK & RESAPAN 1 . Begisting Penutup Septictank 24.00 30,000.00 M 2 2 . Pembesian 158.00 2,000.00 Kg 3 . Pengecoran penutup Septictank 2.40 170,000.00 M 3 VI PEKERJAAN PINTU GERBANG 1 . Pembesian D 16 Up 303.36 1,500.00 Kg Pembesian D 16 Dw 176.35 2,000.00 Kg 2 . Begisting 24.56 30,000.00 M 2 3 . Pancang Kayu 20.00 5,000.00 Ttk 4 . Cor Beton . Lantai Kerja 1 : 3 : 5 2.56 25,000.00 M 2 . Cor Beton Pondasi Telapak Dan Kolom 2.06 170,000.00 M 3 JUMLAH POTONGAN RETENSI 5 % JUMLAH YANG DIBAYARKAN DIBULATKAN TERBI LANG : " TI GABELAS J UTA SEMBI LAN RATUS EMPAT PULUH SATU RI BU RUPI AH " Sorong, 10 Juli 2010 MADOR BORONG PELAKSANA PROYEK SUNGKONO ANDRI EKO S.,ST R E K A P I T U L A S I V O L U M E D A N H A R G A NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA 1,296,864.00 1,617,000.00 2,802,800.00 2,886,345.00 413,600.00 730,000.00 1,425,760.00 720,000.00 316,000.00 408,000.00 455,040.00 352,692.00 736,800.00 100,000.00 64,000.00 350,880.00 14,675,781.00 Rp 733,789.05 Rp 13,941,991.95 Rp 13,941,000.00 Rp PT. BOGOWONTO MULTI KARYA JUNI TRIATMOKO Direktur K E G I A T A N : PENYIAPAN SARANA & PRASARANA PERGURUAN TINGGI AGAMA P E K E R J A A N : PEMBANGUNAN GEDUNG ADMINISTRASI PUSAT STAIN SORONG L O K A S I : KM. 17 - SORONG TAHUN ANGGARAN : 2 0 1 0 I PEKERJAAN BETON Besi Panjang Besi Jumlah / titik Jumlah titik Sat Volume Lantai I 1 . Pasang Stek Tambahan D 16 0.90 16.00 38.00 Kg 864.58 2 . Begisting Kolom Baru Jumlah Titik Lebar 1 Lebar 2 3.85 10 0.35 0.35 3.85 M 2 53.90 0.35 0.35 3 . Begisting Kolom Rekondisi 3.85 26 0.35 0.35 3.85 M 2 140.14 0.35 0.35 4 . Cor Beton Kolom 3.85 36 0.35 0.35 3.85 M 2 16.98 0.35 0.35 BACK-UP DATA OPNAME MANDOR No Uraian Pekerjaan Rumus dan Perhitungan Lebar Tinggi Sat Volume II PASANGAN BATU GUNUNG SALURAN BANGUNAN 1 Pasangan B - C Panjang Luas A Luas B Sat Volume 4.80 0.18 0.18 M 3 0.84 0.70 0.70 2 Pasangan F - G 4.80 0.18 0.18 M 3 0.84 0.70 0.70 3 . Pasangan I - J 9.80 0.10 0.15 M 3 1.23 0.40 0.60 4 . Pasangan Pondasi Tangga 3.80 0.23 M 3 0.86 III PEKERJAAN DINDING Panjang Lebar Tinggi Jumlah Titik Sat Volume 1 . Pasangan Batu Bata Merah 1/2 Bata 3.65 1.00 10.00 M 2 36.50 plong IV PEKERJAAN TIMBUNAN TANAH BAWAH LANTAI 1 . 30.40 13.40 0.35 M 3 142.58 V PEKERJAAN SEPTICTANK & RESAPAN 1 . Begisting Penutup Septictank 6.00 2.00 - 2.00 M 2 24.00 2 . Pembesian Besi Panjang Besi Jumlah / titik Jumlah titik Sat Volume 2.00 Y D 8 2.10 48 2.00 Kg 79.63 2.00 D 8 2.10 16 2.00 Kg 26.54 X 4.00 X D 8 4.10 16 2.00 Kg 51.82 3 . Pengecoran penutup Septictank Panjang Lebar Tinggi Jumlah Titik Sat Volume 6.00 2.00 0.10 2.00 M 2 2.40 VI PEKERJAAN PINTU GERBANG 1 . Pembesian Besi Panjang Besi Jumlah / titik Jumlah titik Sat Volume Pondasi Telapak x & y D 13 2.00 12.00 4.00 Kg 100.03 . Kolom ( K ) Tulangan D 16 6.00 8.00 4.00 Kg 303.36 Beugel D 8 1.05 46 4.00 Kg 76.31 2 . Begisting Panjang Lebar Tinggi Jumlah Titik Sat Volume . Pondasi Telapak 3.20 0.25 4.00 M 2 3.20 . Kolom 0.40 4.45 1.20 4.00 M 2 21.36 0.20 4.45 3 . Pancang Kayu 20.00 Ttk 20.00 4 . Cor Beton . Lantai Kerja 1 : 3 : 5 Panjang Lebar Tinggi Jumlah Titik Sat Volume 0.80 0.80 4.00 M 2 2.56 . Cor Beton Pondasi Telapak 0.80 0.80 0.25 4.00 M 3 0.64 . Cor Beton Kolom 0.40 4.45 0.40 0.20 4.00 M 2 1.42 0.20 4.45 KEGIATAN : PEMELIHARAAN DAN PENINGKATAN JALAN DAN JEMBATAN KOTA SORONG PEKERJAAN : PEMBUATAN DAN RENOVASI JALAN LINGKUNGAN KONTRAKTOR : CV. IGA ABADI KONSULTAN : CV. LINTAS JASA BAGIAN PEKERJAAN : MOBILISASI NO. MOBILISASI DENGAN SATUAN LAMP SUM ( LS ) PEKERJAAN MOBILISASI : (BAHAN & PERALATAN) LS 1. MATERIAL ON SITE 2. BOMAG 3. MOTOR GREDER DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH : PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA DPU KOTA SORONG CV. LINTAS JASA CV. IGA ABADI 1,00 LS JULIARTO KATITO, ST BACK UP DATA Hasil Perhitungan S K E T S PERHITUNGAN VOLUME FERDINAN P. MOMOT Site Engineer Direktur 1.00 KEGIATAN : PEMELIHARAAN DAN PENINGKATAN JALAN DAN JEMBATAN KOTA SORONG PEKERJAAN : PEMBUATAN DAN RENOVASI JALAN LINGKUNGAN KONTRAKTOR : CV. IGA ABADI KONSULTAN : CV. LINTAS JASA BAGIAN PEKERJAAN : PENYIAPAN BADAN JALAN NO. Pembersihan DAMIJA Panjang pembersihan = 265,70 M' Lokasi SECTION A - B L Kiri Rata - rata M' L Kanan Rata - rata M' M' Volume pembersihan Damija = ( 3,20 x 265,70 ) M 2 M 2 DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH : PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA DPU KOTA SORONG CV. LINTAS JASA CV. IGA ABADI 1.60 1.60 3.20 Hasil Perhitungan BACK UP DATA VOLUME S K E T S PERHITUNGAN Site Engineer Direktur JULIARTO KATITO, ST V V = L x P 850.24 850.24 FERDINAN P. MOMOT L L KEGIATAN : PEMELIHARAAN DAN PENINGKATAN JALAN DAN JEMBATAN KOTA SORONG PEKERJAAN : PEMBUATAN DAN RENOVASI JALAN LINGKUNGAN KONTRAKTOR : CV. IGA ABADI KONSULTAN : CV. LINTAS JASA BAGIAN PEKERJAAN : URUGAN PASIR M 3 M 3 M 3 DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH : PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA DPU KOTA SORONG CV. LINTAS JASA CV. IGA ABADI 42.51 32.00 10.51 200.00 1.60 1.60 0.05 65.70 Volume ( M 2 ) 1.60 1.60 0.05 Site Engineer 0 + 265,7 Direktur NO. S K E T S STA L/R Kalkulasi V JULIARTO KATITO, ST FERDINAN P. MOMOT P L 1 L 2 T Rata 2 0 + 200 V = ( L1 + L2 ) x P X T Rata 2 (M') (M') (M') (M') Hasil Perhitungan L L 1 L 2 0.05 Existing Urugkan pasir bawah jalan t 5 cm L L 1 L 2 0.05 Existing Urugkan pasir bawah jalan t 5 cm L L KEGIATAN : PEMELIHARAAN DAN PENINGKATAN JALAN DAN JEMBATAN KOTA SORONG PEKERJAAN : PEMBUATAN DAN RENOVASI JALAN LINGKUNGAN KONTRAKTOR : CV. IGA ABADI KONSULTAN : CV. LINTAS JASA BAGIAN PEKERJAAN : RABAT BETON M 3 M 3 M 3 DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH : PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA DPU KOTA SORONG CV. LINTAS JASA CV. IGA ABADI Site Engineer Direktur V 150.68 JULIARTO KATITO, ST FERDINAN P. MOMOT BACK UP DATA Hasil Perhitungan NO. S K E T S STA L/R Kalkulasi Volume ( M 2 ) P (M') (M') (M') (M') L 1 L 2 T Rata 2 1.60 0.18 115.20 0 + 200 200.00 1.60 0 + 265,7 65.70 1.50 1.50 0.18 35.48 V = ( L1 + L2 ) x P X T Rata 2 L L 1 L 2 0.20 Existing Rabat Beton t 20 cm L L 1 L 2 0.20 Existing Rabat Beton t 20 cm KEGIATAN : PEMELIHARAAN DAN PENINGKATAN JALAN DAN JEMBATAN KOTA SORONG PEKERJAAN : PEMBUATAN DAN RENOVASI JALAN LINGKUNGAN KONTRAKTOR : CV. IGA ABADI KONSULTAN : CV. LINTAS JASA BAGIAN PEKERJAAN : Lapis pondasi kelas C ( Sirtu ) M 3 M 3 DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH : PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA DPU KOTA SORONG CV. LINTAS JASA CV. IGA ABADI 168.00 JULIARTO KATITO, ST P L 1 L 2 T Rata 2 BACK UP DATA Hasil Perhitungan NO. Site Engineer Direktur FERDINAN P. MOMOT V = ( L1 + L2 ) x P X T Rata 2 V 140.00 2.00 2.00 0.30 0 + 200 168.00 (M') (M') Volume ( M 2 ) (M') (M') S K E T S STA L/R Kalkulasi L 1 L 2 L Urugan Sirtu t. 12 cm Existing KEGIATAN : PEMELIHARAAN DAN PENINGKATAN JALAN DAN JEMBATAN KOTA SORONG PEKERJAAN : PEMBUATAN DAN RENOVASI JALAN LINGKUNGAN KONTRAKTOR : CV. IGA ABADI KONSULTAN : CV. LINTAS JASA BAGIAN PEKERJAAN : Lapis pondasi kelas C ( Sirtu ) M 3 M 3 M 3 DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH : PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA DPU KOTA SORONG CV. LINTAS JASA CV. IGA ABADI Site Engineer Direktur V 90.48 JULIARTO KATITO, ST FERDINAN P. MOMOT 39.86 265.70 0.50 0.50 0.15 67.50 1.50 NO. S K E T S STA L/R Kalkulasi Volume ( M 2 ) P L 1 L 2 V = ( L1 + L2 ) x P X T Rata 2 1.50 0.25 50.63 BACK UP DATA Hasil Perhitungan T Rata 2 (M') (M') (M') (M') t1 t2 t1 t2 Cor Beton Urugkan sirtu bahu jalan L2 L1 L L L2 L1 L 1 L 2 L Urugan Sirtu t. 12 cm Existing CV LINTAS JASA Jl. Basuki Rahmat Km. 9,5 Gg. NN SORONG - IJB CV. IGA ABADI SORONG - IJB PEKERJAAN : PEMBUATAN DAN RENOVASI JALAN LINGKUNGAN NOMOR KONTRAK : TANGGAL 01 SEPTEMBER 2007 KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA PEMERINTAH KOTA SORONG DINAS PEKERJAAN UMUM KOTA SORONG KEGIATAN PEMELIHARAAN DAN PENINGKATAN JALAN DAN JEMBATAN KOTA SORONG BACKUP DATA CV. IGA ABADI SORONG - IJB KONTRAKTOR PELAKSANA KEGIATAN PEMELIHARAAN DAN PENINGKATAN JALAN DAN JEMBATAN Waktu Pelaksanan 170 Hari Kalender BULAN SEPTEMBER 2008 NOMOR KONTRAK : 28 / OTSUS / DPU - KS / 2008 TANGGAL 11 JULI 2008 KONTRAKTOR CV. PASIR RAYA PEMERINTAH KOTA SORONG DINAS PEKERJAAN UMUM KOTA SORONG PERBAIKAN DAN PENATAAN JALAN LINGKUNGAN KOTA SORONG MC