APPROVED A

Approved without exception


APPROVED WITH COMMENTS AC
Approved Subject to Incorporation of comments
RETURNED FOR CORRECTION RT
Insufficient Information/ Detail
Resubmit for Approval
REJECTED RJ
Complete redesign required
RECEIVED FOR INFORMATION I
Returned without comments
RECEIVED FOR INFORMATION IC
Returned with comments
any obligations covered under contract
Engineer:
Discipline:
Date:
Note: Approval or comments does not relieve the Contractor of
Pyry Energy
TWO(2) X 500MW
MONG DUONG 1 THERMAL POWER PLANT
Soumen Mitra
Senior Mec Engineer
24-Sep-12
Pyry Comment
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Project

Dwg. / Doc. Title
Condenser General
Layout
Dwg. / Doc. No. MD1-0-V-113-01-00001
HDEC DT No. MD1-HDH-EVN-X-0608 Submitted Date Rev. A
Pyry TR No. Received Date
New HDEC DT No. Re-Submitted Date
Status Approved with Comments

Page 1 / 1
No. Pyrys Comments Contractors Reply / Action
1 This drawing can be reviewed in totality only
after receipt and review of Condenser Thermal
and Mechanical Calculation document and
Condenser Specification Data Sheet.


2 This drawing is at variance with other
Condenser General Arrangement drawings.
Please reconcile documents.


3 Please mark the direction of view on the plan for
side elevation shown in the drawing.


4 Please indicate unique nozzle numbers for each
nozzle connection on the Condenser, with a
legend for such connections, their size, type,
etc.

5 The connections shown for LHP 2, 3 and 4 are
actually piped connections for the heater drains,
and should be shown as such by a nozzle list,
rather being shown similar to the LPH 1A and
1B which are located at condenser neck.

6 Clarify the design temperatures in/out for steam
and sea water side mentioned on the Design
Data section. This does not cover even the
operating data for all heat balance cases
submitted so far. Also submit bypass case heat
balance for verifying condenser performance in
such condition.

7 The hotwell level setting shown on this drawing
needs to be justified by a hotwell level
calculation to establish that the hotwell is
adequately sized to store 3 minutes of VWO flow
between normal and low level as per Contract.