Total Beam Concrete for Floor Plan:

-------------------------------------------------------| Grade
| Volume,m3 |
Raw Cost | Placement Cost |
-------------------------------------------------------|
G25
| 28.89100 | RM
4333.6 | RM
7222.7 |
-------------------------------------------------------Net Side formwork =
=
=

Gross - Beam-slab interface area


206.600 47.380
159.220

Total Beam Formwork for Floor Plan:


-------------------------------------------------------| Location | Area,m2 |
Raw Cost | Placement Cost |
-------------------------------------------------------| Bottom |
54.373 | RM
1359.3 | RM
1631.2 |
-------------------------------------------------------| Side
|
159.220 | RM
3980.5 | RM
4776.6 |
-------------------------------------------------------Beam Main Steel Bar for Floor Plan:
-------------------------------------------------------| Diameter | Weight,kg |
Raw Cost | Placement Cost |
-------------------------------------------------------|
12
|
458.7 | RM
550.4 | RM
871.5 |
|
16
|
370.2 | RM
444.2 | RM
703.4 |
|
20
|
578.5 | RM
694.2 | RM
1099.2 |
|
25
|
626.1 | RM
751.3 | RM
1189.6 |
-------------------------------------------------------| Total
|
2033.5 | RM
2440.2 | RM
3863.6 |
-------------------------------------------------------Beam Link Steel Bar for Floor Plan:
-------------------------------------------------------| Diameter | Weight,kg |
Raw Cost | Placement Cost |
-------------------------------------------------------|
10
|
770.3 | RM
847.4 | RM
1386.6 |
-------------------------------------------------------| Total
|
770.3 | RM
847.4 | RM
1386.6 |
-------------------------------------------------------Summation of All of the Above Cost

-------------------------------------|
Raw Cost
|
Placement Cost |
-------------------------------------| RM
12961.0
| RM
18880.8
|