Task List

Major Outage:
1) Liner Plates, floor and side walls
a. Quote from Rollyed alloys received (48x 96)
i. Need to send them a email about side wall liner plates
b. Washers need to be ordered, with those steel pins
c. Insulation for floor to be ordered (Multiple options)
2) MOC for drain lines
a. Find drawings,
b. Talk to deltak about a fix
c. Find different type of insulation to use inside the casing
3) CO2 Tank inspection
a. Concentration tank to be done
b. Vent all CO2 and buy new
4) GT1 Generator mist eliminator
a. Bug Randall about the GE option
b. Make a CWP for the non GE Option
5) Fin-Fan coolers
a. Need a new design of bearings, bushings for better performace
b. Can they run backwards?
c. Follow up with ecodyne tomorrow
6) Find out more info on the following WO
a. Inspect and Repair PO4 Quill
b. Replace inlet guide vane actuator
c. Penetration Seals Failure
d. Center baffle repairs
7) Notifications
a. Check tube bundle thickness
b.