You are on page 1of 1

Jumeirah Golf Estates Fire and Earth Clubhouse

Power Requirements, Water Supply, Drain point (Backwash)



TSE Irrigation PUMP:

S/N Description Capacity Qty Kilo Watts
1 Multistage
centrifugal (1Duty+1Standby)
5.99 HP 2 8.94
2 Solenoid Valve 0.032 HP 11 0.253
3 Spare 1.0 KW 1.0
TOTAL LOAD 10.194

Water Supply Line :

Pipe Size -3" @4 Bar Pressure for TSE Water Suction from tank
Pipe Size -4 @ 5 Bar Pressure for TSE Water supply to irrigation system

Drain Point For Backwash

TSE water drain 2 Dia to nearest drain


Gardens Lights:

S/N Description Capacity Qty Kilo Watts
1 Palm and trees Ground mounted uplight 70 watts 496 34.72
2 Point light 85 watts 27 2.295
3 Road Ground mounted lights 35 watts 196 6.86
4 Footpath ground mounted light 35 watts 40 1.4
5 Spare 2
TOTAL LOAD 47.27

You might also like