You are on page 1of 6

LNEA DE CONDUCCIN

PROYECTO:
UBICACIN:

PROYECTO INTEGRAL DE MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE HUAMBOS
DISTRITO
: HUAMBOS
LOCALIDAD: HUAMBOS
DEPARTAMENTO
: CAJAMARCA
PROVINCIA: CHOTA

ITEM
01.00.00
01.01.00

DESCRIPCIN

ELEMENTO

CANT

Longitud hor.
Longitud hor.

1
1

DIMENSIONES

PARCIAL

TOTAL

UND

886.92
806.71

886.92
806.71

1693.63

ml

LARGO

ANCHO

ALTO

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO
TRAMO 1 : CAPTACIN A CRP1
TRAMO 2 : CRP 1 A RESERVORIO

01.01.00

CINTAS SEALIZADORA

1693.63

3387.26

3387.26

ml

01.02.00

CERCO DE MALLA HDP DE 1 m DE ALTURA / ELEMENTOS DE SEGURIDAD

1693.63

3387.26

3387.26

ml

01.03.00

PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA

15

15

15

und

02.00.00

MOVIMIENTO DE TIERRAS

02.01.00

EXCAVACIN EN TERRENO NATURAL


ZANJA: ANCHO = 0.40 m, ALTO = 1.00 m

Longitud hor.

1483.35

1483.35

1483.35

ml

02.02.00

EXCAVACIN EN TERRENO ROCOSO


ZANJA: ANCHO = 0.40 m, ALTO = 1.00 m

Longitud hor.

210.28

210.28

210.28

ml

03.00.00

REFINE Y NIVELACIN DE FONDO DE ZANJAS

03.01.00

REFINE Y NIVELACIN P/TUBERA EN TERRENO NATURAL

Longitud hor.

1483.36

1483.36

1483.36

ml

03.03.00

REFINE Y NIVELACIN P/TUBERA EN TERRENO ROCOSO

Longitud hor.

210.28

210.28

210.28

ml

Longitud hor.
Longitud hor.

1
1

886.92
806.71

886.92
806.71

1693.63

ml
ml

Longitud hor.

1693.63

1693.63

1693.63

ml

Longitud hor.

1693.63

1693.63

1693.63

ml

V=

616.48

616.48

m3

1
1

886.92
806.71

886.92
806.71

1693.63

ml
ml

04.00.00
04.01.00

CAMA DE APOYO PARA TUBERAS


CAMA DE APOYO PARA TUBERAS
TRAMO 1 : CAPTACIN A CRP1
TRAMO 2 : CRP 1 A RESERVORIO

05.00.00
05.01.00

06.00.00

RELLENO Y COMPACTACIN INICIAL PARA TUBERAS


RELLENO Y COMPACTACIN INICIAL SOBRE CLAVE DEL TUBO
CON MATERIAL SELECCIONADO
RELLENO Y COMPACTACIN FINAL PARA TUBERAS

06.01.00

RELLENO Y COMPACTACIN DE ZANJAS CON MATERIAL SELECCIONADO

06.02.00

ACARREO DE MATERIAL EXCEDENTE, DP = 30 m


ZANJA: ANCHO = 0.40 m, ALTO = 1.00 m
esponjamiento = 30% y considerando un 70% de material til
V=1693.63 x 0.4 x 1.00 x 1.3 x 0.7 = 616.48 m3

07.00.00
07.01.00

SUMINISTRO E INSTALACIN DE TUBERIAS NTP ISO 4435-1


SUMINISTRO E INST./TUBERIA PVC-SAP =100 mm (4") CLASE 7.5 S.P
TRAMO 1 : CAPTACIN A CRP1
TRAMO 2 : CRP 1 A RESERVORIO

08.00.00
08.01.00

09.00.00
09.01.00
10.00.00

616.48

Longitud hor.
Longitud hor.

SUMINISTRO E INSTALACIN DE ACCESORIOS


CODOS
CODOS 11.25x4"

25

25

25

und

CODOS 22.5x4"

27

27

27

und

CODOS 45x4"

21

21

21

und

CODOS 90x4"

und

1693.63

1693.63

ml

PRUEBAS HIDRULICAS
DOBLE PRUEBA HIDRULICA Y DESINFECCIN EN TUBERAS =4"

Longitud hor.

1693.63

VARIOS

10.01.00

DADOS O ANCLAJE DE CONCRETO PARA FIJAR TUBERIAS D=4"

75

75

75

und

10.02.00

CMARA ROMPE PRESIN

und

10.03.00

VLVULA DE AIRE DE 4"

uhd

10.04.00

VLVULA DE PURGA DE 4"

und

TUBERA LONGITUD DIMETRO


P-1
164.97
25
P-2
142.79
100
P-3
50.66
75
P-4
43.52
75
P-5
18.39
18
P-6
12.25
75
P-7
107.45
18
P-8
54.62
50
P-9
28.51
50
P-10
70.89
50
P-11
49.43
25
P-12
42.99
100
P-13
49.49
100
P-14
72.85
75
P-15
130.70
25
P-16
42.52
50
P-17
40.48
50
P-18
47.41
50
P-19
99.99
50
P-20
28.52
100
P-21
20.18
18
P-22
56.72
100
P-23
35.37
100
P-24
26.68
75
P-25
133.82
50
P-26
25.76
50
P-27
66.62
50
P-28
49.21
18
P-29
61.45
25
P-30
45.83
100
P-31
25.55
100
P-32
45.33
100
P-33
35.23
75
P-34
28.47
18
P-35
61.09
75
P-36
41.71
75
P-37
68.26
100
P-38
67.89
18
P-39
64.92
100
P-40
17.85
100
P-41
45.89
75
P-42
48.91
100
P-43
71.70
100
P-44
233.85
50
P-45
196.92
50
P-46
57.00
50
P-47
58.59
25
P-48
59.29
25
P-49
168.67
25

=18 mm (3/4")

=25 mm (1")
P-1
164.97

=50 mm (2")

=75 mm (3")

=100 mm (4")
P-2

P-5

18.39

P-7

107.45
P-8
P-9
P-10
P-11

P-3
P-4

50.66
43.52

P-6

12.25

54.62
28.51
70.89

49.43
P-12
P-13
P-14

P-15

42.52
40.48
47.41
99.99

P-24

P-38

P-20

28.52

P-22
P-23

56.72
35.37

P-30
P-31
P-32

45.83
25.55
45.33

26.68

133.82
25.76
66.62

49.21
P-29

P-34

72.85

20.18

P-25
P-26
P-27
P-28

42.99
49.49

130.70
P-16
P-17
P-18
P-19

P-21

142.79

61.45

P-33

35.23

P-35
P-36

61.09
41.71

28.47

P-37

68.26

P-39
P-40

64.92
17.85

P-42
P-43

48.91
71.70

67.89

P-41

P-44
P-45
P-46
P-47
P-48
P-49

58.59
59.29
168.67

233.85
196.92
57.00

45.89

TERRENO
TC
TC
TC
TC
TC
TC
TC
TC
TC
RS
TC
TC
TC
TC
TC
RF
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
RF
TC
TC
RS
RS
TC
TC
TC
RF
RS
RS
TC
RS
TC
TC
TC
RS
RS
RS
TC

TC

RS

P-1
P-2
P-3
P-4
P-5
P-6
P-7
P-8
P-9

164.97
142.79
50.66
43.52
18.39
12.25
107.45
54.62
28.51

P-11
P-12
P-13
P-14
P-15

49.43
42.99
49.49
72.85
130.70

P-17
P-18
P-19
P-20
P-21
P-22
P-23
P-24
P-25
P-26
P-27
P-28
P-29

40.48
47.41
99.99
28.52
20.18
56.72
35.37
26.68
133.82
25.76
66.62
49.21
61.45

P-31
P-32

25.55
45.33

P-35
P-36
P-37

70.89

P-33
P-34

35.23
28.47

P-39
P-40

64.92
17.85

P-42

48.91

P-46
P-47
P-48

57.00
58.59
59.29

61.09
41.71
68.26

P-41

45.89

P-43
P-44
P-45

71.70
233.85
196.92

P-49

P-10

168.67

P-50
P-51
P-52
P-53
P-54
P-55
P-56
P-57
P-58
P-59
P-60
P-61
P-62
P-63
P-64
P-65
P-66
P-67
P-68
P-69
P-70
P-71
P-72
P-73
P-74
P-75
P-76
P-77
P-78
P-79
P-80
P-81
P-82
P-83
P-84
P-85
P-86
P-87
P-88
P-89
P-90
P-91
P-92
P-93
P-94
P-95
TOTAL

54.43
63.29
63.52
60.65
60.85
59.53
71.30
119.60
72.47
36.77
67.39
60.53
65.93
57.51
60.91
92.94
52.11
68.48
209.64
185.96
126.15
38.15
108.20
231.55
77.82
57.47
56.49
54.68
48.89
48.03
44.85
30.41
48.92
131.27
89.04
64.74
58.57
72.29
57.79
61.43
200.31
130.26
79.47
54.43
19.69
92.90
6884.76

50
100
50
50
25
18
25
50
50
100
100
50
25
25
18
75
50
50
50
25
75
50
50
50
100
25
18
18
18
18
75
25
25
25
100
100
75
75
75
75
25
50
50
50
25
25

P-50

54.43
P-51

P-52
P-53
P-55

P-54

60.85

P-56

71.30

63.52
60.65

59.53
P-57
P-58

119.60
72.47
P-59
P-60

P-61
P-62
P-63
P-64

36.77
67.39

60.53

65.93
57.51

60.91

P-69

P-66
P-67
P-68

52.11
68.48
209.64

P-71
P-72
P-73

38.15
108.20
231.55

P-65

92.94

P-70

126.15

185.96

P-74
P-75
P-76
P-77
P-78
P-79

63.29

77.82

57.47

56.49
54.68
48.89
48.03
P-80
P-81
P-82
P-83

44.85

30.41
48.92
131.27
P-84
P-85
P-86
P-87
P-88
P-89

P-90

620.12

58.57
72.29
57.79
61.43

200.31
P-91
P-92
P-93

P-94
P-95

89.04
64.74

19.69
92.90
1715.61

130.26
79.47
54.43

2501.88

903.90

1143.26

RS
RF
RF
RF
TC
RS
TC
TC
TC
RS
RS
RF
RF
RF
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
RS
RS
RS
RS
RF
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
RS
RS
RS
TC

P-54

60.85

P-56
P-57
P-58

71.30
119.60
72.47

P-64
P-65
P-66
P-67
P-68
P-69
P-70
P-71
P-72
P-73

P-79
P-80
P-81
P-82
P-83
P-84
P-85
P-86
P-87
P-88
P-89
P-90
P-91

P-95

P-50

54.43

P-55

59.53

P-59
P-60

36.77
67.39

P-74
P-75
P-76
P-77

77.82
57.47
56.49
54.68

P-92
P-93
P-94

79.47
54.43
19.69

60.91
92.94
52.11
68.48
209.64
185.96
126.15
38.15
108.20
231.55

48.03
44.85
30.41
48.92
131.27
89.04
64.74
58.57
72.29
57.79
61.43
200.31
130.26

92.90
5248.87

1059.33

ADUCCIN

4318.78

TC
RS
RF

2159.39
1295.63
863.76

RF

P-16

42.52

P-30

45.83

P-38

67.89

P-51
P-52
P-53

63.29
63.52
60.65

P-61
P-62
P-63

60.53
65.93
57.51

P-78

48.89

576.56

You might also like