You are on page 1of 6

POWER SYSTEM OPERATION CORPORATION LIMITED.

SOUTHERN REGIONAL LOAD DESPATCH CENTRE

DAILY OPERATION REPORT


POWER SUPPLY POSITION IN SOUTHERN REGION FOR 11-JUL-2014

DATE OF REPORTING : 12-JUL-2014 AT 06:00HRS

1. REGIONAL AVAILABILITY
EVENING PEAK (19:30HRS)

NIGHT OFF-PEAK (03:00HRS)*

AVAILABILITY
(MW)*

SHORTAGE
(MW)#

FREQUENCY (Hz)

30938

400

50.08

DAY ENERGY (MU)

AVAILABILITY
(MW)*

SHORTAGE
(MW)#

FREQUENCY (Hz)

MET

SHORTAGE #

25345

900

50.03

706.89

29.70

* MW Availabilty indicated above includes SR ISTS Loss.


2 A. STATE DEMAND (ENERGY - MU)

#Shortage is calculated at 50 Hz which is the sum of Load Shedding and Frequency Correction at 50 Hz.

STATE

THERMAL

HYDRO

GAS/NAPTH
A/ DIESEL

WIND

OTHERS

NET SCH
(FROM GRID)

DRAWAL
(FROM GRID)

AVAILABILITY

DEMAND
MET

SHORTAGE #

AP

62.85

2.95

9.60

11.64

0.00

34.58

32.24

121.62

119.28

1.82

TELANGA
NA

41.10

0.00

0.00

0.00

9.23

71.36

70.05

121.69

120.38

13.58

KAR

57.77

7.87

18.14

34.46

8.20

18.23

16.58

144.67

143.02

11.29

KERALA

0.00

19.19

3.94

0.49

0.13

31.23

32.97

54.98

56.72

1.29

TN

67.19

5.35

16.64

57.07

29.14

87.09

85.64

262.48

261.03

1.67

PONDY

0.00

0.00

0.00

0.00

0.00

6.88

6.46

6.88

6.46

0.05

TOTAL

228.91

35.36

48.32

103.66

46.70

249.37

243.94

712.32

706.89

29.70

# The accuracy of shortage computation depends on timely load shedding details furnished in the web directly by constitutents
2 B. STATE DEMAND (MW) & ENERGY FORECAST (MU)
19:30 HRS PEAK

03:00 HRS OFF-PEAK

DAY PEAK

DAY ENERGY (MU)

STATE

DEMAND
MET

SHORTAGE #

DEMAND
MET

SHORTAGE #

DEMAND
MET

TIME

SHORTAGE#

FORECAST

DEVIATION
FROM
FORECAST
(ACTUAL +
LS FORECAST)
-20.72

AP

4942

4201

200

5360

10:00:00

41

140.00

TELANGANA

4490

4478

400

5530

00:32:00

11

140.00

-8.96

KAR

6576

250

5019

300

7083

08:00

250

169.80

-16.78

KER

2879

150

1752

3155

19:30

150

TN

11396

9297

12553

20:00

59.25

-1.70

273.55

-12.52
-0.76

PONDY

305

248

314

18:31

7.22

SR ISTS LOSS

350

--

350

--

--

--

--

--

--

SR

30938

400

25345

900

31926

19:21

400

649.82

79.65

3. GENERATION :
STATION

INSTALLED
CAPACITY(MW)

19:30HRS
PEAK MW

03:00HRS
OFF-PEAK MW

DAY PEAK
MW

HRS

DAY ENERGY
(MU)

AVG MW

ANDHRA PRADESH
Vijayawada TPS

1760

1221

1167

1447

05:07

30.36

1265

Rayalaseema TPS

1050

396

522

522

03:00

10.26

427

Simhadri (IPP)

1000

953

652

981

06:21

22.23

926

Other Thermal*

800

194

200

200

03:00

--

--

Total Thermal

4610

2764

2541

--

--

62.85

2618

Srisailam RB

770

--

--

--

--

--

--

Lower Sileru

460

--

--

--

--

1.44

60

Upper Sileru

240

57

--

112

19:49

0.27

11

Other Hydro

278

238

60

--

--

1.24

52

Total Hydro

1748

295

60

--

--

2.95

123

Vijjeswaram Gas

272

--

--

--

--

--

--

Reliance Energy Ltd.

220

--

--

--

--

--

--

Jegrupadu

217

--

--

19:00

--

--

Spectrum

208

--

--

--

--

--

--

LANCO

351

--

--

--

--

--

--

Vemegiri (GMR)

370

--

--

--

--

--

--

Jegrupadu Ext.

220

--

--

--

--

--

--

Konaseema

445

--

--

--

--

--

--

Gauthami

464

--

--

--

--

--

--

GMR(BRG)

237

--

--

00:37

--

--

Other Gas/Naptha/Diesel

27

--

--

--

--

9.60

400

Total Gas/Naptha/Diesel

3031

--

--

--

--

9.60

400

Wind

430

482

349

482

19:00

11.64

485

Others

666

651

702

702

03:00

--

--

Total AP

10485

4192

3652

--

--

87.04

3626

* The genaration includes the injection of CPPs for which installed capacity not considerd due to variable nature.

Page 1 of 16

STATION

INSTALLED
CAPACITY(MW)

19:30HRS
PEAK MW

03:00HRS
OFF-PEAK MW

Kothagundam TPS

1720

1158

Kaktiya TPS

500

478

Ramagundan B

63

Total Thermal

DAY PEAK

DAY ENERGY
(MU)

AVG MW

19:00

28.67

1194

12:12

11.27

470

--

--

1.16

48

1629

--

--

41.10

1712

MW

HRS

1144

1158

485

498

--

--

2283

1636

TELANGANA

N'Sagar

816

11

11

12

11:22

--

--

Srisailam LB (Gen)

900

--

--

--

--

--

--

Srisailam LB (Pump

900

--

--

--

--

--

--

Total Hydro

1716

11

11

--

--

--

--

Total TG

3999

1647

1640

--

--

41.10

1712

Raichur TPS

1720

1042

829

1174

21:50

22.33

930

Bellary TPS

1000

906

926

961

05:24

21.02

876

UPCL(IPP)

1200

490

625

625

03:00

14.42

601

Total Thermal

3920

2438

2380

--

--

57.77

2407

Sharavathi

1035

166

112

422

17:46

3.81

159

Nagjher

885

112

--

393

08:02

1.38

58

Varahi

460

35

57

246

06:14

1.29

54

Other Hydro

1992

168

88

--

--

1.39

58

Total Hydro

4372

481

257

--

--

7.87

329

KARNATAKA

Yelehanka Diesel

128

--

--

--

--

--

--

Jindal

1460

623

450

722

08:48

12.40

517
239

Other Gas/Naptha/Diesel

118

--

--

--

--

5.74

Total Gas/Naptha/Diesel

1706

623

450

--

--

18.14

756

Wind

2163

1499

1319

1500

19:21

34.46

1436

Others

1055

425

372

425

19:00

8.20

342

Total KAR

13216

5466

4778

--

--

126.44

5270

KERALA
Iddukki

780

450

33

694

19:44

5.28

220

Sabarigiri

280

203

31

276

19:45

2.84

118

Lower Periyar

180

172

170

175

14:04

4.20

175

Other Hydro

751

497

172

--

--

6.87

286

Total Hydro

1991

1322

406

--

--

19.19

799

Kayamkulam

360

154

153

161

00:01

3.69

154

Reliance Energy Ltd

157

--

--

--

--

--

--

Brahmapuram DPP

107

--

--

--

--

--

--

Kozhikode DPP

128

53

--

70

20:47

0.25

11

Other Gas/Naptha/Diesel

22

--

--

--

--

--

--

Total Gas/Naptha/Diesel

774

207

153

--

--

3.94

165
20

Wind

35

--

--

--

--

0.49

Others

20

--

--

--

--

0.13

Total KER

2820

1529

559

--

--

23.75

989

TAMILNADU
Ennore TPS

450

64

59

69

07:59

1.86

78

North Chennai TPS

630

669

714

1090

00:01

9.04

377

Tutucorin TPS

1050

858

796

974

07:41

21.09

879

Mettur TPS

1440

515

515

581

07:42

13.25

552

Neyveli-I (IPP)

600

336

323

336

19:00

6.67

278

ST-CMS

250

226

150

227

22:39

5.50

229

NCTPS STAGE-II

600

--

--

--

--

9.78

407

Other Thermal

--

--

--

--

--

--

--

Total TN Thermal

5020

2668

2557

--

--

67.19

2800

Kadamparai (G)

400

198

--

199

18:58

0.36

15

Kadamparai (P)

400

--

--

--

--

0.54

22

Other Hydro

1824

172

160

--

--

4.99

208

Total TN Hydro

2224

370

160

--

--

5.35

223

Basin Bridge

120

--

--

--

--

--

--

Kovilkalappal

108

41

40

75

23:06

0.97

40

Kuttalam

101

70

81

81

00:00

1.73

72

Valattur(Stg 1&2)

187

88

90

91

08:13

3.93

164

Samalpatty

106

12

11

12

23:11

0.30

12

P P Nallur

331

273

275

276

08:08

5.73

239

Madurai Power CL

106

12

12

13

05:36

0.31

13

GMR Vasavi

196

47

39

86

10:21

1.10

46

Other Gas/Naptha/Diesel

1477

1404

1410

1410

03:00

2.57

107

Total Gas/Naptha/Diesel

2732

1947

1958

--

--

16.64

693

Wind

7149

2775

994

3494

21:08

57.07

2378

Others

806

--

--

--

--

29.14

1214

Total TN

17931

7760

5669

--

--

175.39

7308

STATION

INSTALLED
CAPACITY(MW)

19:30HRS
PEAK MW

03:00HRS
OFF-PEAK MW

Ramagundam,NTPC

2600

2024

Neyveli TPS II

1470

1007

Neyveli TPS I (EXP)

420

Madras APS

DAY PEAK

DAY ENERGY
(MU)

AVG MW

07:34

49.48

2061

11:37

25.17

1049

398

11:43

9.40

392

301

310

07:37

6.96

290

319

308

319

19:00

7.50

312

440

367

368

372

12:44

8.93

372

Neyveli TPS II (EXP)

--

--

--

--

--

--

--

Talcher II, NTPC

2000

1332

1434

1704

00:00

33.03

1376

Simhadri II, NTPC

1000

773

661

996

08:41

20.19

841

Kundakulam

1000

931

906

935

17:16

20.65

861

Total ISGS

9810

7443

7101

--

--

181.31

7554

Vallur

1000

650

631

664

05:26

15.82

659

Total JV

1000

650

631

--

--

15.82

659

MW

HRS

1714

2228

1018

1101

390

391

440

300

Kaiga STGI

440

Kaiga Unit 3 & 4

CENTRAL SECTOR (ISGS)

JOINT VENTURE

IPP UNDER OPEN ACCESS


LKPPL

366

--

--

--

--

--

--

SIMHAPURI

300

272

259

274

18:42

8.76

365

MEENAKSHI

300

--

--

10:03

--

--

Total IPP

966

272

259

--

--

8.76

365
9902

Total State Thermal

16433

9778

9366

--

--

237.67

Total ISGS Thermal

7490

5526

5218

--

--

137.27

5719

Total Thermal

23923

15304

14584

--

--

374.94

15621

Total Hydro

12051

2479

894

--

--

35.36

1474

*Total Gas/Naptha/Diesel

8609

2777

2561

--

--

48.32

2014

Total Nuclear

1320

986

977

--

--

23.39

974

Total Wind

9777

4756

2662

--

--

103.66

4319
1561

Total Others

2547

1076

1074

--

--

37.47

Inter-regional (Except Talcher II)

--

2018

1522

--

--

92.64

3860

Grand Total

58227

29396

24274

--

--

706.89

29454

* Total Gas/ naptha/Diesel includes pondy Karaikal Power Plant of 32.5 MW

4 A. INTER-REGIONAL EXCHANGES & HVDC - PHYSICAL FLOWS [IMPORT(+)/EXPORT(-)]


MAX INTER-CHANGE (MW)

ELEMENT

19:30 HRS PEAK


MW

03:00 HRS OFFPEAK MW

IMPORT

TIME

EXPORT

TIME

Bhadrawati B2B

945

951

1200

0000

--

--

23.820

Gazuwaka B2B

500

499

650

0000

--

--

13.108

Talcher-Kolar

1905

1507

2000

0000

--

--

40.662

Talcher Stage II I/C

573

72

--

--

--

--

7.637

Raichur-Solapur

-268

-12

477

21:45

--

--

1.359

Upper Sileru-Balimela

--

--

--

--

0.000

ENERGY (MU)

4 B. INTER-REGIONAL EXCHANGES - SCHEDULES, WHEELING, UI & TALCHER AC I/C


ISGS Schedule
Talcher
Stage II
to SR

Bilaterals of SR
constituents

Power Exchange

Wheeling through
SR

Through Through Through ER to SR


ER ISGS Through
ER
WR
ER
WR

29.193

0.950

16.775

0.000

1.826

-0.005

0.000

Diversion of SR
power

WR to
SR

IR Schedule

Through Through ER to SR
ER
WR

0.000

0.000

0.000

27.939

Net UI

Inter-Regional

WR to
SR

ER to SR

WR to
SR

Schedule
(Total)

Flow
(Total)

27.216

-7.195

-2.037

55.156

45.924

5. FREQUENCY PROFILE
% OF TIME
RANGE

<48.8 Hz

<49.0 Hz

<49.2 Hz

<49.5 Hz

<49.7 Hz

<49.9 Hz

49.9 Hz To
50.05 Hz

>50 Hz

>50.05 Hz

0.0

0.0

0.0

0.0

4.9

41.9

50.5

18.6

7.7

Instantenous Maximum
Hz

TIME

Instantenous Minimum
Hz

TIME

Hz

Block Maximum
TIME

Hz

Block Minimum
TIME

Day Avg
Hz

Frequency
Variation
Index

Std. Var.

50.20

08:01:50

49.55

14:16:40

50.04

8:15

49.60

14:30

49.91

0.213

0.111

Page 3 of 16

6. SHORT TERM OPEN ACCESS TRANSACTION


WHEELING
NAME OF THE TRANSACTION

BILATERAL
ER END

WR END

NAME OF THE TRANSACTION

MU

PEAK
(MW)

OFF-PEAK
(MW)

APTRANSCO TOTAL EXPORT

0.000

ADHUNIK-APCPDCL(MITTAL)(0.76MW)(ER-SR)

0.016

0.760

0.760

APLMUNDRA2-APCPDCL(ADANI)(1.51MW)(ER-SR)

0.031

1.510

1.510

APLMUNDRA3-APCPDCL(ADANI)(1.51MW)(ER-SR)

0.031

1.510

1.510

SHRECEMTPS-APCPDCL(SCL)(2.12MW)(ER-SR)

0.044

2.120

2.120

STERENERGY-APCPDCL(STERLITE)(7.56MW)(ER-SR)

0.155

7.560

7.560

JPLSTAGE2-APCPDCL(PTC)(3.93MW)(ER-SR)

0.081

3.930

3.930

STERENERGY-APCPDCL(STERLITE)(3.02MW)(ER-SR)

0.062

3.020

3.020

CSPDCL-APPCC(NVVN)(7.56MW)(ER-SR)

0.155

7.560

7.560

JPLSTAGE2-APPCC(NVVN)(3.02MW)(ER-SR)

0.062

3.020

3.020

JPLSTAGE2-APCPDCL(KISPL)(3.02MW)(ER-SR)

0.062

3.020

3.020

KARCHWANG-APPCC(NVVN)(3.02MW)(ER-SR)

0.062

3.020

3.020

JPLSTAGE2-APCPDCL(KISPL)(22.97MW)(ER-SR)

0.551

22.970

22.970

STERENERGY-APCPDCL(STERLITE)(23.05MW)(ER-SR)

0.553

23.050

23.050

JPLSTAGE2-APCPDCL(PTC)(30MW)(ER-SR)

0.720

30.000

30.000

STERENERGY-APCPDCL(STERLITE)(57.63MW)(ER-SR)

1.383

57.630

57.630

SHRECEMTPS-APCPDCL(SCL)(16.13MW)(ER-SR)

0.387

16.130

16.130

ADHUNIK-APCPDCL(MITTAL)(5.76MW)(ER-SR)

0.138

5.760

5.760

KARCHWANG-APPCC(NVVN)(23.05MW)(ER-SR)

0.553

23.050

23.050

JPLSTAGE2-APPCC(NVVN)(23.05MW)(ER-SR)

0.553

23.050

23.050

CSPDCL-APPCC(NVVN)(57.63MW)(ER-SR)

1.383

57.630

57.630

CSPDCL-APPCC(NVVN)(2.07MW)(ER-SR)

0.019

2.070

2.070

DBPOWER-APPCC(GMRETL)(2.51MW)(ER-SR)

0.015

2.510

2.510

ADHUNIK-APPCC(MITTAL)(16.75MW)(ER-SR)

0.399

16.750

16.750

SIL-APCPDCL(PTC)(13.83MW)(SR-SR)

0.332

13.830

13.830

JANKICORP-APCPDCL(PTC)(2.77MW)(SR-SR)

0.066

2.770

2.770

SIMHAPURI-APPCC(PTC)(41.5MW)(SR-SR)

0.922

41.500

41.500

SIMHAPURI-APPCC(PTC)(80.46MW)(SR-SR)

1.788

80.460

80.460

BMMISPAT-APPCC(NVVN)(46.11MW)(SR-SR)

1.107

46.110

46.110

NSLTUNGA-APPCC(NSLTUNGA)(10.92MW)(SR-SR)

0.262

10.920

10.920

JSWEL-APPCC(JSWPTC)(46.11MW)(SR-SR)

1.107

46.110

46.110

ILCIRON-APPCC(MITTAL)(3MW)(SR-SR)

0.072

3.000

3.000

NSLKOPPA-APPCC(NSLSUGARS)(21.72MW)(SR-SR)

0.521

21.720

21.720

NSLALAND-APPCC(NSLSUGARS)(13.16MW)(SR-SR)

0.316

13.160

13.160

HIMATSINGKA-APPCC(HIMATSINGA)(4.3MW)(SR-SR)

0.103

4.300

4.300

DHRUVMET-APPCC(DHRUVDESH)(8.5MW)(SR-SR)

0.204

8.500

8.500

INDCEMVPUR-INDCEMCMKR(INDIACEM)(8MW)(SR-SR)

0.192

8.000

8.000

AGARSPONGE-APPCC(MITTAL)(7MW)(SR-SR)

0.168

7.000

7.000

KOGANPOWER-APPCC(KOGANPOWER)(6.5MW)(SR-SR)

0.156

6.500

6.500

HKMETALIC-APPCC(MITTAL)(9.6MW)(SR-SR)

0.230

9.600

9.600

JSWEL-APPCC(JSWPTC)(50MW)(SR-SR)

1.200

50.000

50.000

VIJAYSUGAR-APPCC(VIJAYSUG)(25MW)(SR-SR)

0.600

25.000

25.000

PENNACEM-PENNATALAR(PENNACPP)(5MW)(SR-SR)

0.120

5.000

5.000

PENNACEM-PENNABOYYA(PENNACPP)(10MW)(SR-SR)

0.240

10.000

10.000

SIMHAPURI-APPCC(PTC)(129.58MW)(SR-SR)

2.880

129.580

129.580

APTRANSCO TOTAL IMPORT

20.001

INDCEMVPUR-INDCEMCMKR(INDIACEM)(8MW)(SR-SR)

0.192

8.000

8.000

PENNACEM-PENNATALAR(PENNACPP)(5MW)(SR-SR)

0.120

5.000

5.000

PENNACEM-PENNABOYYA(PENNACPP)(10MW)(SR-SR)

0.240

10.000

10.000

TGTRANSCO TOTAL EXPORT

0.552

STERENERGY-TGPCC(STERLITE)(26.94MW)(ER-SR)

0.647

26.940

26.940

JPLSTAGE2-TGPCC(KISPL)(26.85MW)(ER-SR)

0.644

26.850

26.850

JPLSTAGE2-TGPCC(PTC)(35MW)(ER-SR)

0.840

35.000

35.000

STERENERGY-TGPCC(STERLITE)(67.35MW)(ER-SR)

1.616

67.350

67.350

SHRECEMTPS-TGPCC(SCL)(18.85MW)(ER-SR)

0.452

18.850

18.850

JPLSTAGE2-TGPCC(NVVN)(26.94MW)(ER-SR)

0.647

26.940

26.940

ADHUNIK-TGPCC(MITTAL)(6.73MW)(ER-SR)

0.162

6.730

6.730

CSPDCL-TGPCC(NVVN)(67.35MW)(ER-SR)

1.616

67.350

67.350

KARCHWANG-TGPCC(NVVN)(26.94MW)(ER-SR)

0.647

26.940

26.940

KARCHWANG-TGPCC(NVVN)(3.54MW)(ER-SR)

0.073

3.540

3.540

JPLSTAGE2-TGPCC(KISPL)(3.52MW)(ER-SR)

0.072

3.520

3.520

JPLSTAGE2-TGPCC(NVVN)(3.54MW)(ER-SR)

0.073

3.540

3.540

CSPDCL-TGPCC(NVVN)(8.84MW)(ER-SR)

0.182

8.840

8.840

STERENERGY-TGPCC(STERLITE)(3.54MW)(ER-SR)

0.073

3.540

3.540

JPLSTAGE2-TGPCC(PTC)(4.6MW)(ER-SR)

0.095

4.600

4.600

STERENERGY-TGPCC(STERLITE)(8.84MW)(ER-SR)

0.182

8.840

8.840

SHRECEMTPS-TGPCC(SCL)(2.47MW)(ER-SR)

0.051

2.470

2.470

APLMUNDRA3-TGPCC(ADANI)(1.77MW)(ER-SR)

0.036

1.770

1.770

APLMUNDRA2-TGPCC(ADANI)(1.77MW)(ER-SR)

0.036

1.770

1.770

ADHUNIK-TGPCC(MITTAL)(0.88MW)(ER-SR)

0.018

0.880

0.880

CSPDCL-TGPCC(NVVN)(2.42MW)(ER-SR)

0.022

2.420

2.420

ADHUNIK-TGPCC(MITTAL)(19.59MW)(ER-SR)

0.467

19.590

19.590

JANKICORP-TGPCC(PTC)(3.23MW)(SR-SR)

0.078

3.230

3.230

SIL-TGPCC(PTC)(16.17MW)(SR-SR)

0.388

16.170

16.170

SIMHAPURI-TGPCC(PTC)(94.04MW)(SR-SR)

2.090

94.040

94.040

SIMHAPURI-TGPCC(PTC)(48.5MW)(SR-SR)

1.078

48.500

48.500

BMMISPAT-TGPCC(NVVN)(53.89MW)(SR-SR)

1.293

53.890

53.890

NSLTUNGA-TGPCC(NSLTUNGA)(12.76MW)(SR-SR)

0.306

12.760

12.760

JSWEL-TGPCC(JSWPTC)(53.89MW)(SR-SR)

1.293

53.890

53.890

NSLALAND-TGPCC(NSLSUGARS)(15.38MW)(SR-SR)

0.369

15.380

15.380

TGTRANSCO TOTAL IMPORT

15.546

SIL-APCPDCL(PTC)(13.83MW)(SR-SR)

0.332

13.830

13.830

JANKICORP-APCPDCL(PTC)(2.77MW)(SR-SR)

0.066

2.770

2.770

JANKICORP-TGPCC(PTC)(3.23MW)(SR-SR)

0.078

3.230

3.230

SIL-TGPCC(PTC)(16.17MW)(SR-SR)

0.388

16.170

16.170

BMMISPAT-APPCC(NVVN)(46.11MW)(SR-SR)

1.107

46.110

46.110

BMMISPAT-TGPCC(NVVN)(53.89MW)(SR-SR)

1.293

53.890

53.890

NSLTUNGA-APPCC(NSLTUNGA)(10.92MW)(SR-SR)

0.262

10.920

10.920

NSLTUNGA-TGPCC(NSLTUNGA)(12.76MW)(SR-SR)

0.306

12.760

12.760

JSWEL-TGPCC(JSWPTC)(53.89MW)(SR-SR)

1.293

53.890

53.890

JSWEL-APPCC(JSWPTC)(46.11MW)(SR-SR)

1.107

46.110

46.110

ILCIRON-APPCC(MITTAL)(3MW)(SR-SR)

0.072

3.000

3.000

NSLKOPPA-APPCC(NSLSUGARS)(21.72MW)(SR-SR)

0.521

21.720

21.720

NSLALAND-TGPCC(NSLSUGARS)(15.38MW)(SR-SR)

0.369

15.380

15.380

NSLALAND-APPCC(NSLSUGARS)(13.16MW)(SR-SR)

0.316

13.160

13.160

HIMATSINGKA-APPCC(HIMATSINGA)(4.3MW)(SR-SR)

0.103

4.300

4.300

DHRUVMET-APPCC(DHRUVDESH)(8.5MW)(SR-SR)

0.204

8.500

8.500

AGARSPONGE-APPCC(MITTAL)(7MW)(SR-SR)

0.168

7.000

7.000

KOGANPOWER-APPCC(KOGANPOWER)(6.5MW)(SR-SR)

0.156

6.500

6.500

HKMETALIC-APPCC(MITTAL)(9.6MW)(SR-SR)

0.230

9.600

9.600

JSWEL-APPCC(JSWPTC)(50MW)(SR-SR)

1.200

50.000

50.000

VIJAYSUGAR-APPCC(VIJAYSUG)(25MW)(SR-SR)

0.600

25.000

25.000

KPTCL TOTAL EXPORT

10.171

GUVNL-BESCOM(GUVNL)(22.96MW)(ER-SR)

0.472

22.960

22.960

STERENERGY-BESCOM(IDEALEPL)(4.53MW)(ER-SR)

0.093

4.530

4.530

SRPOWERMP-BESCOM(ESSARPOWER)(6.89MW)(ER-SR)

0.142

6.890

6.890

KPTCL TOTAL IMPORT

0.707

KSEB TOTAL EXPORT

0.000

KSEB TOTAL IMPORT

0.000

TNEB TOTAL EXPORT

0.000

TNEB TOTAL IMPORT

0.000

GOA TOTAL EXPORT

0.000

GOA TOTAL IMPORT

0.000

LKPPL TOTAL EXPORT

0.000

Page 4 of 16

7. VOLTAGE LEVEL AT CRITICAL SUB STATION


% OF TIME
SUBSTATION

400 KV

<380 KV

<390 KV

>420 KV

>430 KV

HYDERABAD

0.35

0.35

36.46

GOOTY

0.35

0.35

VIJAYWADA

0.35

KOLAR

MAXIMUM

220 KV / 230 KV
MINIMUM

MAXIMUM

MINIMUM

KV

TIME

KV

TIME

KV

TIME

KV

TIME

0.00

428

0000

413

1100

233

0000

222

1300

29.31

0.00

425

0200

409

0900

238

0100

231

1000

0.35

94.58

13.19

431

0200

420

0800

232

0200

213

0800

0.00

0.00

15.49

0.00

424

0300

397

1900

224

0300

208

0800

BANGALORE

0.69

26.81

0.00

0.00

415

0300

384

0900

227

1800

214

1800

HIRIYUR

0.00

0.00

6.94

0.00

421

0300

404

0900

226

2300

214

0900

CHENNAI

0.35

0.35

19.65

0.00

424

0100

408

1000

230

0000

216

1600

TRICHY

0.35

15.42

0.00

0.00

407

0200

386

1900

229

0200

213

2100

TRIVENDRAM

0.00

7.78

0.00

0.00

420

0300

390

2000

231

0300

211

2000

KAIGA

0.00

0.00

0.00

0.00

420

0200

411

0900

233

0300

227

0800

8. MAJOR RESERVOIR PARTICULARS


DESIGNED
RESERVOIR

MDDL
(Mts)

FRL (Mts)

PRESENT
Energy
(MU)

LAST YEAR

Level (Mts)

Energy
(MU)

LAST DAY

MONTH

Level (Mts)

Energy
(MU)

Inflow
(Mus)

Usage
(Mus)

Prog. Inflow
(Mus)

Prog. Usage
(Mus)
21.80

JALAPUT

818.39

838.40

534

828.61

196

826.25

144

1.61

2.26

13.53

SRISAILAM

243.84

270.70

1392

254.26

138

245.64

0.00

0.00

0.00

0.00

N.SAGAR

149.30

179.90

1398

156.36

34

158.92

0.00

0.00

0.00

23.83

LINGANAMAKKI

522.73

554.50

4557

533.17

529

544.60

2006

5.95

4.04

38.97

59.99

SUPA

495.00

564.00

3159

522.58

542

534.75

1070

3.38

1.56

14.74

98.13

IDUKKI

694.94

732.43

2148

704.45

380

717.63

1087

26.75

5.46

82.67

98.79

KAKKI

908.30

981.45

916

937.51

112

967.38

491

11.65

3.50

37.46

54.11

NILAGIRIS

--

--

1504

--

293

--

694

7.39

0.92

37.75

11.58

TOTAL

--

--

15608

--

2224

--

5492

56.73

17.74

225.12

368.23

Note: The Reservoirs data are of previous day and Cumulative figures for the month is upto previous day

9. DETAILS OF OVER DRAWAL OVER A DAY WHEN FREQUENCY < 49.9 HZ


CONSTITUENTS

AP

TG

KARNATAKA

KERALA

TAMILNADU

PONDY

AVERAGE MW ( F<49.9)

55.92

50.46

44.45

65.99

56.30

7.25

OD MU'S ( F<49.9)

0.13

0.14

0.09

0.59

0.21

0.03

OD NO OF BLOCK( F<49.9)

11

36

15

14

GENERATOR

NLCII

NLCEXPI

RSTP

SEPL

LANCO

MEPL

AVERAGE MW ( F<49.9)

-20.80

-3.82

-16.30

-11.16

0.00

-0.80

Under Injection MU'S ( F<49.9)

-0.19

-0.01

-0.05

-0.06

0.00

0.00

Under Injection NO OF BLOCK( F<49.9)

36

12

13

22

16

10. SIGNIFICANT EVENTS (IF ANY) :

11. SYSTEM CONSTRAINTS (IF ANY) :


12. WEATHER CONDITIONS:
CLOUDY,SCATTERED RAINS IN WHOLE SOUTHERN REGION

Page 5 of 16

You might also like