You are on page 1of 1

JOB SAFETY

ANALYSIS
JOB DESCRIPTION: DATE:

JSA NO.:
NEW: Yes / No
REVISED: Yes / No
INSTRUCTIONS ON
NEXT PAGE
LOCATION: AREA:
REQUIRED AND / OR
RECOMMENDED PPE:
- Regular PPE: coverall, Safety shoe, hard hat, safety glass, ear protection.
SEQUENCE
OF BASIC JOB
STEPS
POTENTIAL HAZARDS
MITIGATION
REQUIRED
STATUS / REMARKS
1. Step 1
Prepare paper
work (PTW,
Method Statement)
- No Drawing
- No Work Permit
- No Method of Statement


-Obtain approved shop
drawing
-Obtain Work Permit
-Obtain approved Method
of Statement

Completed all preparation
works before start the work.
2. Step 2
Preparation
- No safety shoes
- No safety glass
- No helmet
- No gloves
- No safety belt

- Wear safety shoes
- Wear safety glass
- Wear helmet
- Wear gloves
- Wear safety belt

To prepare PPE before start the
work.
3. Step 3
Equipment
- No inspected hand tools
- No inspected drilling machine.
- Slip/Trip hazards
- No inspected scissor lift


- Inspected hand tools
- Inspected drilling machine.
- Checking hazards
- Inspected scissor lift


To check before start the
work.
4. Step 4
Working
-Scissor Lift could be collapsed
- Ladder may be fall down
-Material & equipment and
worker could be dropped out of
working platform of Lift
- Caused fire by spark of hand
machines.
- Fall from high level
- Electric shock.
- falling object
- pinch point ?


- Scissor Lift arranged as
approved type.
- Keep strongly ladder
- Hand tools is contained in
box.
-To arrange Fire
Extinguisher
- Using safety harness
- Checking equipment
before using.
- using tool box
- Nothing stuck at roof area

Training safety rules &
regulation and knowledge of
contruction method for worker
prior working.
Inspected and tagged by MW
Group





5. Step 5
(finishing
work)
Housekeeping and
clean work site.
- Work area is duty
- Material is not tidy




- Clean work area
- Material is tidy




Supervisor must be checked
before leave working area

Prepared by
Supervisor/ Engineer

Reviewed by:
CM/PM Sub-Contractor:

Review by
JOTUN
Supervisor/Engineer

Approved by:
JOTUN (Construction
Manager/ Project Manager)

Review by:
JOTUN EHS
Supervisor

Approved by:
JOTUN EHS Manager