You are on page 1of 132

DAFTAR HARGA SATUAN BAHAN DAN UPAH

NO.

URAIAN HARGA UPAH

HARGA
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

Pekerja
Mandor
Tukang Batu
Tukang Kayu
Tukang Besi
Tukang Keramik
Tukang Plafond
Tukang Pasang Pipa
Tukang Cat
Tukang Las
Tukang Sumur Bor
Pembantu Ahli Bor
Operator terampil
Kepala Tukang
Jaga Malam

1
2
3
4
5
6

TIMBUNAN / GALIAN
Tanah Timbun
Pasir Timbun / urug
Pasir
Pasir Beton
Sirtu
Tanah Humus

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

82,400.00
105,200.00
118,800.00
132,400.00
141,500.00
250,000.00

M3
M3
M3
M3
M3
M3

B.
1
2
3
4
5
6
7
8
9
10

BAHAN PEREKAT
Semen PPC
Cement Putih/ Warna
Lem Kayu
Lem Vinyl / Karet
Perekat Kaca
Waterproof
Lem pipa
Lem pipa
Seal tape
Air kerja

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

1,300.00
2,250.00
40,000.00
45,000.00
85,000.00
60,000.00
78,000.00
12,000.00
3,100.00
35.00

Kg
Kg
Kg
Kg
Kg
Kg
Kg
tube
roll
Ltr

C.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

BATU / BATU CETAKAN


Batu Kerikil
Batu kali
Batu Pecah 1 - 2 cm
Batu Pecah 2 - 3 cm
Batu Pecah 3 - 5 cm
Batu Pecah 5 - 7 cm
Batu Pecah 7 - 10 cm
Batu pecah 15 - 20 cm
Batu pecah 10 - 15 cm
Batu Kacang/jagung 0,5 - 1 cm
Batu Bata 5x10x20 cm
Batu Bataco
10x20x40 cm
Batu Bataco
9x18x36 cm
Batu Krawang 10x10x20 cm

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

300,400.00
255,100.00
288,800.00
285,200.00
276,200.00
268,900.00
231,000.00
203,100.00
213,100.00
230,000.00
500.00
3,800.00
3,600.00
5,000.00

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Bh
Bh
Bh
Bh

URAIAN HARGA BAHAN

65,000.00
75,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
75,000.00
75,000.00
110,000.00
70,000.00

SATUAN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

HARGA

Org/Hari
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OM
SATUAN

NO.

URAIAN HARGA UPAH

HARGA

SATUAN

15
16
17
18
19
20
21
22
23
24

Batu Krawang 12x11x24 cm


Bondbeam/Kanstin 60x30x20 cm
Paving Blok beton tbl 6 cm
Cob stone uk 10 x 20 x 40 cm
Con Block Warna type Uni Pave tbl 6 cm
Con Block Warna type Dosex Six tbl 6 cm
Con Block Warna type Hexagon tbl 6 cm
Con Block K 125
Con Block K 175
Bodem 30cm

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

5,500.00
40,000.00
2,000.00
13,800.00
1,600.00
1,600.00
1,600.00
2,200.00
2,500.00
27,000.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

D.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

KAYU / LANGIT-LANGIT
Balok Kayu Damar Laut / Kelas I
Papan Kayu Damar Laut / Kelas I
Balok Kayu Meranti / Kelas II
Papan Kayu Meranti / Kelas II
Kayu Sembarang Keras / Kelas III
Kayu Bekisting
Papan Sembarang
Kayu Lat Asbes 5x30x400 mm
Kayu Dolken / kayu laut 7,5 - 10
Bambu 6 - 8 / 600 cm
Bilik bambu
Kayu Profil 1"
Kayu Profil 2"
Kayu Profil 3"
Kayu Profil 4"
Profil Gypsum 2"
Profil Gypsum 3"
Profil Gypsum 4"
Profil Gypsum 6"
Plywood 120 x 240 tbl. 9 mm
Plywood 120 x 240 tbl. 6 mm
Plywood 120 x 240 tbl. 4 mm
Teakwood 120 x 240 tbl. 3 mm
Triplek Jati 120 x 240 tbl. 3 mm
Triplek Sungkai 120 x 240 tbl.3 mm
Formica 120 x 240 cm
Gypsum 120 x 240 tbl. 6 mm
Gypsum 120 x 240 tbl. 9 mm
Gypsum 120 x 240 tbl.12 mm
Beeding gypsum
Tepung gypsum
Asbes Lokal 100 x 100 cm
Asbes Atrisco 100 x 100 cm t= 4 mm
Akustik 30 x 30 cm
Akustik 30 x 60 cm
Akustik 60 x 120 cm
Rangka Furing Ceiling Gypsum
Rangka Furing Dinding Gypsum
Tepung Dempul
Kain Kasa/Paper Tape

@Rp. 10,370,400.00
@Rp. 10,370,000.00
@Rp. 6,814,800.00
@Rp. 7,037,000.00
@Rp. 5,000,000.00
@Rp. 3,833,300.00
@Rp.
80,700.00
@Rp.
7,400.00
@Rp.
52,000.00
@Rp.
13,800.00
@Rp.
14,000.00
@Rp.
6,500.00
@Rp.
12,500.00
@Rp.
18,800.00
@Rp.
25,100.00
@Rp.
4,600.00
@Rp.
5,400.00
@Rp.
6,700.00
@Rp.
8,500.00
@Rp.
135,000.00
@Rp.
95,000.00
@Rp.
65,000.00
@Rp.
50,000.00
@Rp.
120,000.00
@Rp.
120,000.00
@Rp.
74,300.00
@Rp.
60,000.00
@Rp.
71,500.00
@Rp.
93,500.00
@Rp.
7,000.00
@Rp.
10,400.00
@Rp.
14,000.00
@Rp.
15,000.00
@Rp.
8,500.00
@Rp.
17,100.00
@Rp.
68,300.00
@Rp.
50,000.00
@Rp.
60,000.00
@Rp.
10,500.00
@Rp.
60,000.00

M3
M3
M3
M3
M3
M3
Kpg
Btg
Btg
Btg
M2
M'
M'
M'
M'
M'
M'
M'
M'
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Btg
Kg
Lbr
Lbr
Lbr
Lbr
Lbr
M2
M2
Kg
Roll

NO.
E.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52

URAIAN HARGA UPAH


BESI / KAWAT / ALLUMINIUM
Besi Beton Polos
Besi Beton Ulir
Besi Profil WF/INP
Besi CNP
Besi Plat Strip
Kawat Beton
Kawat Licin / seng polos
Kawat Duri
Kawat Nyamuk
Kawat Kasa
Kawat Harmonika # 1"
Kawat Burung
Kawat Las
Pagar Kawat BRC 120 polos
Pintu Besi
Pintu Gulung Besi
Pintu Lipat Besi
Pintu Rolling Door
Pintu lipat (folding door) bahan plastik/PVC
Jerajak Besi Bermotif
Jerajak Besi Strip
Kosen Pintu Alluminium ( 80 x 210 ) Coklat
Kosen Pintu Alluminium ( 80 x 210 ) putih
Kosen Jendela Alluminium ( 120 x 60 ) coklat
Kosen Jendela Alluminium ( 120 x 60 ) putih
Pintu Alluminium ( 80 x 210 ) Coklat
Pintu Alluminium ( 80 x 210 ) putih
Profil Alluminium T
Profil rangka pintu aluminium
Almunium strip
Kosen Pintu / jendela aluminium coklat
Kosen Pintu / jendela aluminium putih
Vention Blinds
Verticals Blinds
Bingkai Naco Niki hitam
Bingkai Naco Niki putih
Paku Beton 0,5 - 2"
Paku Beton 2" - 5"
Paku Biasa 0,5 - 2"
Paku Biasa 2 - 5"
Paku seng
Sekrup macam Ukuran
Sekrup 0,5 - 2"
Sekrup fisher
Bout 5/8" - 8"
Bout Angker 3/4" - 10"
Bout Ramset
Rangka Atap Twin light
Wiremesh M6 (2,1 x 5,4)
Wiremesh M8 (2,1 x 5,4)
Furing untuk rangka utama
Furing untuk rangka pembagi

HARGA

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

15,000.00
16,000.00
17,300.00
17,250.00
17,250.00
18,700.00
22,500.00
4,500.00
19,000.00
13,000.00
25,000.00
15,000.00
45,000.00
250,000.00
820,000.00
830,000.00
840,000.00
467,000.00
467,000.00
382,030.00
350,000.00
450,000.00
420,000.00
350,000.00
320,000.00
750,000.00
650,000.00
8,500.00
132,000.00
30,000.00
90,000.00
85,000.00
175,000.00
185,000.00
195,000.00
165,000.00
300.00
500.00
17,000.00
17,000.00
250.00
21,200.00
300.00
400.00
20,000.00
45,400.00
1,500.00
300,000.00
352,000.00
605,000.00
34,100.00
34,800.00

SATUAN

Kg
Kg
Kg
Kg
Kg
Kg
Kg
M'
M2
M2
M2
M2
Kg
Lbr
M2
M2
M2
M2
M2
M2
M2
Bh
Bh
Bh
Bh
Bh
Bh
M'
M'
M'
M'
M'
M2
M2
M2
M2
Bh
Bh
Kg
Kg
Bh
Kg
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
Btg
Btg

NO.

URAIAN HARGA UPAH

53
54
55

Furing untuk rangka ke dinding


Pengikat rangka furing
Kawat penggantung+klipper rangka furing

F.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

PENUTUP LANTAI DAN DINDING


Ubin granito 30 x 30 cm
Ubin granito 40 x 40 cm
Ubin granito 60 x 60 cm
Ubin Mosaik 30 x 30 cm
Ubin Marmer Ex.DN
Ubin teralux marmer 30 x 30 cm
Ubin teralux marmer 40 x 40 cm
Ubin teralux marmer 60 x 60 cm
Keramik Standart 60 x 60 cm
Ubin keramik 10 x 20 cm
Ubin keramik 20 x 20 cm
Ubin keramik 20 x 25 cm
Ubin keramik 25 x 25 cm
Ubin keramik 30 x 30 cm
Ubin keramik 30 x 30 cm anti slip
Ubin keramik 33 x 33 cm
Ubin keramik 40 x 40 cm
Ubin keramik artistik 5 x 20 cm
Ubin keramik artistik timbul 5 x 20 cm
Ubin keramik artistik timbul 10 x 10 cm
Ubin keramik artistik timbul 10 x 20 cm
Ubin keramik Essenza 30 x 30 cm
Ubin keramik Essenza 40 x 40 cm
Porselin 11 x 11 cm putih
Porselin 11 x 11 cm, warna
Porselin 15 x 15 cm, putih
Porselin 15 x 15 cm, warna
Plint ubin teralux marmer 10 x 30 cm
Plint ubin teralux marmer 10 x 40 cm
Plint ubin teralux marmer 10 x 60 cm
Plint ubin granito 10 x 30 cm
Plint ubin granito 10 x 40 cm
Plint ubin granito 10 x 60 cm
Plint ubin keramik 10 x 30 cm
Plint ubin keramik 10 x 40 cm
Plint ubin keramik 10 x 60 cm
Plint ubin keramik 15 x 30 cm
Plint ubin keramik 15 x 40 cm
Plint ubin keramik 15 x 60 cm
Batu Lapis Dinding 7x3x24
Batu kacang
Batu tempel hitam
Batu Poros
Karpet biasa
Carpet 80 % wool, 20 % nylon
Feltex carpet 100 % wool-T-21
Underlyer tebal 6 mm / rubber corrugated
Vynil asbes 30 x 30 cm
Vynil karet 30 x 30 cm KL I

HARGA
@Rp.
@Rp.
@Rp.

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

SATUAN

8,300.00
1,000.00
13,200.00

Btg
set
set

26,300.00
46,600.00
104,700.00
15,290.00
330,000.00
27,200.00
48,400.00
109,500.00
33,000.00
1,300.00
2,600.00
3,250.00
3,750.00
5,910.00
6,800.00
6,500.00
12,000.00
5,000.00
15,000.00
15,000.00
22,000.00
21,200.00
37,600.00
1,200.00
1,500.00
2,300.00
2,500.00
10,000.00
13,000.00
20,000.00
28,000.00
62,800.00
157,200.00
4,200.00
5,600.00
8,400.00
6,300.00
8,400.00
12,600.00
1,818.00
40,000.00
104,500.00
140,000.00
20,000.00
90,000.00
90,000.00
110,000.00
8,200.00
9,800.00

Bh
Bh
Bh
Bh
M2
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
M2
M2
M2
M2
Bh
Bh

NO.

URAIAN HARGA UPAH

50
51
52
53
54
55
56
57

Vynil karet 30 x 30 cm KL II
Vynil motif kembang ex DN 30 x 30 cm
Vynil wall covering lebar 50 cm
Paku Pancing 60 - 230
Wallpaper
Sekrup 3,5"
Perquet Jati
Gymfloor

G.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

PENUTUP ATAP
Atap Genteng Beton
Atap Genteng Keramik
Atap Sirap
Atap Genteng Metal/Multi Roof ( 4 tingkat )
Atap Genteng Asbes Cement 0,32
Atap Aluminium gelombang tebal 0,55
Atap Seng Alumi Zinc warna 0,35
Atap Twin Light
Atap Seng gelombang 6' bjls
Atap Seng gelombang 7' bjls
Atap Seng gelombang 8' bjls
Atap Seng Super Deck 3' x 6' tbl.0,30
Roof light fibreglass gelombang 180 x 90 cm
Atap Asbes gelombang 2,1 x 1,05 tbl.4 mm
Genteng bubung palentong
Genteng bubung palentong super
Genteng bubung kodok
Atap tylux
Nok genteng Beton
Nok genteng Keramik
Nok sudut genteng Keramik
Nok genteng Asbes gelombang Cement 0,35
Nok Alluminium standart 40 cm 18 swg 22
Rabung tylux
Rabung seng 7"
Rabung/ Nok genteng
Rabung/ Nok genteng warna
Rabung genteng metal
Rabung Alumi Zinc warna
Rangka atap baja ringan sederhana (siap pasang)
Rangka atap baja ringan (siap pasang)
Seng plat bjls 32
Seng plat bjls 30
Seng plat bjls 28
Sisalation / aluminium foil
Paku Seng + Ring karet
Paku Seng + Ring karet
Paku hak panjang 15 cm

HARGA
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

SATUAN

9,100.00
9,400.00
65,000.00
700.00
33,600.00
20,400.00
368,500.00
79,800.00

Bh
Bh
M2
Bh
M2
Kg
M2
M2

6,000.00
20,000.00
940.00
65,000.00
66,000.00
98,200.00
69,240.00
90,000.00
48,000.00
56,000.00
61,000.00
68,800.00
46,400.00
38,000.00
9,400.00
12,700.00
9,600.00
50,000.00
12,200.00
35,000.00
105,000.00
25,000.00
52,200.00
38,000.00
20,000.00
4,000.00
5,000.00
25,000.00
23,100.00
120,000.00
140,000.00
75,000.00
70,000.00
68,000.00
20,000.00
25,000.00
350.00
30,500.00

Bh
Bh
Bh
Lbr
Lbr
Lbr
M2
M2
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Bh
Bh
Bh
Lbr
Bh
Bh
Bh
Lbr
M2
Lbr
Lbr
Bh
Bh
Bh
Bh
M2
M2
Lbr
Lbr
Lbr
M2
Kg
Bh
Kg

NO.

URAIAN HARGA UPAH

HARGA

SATUAN

H.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

KUNCI DAN KACA


Kunci tanam antik
Kunci tanam biasa
Kunci tanam kamar mandi
Kunci silinder
Kunci selot
Kunci lemari
Engsel pintu 4"
Engsel jendela 3"
Engsel angin
Kait angin
Rel pintu dorong
Sealent
Spring knip
Door closer
Door handle
Door stop
Espanyolet
Kaca Block 20 x 20 cm
Kaca Polos tbl. 3 mm
Kaca Polos tbl. 5 mm
Kaca Polos tbl. 8 mm
Kaca Reyben tbl. 5 mm
Kaca Reyben tbl. 8 mm
Kaca buram tbl.3 mm
Kaca buram tbl.5 mm
Kaca buram tbl.8 mm
Kaca cermin tebal 5 mm
Kaca cermin tebal 6 mm
Kaca cermin tebal 8 mm
Kaca patri
Kaca wireglass
Rangka daun naco (1 daun)
Rangka daun naco (8 daun)
Rangka daun naco (5 daun)
Rangka daun naco (10 daun)
Kaca Reyben Naco 30 x 60 cm tbl.5 mm
Kaca Polos Naco tbl.5 mm

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

225,000.00
85,000.00
50,000.00
40,000.00
35,000.00
12,500.00
15,000.00
11,000.00
25,000.00
15,000.00
225,000.00
40,000.00
9,100.00
110,000.00
115,000.00
40,000.00
88,500.00
30,000.00
80,000.00
130,000.00
215,000.00
156,000.00
265,000.00
96,000.00
120,000.00
265,000.00
175,000.00
210,000.00
280,000.00
275,000.00
151,300.00
17,000.00
146,000.00
60,000.00
170,000.00
13,500.00
11,500.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Kg
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
Set
Set
Set
Set
Lbr
kaki

I.
1
2
3
4
5
6
7
8
9
10
11
12
13

CAT / MINYAK
Cat Dasar
Cat Tembok setara Vinilex
Cat Tembok setara ICI
Cat Minyak
Cat Menie Kayu
Cat Menie Besi
Cat Sending
Cat Melamix
Cat Vernis Jadi
Cat genteng
Plamir
Dempul Gypsum
Dempul Cat

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

22,300.00
22,700.00
110,000.00
59,100.00
43,000.00
43,000.00
60,000.00
65,000.00
50,000.00
55,000.00
15,700.00
10,400.00
31,600.00

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

NO.

URAIAN HARGA UPAH

HARGA

SATUAN

14
15
16
17
18
19
20
21
22

Minyak Cat
Minyak Bekisting
Residu / Kolter
Soda Api
Sabun
Kuas kecil
Ampelas/Kertas Pasir
Solar
Minyak pelumas

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

15,000.00
6,300.00
6,700.00
12,100.00
10,300.00
15,000.00
1,800.00
4,500.00
44,000.00

Kg
Ltr
Ltr
Kg
Kg
Bh
Lbr
Ltr
Ltr

J.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

SANITASI / PIPA
Kloset duduk / monoblok Lengkap tangki
Kloset duduk / monoblok tanpa tangki
Kloset jongkok biasa
Bakkif Porselen
Wastafel warna (standard)
Urinoir
Kran air 1/2" - 3/4"
Kran air leher angsa 1/2"
Kran Shower
Kran Cebok
Bak fibre 0,3 M3
Bak fibre 1 M3
Bak cuci piring steinless 2 Lobang
Bak cuci piring teraso 2 Lobang
Tempat sabun keramik
Floor Drain 4" standard
Tutup Bak air 1" Kuningan
Instalasi air Bersih
Instalasi air Kotor/Limbah
Buis Beton 1/2 15 cm
Buis Beton 1/2 20 cm
Buis Beton 1/2 30 cm
Buis Beton 15 cm
Buis Beton 20 cm
Buis Beton 30 cm
Buis Beton 40 cm
Buis Beton 50 cm
Buis Beton 60 cm
Buis Beton 80 cm
Buis Beton 100 cm
Bodem pracetak 1/2 30 cm
Pipa PVC Tipe AW 1/2"
Pipa PVC Tipe AW 3/4"
Pipa PVC Tipe AW 1"
Pipa PVC Tipe AW 11/4"
Pipa PVC Tipe AW 11/2"
Pipa PVC Tipe AW 2"
Pipa PVC Tipe AW 21/2"
Pipa PVC Tipe AW 3"
Pipa PVC Tipe AW 4"
Pipa PVC Tipe AW 5"

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

2,050,000.00
1,350,000.00
165,000.00
2,750,000.00
425,000.00
522,500.00
27,300.00
77,200.00
50,000.00
114,000.00
400,000.00
591,000.00
475,000.00
247,500.00
45,000.00
25,000.00
13,800.00
100,000.00
125,000.00
11,300.00
17,800.00
33,000.00
20,000.00
30,000.00
50,000.00
80,000.00
90,000.00
176,000.00
242,000.00
360,000.00
33,000.00
2,300.00
3,632.00
5,615.00
8,864.00
14,260.00
20,495.00
29,306.00
42,499.00
62,790.00
86,920.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Ttk
Ttk
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
Bh
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'

NO.
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95

URAIAN HARGA UPAH


Pipa PVC Tipe AW 6"
Pipa PVC Tipe AW 8"
Pipa PVC Tipe AW 10"
Pipa PVC Tipe AW 12"
Pipa PVC Tipe D 2"
Pipa PVC Tipe D 3"
Pipa PVC Tipe D 4"
Pipa Besi Hitam 1/2"
Pipa Besi Hitam 3/4"
Pipa Besi Hitam 1"
Pipa Besi Hitam 11/2"
Pipa Besi Hitam 2"
Pipa Besi Hitam 21/2"
Pipa besi (mustang)
Pipa Galvanis 1/2"
Pipa Galvanis 3/4"
Pipa Galvanis 1"
Pipa Galvanis 11/4"
Pipa Galvanis 11/2"
Pipa Galvanis 2"
Pipa Galvanis 21/2"
Pipa Galvanis 4"
Pipa Galvanis 5"
Pipa Galvanis 6"
Elbow GIP 1 1/4"
Elbow GIP 1 1/2"
Stop kran 1 1/4"
Stop kran 1 1/2"
Tee GIP 1 1/2"
Dop GIP 1 1/4"
Dop GIP 1 1/2"
Socket GIP 3/4"
Socket GIP 2"
Socket GIP 3"
Socket GIP 4"
Socket GIP 6"
Gate Valve 6"
Gate Valve 4"
Gate Valve 3"
Collar 6"
Collar 4"
Collar 3"
Tee PVC 6 x 6"
Tee PVC 6 x 4"
Tee PVC 6 x 3"
Tee PVC 6 x 2"
Tee PVC 4 x 3"
Tee PVC 4 x 2"
Tee PVC 3 x 2"
Tee PVC 3 x 3"
Pig busa 6"
Pig busa 4"
Pig busa 3"
Pig busa 2"

HARGA
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

134,007.00
213,703.00
320,600.00
509,795.00
11,500.00
23,700.00
34,000.00
14,800.00
20,100.00
29,500.00
37,600.00
47,600.00
50,200.00
230,000.00
14,810.00
21,780.00
27,870.00
34,500.00
54,270.00
78,580.00
102,800.00
154,770.00
240,000.00
327,250.00
19,250.00
19,250.00
267,850.00
267,850.00
22,000.00
8,250.00
8,250.00
9,625.00
35,000.00
70,000.00
110,000.00
225,000.00
1,800,000.00
850,000.00
726,000.00
500,000.00
350,000.00
250,000.00
435,600.00
405,000.00
381,150.00
326,700.00
105,700.00
105,700.00
58,900.00
58,900.00
846,660.00
632,440.00
495,950.00
390,000.00

SATUAN
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
btg
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

NO.
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149

URAIAN HARGA UPAH


Cup 4"
Cup 3"
Cup 2"
Valve Cover CI
Long bend PVC 6" x 90
Long bend PVC 6" x 45
Long bend PVC 6" x 22,5
Long bend PVC 4" x 90
Long bend PVC 4" x 45
Long bend PVC 3" x 90
Long bend PVC 3" x 22.5
Reduser PVC 4" x 3"
Reduser PVC 4" x 2"
Reduser PVC 6" x 4"
Reduser PVC 6" x 3"
Single Air Valve 4"
Single Air Valve 6"
Flange Steel 6"
Flange Steel 4"
Flange Steel 3"
Bend Steel 6"x45
Bend Steel 4"x45
Wall Flange 4"
Flange Spigot 3"
Flange Spigot 4"
Flange Spigot 6"
TY Steel 4"
Elbow steel 110 x 90
Elbow PVC 110 x 90
Rubber Packing t : 3 mm
Solvent Cement
Bolt & Nut 5/8 x 3"
Pelampung 1 1/4"
Water meter 1/2''
Cleam sadle 1/2"
Pipa GIP 1/2"
Elbow GIP 1/2"
Plengking 1/2"
Double naple 1/2"
Stop derat 1/2"
Seal tape
Elbow derat 1/2"
Sewa Pompa
Bak air alumunium kap. 1000 Liter
Pelampung 1 1/4"
Sewa mesin pompa air
Sewa pipa shawn 40 (20 batang)
Alat bantu mesin sumur bor
Bak fiber kap. 3000 Liter
Gravel pack
Bentonite
Pompa submersible 1 Ltr/det
Kabel pompa 1 phase
Panel on/off + stabilisator 170 - 220 Vlt

HARGA
@Rp.
58,000.00
@Rp.
29,000.00
@Rp.
16,500.00
@Rp.
190,000.00
@Rp.
320,000.00
@Rp.
265,000.00
@Rp.
215,000.00
@Rp.
120,000.00
@Rp.
107,000.00
@Rp.
82,000.00
@Rp.
71,000.00
@Rp.
47,500.00
@Rp.
44,000.00
@Rp.
114,000.00
@Rp.
99,000.00
@Rp. 2,750,000.00
@Rp. 4,680,000.00
@Rp.
390,000.00
@Rp.
196,730.00
@Rp.
152,330.00
@Rp.
570,000.00
@Rp.
380,000.00
@Rp.
72,600.00
@Rp.
145,000.00
@Rp.
255,000.00
@Rp.
500,000.00
@Rp.
400,000.00
@Rp.
418,800.00
@Rp.
191,440.00
@Rp.
94,000.00
@Rp.
78,000.00
@Rp.
5,500.00
@Rp.
262,000.00
@Rp.
295,000.00
@Rp.
81,250.00
@Rp.
14,810.00
@Rp.
14,500.00
@Rp.
15,625.00
@Rp.
11,000.00
@Rp.
46,875.00
@Rp.
3,125.00
@Rp.
14,500.00
@Rp.
100,000.00
@Rp. 2,700,000.00
@Rp.
262,000.00
@Rp.
100,000.00
@Rp.
50,000.00
@Rp.
20,000.00
@Rp. 3,900,000.00
@Rp.
146,000.00
@Rp.
20,000.00
@Rp. 13,000,000.00
@Rp.
15,000.00
@Rp. 4,350,000.00

SATUAN
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
m2
kg
bh
Bh
Bh
Bh
M
Bh
Bh
Bh
Bh
rol
Bh
Hari
Unit
Bh
Hari
Hari
Hari
Unit
M3
Kg
Unit
Bh
Set

NO.

URAIAN HARGA UPAH

HARGA

SATUAN

150
151
152
153
154
155
156

Elektrikal magnetic kontrol pompa


Fitting Knee AW 1"
Fitting Tee AW 1"
Fitting Socht AW 1"
Bocht LL-D 1"
Union Socht 1"
D-Nipple 1"

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

900,000.00
5,200.00
7,200.00
4,700.00
24,800.00
7,400.00
18,200.00

Set
Bh
Bh
Bh
Bh
Bh
Bh

K.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

LISTRIK / ACSESORIES
Lampu TL 1 x 20 W Lengkap kotak
Lampu TL 1 x 40 W Lengkap kotak
Lampu TL 2 x 20 W Lengkap kotak
Lampu TL 2 x 40 W Lengkap kotak
Lampu TL 2 x 20 W + sarang sisir
Lampu TL 2 x 40 W + sarang sisir
Lampu TL Bambu 1 x 20 W Lengkap
Lampu TL Bambu 1 x 40 W Lengkap
Lampu XL 5 W
Lampu XL10 W
Lampu XL18 W
Lampu XL24 W
Lampu Downlight 5 W Lengkap
Fitting lampu pijar
Fitting lampu XL biasa
Fitting lampu downlight 3"
Fitting lampu downlight 4"
Lampu Pijar 5 w
Lampu Pijar 10 w
Lampu Pijar 15 w
Lampu Pijar 20 w
Lampu Pijar 25 w
Lampu Pijar 40 w
Stop Kontak Tanam
Saklar Tunggal
Saklar Ganda
Saklar Triple
Zekring box 1 grup
Zekring box 2 grup
Zekring box 3 grup
Zekring box 4 grup
MCB 2 Ampere
MCB 4 Ampere
MCB 6 Ampere
MCB 8 Ampere
Kabel Listrik NYA 1,5 mm
Kabel Listrik NYA 2,5 mm
Kabel Listrik NYA 4 mm
Kabel Listrik NYM 2 1,5 mm
Kabel Listrik NYM 2 2,5 mm
Kabel Listrik NYM 2 4 mm
Instalasi listrik titik api / Lampu Nyala

@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.

54,400.00
60,500.00
163,400.00
183,900.00
365,000.00
435,000.00
108,900.00
123,400.00
25,400.00
29,000.00
33,900.00
38,700.00
54,500.00
7,500.00
10,000.00
33,000.00
40,000.00
7,500.00
8,000.00
8,500.00
9,000.00
9,500.00
10,500.00
9,200.00
16,400.00
21,800.00
24,200.00
26,600.00
31,400.00
38,500.00
46,200.00
32,000.00
35,455.00
44,627.00
90,182.00
1,270.00
2,160.00
3,420.00
4,920.00
9,540.00
10,340.00
90,000.00

Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Bh
Bh
Bh
Bh
Unt
Unt
Unt
Unt
Unt
Unt
Unt
Unt
M'
M'
M'
M'
M'
M'
Ttk

11

DAFTAR ANALISA BIAYA KONSTRUKSI TAHUN 2012


DINAS CIPTA KARYA DAN PERTAMBANGAN
KAB. DELI SERDANG
SNI 03-2835-2002
PA

6.2.

Pagar sementara 1 m' dari seng gelombang tinggi 2 meter


SNI 03-2835-2002 / 6.2
Bahan Kayu dolken
1.2500 Btg x Rp
52,000.00
Semen PPC
2.5000 Kg
x Rp
1,300.00
Seng gelombang
1.2000 Lbr x Rp
48,000.00
Pasir
0.0050 M3 x Rp
118,800.00
Koral beton
0.0090 M3 x Rp
300,400.00
Kayu 5/7
0.0720 M3 x Rp
3,833,300.00
Paku biasa 2" - 5"
0.0600 Kg
x Rp
17,000.00
Jumlah (1)
Upah

PA

Tukang kayu
Pekerja
Kepala tukang
Mandor

0.2000
0.4000
0.0200
0.0200

Oh
Oh
Oh
Oh

Pengukuran dan Pemasangan bouwplank 1 m'


SNI 03-2835-2002 / 6.4
Bahan Kayu 5/7
0.0120 M3
Paku biasa 2" - 5"
0.0200 Kg
Kayu papan 3/10
0.0070 M3

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

65,000.00
3,250.00
57,600.00
594.00
2,703.60
275,997.60
1,020.00
406,165.20

Rp
95,000.00
Rp
65,000.00
Rp
110,000.00
Rp
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

19,000.00
26,000.00
2,200.00
1,500.00
48,700.00
454,865.20
454,865.00

x Rp
3,833,300.00
x Rp
17,000.00
x Rp
3,833,300.00
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

45,999.60
340.00
26,833.10
73,172.70

x
x
x
x

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,500.00
6,500.00
1,100.00
375.00
17,475.00
90,647.70
90,647.00

52,000.00 =

Rp

88,400.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

804,993.00
5,100.00
13,650.00
3,564.00
15,020.00
72,000.00
1,002,727.00

x
x
x
x

6.4

Upah

PA

PEKERJAAN PERSIAPAN

Tukang kayu
Pekerja
Kepala tukang
Mandor

0.1000
0.1000
0.0100
0.0050

Oh
Oh
Oh
Oh

Pembuatan Gudang Semen dan Alat-Alat 1 M2


SNI 03-2835-2002 / 6.5
Bahan Dolken Kayu dia. 8-10/400 cm
1.7000 btg

Rp
95,000.00
Rp
65,000.00
Rp
110,000.00
Rp
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

6.5

Kayu
Paku Biasa
Semen PPC
Pasir
Kerikil
Seng Gelombang bjls

0.2100
0.3000
10.5000
0.0300
0.0500
1.5000

m3
kg
kg
m3
m3
lbr

x Rp
x
x
x
x
x
x

Rp
3,833,300.00
Rp
17,000.00
Rp
1,300.00
Rp
118,800.00
Rp
300,400.00
Rp
48,000.00
Jumlah (1)

=
=
=
=
=
=
=

12

PA

Upah

Tukang kayu
Pekerja
Kepala tukang
Mandor

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

190,000.00
65,000.00
22,000.00
3,750.00
280,750.00
1,283,477.00
1,283,477.00

6.8

Membersihkan lapangan dan perataan 1 m


SNI 03-2835-2002 / 6.8
Pekerja
0.1000 Oh
Mandor
0.0050 Oh

x Rp
x Rp
Jumlah

65,000.00 =
75,000.00 =
=

Rp
Rp
Rp

6,500.00
375.00
6,875.00

x Rp
x Rp
Jumlah

65,000.00 =
75,000.00 =
=

Rp
Rp
Rp

433,355.00
24,975.00
458,330.00

x Rp
x Rp
Jumlah

65,000.00 =
75,000.00 =
=

Rp
Rp
Rp

325,000.00
18,750.00
343,750.00

Pasangan pagar 1m kawat jaring galvanis, tinggi 1.00 m


SNI 03-2835-2002 / 6.15
Bahan Kawat jaring galvanis/BRC
0.4340 Lbr x Rp
250,000.00 =
Jumlah (1)
=

Rp
Rp

108,500.00
108,500.00

Rp
Rp
Rp
Rp
Rp
Rp

2,730.00
440.00
3,990.00
150.00
7,310.00
115,810.00

Upah

PA

6.13
Upah

PA

6.14
Upah

PA

Bongkaran beton betulang 1 m


SNI 03-2835-2002 / 6.13
Pekerja
Mandor

6.6670 Oh
0.3330 Oh

Bongkaran dinding tembok bata merah 1m


SNI 03-2835-2002 / 6.14
Pekerja
5.0000 Oh
Mandor
0.2500 Oh

Pekerja
Kepala tukang
Tukang
Mandor

SNI 2835:2008
6.1.
Upah

PT

Oh
Oh
Oh
Oh

x
x
x
x

Rp
95,000.00
Rp
65,000.00
Rp
110,000.00
Rp
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

6.15

Upah

PT

2.0000
1.0000
0.2000
0.0500

6.2.
Upah

0.0420
0.0040
0.0420
0.0020

Oh
Oh
Oh
Oh

x
x
x
x

Rp
65,000.00
Rp
110,000.00
Rp
95,000.00
Rp
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

HARGA SATUAN PEKERJAAN TANAH

Menggali 1 m3 tanah biasa sedalam 1 meter


SNI 2835:2008 / 6.1
Pekerja
0.7500 Oh
Mandor
0.0250 Oh

Menggali 1 m3 tanah biasa sedalam 2 meter


SNI 2835:2008 / 6.2
Pekerja
0.9000 Oh
Mandor
0.0450 Oh

x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

48,750.00
1,875.00
50,625.00

x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

58,500.00
3,375.00
61,875.00

13

PT

6.4.
Upah

PT

6.5.
Upah

PT

6.6.
Upah

PT

6.7.
Upah

PT

6.8.
Upah

PT

PT

6.9.

6.10.
Upah

PT

Menggali 1 m3 tanah keras sedalam 1 meter


SNI 2835:2008 / 6.4
Pekerja
1.0000 Oh
Mandor
0.0320 Oh

x Rp.
x Rp.
Jumlah

65,000.00
75,000.00

= Rp.
= Rp.
= Rp.

65,000.00
2,400.00
67,400.00

x Rp.
x Rp.
Jumlah

65,000.00
75,000.00

= Rp.
= Rp.
= Rp.

97,500.00
4,500.00
102,000.00

x Rp.
x Rp.
Jumlah

65,000.00
75,000.00

= Rp.
= Rp.
= Rp.

78,000.00
3,375.00
81,375.00

x Rp.
x Rp.
Jumlah

65,000.00
75,000.00

= Rp.
= Rp.
= Rp.

3,250.00
375.00
3,625.00

x Rp.
x Rp.
Jumlah

65,000.00
75,000.00

= Rp.
Rp.
= Rp.

21,450.00
750.00
22,200.00

Mengurug kembali 1m3 galian


SNI 2835:2008 / 6.9
Mengurug kembali 1m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian
0.3330 Oh
x Rp.
50,625.00 = Rp.
Dibulatkan
= Rp.

16,858.13
16,858.00

Menggali 1 m3 tanah cadas sedalam 1 meter


SNI 2835:2008 / 6.5
Pekerja
1.5000 Oh
Mandor
0.0600 Oh

Menggali tanah lumpur sedalam 1 meter


SNI 2835:2008 / 6.6
Pekerja
1.2000 Oh
Mandor
0.0450 Oh

Mengerjakan 1 m2 stripping tebing setinggi 1 meter


SNI 2835:2008 / 6.7
Pekerja
0.0500 Oh
Mandor
0.0050 Oh

Membuang 1 m3 tanah sejauh 15 meter


SNI 2835:2008 / 6.8
Pekerja
Mandor

0.3300 Oh
0.0100 Oh

Memadatkan kembali 1 m3 tanah (per 20 cm)


SNI 2835:2008 / 6.10
Pekerja
0.5000 Oh
Mandor
0.0500 Oh

Mengurug 1 m3 pasir urug


SNI 2835:2008 / 6.11
Bahan Pasir urug

x Rp.
x Rp.
Jumlah

65,000.00
75,000.00

= Rp.
= Rp.
= Rp.

32,500.00
3,750.00
36,250.00

1.2000 M

x Rp.
105,200.00
Jumlah (1)

= Rp.
= Rp.

126,240.00
126,240.00

0.3000 Oh
0.0100 Oh

x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=

19,500.00
750.00
20,250.00
146,490.00

6.11.

Upah

Pekerja
Mandor

Rp.
Rp.
Rp.
Rp.

14

PT

6.12.

Memasang 1 m3 Lapisan pudel camp. 1KP:3PP:7TL untuk stabilisasi tanah


SNI 2835:2008 / 6.12
Bahan Kerikil
0.1350 M
x Rp.
300,400.00
Pasir urug
0.4000 M
x Rp.
105,200.00
Tanah liat
0.9480 M
x Rp.
82,400.00
Jumlah (1)
Upah

PT

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

Memasang 1 m3 Lapisan pudel camp. 1KP:5TL untuk stabilisasi tanah


SNI 2835:2008 / 6.13
Bahan Kerikil
0.2480 M
x Rp.
300,400.00
Tanah liat
1.2400 M
x Rp.
82,400.00
Jumlah (1)

40,554.00
42,080.00
78,115.20
160,749.20

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

52,000.00
38,000.00
4,400.00
6,000.00
100,400.00
261,149.20
261,149.00

= Rp.
= Rp.
= Rp.

74,499.20
102,176.00
176,675.20

Pekerja
Tukang batu
Kepala tukang
Mandor

Mengurug 1 m3 sirtu padat


SNI 2835:2008 / 6.15
Bahan Sirtu

0.8000
0.4000
0.0400
0.0800

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

52,000.00
38,000.00
4,400.00
6,000.00
100,400.00
277,075.20
277,075.00

6.15.

Upah

PT

0.8000
0.4000
0.0400
0.0800

Rp.
Rp.
Rp.
Rp.

6.13

Upah

PT

Pekerja
Tukang batu
Kepala tukang
Mandor

=
=
=
=

Pekerja
Mandor

Menimbun 1 m3 tanah
SNI 2835:2008 / 6.15a
Bahan Tanah timbun

1.2000 M

x Rp.
141,500.00
Jumlah (1)

= Rp.
= Rp.

169,800.00
169,800.00

0.2500 Oh
0.0250 Oh

x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

16,250.00
1,875.00
18,125.00
187,925.00

1.2000 M

x Rp.
82,400.00
Jumlah (1)

= Rp.
= Rp.

98,880.00
98,880.00

0.2500 Oh
0.0250 Oh

x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=

6.15a

Upah

Pekerja
Mandor

Rp.
Rp.
Rp.
Rp.

16,250.00
1,875.00
18,125.00
117,005.00

15

SNI 2835:2008
PP

6.1.

Memasang 1 M pondasi batu belah/kali, 1 PC : 3 PP


SNI 2835:2008 / 6.1
Bahan Batu kali 15/20 cm
1.2000 M
Semen PPC
202.0000 Kg
Pasir pasang
0.4850 M

Upah

PP

1.5000
0.7500
0.0750
0.0750

Oh
Oh
Oh
Oh

Memasang 1 M pondasi batu belah/kali, 1 PC : 4 PP


SNI 2835:2008 / 6.2
Bahan Batu kali 15/20 cm
1.2000 M
Semen PPC
163.0000 Kg
Pasir Pasang
0.5200 M

=
=
=
=

Rp.
Rp.
Rp.
Rp.

306,120.00
262,600.00
57,618.00
626,338.00

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

97,500.00
71,250.00
8,250.00
5,625.00
182,625.00
808,963.00

x Rp.
255,100.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

306,120.00
211,900.00
61,776.00
579,796.00

Pekerja
Tukang batu
Kepala tukang
Mandor

1.5000
0.7500
0.0750
0.0750

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

97,500.00
71,250.00
8,250.00
5,625.00
182,625.00
762,421.00

x Rp.
255,100.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

306,120.00
176,800.00
64,627.20
547,547.20

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

97,500.00
71,250.00
8,250.00
5,625.00
182,625.00
730,172.20
730,172.00

x Rp.
255,100.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

306,120.00
152,100.00
66,646.80
524,866.80

6.3.

Memasang 1 M pondasi batu belah/kali, 1 PC : 5 PP


SNI 2835:2008 / 6.3
Bahan Batu kali 15/20 cm
1.2000 M
Semen PPC
136.0000 Kg
Pasir Pasang
0.5440 M

Upah

PP

Pekerja
Tukang batu
Kepala tukang
Mandor

x Rp.
255,100.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

6.2.

Upah

PP

HARGA SATUAN PEKERJAAN PONDASI

Pekerja
Tukang batu
Kepala tukang
Mandor

1.5000
0.7500
0.0750
0.0750

Oh
Oh
Oh
Oh

6.4.

Memasang 1 M pondasi batu belah/kali, 1 PC : 6 PP


SNI 2835:2008 / 6.4
Bahan Batu kali 15/20 cm
1.2000 M
Semen PPC
117.0000 Kg
Pasir Pasang
0.5610 M

16

Upah

PP

Oh
Oh
Oh
Oh

Memasang 1 M pondasi batu belah/kali, 1 PC :8 PP


SNI 2835:2008 / 6.5
Bahan Batu kali 15/20 cm
1.2000 M
Semen PPC
91.0000 Kg
Pasir Pasang
0.5840 M

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

97,500.00
71,250.00
8,250.00
5,625.00
182,625.00
707,491.80
707,491.00

x Rp.
255,100.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

306,120.00
118,300.00
69,379.20
493,799.20

Pekerja
Tukang batu
Kepala tukang
Mandor

1.5000
0.7500
0.0750
0.0750

Oh
Oh
Oh
Oh

x
x
x
x

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

97,500.00
71,250.00
8,250.00
5,625.00
182,625.00
676,424.20
676,424.00

Memasang 1m3 batu kosong (anstamping)


SNI 2835:2008 / 6.9
Bahan Batu kali 15/20 cm
1.2000 M
Pasir urug
0.4320 M

x Rp.
255,100.00
x Rp.
105,200.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

306,120.00
45,446.40
351,566.40

x
x
x
x

=
=
=
=
=
=
=

50,700.00
37,050.00
4,290.00
2,925.00
94,965.00
446,531.40
446,531.00

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan

6.9.

Upah

PP

1.5000
0.7500
0.0750
0.0750

6.5.

Upah

PP

Pekerja
Tukang batu
Kepala tukang
Mandor

Pekerja
Tukang batu
Kepala tukang
Mandor

0.7800
0.3900
0.0390
0.0390

Oh
Oh
Oh
Oh

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

6.10.

Memasang 1 M pondasi siklop, 60% beton camp. 1PC:2PB:3KR dan 40% batu belah/kali
SNI 2835:2008 / 6.10
Bahan Batu kali 15/20 cm
0.4800 M
x Rp.
255,100.00 = Rp.
Besi beton
126.0000 Kg
x Rp.
15,000.00 = Rp.
Semen PPC
194.0000 Kg
x Rp.
1,300.00 = Rp.
Pasir
0.3120 M
x Rp.
118,800.00 = Rp.
Kerikil
0.4680 M
x Rp.
300,400.00 = Rp.
Kawat beton
1.8000 Kg
x Rp.
18,700.00 = Rp.
Jumlah (1)
= Rp.
Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

3.4000
0.8500
0.0850
0.1700

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

122,448.00
1,890,000.00
252,200.00
37,065.60
140,587.20
33,660.00
2,475,960.80
221,000.00
80,750.00
9,350.00
12,750.00
323,850.00
2,799,810.80
2,799,810.00

17

PP

6.11.

Memasang 1 M3 pondasi sumuran diameter 100 Cm


SNI 2835:2008 / 6.11
Bahan Batu kali 15/20 cm
0.4500 M
Semen PPC
194.0000 Kg
Pasir
0.3120 M
Kerikil
0.4680 M

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

SNI 6897:2008
PD

PD

2.4000
0.8000
0.0800
0.1190

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
255,100.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
300,400.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

114,795.00
252,200.00
37,065.60
140,587.20
544,647.80

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

156,000.00
76,000.00
8,800.00
8,925.00
249,725.00
794,372.80
794,372.00

PEKERJAAN DINDING

6.1

Memasang 1m2 dinding bata merah tebal 1 bata,


SNI 6897:2008 / 6.1
Bahan Bata merah
140.0000
Semen PPC
43.5000
Pasir pasang
0.0800

camp. 1PC : 2 PP
Bh
Kg
M

x Rp.
500.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

70,000.00
56,550.00
9,504.00
136,054.00

Upah

Oh
Oh
Oh
Oh

x
x
x
x

= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp

39,000.00
19,000.00
2,200.00
2,250.00
62,450.00
198,504.00
198,504.00

Pekerja
Tukang batu
Kepala tukang
Mandor

0.6000
0.2000
0.0200
0.0300

6.2

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

Memasang 1m2 dinding bata merah tebal 1 bata,


SNI 6897:2008 / 6.2
Bahan Bata merah
140.0000
Semen PPC
32.9500
Pasir pasang
0.0910

camp. 1PC : 3 PP
Bh
Kg
M

x Rp.
500.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

70,000.00
42,835.00
10,810.80
123,645.80

Upah

Oh
Oh
Oh
Oh

x
x
x
x

= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp

39,000.00
19,000.00
2,200.00
2,250.00
62,450.00
186,095.80
186,095.00

Pekerja
Tukang batu
Kepala tukang
Mandor

0.6000
0.2000
0.0200
0.0300

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

18

PD

PD

6.4

Memasang 1m2 dinding bata merah tebal 1 bata,


SNI 6897:2008 / 6.4
Bahan Bata merah
140.0000
Semen PPC
26.5500
Pasir pasang
0.0930

camp. 1PC : 4 PP
Bh
Kg
M

x Rp.
500.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

70,000.00
34,515.00
11,048.40
115,563.40

Upah

Oh
Oh
Oh
Oh

x
x
x
x

= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp

39,000.00
19,000.00
2,200.00
2,250.00
62,450.00
178,013.40
178,013.00

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

Memasang 1m2 dinding bata merah tebal 1/2 bata, camp. 1PC : 2 PP
SNI 6897:2008 / 6.7
Bahan Bata merah
70.0000 Bh x Rp.
500.00
Semen PPC
18.9500 Kg x Rp.
1,300.00
Pasir pasang
0.0380 M x Rp.
118,800.00
Jumlah (1)
Pekerja
Tukang batu
Kepala tukang
Mandor

0.3000
0.1000
0.0100
0.0150

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

Memasang 1m2 dinding bata merah tebal 1/2 bata, camp. 1PC : 3 PP
SNI 6897:2008 / 6.8
Bahan Bata merah
70.0000 Bh x Rp.
500.00
Semen PPC
14.3700 Kg x Rp.
1,300.00
Pasir pasang
0.0400 M x Rp.
118,800.00
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

35,000.00
24,635.00
4,514.40
64,149.40

= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp

19,500.00
9,500.00
1,100.00
1,125.00
31,225.00
95,374.40
95,374.00

=
=
=
=

Rp
Rp
Rp
Rp

35,000.00
18,681.00
4,752.00
58,433.00

= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp

19,500.00
9,500.00
1,100.00
1,125.00
31,225.00
89,658.00
89,658.00

=
=
=
=

35,000.00
14,950.00
5,108.40
55,058.40

6.8.

Upah

PD

0.6000
0.2000
0.0200
0.0300

6.7.

Upah

PD

Pekerja
Tukang batu
Kepala tukang
Mandor

Pekerja
Tukang batu
Kepala tukang
Mandor

0.3000
0.1000
0.0100
0.0150

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

6.9.

Memasang 1m2 dinding bata merah tebal 1/2 bata, camp. 1PC : 4 PP
SNI 6897:2008 / 6.9
Bahan Bata merah
70.0000 Bh x Rp.
500.00
Semen PPC
11.5000 Kg x Rp.
1,300.00
Pasir pasang
0.0430 M x Rp.
118,800.00
Jumlah (1)

Rp
Rp
Rp
Rp

19

Upah

PD

Oh
Oh
Oh
Oh

Memasang 1m2 dinding batako, camp. 1PC : 4 PP


SNI 6897:2008 / 6.9.a
Bahan Batako 9x18x38
15.0000 Bh
Semen PPC
5.7500 Kg
Pasir pasang
0.0200 M

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp

19,500.00
9,500.00
1,100.00
1,125.00
31,225.00
86,283.40
86,283.00

x Rp.
3,600.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

54,000.00
7,475.00
2,376.00
63,851.00

Pekerja
Tukang batu
Kepala tukang
Mandor

0.3000
0.1000
0.0100
0.0150

Oh
Oh
Oh
Oh

x
x
x
x

= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp

19,500.00
9,500.00
1,100.00
1,125.00
31,225.00
95,076.00
95,076.00

=
=
=
=

Rp
Rp
Rp
Rp

35,000.00
12,584.00
5,346.00
52,930.00

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

19,500.00
9,500.00
1,100.00
1,125.00
31,225.00
84,155.00

x Rp.
255,100.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

306,120.00
211,900.00
61,776.00
579,796.00

x
x
x
x

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

234,000.00
114,000.00
13,200.00
13,500.00
374,700.00
954,496.00

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

6.10

Memasang 1m2 dinding bata merah tebal 1/2 bata, camp. 1PC : 5 PP
SNI 6897:2008 / 6.10
Bahan Bata merah
70.0000 Bh x Rp.
500.00
Semen PPC
9.6800 Kg x Rp.
1,300.00
Pasir pasang
0.0450 M x Rp.
118,800.00
Jumlah (1)
Upah

PD

0.3000
0.1000
0.0100
0.0150

6.9.a

Upah

PD

Pekerja
Tukang batu
Kepala tukang
Mandor

Pekerja
Tukang batu
Kepala tukang
Mandor

0.3000
0.1000
0.0100
0.0150

Oh
Oh
Oh
Oh

1 m3 Pasangan dinding batu kali, 1Pc : 4 Ps


SNI 2002 / 6.30
Bahan Batu kali 15/20
1.2000 M
Semen PPC
163.0000 Kg
Pasir pasang
0.5200 M

x
x
x
x

6.30.

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

3.6000
1.2000
0.1200
0.1800

Oh
Oh
Oh
Oh

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

20

PD

7.10

3m3 - Pekerjaan pembangunan penempatan bronjong termasuk penyediaan batu dan kawat

Bronjong diameter 4 mm untuk anyaman


Bahan Kawat anyaman 4 mm
45.0000 Kg
Batu kali
3.0000 Kg

Upah

a.

b.

Penganyam
Pekerja
Mandor
Pengisian dan penempatan
Pekerja
Mandor

Pekerjaan bronjong 1 m3

SNI 2837:2008
PPL

Rp
Rp
Rp

1,012,500.00
765,300.00
1,777,800.00

1.8000 Oh
0.0800 Oh

x Rp.
x Rp.

65,000.00
75,000.00

=
=

Rp
Rp

117,000.00
6,000.00

4.5000 Oh
0.0750 Oh

x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=

Rp
Rp
Rp
Rp

292,500.00
5,625.00
421,125.00
2,198,925.00

0.3333

Rp.
Rp

732,975.00
732,975.00

x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

20,155.20
1,900.80
22,056.00

x
x
x
x

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

19,500.00
14,250.00
1,650.00
1,125.00
36,525.00
58,581.00
58,581.00

x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

13,291.20
2,376.00
15,667.20

x
x
x
x

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

19,500.00
14,250.00
1,650.00
1,125.00
36,525.00
52,192.20
52,192.00

= Rp.
= Rp.
= Rp.

10,108.80
2,732.40
12,841.20

2,198,925.00 =
Dibulatkan
=

HARGA SATUAN PEKERJAAN PLESTERAN

Memasang 1 m2 Plesteran 1 PC : 1 PP, tebal 15 mm


SNI 2837:2008 / 6.1
Bahan Semen PPC
15.5040 Kg
Pasir pasang
0.0160 M

Pekerja
Tukang batu
Kepala tukang
Mandor

0.3000
0.1500
0.0150
0.0150

Oh
Oh
Oh
Oh

Memasang 1 m2 Plesteran 1 PC : 2 PP, tebal 15 mm


SNI 2837:2008 / 6.2
Bahan Semen PPC
10.2240 Kg
Pasir pasang
0.0200 M

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

6.2.

Upah

PPL

=
=
=

6.1.

Upah

PPL

x Rp.
22,500.00
x Rp.
255,100.00
Jumlah (1)

Pekerja
Tukang batu
Kepala tukang
Mandor

0.3000
0.1500
0.0150
0.0150

Oh
Oh
Oh
Oh

Memasang 1 m2 Plesteran 1 PC : 3 PP, tebal 15 mm


SNI 2837:2008 / 6.3
Bahan Semen PPC
7.7760 Kg
Pasir pasang
0.0230 M

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

6.3.

x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

21

Upah

PPL

Oh
Oh
Oh
Oh

Memasang 1 m2 Plesteran 1 PC : 4 PP, tebal 15 mm


SNI 2837:2008 / 6.4
Bahan Semen PPC
6.2400 Kg
Pasir pasang
0.0240 M

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

19,500.00
14,250.00
1,650.00
1,125.00
36,525.00
49,366.20
49,366.00

x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

8,112.00
2,851.20
10,963.20

Pekerja
Tukang batu
Kepala tukang
Mandor

0.3000
0.1500
0.0150
0.0150

Oh
Oh
Oh
Oh

x
x
x
x

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

19,500.00
14,250.00
1,650.00
1,125.00
36,525.00
47,488.20
47,488.00

Memasang 1 m2 Plesteran 1 PC : 2 PP, tebal 20 mm


SNI 2837:2008 / 6.13
Bahan Semen PPC
13.6320 Kg
Pasir pasang
0.0270 M

x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

17,721.60
3,207.60
20,929.20

x
x
x
x

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

26,000.00
19,000.00
2,200.00
1,650.00
48,850.00
69,779.20
69,779.00

x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

13,478.40
3,682.80
17,161.20

x
x
x
x

=
=
=
=
=
=
=

26,000.00
19,000.00
2,200.00
1,650.00
48,850.00
66,011.20
66,011.00

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

6.13.

Upah

PPL

0.3000
0.1500
0.0150
0.0150

6.4.

Upah

PPL

Pekerja
Tukang batu
Kepala tukang
Mandor

Pekerja
Tukang batu
Kepala tukang
Mandor

0.4000
0.2000
0.0200
0.0220

Oh
Oh
Oh
Oh

Memasang 1 m2 Plesteran 1 PC : 3 PP, tebal 20 mm


SNI 2837:2008 / 6.14
Bahan Semen PPC
10.3680 Kg
Pasir pasang
0.0310 M

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

6.14.

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.4000
0.2000
0.0200
0.0220

Oh
Oh
Oh
Oh

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

22

PPL

6.15.

Memasang 1 m2 Plesteran 1 PC : 4 PP, tebal 20 mm


SNI 2837:2008 / 6.15
Bahan Semen PPC
8.3200 Kg
Pasir pasang
0.0320 M

Upah

PPL

Oh
Oh
Oh
Oh

Memasang 1 m2 Plesteran 1 PC : 5 PP, tebal 20 mm


SNI 2837:2008 / 6.16
Bahan Semen PPC
6.9120 Kg
Pasir pasang
0.0350 M

10,816.00
3,801.60
14,617.60

x
x
x
x

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

26,000.00
19,000.00
2,200.00
1,650.00
48,850.00
63,467.60
63,467.00

x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

8,985.60
4,158.00
13,143.60

x
x
x
x

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

26,000.00
19,000.00
2,200.00
1,650.00
48,850.00
61,993.60
61,993.00

5,616.00
712.80
6,328.80

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

Pekerja
Tukang batu
Kepala tukang
Mandor

Memasang 1 m2 Plesteran Ciprat


SNI 2837:2008 / 6.23
Bahan Semen PPC
Pasir pasang

0.4000
0.2000
0.0200
0.0220

Oh
Oh
Oh
Oh

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

6.23.

Upah

PPL

0.4000
0.2000
0.0200
0.0220

= Rp.
= Rp.
= Rp.

6.16.

Upah

PPL

Pekerja
Tukang batu
Kepala tukang
Mandor

x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

Pekerja
Tukang batu
Kepala tukang
Mandor

4.3200 Kg
0.0060 M

x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

0.3000
0.1000
0.0100
0.0150

x
x
x
x

=
=
=
=
=
=
=

Oh
Oh
Oh
Oh

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

Memasang 1 m2 finishing Siar pas. Batu kali adukan 1 PC : 2 PP


SNI 2837:2008 / 6.26
Bahan Semen PPC
6.3400 Kg
x Rp.
1,300.00
Pasir pasang
0.0120 M
x Rp.
118,800.00
Jumlah (1)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

19,500.00
9,500.00
1,100.00
1,125.00
31,225.00
37,553.80
37,553.00

= Rp.
= Rp.
= Rp.

8,242.00
1,425.60
9,667.60

6.26.

23

Upah

PPL

Pekerja
Tukang batu
Kepala tukang
Mandor

Memasang 1 m2 Acian
SNI 2837:2008 / 6.27
Bahan Semen PPC

0.3000
0.1500
0.0150
0.0150

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

19,500.00
14,250.00
1,650.00
1,125.00
36,525.00
46,192.60
46,192.00

4,225.00
4,225.00

6.27.

3.2500 Kg

x Rp.
1,300.00
Jumlah (1)

= Rp.
= Rp.

0.1000
0.0500
0.0050
0.0050

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

6,500.00
4,750.00
550.00
375.00
12,175.00
16,400.00
16,400.00

SNI 3434:2008
HARGA SATUAN PEKERJAAN KAYU
PK
6.1.
Membuat dan memasang 1m3 kusen pintu dan jendela, kayu kelas I:
SNI 3434:2008 / 6.1
Bahan Balok kayu
1.1000 M
x Rp. 10,370,400.00
Paku 10cm
1.2500 Kg
x Rp.
17,000.00
Lem Kayu
1.0000 Kg
x Rp.
40,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

11,407,440.00
21,250.00
40,000.00
11,468,690.00

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

455,000.00
1,995,000.00
231,000.00
26,250.00
2,707,250.00
14,175,940.00

Membuat dan memasang 1m3 kusen pintu dan jendela, kayu kelas II:
SNI 3434:2008 / 6.2
Bahan Balok Kayu
1.2000 M
x Rp.
6,814,800.00
Paku 10cm
1.2500 Kg
x Rp.
17,000.00
Lem Kayu
1.0000 Kg
x Rp.
40,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

8,177,760.00
21,250.00
40,000.00
8,239,010.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

390,000.00
1,710,000.00
198,000.00
22,500.00
2,320,500.00
10,559,510.00

Upah

Upah

PK

Pekerja
Tukang batu
Kepala tukang
Mandor

Pekerja
Tukang kayu
Kepala tukang
Mandor

7.0000
21.0000
2.1000
0.3500

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

x
x
x
x

6.2.

Upah

Pekerja
Tukang kayu
Kepala tukang
Mandor

6.0000
18.0000
1.8000
0.3000

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)

24

PK

6.2a.

Membuat dan memasang 1m3 kusen pintu dan jendela, kayu kelas III:
SNI 3434:2008 / 6.2a
Bahan Balok Kayu
1.2000 M
x Rp.
5,000,000.00
Paku 10cm
1.2500 Kg
x Rp.
17,000.00
Lem Kayu
1.0000 Kg
x Rp.
40,000.00
Jumlah (1)
Upah

PK

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)

Membuat dan memasang 1m2 pintu klamp standar , kayu kelas II:
SNI 3434:2008 / 6.3
Bahan Papan Kayu
0.0400 M
x Rp.
7,037,000.00
Paku 5 cm - 7cm
0.0500 Kg
x Rp.
17,000.00
Jumlah (1)

6,000,000.00
21,250.00
40,000.00
6,061,250.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

390,000.00
1,710,000.00
198,000.00
22,500.00
2,320,500.00
8,381,750.00

= Rp.
= Rp.
= Rp.

281,480.00
850.00
282,330.00

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.3500
1.0500
0.1050
0.0180

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,750.00
99,750.00
11,550.00
1,350.00
135,400.00
417,730.00

= Rp.
= Rp.
= Rp.

200,000.00
850.00
200,850.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,750.00
99,750.00
11,550.00
1,350.00
135,400.00
336,250.00

= Rp.
= Rp.

281,480.00
20,000.00
301,480.00

=
=
=
=
=
=

65,000.00
285,000.00
33,000.00
3,750.00
386,750.00
688,230.00

6.4.

Membuat dan memasang 1 m2 pintu klamp sederhana, kayu kelas III :


SNI 3434:2008 / 6.4
Bahan Papan Kayu
0.0400 M
x Rp.
5,000,000.00
Paku biasa 2" - 5"
0.0500 Kg
x Rp.
17,000.00
Jumlah (1)
Upah

PK

6.0000
18.0000
1.8000
0.3000

Rp.
Rp.
Rp.
Rp.

6.3.

Upah

PK

Pekerja
Tukang kayu
Kepala tukang
Mandor

=
=
=
=

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.3500
1.0500
0.1050
0.0180

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)

6.5.

Membuat dan memasang 1m2 pintu panel, kayu kelas II:


SNI 3434:2008 / 6.5
Bahan Papan Kayu
0.0400 M
x Rp.
7,037,000.00
Lem Kayu
0.5000 Kg
x Rp.
40,000.00
Jumlah (1)
Upah

Pekerja
Tukang kayu
Kepala tukang
Mandor

1.0000
3.0000
0.3000
0.0500

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

25

PK

6.5a

Membuat dan memasang 1m2 pintu panel, kayu kelas III :


SNI 3434:2008 / 6.5a
Bahan Papan Kayu
0.0400 M
x Rp.
5,000,000.00
Lem Kayu
0.5000 Kg
x Rp.
40,000.00
Jumlah (1)
Upah

PK

PK

PK

Pekerja
Tukang kayu
Kepala tukang
Mandor

1.0000
3.0000
0.3000
0.0500

Oh
Oh
Oh
Oh

6.6.

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)

= Rp.
= Rp.
= Rp.

200,000.00
20,000.00
220,000.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

65,000.00
285,000.00
33,000.00
3,750.00
386,750.00
606,750.00

Membuat dan memasang 1 m2 pintu dan jendela kaca,


SNI 3434:2008 / 6.6
Bahan Papan Kayu
0.0240 M3
Kaca polos 5 mm
0.6500 M2
Lem Kayu
0.8000 Kg

kayu kelas II:


x Rp.
7,037,000.00
x Rp.
130,000.00
x Rp.
40,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

168,888.00
84,500.00
32,000.00
285,388.00

Upah

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,000.00
228,000.00
26,400.00
3,000.00
309,400.00
594,788.00

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.8000
2.4000
0.2400
0.0400

Oh
Oh
Oh
Oh

6.6a.

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)

Membuat dan memasang 1 m2 pintu dan jendela kaca,


SNI 3434:2008 / 6.6a
Bahan Kayu SK
0.0240 M3
Kaca polos 5 mm
0.6500 M2
Lem Kayu
0.8000 Kg

kayu kelas III:


x Rp.
5,000,000.00
x Rp.
130,000.00
x Rp.
40,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

120,000.00
84,500.00
32,000.00
236,500.00

Upah

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,000.00
228,000.00
26,400.00
3,000.00
309,400.00
545,900.00

= Rp.
= Rp.
= Rp.

450,368.00
20,000.00
470,368.00

=
=
=
=
=
=

65,000.00
285,000.00
33,000.00
3,750.00
386,750.00
857,118.00

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.8000
2.4000
0.2400
0.0400

Oh
Oh
Oh
Oh

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)

6.7.

Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas II:
SNI 3434:2008 / 6.7
Bahan Papan Kayu
0.0640 M
x Rp.
7,037,000.00
Lem Kayu
0.5000 Kg
x Rp.
40,000.00
Jumlah (1)
Upah

Pekerja
Tukang kayu
Kepala tukang
Mandor

1.0000
3.0000
0.3000
0.0500

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

26

PK

6.7a

Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas III:
SNI 3434:2008 / 6.7a
Bahan Papan Kayu
0.0640 M
x Rp.
5,000,000.00
Lem Kayu
0.5000 Kg
x Rp.
40,000.00
Jumlah (1)
Upah

PK

PK

PK

Pekerja
Tukang kayu
Kepala tukang
Mandor

1.0000
3.0000
0.3000
0.0500

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)

= Rp.
= Rp.
= Rp.

320,000.00
20,000.00
340,000.00

=
=
=
=
=
=

65,000.00
285,000.00
33,000.00
3,750.00
386,750.00
726,750.00

6.8.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Membuat 1 m2 daun pintu plywood rangkap, rangka tertutup, kayu kelas II (lbr sd
SNI 3434:2008 / 6.8
Bahan Papan kayu
0.0250 M
x Rp.
7,037,000.00 =
Paku 1cm - 2,5cm
0.0300 Kg
x Rp.
17,000.00 =
Lem kayu
0.5000 Kg
x Rp.
40,000.00 =
Plywood tbl 4mm
1.0000 Lbr x Rp.
65,000.00 =
Jumlah (1)
=

90cm):
Rp.
Rp.
Rp.
Rp.
Rp.

175,925.00
510.00
20,000.00
65,000.00
261,435.00

Upah

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,500.00
199,500.00
23,100.00
2,625.00
270,725.00
532,160.00

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.7000
2.1000
0.2100
0.0350

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

6.8a.

Membuat 1 m2 daun pintu plywood rangkap, rangka tertutup,kayu kelas III (lbr sd
SNI 3434:2008 / 6.8a
Bahan Papan kayu
0.0250 M
x Rp.
5,000,000.00 =
Paku 1cm - 2,5cm
0.0300 Kg
x Rp.
17,000.00 =
Lem kayu
0.5000 Kg
x Rp.
40,000.00 =
Plywood tbl 4mm
1.0000 Lbr x Rp.
65,000.00 =
Jumlah (1)
=

90cm):
Rp.
Rp.
Rp.
Rp.
Rp.

125,000.00
510.00
20,000.00
65,000.00
210,510.00

Upah

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

45,500.00
199,500.00
23,100.00
2,625.00
270,725.00
481,235.00
481,235.00

= Rp.
= Rp.
= Rp.

422,220.00
2,550.00
424,770.00

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.7000
2.1000
0.2100
0.0350

Oh
Oh
Oh
Oh

Memasang 1m2 jalusi kusen, kayu kelas II :


SNI 3434:2008 / 6.10
Bahan Papan kayu
0.0600 M
Paku 1cm - 2,5cm
0.1500 Kg

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan

=
=
=
=
=
=
=

6.10.

x Rp.
x Rp.

7,037,000.00
17,000.00
Jumlah (1)

27

Upah

PK

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

43,550.00
190,000.00
22,000.00
25,125.00
280,675.00
705,445.00

x Rp.
x Rp.

5,000,000.00
17,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

300,000.00
2,550.00
302,550.00

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

43,550.00
190,000.00
22,000.00
25,125.00
280,675.00
583,225.00

Oh
Oh
Oh
Oh

Memasang 1m2 teakwood rangkap, rangka expose kayu kelas II:


SNI 3434:2008 / 6.11
Bahan Papan kayu
0.0250 M
x Rp.
7,037,000.00
Paku 1cm - 2,5cm
0.0300 Kg
x Rp.
17,000.00
Lem kayu
0.3000 Lt
x Rp.
40,000.00
Teakwood (120 x 240 x 3 mm)
1.0000 Lbr x Rp.
50,000.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

175,925.00
510.00
12,000.00
50,000.00
238,435.00

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,000.00
228,000.00
26,400.00
3,000.00
309,400.00
547,835.00

6.11a. Memasang 1m2 teakwood rangkap, rangka expose kayu kelas III:
SNI 3434:2008 / 6.11a
Bahan Papan kayu
0.0250 M
x Rp.
5,000,000.00
Paku 1cm - 2,5cm
0.0300 Kg
x Rp.
17,000.00
Lem kayu
0.3000 Lt
x Rp.
40,000.00
Teakwood (120 x 240 x 3 mm)
1.0000 Lbr x Rp.
50,000.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

125,000.00
510.00
12,000.00
50,000.00
187,510.00

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

52,000.00
228,000.00
26,400.00
3,000.00
309,400.00
496,910.00
496,910.00

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.6700
2.0000
0.2000
0.3350

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

6.11.

Upah

PK

0.6700
2.0000
0.2000
0.3350

6.10a. Memasang 1m2 jalusi kusen, kayu kelas III :


SNI 3434:2008 / 6.10a
Bahan Papan kayu
0.0600 M
Paku 1cm - 2,5cm
0.1500 Kg

Upah

PK

Pekerja
Tukang kayu
Kepala tukang
Mandor

Upah

Pekerja
Tukang kayu
Kepala tukang
Mandor

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.8000
2.4000
0.2400
0.0400

0.8000
2.4000
0.2400
0.0400

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

x
x
x
x

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan

28

PK

6.13.

Memasang 1m3 konstruksi kuda-kuda konvensional, kayu kelas I:


SNI 3434:2008 / 6.13
Bahan Balok kayu
1.1000 M
x Rp. 10,370,400.00
Besi strip
15.0000 Kg
x Rp.
17,250.00
Paku 12 cm
5.6000 Kg
x Rp.
17,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

11,407,440.00
258,750.00
95,200.00
11,761,390.00

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

260,000.00
1,140,000.00
132,000.00
15,000.00
1,547,000.00
13,308,390.00

Memasang 1m3 konstruksi kuda-kuda konvensional, kayu kelas II:


SNI 3434:2008 / 6.13a
Bahan Balok kayu
1.1000 M
x Rp.
6,814,800.00
Besi strip
15.0000 Kg
x Rp.
17,250.00
Paku 12 cm
5.6000 Kg
x Rp.
17,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

7,496,280.00
258,750.00
95,200.00
7,850,230.00

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

260,000.00
1,140,000.00
132,000.00
15,000.00
1,547,000.00
9,397,230.00

6.13b. Memasang 1m3 konstruksi kuda-kuda konvensional, kayu kelas III:


SNI 3434:2008 / 6.13b
Bahan Balok kayu
1.1000 M
x Rp.
5,000,000.00
Besi strip
15.0000 Kg
x Rp.
17,250.00
Paku 12 cm
5.6000 Kg
x Rp.
17,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

5,500,000.00
258,750.00
95,200.00
5,853,950.00

Upah

PK

Upah

PK

4.0000
12.0000
1.2000
0.2000

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

6.13a

Upah

PK

Pekerja
Tukang kayu
Kepala tukang
Mandor

Pekerja
Tukang kayu
Kepala tukang
Mandor

Pekerja
Tukang kayu
Kepala tukang
Mandor

4.0000
12.0000
1.2000
0.2000

4.0000
12.0000
1.2000
0.2000

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

Memasang 1 m3 konstruksi gordeng, kayu kelas I :


SNI 3434:2008 / 6.15
Bahan Balok Kayu
1.1000 M
Paku 12 cm
3.0000 Kg

x
x
x
x

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

260,000.00
1,140,000.00
132,000.00
15,000.00
1,547,000.00
7,400,950.00

x Rp.
x Rp.

10,370,400.00
17,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

11,407,440.00
51,000.00
11,458,440.00

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

156,000.00
684,000.00
79,200.00
9,000.00
928,200.00
12,386,640.00

6.15.

Upah

Pekerja
Tukang kayu
Kepala tukang
Mandor

2.4000
7.2000
0.7200
0.1200

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

29

PK

6.15a

Memasang 1 m3 konstruksi gordeng, kayu kelas II :


SNI 3434:2008 / 6.15a
Bahan Balok Kayu
1.1000 M
Paku 12 cm
3.0000 Kg

Upah

PK

Oh
Oh
Oh
Oh

= Rp.
= Rp.
= Rp.

7,496,280.00
51,000.00
7,547,280.00

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

156,000.00
684,000.00
79,200.00
9,000.00
928,200.00
8,475,480.00

10,370,400.00
10,370,400.00
17,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

145,185.60
37,333.44
4,250.00
186,769.04

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

6,500.00
9,500.00
1,100.00
375.00
17,475.00
204,244.04
204,244.00

6,814,800.00
6,814,800.00
17,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

95,407.20
24,533.28
4,250.00
124,190.48

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

6,500.00
9,500.00
1,100.00
375.00
17,475.00
141,665.48
141,665.00

6,814,800.00
6,814,800.00
17,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

95,407.20
49,066.56
4,250.00
148,723.76

Rp.
Rp.
Rp.
Rp.

Memasang 1m2 rangka atap genteng keramik, kayu kelas I :


SNI 3434:2008 / 6.16
Bahan Kaso-kaso (5x7)cm
0.0140 M
x Rp.
Reng (2x3) cm
0.0036 M
x Rp.
Paku 5cm dan 10cm
0.2500 Kg
x Rp.

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.1000
0.1000
0.0100
0.0050

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

6.16.a Memasang 1m2 rangka atap genteng keramik, kayu kelas II :


SNI 3434:2008 / 6.16a
Bahan Kaso-kaso (5x7)cm
0.0140 M
x Rp.
Reng (2x3) cm
0.0036 M
x Rp.
Paku 5cm dan 10cm
0.2500 Kg
x Rp.

Upah

PK

2.4000
7.2000
0.7200
0.1200

6,814,800.00
17,000.00
Jumlah (1)

6.16.

Upah

PK

Pekerja
Tukang kayu
Kepala tukang
Mandor

x Rp.
x Rp.

6.17.

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.1000
0.1000
0.0100
0.0050

Oh
Oh
Oh
Oh

memasang rangka atap genteng beton, kayu kelas II 1


SNI 3434:2008 / 6.17
Bahan Kaso-kaso (5x7)cm
0.0140 M
Reng (3x4) cm
0.0072 M
Paku 5cm dan 10cm
0.2500 Kg

x
x
x
x

Rp.
Rp.
Rp.
Rp.

m2 :
x Rp.
x Rp.
x Rp.

30

Upah

PK

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

6,500.00
9,500.00
1,100.00
375.00
17,475.00
166,198.76
166,198.00

x Rp.
x Rp.

6,814,800.00
17,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

1,124,442.00
3,400.00
1,127,842.00

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.1200
0.1200
0.0120
0.0060

Oh
Oh
Oh
Oh

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,800.00
11,400.00
1,320.00
450.00
20,970.00
1,148,812.00

= Rp.
= Rp.
= Rp.

77,000.00
3,400.00
80,400.00

Rp.
Rp.
Rp.
Rp.

6.19.

Pasang rangka langit-langit (0.50 x 1.00) m, kayu kelas III 1 m2 :


SNI 3434:2008 / 6.19
Bahan Kaso-kaso (5x7) cm
0.0154 M
x Rp.
5,000,000.00
Paku 7cm dan 10cm
0.2000 Kg
x Rp.
17,000.00
Jumlah (1)
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.1500
0.3000
0.0300
0.0750

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan

Pasang rangka langit-langit (0.60 x 0.60) m, kayu kelas III 1 m2 :


SNI 3434:2008 / 6.20
Bahan Kaso-kaso (5x7) cm
0.0163 M
x Rp.
5,000,000.00
Paku 7cm dan 10cm
0.2500 Kg
x Rp.
17,000.00
Jumlah (1)

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

9,750.00
28,500.00
3,300.00
5,625.00
47,175.00
127,575.00
127,575.00

= Rp.
= Rp.
= Rp.

81,500.00
4,250.00
85,750.00

6.20.

Upah

PK

Oh
Oh
Oh
Oh

memasang rangka atap sirap, kayu kelas II 1 m2:


SNI 3434:2008 / 6.18
Bahan Kayu kelas II
0.1650 M
Paku 5cm dan 10cm
0.2000 Kg

Upah

PK

0.1000
0.1000
0.0100
0.0050

6.18.

Upah

PK

Pekerja
Tukang kayu
Kepala tukang
Mandor

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.2000
0.3000
0.0300
0.0100

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas II :


SNI 3434:2008 / 6.21
Bahan Papan Kayu
0.0072 M
x Rp.
Paku 5cm dan 7cm
0.1000 Kg
x Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

13,000.00
28,500.00
3,300.00
750.00
45,550.00
131,300.00
131,300.00

7,037,000.00
17,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

50,666.40
1,700.00
52,366.40

6.21.

31

Upah

PK

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.1000
0.2000
0.0200
0.0050

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas II :


SNI 3434:2008 / 6.22
Bahan Papan Kayu
0.0110 M
x Rp.
Paku 5cm dan 7cm
0.0500 Kg
x Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

6,500.00
19,000.00
2,200.00
375.00
28,075.00
80,441.40
80,441.00

5,000,000.00
17,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

36,000.00
1,700.00
37,700.00

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

6,500.00
19,000.00
2,200.00
375.00
28,075.00
65,775.00
65,775.00

7,037,000.00
17,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

77,407.00
850.00
78,257.00

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

6.22.

Upah

PK

0.1000
0.2000
0.0200
0.0050

6.21a. Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas III :
SNI 3434:2008 / 6.21a
Bahan Papan Kayu
0.0072 M
x Rp.
Paku 5cm dan 7cm
0.1000 Kg
x Rp.

Upah

PK

Pekerja
Tukang kayu
Kepala tukang
Mandor

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.1000
0.2000
0.0200
0.0050

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Memasang 1 m2 rangka dinding pemisah (60 x 120)cm , kayu kelas III :


SNI 3434:2008 / 6.23
Bahan kayu SK, balok 5/7
0.0280 M
x Rp.
5,000,000.00
Paku 5cm dan 7cm
0.1500 Kg
x Rp.
17,000.00
Jumlah (1)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,500.00
19,000.00
2,200.00
375.00
28,075.00
106,332.00

= Rp.
= Rp.
= Rp.

140,000.00
2,550.00
142,550.00

=
=
=
=
=
=

9,750.00
42,750.00
4,950.00
600.00
58,050.00
200,600.00

6.23.

Upah

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.1500
0.4500
0.0450
0.0080

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

32

PK

6.25.

Memasang 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas III:


SNI 3434:2008 / 6.25
Bahan Balok kayu (6x12) cm
0.0280 M
x Rp.
5,000,000.00
Paku 5cm dan 10cm
0.1500 Kg
x Rp.
17,000.00
Lem kayu
0.5600 Lt
x Rp.
40,000.00
Plywood (120 x 240 x 4 mm)
0.8600 Lbr x Rp.
65,000.00
Jumlah (1)
Upah

PK

Oh
Oh
Oh
Oh

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,000.00
57,000.00
6,600.00
750.00
77,350.00
298,200.00

x Rp.
x Rp.

65,000.00
17,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

26,000.00
850.00
26,850.00

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,625.00
7,125.00
880.00
75.00
9,705.00
36,555.00

Memasang 1 m2 dinding bilik bambu, kayu kelas III :


SNI 3434:2008 / 6.28
Bahan Bilik bambu (1,8 x 1,8)m
1.5000 M2
Kaso (5x7) cm
0.0140 M3
Paku
0.0120 Kg
List kayu 2/4
0.0030 M3

x
x
x
x

Rp.
Rp.
Rp.
Rp.

14,000.00
5,000,000.00
17,000.00
5,000,000.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

21,000.00
70,000.00
204.00
15,000.00
106,204.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

6,500.00
4,750.00
550.00
375.00
12,175.00
118,379.00
118,379.00

= Rp.
= Rp.
= Rp.

60,000.00
1,700.00
61,700.00

Memasang 1 m2 dinding lambrizing dari plywood :


SNI 3434:2008 / 6.27
Bahan Plywood (120 x 240 x 4 mm)
0.4000 Lbr
Paku 1 cm dan 2,5 cm
0.0500 Kg

x
x
x
x

140,000.00
2,550.00
22,400.00
55,900.00
220,850.00

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

6.27.

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.0250
0.0750
0.0080
0.0010

6.28.

Upah

PK

0.2000
0.6000
0.0600
0.0100

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Upah

PK

Pekerja
Tukang kayu
Kepala tukang
Mandor

=
=
=
=
=

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.1000
0.0500
0.0050
0.0050

Oh
Oh
Oh
Oh

6.38.

Memasang 1 m2 rangka langit-langit (1.00x1.00)m, kayu kelas III :


SNI 03-3435:1994 / 6.38
Bahan Kayu kelas III
0.0120 M3
x Rp.
5,000,000.00
Paku 5cm dan 10cm
0.1000 Kg
x Rp.
17,000.00
Jumlah (1)

33

Upah

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.1500
0.2500
0.0250
0.0750

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,750.00
23,750.00
2,750.00
5,625.00
41,875.00
103,575.00

Rp.
Rp.
Rp.
Rp.
Rp.

321,100.00
82,555.00
222,777.00
7,525.00
633,957.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

104,000.00
26,125.00
3,080.00
6,225.00
139,430.00
773,387.00

Rp.
Rp.
Rp.
Rp.
Rp.

358,800.00
78,660.00
225,676.00
7,525.00
670,661.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

104,000.00
26,125.00
3,080.00
6,225.00
139,430.00
810,091.00

Rp.
Rp.
Rp.
Rp.
Rp.

388,700.00
75,905.00
226,791.00
7,525.00
698,921.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

107,250.00
26,125.00
3,080.00
6,225.00
142,680.00
841,601.00

SNI 7394:2008
PEKERJAAN BETON
catatan :
Bobot isi pasir = 1.400kg/m3, Bobot isi kerikil = 1.350 kg/m3, bukling factor = 20%
PB

6.1.

Membuat 1 m3 beton mutu fc = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87
SNI 7394:2008 / 6.1
Bahan Semen PPC
247.0000 Kg
x Rp.
1,300.00 =
Pasir
869.0000 Kg
x Rp.
95.00 =
Kerikil (maksimum 3 mm)
999.0000 Kg
x Rp.
223.00 =
Air
215.0000 Ltr
x Rp.
35.00 =
Jumlah (1)
=
Upah

PB

1.6000
0.2750
0.0280
0.0830

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

6.2.

Membuat 1 m3 beton mutu fc = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78
SNI 7394:2008 / 6.2
Bahan Semen PPC
276.0000 Kg
x Rp.
1,300.00 =
Pasir
828.0000 Kg
x Rp.
95.00 =
Kerikil (maksimum 3 mm)
1012.0000 Kg
x Rp.
223.00 =
Air
215.0000 Ltr
x Rp.
35.00 =
Jumlah (1)
=
Upah

PB

Pekerja
Tukang batu
Kepala tukang
Mandor

Pekerja
Tukang batu
Kepala tukang
Mandor

1.6000
0.2750
0.0280
0.0830

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

6.3.

Membuat 1 m3 beton mutu fc = 12,2 MPa (K 150), slump (C1216) cm, w/c = 0,72
SNI 7394:2008 / 6.3
Bahan Semen PPC
299.0000 Kg
x Rp.
1,300.00 =
Pasir
799.0000 Kg
x Rp.
95.00 =
Kerikil (maksimum 3 mm)
1017.0000 Kg
x Rp.
223.00 =
Air
215.0000 Ltr
x Rp.
35.00 =
Jumlah (1)
=
Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

1.6500
0.2750
0.0280
0.0830

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

34
PB

PB

6.4.

Membuat 1 m3 lantai kerja beton mutu fc = 7,4


SNI 7394:2008 / 6.4
Bahan Semen PPC
230.0000
Pasir
893.0000
Kerikil (maksimum 3 mm)
1027.0000
Air
200.0000

MPa (K 100), slump (3-6)cm, w/c = 0,87


Kg
Kg
Kg
Ltr

x
x
x
x

Rp.
Rp.
Rp.
Rp.

1,300.00
95.00
223.00
35.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

299,000.00
84,835.00
229,021.00
7,000.00
619,856.00

Upah

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

78,000.00
19,000.00
2,200.00
4,500.00
103,700.00
723,556.00

Membuat 1 m3 beton mutu fc = 14,5 MPa (K 175), slump (12 2)cm, w/c = 0,66
SNI 7394:2008 / 6.5
Bahan Semen PPC
326.0000 Kg
x Rp.
1,300.00 = Rp.
Pasir
760.0000 Kg
x Rp.
95.00 = Rp.
Kerikil (maksimum 3 mm)
1029.0000 Kg
x Rp.
223.00 = Rp.
Air
215.0000 Ltr
x Rp.
35.00 = Rp.
Jumlah (1)
= Rp.

423,800.00
72,200.00
229,467.00
7,525.00
732,992.00

Pekerja
Tukang batu
Kepala tukang
Mandor

1.6500
0.2750
0.0280
0.0830

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

107,250.00
26,125.00
3,080.00
6,225.00
142,680.00
875,672.00

6.5.a

Membuat dan menghampar 1 m3 mutu beton fc = 14,5 MPa (K 175), slump (122)cm, w/c=0,66
SNI 7394:2008, ABKPU2005-6.35 / 6.5a
Bahan Semen PPC
326.0000 Kg
x Rp.
1,300.00 = Rp.
423,800.00
Pasir
760.0000 Kg
x Rp.
95.00 = Rp.
72,200.00
Kerikil (maksimum 3 mm)
1029.0000 Kg
x Rp.
223.00 = Rp.
229,467.00
Air
215.0000 Ltr
x Rp.
35.00 = Rp.
7,525.00
Jumlah (1)
732,992.00
Upah

PB

1.2000
0.2000
0.0200
0.0600

6.5.

Upah

PB

Pekerja
Tukang batu
Kepala tukang
Mandor

Pekerja
Tukang batu
Kepala tukang
Mandor

4.9500
0.8250
0.0840
0.2490

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

321,750.00
78,375.00
9,240.00
18,675.00
428,040.00
1,161,032.00

Membuat 1 m3 beton mutu fc = 16,9 MPa (K 200), slump (12 2)cm, w/c = 0,61
SNI 7394:2008 / 6.6
Bahan Semen PPC
352.0000 Kg
x Rp.
1,300.00 = Rp.
Pasir
731.0000 Kg
x Rp.
95.00 = Rp.
Kerikil (maksimum 3 mm)
1031.0000 Kg
x Rp.
223.00 = Rp.
Air
215.0000 Ltr
x Rp.
35.00 = Rp.
Jumlah (1)
= Rp.

457,600.00
69,445.00
229,913.00
7,525.00
764,483.00

6.6.

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

1.6500
0.2750
0.0280
0.0830

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

107,250.00
26,125.00
3,080.00
6,225.00
142,680.00
907,163.00

35
PB

6.7.

Membuat 1 m3 beton mutu fc = 19,3 MPa (K 225), slump (12 2)cm, w/c = 0,58
SNI 7394:2008 / 6.7
Bahan Semen PPC
371.0000 Kg
x Rp.
1,300.00 = Rp.
Pasir
698.0000 Kg
x Rp.
95.00 = Rp.
Kerikil (maksimum 3 mm)
1047.0000 Kg
x Rp.
223.00 = Rp.
Air
215.0000 Ltr
x Rp.
35.00 = Rp.
Jumlah (1)
= Rp.
Upah

PB

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

Membuat 1 m3 beton mutu fc = 21,7 MPa (K 250), slump (12 2) cm, w/c =
SNI 7394:2008 / 6.8
Bahan Semen PPC
384.0000 Kg
x Rp.
1,300.00
Pasir
692.0000 Kg
x Rp.
95.00
Kerikil (maksimum 3 mm)
1039.0000 Kg
x Rp.
223.00
Air
215.0000 Ltr
x Rp.
35.00
Jumlah (1)
Pekerja
Tukang batu
Kepala tukang
Mandor

1.6500
0.2750
0.0280
0.0830

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

107,250.00
26,125.00
3,080.00
6,225.00
142,680.00
932,296.00

0,56
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

499,200.00
65,740.00
231,697.00
7,525.00
804,162.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

107,250.00
26,125.00
3,080.00
6,225.00
142,680.00
946,842.00

Rp.
Rp.
Rp.
Rp.
Rp.

527,800.00
64,980.00
228,798.00
7,525.00
829,103.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

107,250.00
26,125.00
3,080.00
6,225.00
142,680.00
971,783.00

6.9.

Membuat 1 m3 beton mutu fc = 24, MPa (K 275), slump (12 2) cm, w/c = 0,53
SNI 7394:2008 / 6.9
Bahan Semen PPC
406.0000 Kg
x Rp.
1,300.00 =
Pasir
684.0000 Kg
x Rp.
95.00 =
Kerikil (maksimum 3 mm)
1026.0000 Kg
x Rp.
223.00 =
Air
215.0000 Ltr
x Rp.
35.00 =
Jumlah (1)
=
Upah

PB

1.6500
0.2750
0.0280
0.0830

6.8.

Upah

PB

Pekerja
Tukang batu
Kepala tukang
Mandor

482,300.00
66,310.00
233,481.00
7,525.00
789,616.00

Pekerja
Tukang batu
Kepala tukang
Mandor

1.6500
0.2750
0.0280
0.0830

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

6.10.

Membuat 1 m3 beton mutu fc = 26,4 MPa (K 300), slump (12 2) cm, w/c =
SNI 7394:2008 / 6.10
Bahan Semen PPC
413.0000 Kg
x Rp.
1,300.00
Pasir
681.0000 Kg
x Rp.
95.00
Kerikil (maksimum 3 mm)
1021.0000 Kg
x Rp.
223.00
Air
215.0000 Ltr
x Rp.
35.00
Jumlah (1)
Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

1.6500
0.2750
0.0280
0.0830

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

0,52
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

536,900.00
64,695.00
227,683.00
7,525.00
836,803.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

107,250.00
26,125.00
3,080.00
6,225.00
142,680.00
979,483.00

36
PB

6.11.

Membuat 1 m3 beton mutu fc = 28,8 MPa (K 325), slump (12 2) cm, w/c =
SNI 7394:2008 / 6.11
Bahan Semen PPC
439.0000 Kg
x Rp.
1,300.00
Pasir
670.0000 Kg
x Rp.
95.00
Kerikil (maksimum 3 mm)
1006.0000 Kg
x Rp.
223.00
Air
215.0000 Ltr
x Rp.
35.00
Jumlah (1)
Upah

PB

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

Membuat 1 m3 beton mutu fc = 31,2 MPa (K 350), slump (12 2) cm, w/c =
SNI 7394:2008 / 6.12
Bahan Semen PPC
448.0000 Kg
x Rp.
1,300.00
Pasir
667.0000 Kg
x Rp.
95.00
Kerikil (maksimum 3 mm)
1000.0000 Kg
x Rp.
223.00
Air
215.0000 Ltr
x Rp.
35.00
Jumlah (1)
Pekerja
Tukang batu
Kepala tukang
Mandor

Pembesian 10 kg dengan besi beton


SNI 7394:2008 / 6.17
Bahan Besi beton
Kawat beton

2.1000
0.3500
0.0350
0.1050

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

570,700.00
63,650.00
224,338.00
7,525.00
866,213.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

136,500.00
33,250.00
3,850.00
7,875.00
181,475.00
1,047,688.00

0,48

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

582,400.00
63,365.00
223,000.00
7,525.00
876,290.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

136,500.00
33,250.00
3,850.00
7,875.00
181,475.00
1,057,765.00

6.17

Upah

PB

2.1000
0.3500
0.0350
0.1050

6.12.

Upah

PB

Pekerja
Tukang batu
Kepala tukang
Mandor

0,49

10.5000 Kg
0.1500 Kg

Pekerja
Tukang besi
Kepala tukang
Mandor

0.0700
0.0700
0.0070
0.0040

Pembesian 1 kg besi beton

0.1000

Oh
Oh
Oh
Oh

Memasang 1 m2 bekisting untuk pondasi


SNI 7394:2008 / 6.20
Bahan Kayu Bekisting
0.0400 M
Paku 5 cm - 10 cm
0.3000 Kg
Minyak bekisting
0.1000 Ltr

x Rp.
x Rp.

15,000.00 =
18,700.00 =
Jumlah (1)
=

Rp.
Rp.
Rp.

157,500.00
2,805.00
160,305.00

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
172,575.00
Dibulatkan

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

4,550.00
6,650.00
770.00
300.00
12,270.00
172,575.00
17,257.50
17,257.00

3,833,300.00
17,000.00
6,300.00
Jumlah (1)
x Rp.
159,062.00

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

153,332.00
5,100.00
630.00
159,062.00
79,531.00

Rp.
Rp.
Rp.
Rp.

6.20.

Bahan bekisting dihitung pakai 2 x

0.5000

x Rp.
x Rp.
x Rp.

37

Upah

PB

Memasang 1 m2 bekisting untuk sloof


SNI 7394:2008 / 6.21
Bahan Kayu SK Bekisting
Paku 5 cm - 10 cm
Minyak bekisting

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

33,800.00
24,700.00
2,860.00
1,950.00
63,310.00
142,841.00

0.0450 M
0.3000 Kg
0.1000 Ltr

3,833,300.00
17,000.00
6,300.00
Jumlah (1)
x Rp.
178,228.50

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

172,498.50
5,100.00
630.00
178,228.50
89,114.25

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

33,800.00
24,700.00
2,860.00
1,950.00
63,310.00
152,424.25
152,424.00

x Rp.
x Rp.
x Rp.

Bahan bekisting dihitung pakai 2 x

0.5000

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.5200
0.2600
0.0260
0.0260

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

0.0400
0.4000
0.2000
0.0150
0.3500
2.0000

M
Kg
Ltr
M
Lbr
Btg

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,833,300.00
17,000.00
6,300.00
3,833,300.00
135,000.00
52,000.00
Jumlah (1)
x Rp.
370,141.50

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

153,332.00
6,800.00
1,260.00
57,499.50
47,250.00
104,000.00
370,141.50
185,070.75

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah total
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

42,900.00
31,350.00
3,630.00
2,475.00
80,355.00
265,425.75
265,425.00

3,833,300.00
17,000.00
6,300.00
3,833,300.00
135,000.00
52,000.00
Jumlah (1)
x Rp.
381,641.40

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

153,332.00
6,800.00
1,260.00
68,999.40
47,250.00
104,000.00
381,641.40
190,820.70

6.22.

Memasang 1 M2 bekisting untuk Kolom


SNI 7394:2008 / 6.22
Bahan Kayu SK Bekisting
Paku biasa 2' - 5"
Minyak bekisting
Balok Kayu SK Bekisting
Plywood tebal 9 mm
Kayu Dolken/Laut 3'-4'/4 m

Upah

PB

0.5200
0.2600
0.0260
0.0260

6.21.

Upah

PB

Pekerja
Tukang kayu
Kepala tukang
Mandor

Bahan bekisting dihitung pakai 2 x

0.5000

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.6600
0.3300
0.0330
0.0330

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

0.0400
0.4000
0.2000
0.0180
0.3500
2.0000

M
Kg
Ltr
M
Lbr
Btg

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6.23.

Memasang 1 M2 bekisting untuk Balok


SNI 7394:2008 / 6.23
Bahan Kayu SK Bekisting
Paku biasa 2' - 5"
Minyak bekisting
Balok Kayu SK Bekisting
Plywood tebal 9 mm
Kayu Dolken/Laut 3'-4'/4 m
Bahan bekisting dihitung pakai 2 x

0.5000

38

Upah

PB

0.6600
0.3300
0.0330
0.0330

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah total
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

42,900.00
31,350.00
3,630.00
2,475.00
80,355.00
271,175.70
271,175.00

Memasang 1 M2 bekisting untuk plat lantai


SNI 7394:2008 / 6.24
Bahan Kayu SK Bekisting
0.0400
Paku biasa 2' - 5"
0.4000
Minyak bekisting
0.2000
Balok Kayu SK Bekisting
0.0150
Plywood tebal 9 mm
0.3500
Kayu Dolken/Laut 3'-4'/4 m
6.0000

M
Kg
Ltr
M
Lbr
Btg

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,833,300.00
17,000.00
6,300.00
3,833,300.00
135,000.00
52,000.00
Jumlah (1)
x Rp.
578,141.50

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

153,332.00
6,800.00
1,260.00
57,499.50
47,250.00
312,000.00
578,141.50
289,070.75

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah total
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

42,900.00
31,350.00
3,630.00
2,475.00
80,355.00
369,425.75
369,425.00

6.24.

Bahan bekisting dihitung pakai 2 x

0.5000

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.6600
0.3300
0.0330
0.0330

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Memasang 1 M2 bekisting untuk dinding


SNI 7394:2008 / 6.25
Bahan Kayu SK Bekisting
Paku biasa 2' - 5"
Minyak bekisting
Balok Kayu SK Bekisting
Plywood tebal 9 mm
Kayu Dolken/Laut 3'-4'/4 m
Formtie/penjaga jarak bekisting/spacer

0.0300
0.4000
0.2000
0.0200
0.3500
3.0000
4.0000

M
Kg
Ltr
M
Lbr
Btg
Btg

x
x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Bahan bekisting dihitung pakai 2 x

0.5000

3,833,300.00
17,000.00
6,300.00
3,833,300.00
135,000.00
52,000.00
52,000.00
Jumlah (1)
x Rp.
610,975.00

=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

114,999.00
6,800.00
1,260.00
76,666.00
47,250.00
156,000.00
208,000.00
610,975.00
305,487.50

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.6600
0.3300
0.0330
0.0330

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

42,900.00
31,350.00
3,630.00
2,475.00
80,355.00
385,842.50
385,842.00

Upah

PB

Pekerja
Tukang kayu
Kepala tukang
Mandor

6.25.

Upah

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah total
Dibulatkan

39

PB

6.26.

Memasang 1 M2 bekisting untuk tangga


SNI 7394:2008 / 6.26
Bahan Kayu SK Bekisting
Paku biasa 2' - 5"
Minyak bekisting
Balok Kayu SK Bekisting
Plywood tebal 9 mm
Kayu Dolken/Laut 3'-4'/4 m

0.0300
0.4000
0.1500
0.0150
0.3500
2.0000

M
Kg
Ltr
M
Lbr
Btg

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,833,300.00
17,000.00
6,300.00
3,833,300.00
135,000.00
52,000.00
Jumlah (1)

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

114,999.00
6,800.00
945.00
57,499.50
47,250.00
104,000.00
331,493.50

0.6600
0.3300
0.0330
0.0330

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah total
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

42,900.00
31,350.00
3,630.00
2,475.00
80,355.00
411,848.50
411,848.00

x Rp.
x Rp.
x Rp.

3,833,300.00
17,000.00
52,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

101,199.12
10,200.00
26,000.00
137,399.12

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

9,750.00
4,750.00
550.00
600.00
15,650.00
153,049.12
153,049.00

Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)


SNI 7394:2008 / 6.28
Bahan Kayu SK Bekisting
0.2000 M
x Rp.
3,833,300.00
Paku 5 cm - 12 cm
1.5000 Kg
x Rp.
17,000.00
Minyak bekisting
0.4000 Ltr x Rp.
6,300.00
Besi beton polos
157.5000 Kg
x Rp.
15,000.00
Kawat beton
2.2500 Kg
x Rp.
18,700.00
Semen PPC
336.0000 Kg
x Rp.
1,300.00
Pasir beton
0.5400 M
x Rp.
132,400.00
Kerikil
0.8100 M
x Rp.
300,400.00
Jumlah (1)

=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

766,660.00
25,500.00
2,520.00
2,362,500.00
42,075.00
436,800.00
71,496.00
243,324.00
3,950,875.00

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

344,500.00
26,125.00
123,500.00
99,750.00
29,150.00
19,875.00
642,900.00
4,593,775.00

Upah

PB

6.27.

Memasang 1 M2 jembatan untuk pengecoran beton


SNI 7394:2008 / 6.27
Bahan Kayu kelas III, papan Bekisting
0.0264 M
Paku biasa 2" - 5 "
0.6000 Kg
Kayu Dolken/Laut 3'-4'/4 m
0.5000 Btg

Upah

PB

Pekerja
Tukang kayu
Kepala tukang
Mandor

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.1500
0.0500
0.0050
0.0080

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

6.28.

Upah

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

5.3000
0.2750
1.3000
1.0500
0.2650
0.2650

Oh
Oh
Oh
Oh
Oh
Oh

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
95,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)

40

PB

6.29.

Membuat 1 M3 sloof beton bertulang (200 kg besi + bekisting)


SNI 7394:2008 / 6.29
Bahan Kayu SK Bekisting
0.2700 M
x Rp.
3,833,300.00
Paku biasa 2" - 5 "
2.0000 Kg
x Rp.
17,000.00
Minyak bekisting
0.6000 Ltr x Rp.
6,300.00
Besi beton polos
210.0000 Kg
x Rp.
15,000.00
Kawat beton
3.0000 Kg
x Rp.
18,700.00
Semen PPC
336.0000 Kg
x Rp.
1,300.00
Pasir beton
0.5400 M
x Rp.
132,400.00
Kerikil
0.8100 M
x Rp.
300,400.00
Jumlah (1)

=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,034,991.00
34,000.00
3,780.00
3,150,000.00
56,100.00
436,800.00
71,496.00
243,324.00
5,030,491.00

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

367,250.00
26,125.00
148,200.00
133,000.00
35,530.00
21,225.00
731,330.00
5,761,821.00

Membuat 1 M3 kolom beton bertulang (300 kg besi + bekisting)


SNI 7394:2008 / 6.30
Bahan Kayu SK Bekisting
0.4000 M
x Rp.
3,833,300.00 =
Paku biasa 2" - 5 "
4.0000 Kg
x Rp.
17,000.00 =
Minyak bekisting
2.0000 Ltr x Rp.
6,300.00 =
Besi beton polos
315.0000 Kg
x Rp.
15,000.00 =
Kawat beton
4.5000 Kg
x Rp.
18,700.00 =
Semen PPC
336.0000 Kg
x Rp.
1,300.00 =
Pasir beton
0.5400 M
x Rp.
132,400.00 =
Kerikil
0.8100 M
x Rp.
300,400.00 =
Kayu sembarang balok
0.1500 M
x Rp.
3,833,300.00 =
Plywood 9 mm
3.5000 Lbr x Rp.
135,000.00 =
Kayu Dolken/Laut 3'-4'/4 m
20.0000 Btg x Rp.
52,000.00 =
Jumlah (1)
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,533,320.00
68,000.00
12,600.00
4,725,000.00
84,150.00
436,800.00
71,496.00
243,324.00
574,995.00
472,500.00
1,040,000.00
9,262,185.00

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

458,250.00
26,125.00
156,750.00
199,500.00
44,330.00
26,475.00
911,430.00
10,173,615.00

Membuat 1 M3 balok beton bertulang (200 kg besi + bekisting)


SNI 7394:2008 / 6.31
Bahan Kayu SK Bekisting
0.3200 M
x Rp.
3,833,300.00 =
Paku biasa 2" - 5 "
3.2000 Kg
x Rp.
17,000.00 =
Minyak bekisting
1.6000 Ltr x Rp.
6,300.00 =
Besi beton polos
210.0000 Kg
x Rp.
15,000.00 =
Kawat beton
3.0000 Kg
x Rp.
18,700.00 =
Semen PPC
336.0000 Kg
x Rp.
1,300.00 =
Pasir beton
0.5400 M
x Rp.
132,400.00 =

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,226,656.00
54,400.00
10,080.00
3,150,000.00
56,100.00
436,800.00
71,496.00

Upah

PB

5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

Oh
Oh
Oh
Oh
Oh
Oh

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
95,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)

6.30.

Upah

PB

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

7.0500
0.2750
1.6500
2.1000
0.4030
0.3530

Oh
Oh
Oh
Oh
Oh
Oh

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
95,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)

6.31.

41

Kerikil
Kayu sembarang balok
Plywood 9 mm
Kayu Dolken/Laut 3'-4'/4 m

Upah

PB

M
M
Lbr
Btg

x
x
x
x

Rp.
Rp.
Rp.
Rp.

300,400.00
3,833,300.00
135,000.00
52,000.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

243,324.00
536,662.00
378,000.00
832,000.00
6,995,518.00

6.3500
0.2750
1.6500
1.4000
0.3330
0.3180

Oh
Oh
Oh
Oh
Oh
Oh

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
95,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

412,750.00
26,125.00
156,750.00
133,000.00
36,630.00
23,850.00
789,105.00
7,784,623.00

3,833,300.00
17,000.00
6,300.00
15,000.00
18,700.00
1,300.00
132,400.00
300,400.00
3,833,300.00
135,000.00
52,000.00
Jumlah (1)

=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,226,656.00
54,400.00
10,080.00
2,362,500.00
42,075.00
436,800.00
71,496.00
243,324.00
459,996.00
378,000.00
1,664,000.00
6,949,327.00

65,000.00
95,000.00
95,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

344,500.00
26,125.00
123,500.00
99,750.00
29,150.00
19,875.00
642,900.00
7,592,227.00

=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

919,992.00
54,400.00
10,080.00
2,362,500.00
42,075.00
436,800.00
71,496.00
243,324.00
613,328.00
378,000.00
1,248,000.00
6,379,995.00

6.32.

Membuat 1 M3 plat beton bertulang (150 kg besi + bekisting)


SNI 7394:2008 / 6.32
Bahan Kayu SK Bekisting
0.3200 M
x Rp.
Paku biasa 2" - 5 "
3.2000 Kg
x Rp.
Minyak bekisting
1.6000 Ltr x Rp.
Besi beton polos
157.5000 Kg
x Rp.
Kawat beton
2.2500 Kg
x Rp.
Semen PPC
336.0000 Kg
x Rp.
Pasir beton
0.5400 M
x Rp.
Kerikil
0.8100 M
x Rp.
Kayu sembarang balok
0.1200 M
x Rp.
Plywood 9 mm
2.8000 Lbr x Rp.
Kayu Dolken/Laut 3'-4'/4 m
32.0000 Btg x Rp.

Upah

PB

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

0.8100
0.1400
2.8000
16.0000

6.33.

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

5.3000
0.2750
1.3000
1.0500
0.2650
0.2650

Oh
Oh
Oh
Oh
Oh
Oh

Membuat 1 M3 dinding beton bertulang (150 kg besi +


SNI 7394:2008 / 6.33
Bahan Kayu SK Bekisting
0.2400 M
Paku biasa 2" - 5 "
3.2000 Kg
Minyak bekisting
1.6000 Ltr
Besi beton polos
157.5000 Kg
Kawat beton
2.2500 Kg
Semen PPC
336.0000 Kg
Pasir beton
0.5400 M
Kerikil
0.8100 M
Kayu sembarang balok
0.1600 M
Plywood 9 mm
2.8000 Lbr
Kayu Dolken/Laut 3'-4'/4 m
24.0000 Btg

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

bekisting)
x
x
x
x
x
x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,833,300.00
17,000.00
6,300.00
15,000.00
18,700.00
1,300.00
132,400.00
300,400.00
3,833,300.00
135,000.00
52,000.00
Jumlah (1)

42

Upah

PB

PB

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

5.3000
0.2750
1.3000
1.0500
0.2650
0.2650

Oh
Oh
Oh
Oh
Oh
Oh

6.34.

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
95,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

344,500.00
26,125.00
123,500.00
99,750.00
29,150.00
19,875.00
642,900.00
7,022,895.00

Membuat 1 M3 dinding beton bertulang (200 kg besi +


SNI 7394:2008 / 6.34
Bahan Kayu SK Bekisting
0.2500 M
Paku biasa 2" - 5 "
3.0000 Kg
Minyak bekisting
1.2000 Ltr
Besi beton polos
210.0000 Kg
Kawat beton
3.0000 Kg
Semen PPC
336.0000 Kg
Pasir beton
0.5400 M
Kerikil
0.8100 M
Kayu sembarang balok
0.1050 M
Plywood 9 mm
2.5000 Lbr
Kayu Dolken/Laut 3'-4'/4 m
14.0000 Btg

bekisting)
x
x
x
x
x
x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,833,300.00
17,000.00
6,300.00
15,000.00
18,700.00
1,300.00
132,400.00
300,400.00
3,833,300.00
135,000.00
52,000.00
Jumlah (1)

=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

958,325.00
51,000.00
7,560.00
3,150,000.00
56,100.00
436,800.00
71,496.00
243,324.00
402,496.50
337,500.00
728,000.00
6,442,601.50

Upah

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
95,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

367,250.00
26,125.00
148,200.00
133,000.00
35,530.00
21,225.00
731,330.00
7,173,931.50
7,173,931.00

3,833,300.00
17,000.00
15,000.00
18,700.00
1,300.00
118,800.00
300,400.00
Jumlah (1)
65,000.00
95,000.00
95,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

7,666.60
170.00
45,000.00
841.50
5,200.00
712.80
2,703.60
62,294.50
11,700.00
1,900.00
1,900.00
1,900.00
660.00
675.00
18,735.00
81,029.50
81,029.00

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

Oh
Oh
Oh
Oh
Oh
Oh

6.35.

Membuat 1 M' kolom praktis beton bertulang (11 x 11)cm


SNI 7394:2008 / 6.35
Bahan Kayu SK Bekisting
0.0020 M
x Rp.
Paku biasa 2" - 5 "
0.0100 Kg
x Rp.
Besi beton polos
3.0000 Kg
x Rp.
Kawat beton
0.0450 Kg
x Rp.
Semen PPC
4.0000 Kg
x Rp.
Pasir
0.0060 M
x Rp.
Kerikil
0.0090 M
x Rp.
Upah

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

0.1800
0.0200
0.0200
0.0200
0.0060
0.0090

Oh
Oh
Oh
Oh
Oh
Oh

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

43

PB

6.36.

Membuat 1 M' ring balok beton bertulang


SNI 7394:2008 / 6.36
Bahan Kayu SK Bekisting
Paku biasa 2" - 5 "
Besi beton polos
Kawat beton
Semen PPC
Pasir
Kerikil

(10 x 15) cm
0.0030
0.0200
3.6000
0.0500
5.5000
0.0090
0.0150

M
Kg
Kg
Kg
Kg
M
M

x
x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Upah

0.2970
0.0330
0.0330
0.0330
0.0100
0.0150

Oh
Oh
Oh
Oh
Oh
Oh

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Supl. BSl

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

11,499.90
340.00
54,000.00
935.00
7,150.00
1,069.20
4,506.00
79,500.10
19,305.00
3,135.00
3,135.00
3,135.00
1,100.00
1,125.00
30,935.00
110,435.10
110,435.00

Membuat 1 M' sloof 20x20 cm

Bahan Bekisting/mal sloof


Besi beton
Beton camp. 1:2:3

2
0.4000 M
5.0340 Kg
0.0400 M

x Rp.
x Rp.
x Rp.

89,114.25
16,030.50
751,620.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

35,645.70
80,697.54
30,064.80
146,408.04

Upah

2
0.4000 M
5.0340 Kg
0.0400 M

x Rp.
x Rp.
x Rp.

63,310.00
1,227.00
139,750.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp

25,324.00
6,176.72
5,590.00
37,090.72
183,498.76
183,498.00

Bahan Bekisting/mal kolom


Besi beton
Beton camp. 1:2:3

2
1.5500 M
12.5500 Kg
0.1570 M

x Rp.
x Rp.
x Rp.

185,070.75
16,030.50
751,620.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

286,859.66
201,182.78
118,004.34
606,046.78

Upah

2
1.5500 M
12.5500 Kg
0.1570 M

x Rp.
x Rp.
x Rp.

80,355.00
1,227.00
139,750.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp

124,550.25
15,398.85
21,940.75
161,889.85
767,936.63
767,936.00

Membuat 1 m3 beton tumbuk, 1 Pc : 3 Ps : 5 Kr


ABK-PU 2005/7.1
Bahan Semen PPC
218.0000 Kg
Pasir beton
0.5200 M
Kerikil
0.8700 M

x Rp.
x Rp.
x Rp.

1,300.00
132,400.00
300,400.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

283,400.00
68,848.00
261,348.00
613,596.00

Supl. BKl

PB

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

3,833,300.00
17,000.00
15,000.00
18,700.00
1,300.00
118,800.00
300,400.00
Jumlah (1)
65,000.00
95,000.00
95,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

Bekisting/mal sloof
Besi beton
Beton camp. 1:2:3

Membuat 1 M' kolom 20x30 cm

Membuat 1 M' kolom 20x30 cm


Besi beton
Beton camp. 1:2:3

7.1.

44

Upah

PB

Oh
Oh
Oh
Oh

Membuat 1 m3 beton tumbuk, 1 Pc : 3 Ps : 6 Kr


ABK-PU 2005-PB/7.2
Bahan Semen PPC
197.0000 Kg
Pasir beton
0.4700 M
Kerikil
0.9400 M

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

107,250.00
23,750.00
2,750.00
6,000.00
139,750.00
753,346.00

x Rp.
x Rp.
x Rp.

1,300.00
132,400.00
300,400.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

256,100.00
62,228.00
282,376.00
600,704.00

Pekerja
Tukang batu
Kepala tukang
Mandor

1.6500
0.2500
0.0250
0.0800

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

107,250.00
23,750.00
2,750.00
6,000.00
139,750.00
740,454.00

x Rp.
x Rp.
x Rp.

1,300.00
132,400.00
300,400.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

364,000.00
71,496.00
270,360.00
705,856.00

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

107,250.00
23,750.00
2,750.00
6,000.00
139,750.00
845,606.00

7.6.

Membuat 1 m3 beton camp. 1 Pc : 2 Ps : 4 Kr


ABK-PU 2005-PB/7.6
Bahan Semen PPC
280.0000 Kg
Pasir beton
0.5400 M
Kerikil
0.9000 M

Upah

PB

1.6500
0.2500
0.0250
0.0800

7.2.

Upah

PB

Pekerja
Tukang batu
Kepala tukang
Mandor

Pekerja
Tukang batu
Kepala tukang
Mandor

1.6500
0.2500
0.0250
0.0800

Oh
Oh
Oh
Oh

7.6a.

Membuat 1 m3 dan menghampar beton camp. 1 Pc :


ABK-PU 2005 PB/7.6a
Bahan Semen PPC
280.0000 Kg
Pasir beton
0.5400 M
Kerikil
0.9000 M

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

3.3000
0.5000
0.0500
0.1600

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

2 Ps : 4 Kr
x Rp.
x Rp.
x Rp.

1,300.00
132,400.00
300,400.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

364,000.00
71,496.00
270,360.00
705,856.00

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

214,500.00
47,500.00
5,500.00
12,000.00
279,500.00
985,356.00

Rp.
Rp.
Rp.
Rp.

45

PB

7.13.

Membuat 1 m3 beton camp. 1 Pc : 2 Ps : 3 Kr


ABK-PU 2005 PB/ 7.13
Bahan Semen PPC
336.0000 Kg
Pasir beton
0.5400 M
Kerikil
0.8100 M

Upah

PB

Pekerja
Tukang batu
Kepala tukang
Mandor

1.6500
0.2500
0.0250
0.0800

Oh
Oh
Oh
Oh

7.13a

Membuat dan menghampar beton 1 m3 camp. 1 Pc :


ABK-PU 2005 PB/ 7.13a
Bahan Semen PPC
336.0000 Kg
Pasir beton
0.5400 M
Kerikil
0.8100 M

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

SNI 03-3436-1994

4.9500
0.7500
0.0750
0.2400

Oh
Oh
Oh
Oh

x Rp.
x Rp.
x Rp.

1,300.00
132,400.00
300,400.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

436,800.00
71,496.00
243,324.00
751,620.00

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

107,250.00
23,750.00
2,750.00
6,000.00
139,750.00
891,370.00

Rp.
Rp.
Rp.
Rp.

2 Ps : 3 Kr
x Rp.
x Rp.
x Rp.

1,300.00
132,400.00
300,400.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

436,800.00
71,496.00
243,324.00
751,620.00

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

321,750.00
71,250.00
8,250.00
18,000.00
419,250.00
1,170,870.00

= Rp.
= Rp.
= Rp.

19,380.00
3,000.00
22,380.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,100.00
6,365.00
770.00
525.00
16,760.00
39,140.00

= Rp.
= Rp.
= Rp.

25,500.00
3,000.00
28,500.00

Rp.
Rp.
Rp.
Rp.

PEKERJAAN PENUTUP ATAP

PPA 6.15

Pasang atap asbes gelombang ( 2,10 x 1,05 m ) x 4 mm 1 M


SNI 03-3436-1994 / 6.15
Bahan Atap asbes gelombang
0.5100 Lbr x Rp.
38,000.00
Paku seng
0.1200 Kg x Rp.
25,000.00
Jumlah (1)
Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Pasang atap Tylux 1 M


SNI 03-3436-1994 / 6.15a
Bahan Atap tylux
Paku seng

0.1400
0.0670
0.0070
0.0070

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

PPA 6.15a

0.5100 Lbr x Rp.


50,000.00
0.1200 Kg x Rp.
25,000.00
Jumlah (1)

46

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1400
0.0670
0.0070
0.0070

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

Pasang bubung stel gelombang 0,92 m 1 M'


SNI 03-3436-1994 / 6.22
Bahan Bubung stel gelombang
2.4000 Lbr x Rp.
25,000.00
Paku seng
6.0000 Bh x Rp.
350.00
Jumlah (1)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,100.00
6,365.00
770.00
525.00
16,760.00
45,260.00

= Rp.
= Rp.
= Rp.

60,000.00
2,100.00
62,100.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,460.00
11,875.00
1,430.00
300.00
19,065.00
81,165.00

PPA 6.22

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Pasang nok Tylux 1 M'


SNI 03-3436-1994 / 6.29a
Bahan Nok Tylux
Paku seng

0.0840
0.1250
0.0130
0.0040

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

1.1000
6.0000

Bh
Bh

x Rp.
38,000.00
x Rp.
350.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

41,800.00
2,100.00
43,900.00

0.0840
0.1250
0.0130
0.0040

Oh
Oh
Oh
Oh

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,460.00
11,875.00
1,430.00
300.00
19,065.00
62,965.00

11.0000
0.0300

Bh
Kg

x Rp.
6,000.00
x Rp.
17,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

66,000.00
510.00
66,510.00

0.2000
0.1000
0.0100
0.0100

Oh
Oh
Oh
Oh

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,000.00
9,500.00
1,100.00
750.00
24,350.00
90,860.00

11.0000
0.0300

Bh
Kg

x Rp.
20,000.00
x Rp.
17,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

220,000.00
510.00
220,510.00

PPA 6.29a

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Pasang atap genteng beton 1 M


SNI 03-3436-1994 / 6.30
Bahan Atap genteng beton
Paku biasa 2" - 5"

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

PPA 6.30

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Pasang atap genteng keramik 1 M


SNI 03-3436-1994 / 6.30a
Bahan Atap genteng keramik
Paku biasa 2" - 5"

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

PPA 6.30a

47

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.2000
0.1000
0.0100
0.0100

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

Pasang atap genteng metal / Multi Roof 1 M


SNI 03-3436-1994 / 6.32
Bahan Atap genteng Metal
1.0200 Lbr x Rp.
65,000.00
Paku biasa 2" - 5"
0.2000 Kg x Rp.
17,000.00
Jumlah (1)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,000.00
9,500.00
1,100.00
750.00
24,350.00
244,860.00

= Rp.
= Rp.
= Rp.

66,300.00
3,400.00
69,700.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,000.00
9,500.00
1,100.00
75.00
23,675.00
93,375.00

PPA 6.32

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Pasang atap sirap 1 M


SNI 03-3436-1994/ 6.33
Bahan Atap Sirap
Paku biasa " - 1"

0.2000
0.1000
0.0100
0.0010

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

60.0000
0.2000

Bh
Kg

x Rp.
940.00
x Rp.
17,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

56,400.00
3,400.00
59,800.00

0.1660
0.2500
0.0250
0.0080

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,790.00
23,750.00
2,750.00
600.00
37,890.00
97,690.00

3.5000
0.0500
10.8000
0.0320
1.0000

Bh
Kg
Kg
M
Kg

x
x
x
x
x

Rp.
12,200.00
Rp.
17,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

42,700.00
850.00
14,040.00
3,801.60
2,250.00
63,641.60

0.4000
0.2000
0.0200
0.0200

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

26,000.00
19,000.00
2,200.00
1,500.00
48,700.00
112,341.60

Dibulatkan

= Rp

112,341.00

= Rp.
= Rp.

122,500.00
850.00

PPA 6.33

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

PPA 6.34

Pasang nok genteng beton 1 M'


SNI 03-3436-1994 / 6.34
Bahan Nok atap Genteng beton
Paku biasa 2" x 5"
Semen PC
Pasir pasang
Semen warna

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

PPA 6.34a

Pasang nok genteng keramik 1 M'


SNI 03-3436-1994 / 6.34a
Bahan Nok atap Genteng keramik
Paku biasa 2" x 5"

3.5000
0.0500

Bh
Kg

x Rp.
x Rp.

35,000.00
17,000.00

48

Upah

Semen PC
Pasir pasang
Semen warna

10.8000
0.0320
1.0000

Kg
M
Kg

x Rp.
1,300.00
x Rp.
118,800.00
x Rp.
2,250.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

14,040.00
3,801.60
2,250.00
143,441.60

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.4000
0.2000
0.0200
0.0200

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

26,000.00
19,000.00
2,200.00
1,500.00
48,700.00
192,141.60

Dibulatkan

= Rp

192,141.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

367,500.00
340.00
4,680.00
1,188.00
787.50
374,495.50

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,000.00
9,500.00
1,100.00
750.00
24,350.00
398,845.50

Dibulatkan

= Rp

398,845.00

1.1000 Lbr x Rp.


25,000.00
0.0400 Kg x Rp.
17,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

27,500.00
680.00
28,180.00

0.1500
0.0700
0.0080
0.0060

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,750.00
6,650.00
880.00
450.00
17,730.00
45,910.00

0.4000 Lbr x Rp.


75,000.00
0.0600 Kg x Rp.
17,000.00
0.0500 Kg x Rp.
17,000.00
0.0040 M x Rp.
5,000,000.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

30,000.00
1,020.00
850.00
20,000.00
51,870.00

PPA 6.34b

Pasang nok penutup / cabang genteng keramik 1 Buah


SNI 03-3436-1994 / 6.34b
Bahan Nok penutup genteng keramik
3.5000 Bh x Rp.
105,000.00
Paku biasa 2" x 5"
0.0200 Kg x Rp.
17,000.00
Semen PC
3.6000 Kg x Rp.
1,300.00
Pasir pasang
0.0100 M x Rp.
118,800.00
Semen warna
0.3500 Kg x Rp.
2,250.00
Jumlah (1)
Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

nok genteng metal 1 M'


SNI 03-3436-1994 / 6.36
Bahan Nok/ rabung genteng metal
Paku biasa 2" - 5"

0.2000
0.1000
0.0100
0.0100

Oh
Oh
Oh
Oh

x
x
x
x

PPA 6.36

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Pasang nok sirap 1 M'


SNI 03-3436-1992 / 6.37
Bahan Seng plat 3" x 6" BJLS 28
Paku biasa " - 1"
Paku biasa 2" - 5"
Kayu papan tbl. 3 cm

Oh
Oh
Oh
Oh

x
x
x
x

PPA 6.37

49

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Pasang atap seng gelombang 1 M2


SNI 03-3436-1994 / 6.38
Bahan Seng Gelombang 3"x 6" BJLS
Paku seng

0.1250
0.2500
0.0250
0.0060

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

8,125.00
23,750.00
2,750.00
450.00
35,075.00
86,945.00

0.7000 Lbr x Rp.


48,000.00
0.0400 Kg x Rp.
25,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

33,600.00
1,000.00
34,600.00

0.1200
0.0600
0.0060
0.0060

Oh
Oh
Oh
Oh

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,800.00
5,700.00
660.00
450.00
14,610.00
49,210.00

0.6000
0.0200

Bh
Kg

x Rp.
20,000.00
x Rp.
25,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

12,000.00
500.00
12,500.00

0.1500
0.0700
0.0080
0.0060

Oh
Oh
Oh
Oh

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,750.00
6,650.00
880.00
450.00
17,730.00
30,230.00

1.0500
0.0200

Bh
Kg

x Rp.
23,100.00
x Rp.
30,500.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

24,255.00
610.00
24,865.00

0.1500
0.0750
0.0080
0.0060

Oh
Oh
Oh
Oh

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,750.00
7,125.00
880.00
450.00
18,205.00
43,070.00

1.0500
0.0200

M
Kg

x Rp.
98,200.00
x Rp.
30,500.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

103,110.00
610.00
103,720.00

PPA 6.38

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Pasang rabung seng 1 M'


SNI 03-3436-1994 / 6.39
Bahan Rabung seng
Paku Seng

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

PPA 6.39

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Pasang rabung alumi zink warna 1 M'


SNI 03-3436-1994/ 6.39a
Bahan Rabung alumi zink warna
Paku hak panjang 15 cm

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

PPA 6.39a

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Pasang atap aluminium 1 M2


SNI 03-3436-1994 / 6.40
Bahan Atap Alluminium gelombang 0,55
Paku hak panjang 15 cm

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

PPA 6.40

50

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1500
0.0750
0.0080
0.0060

Oh
Oh
Oh
Oh

x
x
x
x

Pasang atap alumi zink warna 0,35mm 1 M2


SNI 03-3436-1994 / 6.40a
Bahan Atap alumi zink warna 0.35mm
1.0500
Paku hak panjang 15 cm
0.0200

M
Kg

0.1500
0.0750
0.0080
0.0060

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,750.00
7,125.00
880.00
450.00
18,205.00
121,925.00

x Rp.
69,240.00
x Rp.
30,500.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

72,702.00
610.00
73,312.00

Oh
Oh
Oh
Oh

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,750.00
7,125.00
880.00
450.00
18,205.00
91,517.00

1.2000
0.0400

M
Kg

x Rp.
52,200.00
x Rp.
30,500.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

62,640.00
1,220.00
63,860.00

0.1000
0.1000
0.0100
0.0100

Oh
Oh
Oh
Oh

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,500.00
9,500.00
1,100.00
750.00
17,850.00
81,710.00

1.0500

x Rp.
20,000.00
Jumlah (1)

= Rp.
= Rp.

21,000.00
21,000.00

0.1500
0.0500
0.0050
0.0080

Oh
Oh
Oh
Oh

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,750.00
4,750.00
550.00
600.00
15,650.00
36,650.00

= Rp.
= Rp.

225,000.00
225,000.00

PPA 6.40a

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Pasang nok aluminium 1 M2


SNI 03-3436-1994 / 6.41
Bahan Nok Standar 40 cm 18 SWG 22
Paku hak panjang 15 cm

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

PPA 6.41.

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Pasang aluminium foil / sisalation 1 M2


SNI 03-3436-1994 / 6.42
Bahan Sisalation / Alluminium foil

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

PPA 6.42

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

ABKPU 2005, Pt-T-30-2000-C

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

PEKERJAAN KUNCI DAN KACA

PKK 6.1

pasang kunci tanam antik 1 buah


ABKPU 2005-PKK/ 6.1
Bahan Kunci tanam antik

1.0000

Bh

x Rp.
225,000.00
Jumlah (1)

51

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0600
0.6000
0.0600
0.0030

Oh
Oh
Oh
Oh

x
x
x
x

1.0000

Bh

0.0100
0.5000
0.0100
0.0050

pasang kunci tanam kamar mandi 1 buah


ABKPU 2005-PKK/ 6.3
Bahan Kunci tanam kamar mandi
1.0000

pasang kunci tanam biasa 1 buah


ABKPU 2005-PKK/ 6.2
Bahan Kunci tanam biasa

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,900.00
57,000.00
6,600.00
225.00
67,725.00
292,725.00

x Rp.
85,000.00
Jumlah (1)

= Rp.
= Rp.

85,000.00
85,000.00

Oh
Oh
Oh
Oh

x
x
x
x

=
=
=
=
=
=

Bh

Oh
Oh
Oh
Oh

PKK 6.2

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

650.00
47,500.00
1,100.00
375.00
49,625.00
134,625.00

x Rp.
50,000.00
Jumlah (1)

= Rp.
= Rp.

50,000.00
50,000.00

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

325.00
47,500.00
550.00
187.50
48,562.50
98,562.50

Dibulatkan

= Rp

98,562.00

PKK 6.3

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

pasang kunci silinder 1 buah


ABKPU 2005-PKK/ 6.4
Bahan Kunci silinder

0.0050
0.5000
0.0050
0.0025

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PKK 6.4

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

pasang engsel pintu 1 buah


ABKPU 2005-PKK/ 6.5
Bahan engsel pintu

1.0000

Bh

x Rp.
40,000.00
Jumlah (1)

= Rp.
= Rp.

40,000.00
40,000.00

0.0050
0.5000
0.0050
0.0025

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

325.00
47,500.00
550.00
187.50
48,562.50
88,562.50

Dibulatkan

= Rp

88,562.00

= Rp.
= Rp.

15,000.00
15,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PKK 6.5

1.0000

Bh

x Rp.
15,000.00
Jumlah (1)

52

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0150
0.1500
0.0150
0.0075

pasang engsel jendela kupu-kupu 1 buah


ABKPU 2005-PKK/ 6.6
Bahan Engsel jendela
1.0000

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

975.00
14,250.00
1,650.00
562.50
17,437.50
32,437.50

Dibulatkan

= Rp

32,437.00

PKK 6.6

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

pasang engsel angin 1 buah


ABKPU 2005-PKK/ 6.7
Bahan Engsel angin

Bh

x Rp.
11,000.00
Jumlah (1)

= Rp.
= Rp.

11,000.00
11,000.00

0.0100
0.1000
0.0100
0.0050

Oh
Oh
Oh
Oh

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

650.00
9,500.00
1,100.00
375.00
11,625.00
22,625.00

1.0000

Bh

x Rp.
25,000.00
Jumlah (1)

= Rp.
= Rp.

25,000.00
25,000.00

0.0200
0.2000
0.0200
0.0100

Oh
Oh
Oh
Oh

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,300.00
19,000.00
2,200.00
750.00
23,250.00
48,250.00

1.0000

Bh

x Rp.
9,100.00
Jumlah (1)

= Rp.
= Rp.

9,100.00
9,100.00

0.0150
0.1500
0.0150
0.0008

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Dibulatkan

= Rp

26,031.00

= Rp.
= Rp.

15,000.00
15,000.00

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

PKK 6.7

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

pasang spring knip 1 buah


ABKPU 2005-PKK/ 6.8
Bahan Spring knip

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

PKK 6.8

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

pasang kait angin 1 buah


ABKPU 2005-PKK/ 6.9
Bahan Kait angin

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

975.00
14,250.00
1,650.00
56.25
16,931.25
26,031.25

PKK 6.9

1.0000

Bh

x Rp.
15,000.00
Jumlah (1)

53

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

pasang door closer 1 buah


ABKPU 2005-PKK/ 6.10
Bahan Door closer

0.0150
0.1500
0.0150
0.0008

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

975.00
14,250.00
1,650.00
56.25
16,931.25
31,931.25

Dibulatkan

= Rp

31,931.00

PKK 6.10

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

pasang kunci selot 1 buah


ABKPU 2005-PKK/ 6.11
Bahan Kunci selot

1.0000

Bh

x Rp.
110,000.00
Jumlah (1)

= Rp.
= Rp.

110,000.00
110,000.00

0.0500
0.5000
0.0500
0.0025

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

3,250.00
47,500.00
5,500.00
187.50
56,437.50
166,437.50

Dibulatkan

= Rp

166,437.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PKK 6.11

1.0000

Bh

x Rp.
35,000.00
Jumlah (1)

= Rp.
= Rp.

35,000.00
35,000.00

0.0200
0.2000
0.0200
0.0010

Oh
Oh
Oh
Oh

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,300.00
19,000.00
2,200.00
75.00
22,575.00
57,575.00

pasang pegangan pintu / door holder 1 buah


ABKPU 2005-PKK/ 6.12
Bahan Pegangan pintu/door holder
1.0000

Bh

x Rp.
115,000.00
Jumlah (1)

= Rp.
= Rp.

115,000.00
115,000.00

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

3,250.00
47,500.00
5,500.00
187.50
56,437.50
171,437.50

Dibulatkan

= Rp

171,437.00

= Rp.
= Rp.

40,000.00
40,000.00

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

PKK 6.12

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

pasang door stop 1 buah


ABKPU 2005-PKK/ 6.13
Bahan Door stop

0.0500
0.5000
0.0500
0.0025

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PKK 6.13

1.0000

Bh

x Rp.
40,000.00
Jumlah (1)

54

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

pasang rel pintu dorong 1 buah


ABKPU 2005-PKK/ 6.14
Bahan Rel pintu dorong

0.0100
0.1000
0.0100
0.0005

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

650.00
9,500.00
1,100.00
37.50
11,287.50
51,287.50

Dibulatkan

= Rp

51,287.00

PKK 6.14

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

pasang kunci lemari 1 buah


ABKPU 2005-PKK/ 6.15
Bahan Kunci lemari

1.0000

Bh

x Rp.
225,000.00
Jumlah (1)

= Rp.
= Rp.

225,000.00
225,000.00

0.0600
0.6000
0.0600
0.0030

Oh
Oh
Oh
Oh

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,900.00
57,000.00
6,600.00
225.00
67,725.00
292,725.00

1.0000

Bh

x Rp.
12,500.00
Jumlah (1)

= Rp.
= Rp.

12,500.00
12,500.00

0.0250
0.2500
0.0250
0.0013

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1,625.00
23,750.00
2,750.00
93.75
28,218.75
40,718.75

Dibulatkan

= Rp

40,718.00

88,000.00
88,000.00

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

PKK 6.15

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

pasang kaca 1 M , tebal 3 mm


ABKPU 2005-PKK/ 6.16
Bahan Kaca polos

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PKK 6.16

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

pasang kaca 1 M , tebal 5 mm


ABKPU 2005-PKK/ 6.17
Bahan Kaca polos

1.1000

x Rp.
80,000.00
Jumlah (1)

= Rp.
= Rp.

0.0150
0.1500
0.0150
0.0008

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Dibulatkan

= Rp

104,931.00

= Rp.
= Rp.

143,000.00
143,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

975.00
14,250.00
1,650.00
56.25
16,931.25
104,931.25

PKK 6.17

1.1000

x Rp.
130,000.00
Jumlah (1)

55

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

pasang kaca 1 M, tebal 8 mm


ABKPU 2005-PKK/ 6.18
Bahan Kaca polos

0.0155
0.1550
0.0155
0.0008

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,007.50
14,725.00
1,705.00
56.25
17,493.75
160,493.75

Dibulatkan

= Rp

160,493.00

PKK 6.18

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

pasang kaca buram 1 M , tebal 5 mm


ABKPU 2005-PKK/ 6.19
Bahan Kaca buram
Sealent

1.1000

x Rp.
215,000.00
Jumlah (1)

= Rp.
= Rp.

236,500.00
236,500.00

0.0165
0.1650
0.0165
0.0008

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1,072.50
15,675.00
1,815.00
60.00
18,622.50
255,122.50

Dibulatkan

= Rp

255,122.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PKK 6.19

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

pasang kaca cermin 1 M , tebal 5 mm


ABKPU 2005-PKK/ 6.20
Bahan Kaca cermin

1.1000
0.0500

M
Kg

x Rp.
120,000.00
x Rp.
40,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

132,000.00
2,000.00
134,000.00

0.0155
0.1550
0.0155
0.0008

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1,007.50
14,725.00
1,705.00
56.25
17,493.75
151,493.75

Dibulatkan

= Rp

151,493.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PKK 6.20

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

pasang kaca cermin 1 M , tebal 8 mm


ABKPU 2005-PKK/ 6.21
Bahan Kaca cermin

1.1000

x Rp.
175,000.00
Jumlah (1)

= Rp.
= Rp.

192,500.00
192,500.00

0.0155
0.1550
0.0155
0.0008

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1,007.50
14,725.00
1,705.00
56.25
17,493.75
209,993.75

Dibulatkan

= Rp

209,993.00

= Rp.
= Rp.

308,000.00
308,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PKK 6.21

1.1000

x Rp.
280,000.00
Jumlah (1)

56

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0165
0.1650
0.0165
0.0008

pasang kaca "wireglass" 1 M , tebal 5 mm


ABKPU 2005-PKK/ 6.23
Bahan Kaca Wireglass
1.1000

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,072.50
15,675.00
1,815.00
60.00
18,622.50
326,622.50

Dibulatkan

= Rp

326,622.00

PKK 6.23

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

pasang kaca patri 1 M, tebal 5 mm


ABKPU 2005-PKK/ 6.24
Bahan Kaca Patri

0.0155
0.1550
0.0155
0.0008

x Rp.
151,300.00
Jumlah (1)

= Rp.
= Rp.

166,430.00
166,430.00

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1,007.50
14,725.00
1,705.00
56.25
17,493.75
183,923.75

Dibulatkan

= Rp

183,923.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PKK 6.24

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

pasang kaca Reyben 1 M , tebal 5 mm


ABKPU 2005-PKK/ 6.24a
Bahan Kaca Reyben

1.1000

x Rp.
275,000.00
Jumlah (1)

= Rp.
= Rp.

302,500.00
302,500.00

0.0250
0.2500
0.0250
0.0013

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1,625.00
23,750.00
2,750.00
93.75
28,218.75
330,718.75

Dibulatkan

= Rp

330,718.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PKK 6.24a

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.1000

x Rp.
156,000.00
Jumlah (1)

= Rp.
= Rp.

171,600.00
171,600.00

0.0155
0.1550
0.0155
0.0008

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1,007.50
14,725.00
1,705.00
56.25
17,493.75
189,093.75

Dibulatkan

= Rp

189,093.00

= Rp.
= Rp.
= Rp.

80,500.00
119,000.00
80,500.00

pasang jendela kaca nako polos + rangka 1 M'


Pt-T-30-2000-C.II.16
Bahan Kaca nako
7.0000 daun x Rp.
11,500.00
Rangka nako
7.0000 daun x Rp.
17,000.00
Jumlah (1)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PKK II.16

57

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.3000
0.3000
0.0300
0.0150

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

19,500.00
28,500.00
3,300.00
1,125.00
52,425.00
132,925.00

= Rp.
= Rp.
= Rp.

94,500.00
119,000.00
94,500.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

19,500.00
28,500.00
3,300.00
1,125.00
52,425.00
146,925.00

15,000.00
17,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

16,500.00
170.00
16,670.00

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

1,950.00
6,650.00
770.00
112.50
9,482.50
26,152.50

Dibulatkan

= Rp

26,152.00

14,000.00
17,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

15,400.00
170.00
15,570.00

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

1,950.00
6,650.00
770.00
112.50
9,482.50
25,052.50

Dibulatkan

= Rp

pasang jendela kaca raybend polos + rangka 1 M'


Pt-T-30-2000-C.II.16a
Bahan Kaca nako raybend
7.0000 daun x Rp.
13,500.00
Rangka nako
7.0000 daun x Rp.
17,000.00
Jumlah (1)

=
=
=
=
=
=

PKK II.16a

Upah

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

SNI 2839:2008
PLL

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

HARGA SATUAN PEKERJAAN LANGIT - LANGIT

6.1

Memasang 1 m2 langit - langit asbes semen tebal 4 mm


SNI 2839:2008/ 6.1
Bahan Pelat asbes tebal 4 mm
1.1000 Lbr x Rp.
Paku
0.0100 Kg
x Rp.

Upah

PLL

0.3000
0.3000
0.0300
0.0150

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.0300
0.0700
0.0070
0.0015

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Memasang 1m2 langit - langit asbes semen tebal 3,5 mm


SNI 2839:2008/ 6.1a
Bahan Pelat asbes tebal 3,5 mm
1.1000 Lbr x Rp.
Paku
0.0100 Kg
x Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6.1a

Upah

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.0300
0.0700
0.0070
0.0015

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

25,052.00

58

PLL

6.2

1 M Langit - langit akustik ( 30 x 30 ) cm


SNI 2839:2008/ 6.2
Bahan Akustik ukuran 30 x 30 cm
11.5000 Lbr
Paku
0.0500 Kg

Upah

PLL

Oh
Oh
Oh
Oh

Memasang 1 M Langit - langit akustik ( 30 x 60 ) cm


SNI 2839:2008/ 6.3
Bahan Akustik ukuran 30 x 60 cm
5.8000 Lbr
Paku
0.0500 Kg

= Rp.
= Rp.
= Rp.

97,750.00
850.00
98,600.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,900.00
11,400.00
1,320.00
225.00
16,845.00
115,445.00

x Rp.
x Rp.

17,100.00
17,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

99,180.00
850.00
100,030.00

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.0600
0.1000
0.0100
0.0030

Oh
Oh
Oh
Oh

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,900.00
9,500.00
1,100.00
225.00
14,725.00
114,755.00

68,300.00
17,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

102,450.00
850.00
103,300.00

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,900.00
9,500.00
1,100.00
225.00
14,725.00
118,025.00

= Rp.
= Rp.
= Rp.

24,375.00
510.00
24,885.00

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

4,550.00
9,500.00
1,100.00
262.50
15,412.50
40,297.50

Dibulatkan

= Rp

Rp.
Rp.
Rp.
Rp.

6.4

Memasang 1 M Langit - langit akustik ( 60 x 120 ) cm


SNI 2839:2008/ 6.4
Bahan Akustik arm strong.60/120 cm
1.5000 Lbr x Rp.
Paku
0.0500 Kg
x Rp.

Upah

PLL

0.0600
0.1200
0.0120
0.0030

8,500.00
17,000.00
Jumlah (1)

6.3

Upah

PLL

Pekerja
Tukang kayu
Kepala tukang
Mandor

x Rp.
x Rp.

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.0600
0.1000
0.0100
0.0030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

6.5

Memasang 1 M Langit - langit tripleks ( 120 x 240 ) cm, tebal 4 mm


SNI 2839:2008/ 6.5
Bahan Tripleks
0.3750 Lbr x Rp.
65,000.00
Paku
0.0300 Kg
x Rp.
17,000.00
Jumlah (1)
Upah

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.0700
0.1000
0.0100
0.0035

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

40,297.00

59

PLL

6.5a

1 M Langit - langit plywood ( 60 x 120 ) cm, tebal 6 mm


SNI 2839:2008/ 6.5a
Bahan Tripleks
0.3750 Lbr x Rp.
Paku
0.0300 Kg
x Rp.

Upah

PLL

Oh
Oh
Oh
Oh

1 M Langit - langit gypsum board, tebal 9 mm


SNI 2839:2008/ 6.7
Bahan Gypsum board (1200/2400/9) mm
0.3640 Lbr
Paku sekrup
0.1100 Kg

35,625.00
510.00
36,135.00

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

4,550.00
9,500.00
1,100.00
262.50
15,412.50
51,547.50

Dibulatkan

= Rp

51,547.00

x Rp.
x Rp.

71,500.00
21,200.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

26,026.00
2,332.00
28,358.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,500.00
4,750.00
550.00
375.00
12,175.00
40,533.00

x Rp.
x Rp.

60,000.00
21,200.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

21,840.00
2,332.00
24,172.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,500.00
4,750.00
550.00
375.00
12,175.00
36,347.00

x Rp.
x Rp.

93,500.00
21,200.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

34,034.00
2,332.00
36,366.00

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

6,500.00
4,750.00
550.00
375.00
12,175.00
48,541.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.1000
0.0500
0.0050
0.0050

Oh
Oh
Oh
Oh

6.7a

1 M Langit - langit gypsum board, tebal 6 mm


SNI 2839:2008/ 6.7a
Bahan Gypsum board (1200/2400/6) mm
0.3640 Lbr
Paku sekrup
0.1100 Kg

Upah

PLL

0.0700
0.1000
0.0100
0.0035

= Rp.
= Rp.
= Rp.

6.7

Upah

PLL

Pekerja
Tukang kayu
Kepala tukang
Mandor

95,000.00
17,000.00
Jumlah (1)

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.1000
0.0500
0.0050
0.0050

Oh
Oh
Oh
Oh

6.7b

1 M Langit - langit gypsum board, tebal 12 mm


SNI 2839:2008/ 6.7b
Bahan Gypsum board (1200/2400/12) mm
0.3640 Lbr
Paku sekrup
0.1100 Kg

Upah

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.1000
0.0500
0.0050
0.0050

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

60

PLL

6.8

Memasang 1 m' plafond gypsum profil 4"


SNI 2839:2008/ 6.8
Bahan List gypsum profil
1.0500 Lbr
Tepung gypsum
0.1500 Kg

Upah

PLL

6.9

Memasang 1 m' Langit - langit akustik 60


SNI 2839:2008/ 6.9
Bahan Profil alluminium "T"
Kawat seng polos
Ramset/dina bolt
Akustik 60/120 cm

Upah

PLL

Pekerja
Tukang besi
Kepala tukang
Mandor

0.0600
0.0600
0.0060
0.0030

Oh
Oh
Oh
Oh

6,700.00
10,400.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,900.00
5,700.00
660.00
225.00
10,485.00
19,080.00

Rp.
Rp.
Rp.
Rp.

7,035.00
1,560.00
8,595.00

x 120 cm + rangka alluminium


3.6000
0.1500
1.0500
1.5000

M'
Kg
Bh
Lbr

x
x
x
x

Rp.
Rp.
Rp.
Rp.

8,500.00
22,500.00
1,500.00
68,300.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

30,600.00
3,375.00
1,575.00
102,450.00
138,000.00

0.5000
0.5000
0.0500
0.0250

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

32,500.00
47,500.00
5,500.00
1,875.00
87,375.00
225,375.00

x Rp.
x Rp.

6,500.00
17,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

7,150.00
170.00
7,320.00

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,250.00
4,750.00
550.00
225.00
8,775.00
16,095.00

6.10

Memasang 1 m' List Langit - langit Kayu profil


SNI 2839:2008/ 6.10
Bahan List kayu profil 3"
1.1000 M'
Paku
0.0100 Kg

Upah

PLL

Pekerja
Tukang kayu
Kepala tukang
Mandor

x Rp.
x Rp.

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.0500
0.0500
0.0050
0.0030

Oh
Oh
Oh
Oh

6.20

Rp.
Rp.
Rp.
Rp.

Memasang 1 M Langit - langit asbes (1,00 x 1,00) m,


ABKPU 2005-PLL/6.20
Bahan Kayu SK
0.0120 M
Paku
0.0600 Kg
Asbes 1,00 x 1,00 m
1.1000 Lbr

Rangka Kayu SK
x Rp.
x Rp.
x Rp.

5,000,000.00
17,000.00
14,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

60,000.00
1,020.00
15,400.00
76,420.00

Upah

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

11,700.00
30,400.00
3,520.00
675.00
46,295.00
122,715.00

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.1800
0.3200
0.0320
0.0090

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

61

PLL

6.21

Memasang 1 M langit - langit plywood 4 mm + rangka kayu SK 1


ABKPU 2005-PLL/6.20
Bahan Kayu SK
0.0130 M
x Rp.
5,000,000.00
Paku biasa 2" - 5"
0.0600 Kg
x Rp.
17,000.00
Plywood 4' x 8' x 4 mm
0.3900 Lbr x Rp.
50,000.00
Jumlah (1)
Upah

PLL

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.2700
0.4000
0.0400
0.0135

=
=
=
=

Rp.
Rp.
Rp.
Rp.

65,000.00
1,020.00
19,500.00
85,520.00

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

17,550.00
38,000.00
4,400.00
1,012.50
60,962.50
146,482.50
146,482.00

Memasang 1 M2 Langit - langit besi furing


Dihitung
Bahan Furing untuk rangka utama
0.2700 btg
Furing untuk rangka pembagi
0.3900 btg
Furing untuk rangka ke dinding
0.1400 btg
Pengikat rangka furing
1.6800 btg
Paku Ramset
0.8500 bh
Paku beton
0.7400 bh
Kawat penggantung+klipper
1.0800 bh

x
x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

34,100.00
34,800.00
8,300.00
1,000.00
1,500.00
300.00
13,200.00
Jumlah (1)

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,207.00
13,572.00
1,162.00
1,680.00
1,275.00
222.00
14,256.00
41,374.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,500.00
14,250.00
1,650.00
375.00
22,775.00
64,149.00

7.1

Upah

Pekerja
Tukang kayu
Kepala tukang
Mandor

SNI 7395:2008

0.1000
0.1500
0.0150
0.0050

Oh
Oh
Oh
Oh

PEKERJAAN PENUTUP LANTAI DAN DINDING

PLD 6.9

Memasang 1 m2 lantai ubin granit ukuran 40 x 40


SNI 7395:2008 / 6.9
Bahan Ubin granito 40 x 40 cm
6.6300
Semen PPC
9.8000
Pasir pasang
0.0450
Semen warna
1.3000

cm
Bh
Kg
M
Kg

x
x
x
x

Rp.
46,600.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

308,958.00
12,740.00
5,346.00
2,925.00
329,969.00

Upah

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16,250.00
11,875.00
1,430.00
975.00
30,530.00
360,499.00

Pekerja
Tukang batu
Kepala tukang
Mandor

0.2500
0.1250
0.0130
0.0130

62

PLD 6.10

Memasang 1 m2 lantai ubin granit ukuran 30 x 30


SNI 7395:2008 / 6.10
Bahan Ubin granito 30 x 30 cm
11.8700
Semen PPC
10.0000
Pasir pasang
0.0450
Semen warna
1.5000

cm
Bh
Kg
M
Kg

x
x
x
x

Rp.
26,300.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

312,181.00
13,000.00
5,346.00
3,375.00
333,902.00

Upah

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16,900.00
12,350.00
1,430.00
975.00
31,655.00
365,557.00

Pekerja
Tukang batu
Kepala tukang
Mandor

0.2600
0.1300
0.0130
0.0130

PLD 6.13

Memasang 1 m2 lantai ubin teralux marmer ukuran 60


SNI 7395:2008 / 6.13
Bahan Ubin teralux marmar 60 x 60 cm
3.1000 Bh
Semen PPC
9.6000 Kg
Pasir pasang
0.0450 M
Semen warna
1.5000 Kg

x 60 cm
x
x
x
x

Rp.
109,500.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

339,450.00
12,480.00
5,346.00
3,375.00
360,651.00

Upah

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,600.00
11,400.00
1,320.00
900.00
29,220.00
389,871.00

Pekerja
Tukang batu
Kepala tukang
Mandor

PLD 6.13a

Memasang 1 m2 lantai keramik standart


SNI 7395:2008 / 6.13
Bahan Ubin teralux marmar 60 x 60 cm
Semen PPC
Pasir pasang
Semen warna

Upah

PLD 6.14

Pekerja
Tukang batu
Kepala tukang
Mandor

0.2400
0.1200
0.0120
0.0120

Oh
Oh
Oh
Oh

ukuran 60 x 60 cm
3.1000
9.6000
0.0450
1.5000

Bh
Kg
M
Kg

x
x
x
x

Rp.
33,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

102,300.00
12,480.00
5,346.00
3,375.00
123,501.00

0.2400
0.1200
0.0120
0.0120

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,600.00
11,400.00
1,320.00
900.00
29,220.00
152,721.00

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

320,892.00
12,740.00
5,346.00
2,925.00
341,903.00

Memasang 1 m2 lantai ubin teralux marmer ukuran 40


SNI 7395:2008 / 6.14
Bahan Ubin marmar 40 x 40 cm
6.6300 Bh
Semen PPC
9.8000 Kg
Pasir pasang
0.0450 M
Semen warna
1.3000 Kg

x 40 cm
x
x
x
x

Rp.
48,400.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

63

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.2500
0.1250
0.0130
0.0130

Oh
Oh
Oh
Oh

PLD 6.15

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16,250.00
11,875.00
1,430.00
975.00
30,530.00
372,433.00

Memasang 1 m2 lantai ubin teralux marmer ukuran 30


SNI 7395:2008 / 6.15
Bahan Ubin marmar 30 x 30 cm
11.8700 Bh
Semen PPC
10.0000 Kg
Pasir pasang
0.0450 M
Semen warna
1.5000 Kg

x 30 cm
x
x
x
x

Rp.
27,200.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

322,864.00
13,000.00
5,346.00
3,375.00
344,585.00

Upah

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16,900.00
12,350.00
1,430.00
975.00
31,655.00
376,240.00

Memasang 1 m' plint ubin granit ukuran 10 x 40 cm


SNI 7395:2008 / 6.24
Bahan Plint ubin granito 10 x 40 cm
2.6500 Bh
Semen PPC
1.1400 Kg
Pasir pasang
0.0030 M
Semen warna
0.1000 Kg

x
x
x
x

Rp.
62,800.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

166,420.00
1,482.00
356.40
225.00
168,483.40

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,850.00
8,550.00
990.00
375.00
15,765.00
184,248.40

Dibulatkan

= Rp

184,248.00

x
x
x
x

Rp.
28,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

98,840.00
1,482.00
356.40
225.00
100,903.40

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,850.00
8,550.00
990.00
375.00
15,765.00
116,668.40

Dibulatkan

= Rp

Pekerja
Tukang batu
Kepala tukang
Mandor

0.2600
0.1300
0.0130
0.0130

PLD 6.24

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.0900
0.0900
0.0090
0.0050

Oh
Oh
Oh
Oh

PLD 6.25

Memasang 1 m' plint ubin granit ukuran 10 x 30 cm


SNI 7395:2008 / 6.25
Bahan Plint ubin granito 10 x 30 cm
3.5300 Bh
Semen PPC
1.1400 Kg
Pasir pasang
0.0030 M
Semen warna
0.1000 Kg

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.0900
0.0900
0.0090
0.0050

Oh
Oh
Oh
Oh

116,668.00

64

PLD 6.28

Memasang 1 m' plint ubin teralux marmer ukuran 10 x


SNI 7395:2008 / 6.28
Bahan Plint ubin marmer 10 x 60 cm
1.7000 Bh
Semen PPC
1.1400 Kg
Pasir pasang
0.0030 M
Semen warna
0.1000 Kg

60 cm
x
x
x
x

Rp.
157,200.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

267,240.00
1,482.00
356.40
225.00
269,303.40

Upah

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,850.00
8,550.00
990.00
375.00
15,765.00
285,068.40

Dibulatkan

= Rp

Pekerja
Tukang batu
Kepala tukang
Mandor

0.0900
0.0900
0.0090
0.0050

Oh
Oh
Oh
Oh

PLD 6.29

285,068.00

Memasang 1 m' plint ubin teralux marmer ukuran 10 x


SNI 7395:2008 / 6.29
Bahan Plint ubin marmer 10 x 40 cm
2.6500 Bh
Semen PPC
1.1400 Kg
Pasir pasang
0.0030 M
Semen warna
0.1000 Kg

40 cm
x
x
x
x

Rp.
13,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

34,450.00
1,482.00
356.40
225.00
36,513.40

Upah

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,850.00
8,550.00
990.00
375.00
15,765.00
52,278.40

Dibulatkan

= Rp

52,278.00

Pekerja
Tukang batu
Kepala tukang
Mandor

0.0900
0.0900
0.0090
0.0050

Oh
Oh
Oh
Oh

PLD 6.30

Memasang 1 m' plint ubin teralux marmer ukuran 10 x


SNI 7395:2008 / 6.30
Bahan Plint ubin marmer 10 x 30 cm
3.5300 Bh
Semen PPC
1.1400 Kg
Pasir pasang
0.0030 M
Semen warna
0.1000 Kg

30 cm
x
x
x
x

Rp.
10,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

35,300.00
1,482.00
356.40
225.00
37,363.40

Upah

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,850.00
8,550.00
990.00
375.00
15,765.00
53,128.40

Dibulatkan

= Rp

Pekerja
Tukang batu
Kepala tukang
Mandor

0.0900
0.0900
0.0090
0.0050

Oh
Oh
Oh
Oh

53,128.00

65

PLD 6.32

Memasang 1 m2 lantai keramik artistik (10 x 20) cm


SNI 7395:2008 / 6.32
Bahan Keramik artistik 10 x 20 cm
53.0000 Bh
Semen PPC
8.1900 Kg
Pasir pasang
0.0450 M
Semen warna
2.7500 Kg

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.7000
0.3500
0.0350
0.0350

Oh
Oh
Oh
Oh

Memasang 1 m2 lantai keramik artistik (10 x 10) cm


SNI 7395:2008 / 6.33
Bahan Keramik artistik 10 x 10 cm
106.0000 Bh
Semen PPC
8.1900 Kg
Pasir pasang
0.0450 M
Semen warna
3.2000 Kg

x
x
x
x

Rp.
22,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

1,166,000.00
10,647.00
5,346.00
6,187.50
1,188,180.50

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
1,273,405.50

Dibulatkan

= Rp

1,273,405.00

x
x
x
x

Rp.
15,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

1,590,000.00
10,647.00
5,346.00
7,200.00
1,613,193.00

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
1,698,418.00

Dibulatkan

= Rp

x
x
x
x

Rp.
5,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

530,000.00
10,647.00
5,346.00
7,200.00
553,193.00

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
638,418.00

Dibulatkan

= Rp

PLD 6.33

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.7000
0.3500
0.0350
0.0350

Oh
Oh
Oh
Oh

Memasang 1 m2 lantai keramik artistik (5 x 20) cm


SNI 7395:2008 / 6.33a
Bahan Keramik artistik 5 x 20 cm
106.0000 Bh
Semen PPC
8.1900 Kg
Pasir pasang
0.0450 M
Semen warna
3.2000 Kg

1,698,418.00

PLD 6.33a

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.7000
0.3500
0.0350
0.0350

Oh
Oh
Oh
Oh

638,418.00

66

PLD 6.34

Memasang 1 m2 lantai keramik 33 x 33 cm


SNI 7395:2008 / 6.34
Bahan Ubin keramik 33 x 33 cm
10.0000
Semen PPC
10.0000
Pasir pasang
0.0450
Semen warna
1.5000

Bh
Kg
M
Kg

x
x
x
x

Rp.
6,500.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

65,000.00
13,000.00
5,346.00
3,375.00
86,721.00

0.7000
0.3500
0.0350
0.0350

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
171,946.00

Memasang 1 m2 lantai keramik 30 x 30 cm


SNI 7395:2008 / 6.35
Bahan Ubin keramik 30 x 30 cm
11.8700
Semen PPC
10.0000
Pasir pasang
0.0450
Semen warna
1.5000

Bh
Kg
M
Kg

x
x
x
x

Rp.
5,910.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

70,151.70
13,000.00
5,346.00
3,375.00
91,872.70

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
177,097.70

Dibulatkan

= Rp

177,097.00

x
x
x
x

Rp.
6,800.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

80,716.00
13,000.00
5,346.00
3,375.00
102,437.00

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

PLD 6.35

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.7000
0.3500
0.0350
0.0350

PLD 6.35a

Memasang 1 m2 lantai keramik 30 x 30 cm anti slip


SNI 7395:2008 / 6.35a
Bahan Keramik 30 x 30 cm anti slip
11.8700 Bh
Semen PPC
10.0000 Kg
Pasir pasang
0.0450 M
Semen warna
1.5000 Kg

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.7000
0.3500
0.0350
0.0350

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
187,662.00

Memasang 1 m2 lantai keramik 40 x 40 cm


SNI 7395:2008 / 6.35b
Bahan Ubin keramik 40 x 40 cm
6.2500
Semen PPC
10.0000
Pasir pasang
0.0450
Semen warna
1.5000

Bh
Kg
M
Kg

x
x
x
x

Rp.
12,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

75,000.00
13,000.00
5,346.00
3,375.00
96,721.00

PLD 6.35b

67

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.7000
0.3500
0.0350
0.0350

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
181,946.00

Memasang 1 m2 lantai keramik 20 x 20 cm


SNI 7395:2008 / 6.36
Bahan Ubin keramik 20 x 20 cm
26.5000
Semen PPC
10.4000
Pasir pasang
0.0450
Semen warna
1.6200

Bh
Kg
M
Kg

x
x
x
x

Rp.
2,600.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

68,900.00
13,520.00
5,346.00
3,645.00
91,411.00

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
176,636.00

Memasang 1 m2 lantai mosaik 30 x 30 cm, campuran 1PC : 3 PP


SNI 7395:2008 / 6.38
Bahan Mosaik 30 x 30 cm
11.8700 Bh x Rp.
15,290.00
Semen PPC
14.1500 Kg x Rp.
1,300.00
Pasir pasang
0.0390 M x Rp.
118,800.00
Semen warna
2.0000 Kg x Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

181,492.30
18,395.00
4,633.20
4,500.00
209,020.50

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
294,245.50

Dibulatkan

= Rp

PLD 6.36

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.7000
0.3500
0.0350
0.0350

PLD 6.38

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

PLD 6.39

Memasang 1 m' plint keramik ukuran 10


SNI 7395:2008 / 6.39
Bahan Ubin Keramik 10 x 20 cm
Semen PPC
Pasir pasang
Semen warna

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.7000
0.3500
0.0350
0.0350

Oh
Oh
Oh
Oh

x
x
x
x

294,245.00

x 20 cm
5.0000
0.8500
0.0032
0.0800

Bh
Kg
M
Kg

x
x
x
x

Rp.
1,300.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

6,500.00
1,105.00
380.16
180.00
8,165.16

0.0900
0.0900
0.0090
0.0045

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,850.00
8,550.00
990.00
337.50
15,727.50
23,892.66

Dibulatkan

= Rp

23,892.00

68

PLD 6.43

Memasang 1 m2 lantai marmer (100 x 100) cm


SNI 7395:2008 / 6.43
Bahan Marmer
1.0600
Semen PPC
14.1500
Pasir pasang
0.0390
Semen warna
2.0000

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

1 M Pasang lantai paving block


An. BOW
Bahan Paving block
Pasir

0.6200
0.3500
0.0350
0.0300

Bh
Kg
M
Kg

x
x
x
x

Rp.
330,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

349,800.00
18,395.00
4,633.20
4,500.00
377,328.20

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

40,300.00
33,250.00
3,850.00
2,250.00
79,650.00
456,978.20

Dibulatkan

= Rp

456,978.00

88,000.00
11,880.00
99,880.00

G. 67.a

Upah

G. 67.b

Pekerja
Tukang
Kepala tukang
Mandor

44.0000
0.1000

Bh
M

x Rp.
2,000.00
x Rp.
118,800.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

0.1250
0.0625
0.0063
0.0625

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

8,125.00
5,937.50
693.00
4,687.50
19,443.00
119,323.00

pemasangan cab stone (pengikat paving block)

Bahan Cab stone beton


Pasir
Semen

2.5000
0.0080
1.1000

Bh
M
M

x Rp.
13,800.00
x Rp.
118,800.00
x Rp.
1,300.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

34,500.00
950.40
1,430.00
36,880.40

Upah

0.0410
0.0150
0.0015
0.0150

Oh
Oh
Oh
Oh

x
x
x
x

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,665.00
1,425.00
165.00
1,125.00
5,380.00
42,260.40
42,260.00

1.0500
0.3500

M
Kg

x Rp.
20,000.00
x Rp.
40,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

21,000.00
14,000.00
35,000.00

Pekerja
Tukang
Kepala tukang
Mandor

Memasang 1 m2 lantai karpet


SNI 7395:2008 / 6.44
Bahan Carpet
Lem vinyl

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

PLD 6.44

69

Upah

Pekerja
Tukang kayu
Kepala tukang
Mandor

1 M Pasang lantai karpet 100% wool


SNI 7395:2008 / 6.44a
Bahan Karpet wool
Lem vinyl

0.1700
0.1700
0.0170
0.0090

Oh
Oh
Oh
Oh

x
x
x
x

1.0500
0.3500

M
Kg

0.1700
0.1700
0.0170
0.0090

Oh
Oh
Oh
Oh

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

11,050.00
16,150.00
1,870.00
675.00
29,745.00
64,745.00

x Rp.
90,000.00
x Rp.
40,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

94,500.00
14,000.00
108,500.00

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

11,050.00
16,150.00
1,870.00
675.00
29,745.00
138,245.00

x Rp.
110,000.00
x Rp.
40,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

115,500.00
14,000.00
129,500.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,800.00
11,400.00
1,320.00
450.00
20,970.00
150,470.00

PLD 6.44a

Upah

Pekerja
Tukang
Kepala tukang
Mandor

Memasang 1 M underlayer / pelapis bawah karpet


SNI 7395:2008 / 6.45
Bahan Under layer/ rubber corrugated
1.0500 M
Lem
0.3500 Kg

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

PLD 6.45

Upah

Pekerja
Tukang
Kepala tukang
Mandor

0.1200
0.1200
0.0120
0.0060

Oh
Oh
Oh
Oh

x
x
x
x

1.0500
0.6000

M
Kg

x Rp.
368,500.00
x Rp.
40,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

386,925.00
24,000.00
410,925.00

0.7000
0.3500
0.0350
0.0350

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
496,150.00

Memasang 1 m2 dinding porselin 11 x 11 cm


SNI 7395:2008 / 6.48
Bahan Porselin 11 x 11 cm
83.0000
Semen PPC
9.3000
Pasir pasang
0.0180
Semen warna
1.5000

Bh
Kg
M
Kg

x
x
x
x

Rp.
1,200.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

99,600.00
12,090.00
2,138.40
3,375.00
117,203.40

Memasang 1 m2 lantai parquet jati


SNI 7395:2008 / 6.46
Bahan Perquet jati
Lem vinyl

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

PLD 6.46

Upah

Pekerja
Tukang
Kepala tukang
Mandor

PLD 6.48

70

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.6200
0.5000
0.0500
0.0300

Oh
Oh
Oh
Oh

Memasang 1 m2 dinding porselin 11 x 11 cm, warna


SNI 7395:2008 / 6.48a
Bahan Porselin 11 x 11 cm warna
83.0000 Bh
Semen PPC
9.3000 Kg
Pasir pasang
0.0180 M
Semen warna
1.5000 Kg

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

40,300.00
47,500.00
5,500.00
2,250.00
95,550.00
212,753.40

Dibulatkan

= Rp

212,753.00

x
x
x
x

Rp.
1,500.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

124,500.00
12,090.00
2,138.40
3,375.00
142,103.40

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

40,300.00
47,500.00
5,500.00
2,250.00
95,550.00
237,653.40

Dibulatkan

= Rp

237,653.00

PLD 6.48a

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.6200
0.5000
0.0500
0.0300

1 M Pasang dinding porselin 15 x 15 cm, putih


SNI 2002-PLD / 6.48b
Bahan Porselin 15 x 15 cm putih
45.0000
Semen PPC
9.3000
Pasir pasang
0.0180
Semen warna
1.5000

Oh
Oh
Oh
Oh

PLD 6.48b

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.6000
0.4500
0.0450
0.0300

1 M Pasang dinding porselin 15 x 15 cm, warna


SNI 2002-PLD / 6.48c
Bahan Porselin 15 x 15 cm warna
45.0000
Semen PPC
9.3000
Pasir pasang
0.0180
Semen warna
1.5000

Bh
Kg
M
Kg

x
x
x
x

Rp.
2,300.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

103,500.00
12,090.00
2,138.40
3,375.00
121,103.40

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

39,000.00
42,750.00
4,950.00
2,250.00
88,950.00
210,053.40

Dibulatkan

= Rp

210,053.00

Rp.
2,500.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

112,500.00
12,090.00
2,138.40
3,375.00
130,103.40

PLD 6.48c

Bh
Kg
M
Kg

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.

71

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.6000
0.4500
0.0450
0.0300

PLD 6.51

Memasang 1 m2 dinding keramik artistik 10 x 20


SNI 7395:2008 / 6.51
Bahan Keramik artistik 10x20 cm
53.0000
PPC Cement
9.3000
Pasir pasang
0.0180
Semen warna
2.7500

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.9000
0.4500
0.0450
0.0450

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Dibulatkan

= Rp

39,000.00
42,750.00
4,950.00
2,250.00
88,950.00
219,053.40
219,053.00

cm
Bh
Kg
M
Kg

x
x
x
x

Rp.
22,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

1,166,000.00
12,090.00
2,138.40
6,187.50
1,186,415.90

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

58,500.00
42,750.00
4,950.00
3,375.00
109,575.00
1,295,990.90

Dibulatkan

= Rp

1,295,990.00

x
x
x
x

Rp.
15,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

1,590,000.00
12,090.00
2,138.40
6,525.00
1,610,753.40

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

58,500.00
42,750.00
4,950.00
3,375.00
109,575.00
1,720,328.40

Dibulatkan

= Rp

PLD 6.52

Memasang 1 m2 dinding keramik artistik 5 x 20 cm


SNI 7395:2008 / 6.52
Bahan Keramik artistik timbul 5x20 cm
106.0000 Bh
PPC Cement
9.3000 Kg
Pasir pasang
0.0180 M
Semen warna
2.9000 Kg

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.9000
0.4500
0.0450
0.0450

Oh
Oh
Oh
Oh

1,720,328.00

72

PLD 6.53

Memasang 1 m2 dinding keramik (10 x 20) cm


SNI 7395:2008 / 6.53
Bahan Keramik 10 x 20 cm
53.0000
PPC Cement
9.3000
Pasir pasang
0.0180
Semen warna
2.7500

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.9000
0.4500
0.0450
0.0450

Memasang 1 m2 dinding keramik (20 x 20) cm


SNI 7395:2008 / 6.54
Bahan Keramik 20 x 20 cm
26.5000
PPC Cement
9.3000
Pasir pasang
0.0180
Semen warna
1.9400

Bh
Kg
M
Kg

x
x
x
x

Rp.
1,300.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

68,900.00
12,090.00
2,138.40
6,187.50
89,315.90

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

58,500.00
42,750.00
4,950.00
3,375.00
109,575.00
198,890.90

Dibulatkan

= Rp

198,890.00

PLD 6.54

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.9000
0.4500
0.0450
0.0450

1 M Pasang dinding keramik 20 x 25 cm


SNI 7395:2008 / 6.54a
Bahan Keramik 20 x 25 cm
20.5000
PPC Cement
9.3000
Pasir pasang
0.0180
Semen warna
1.9400

Bh
Kg
M
Kg

x
x
x
x

Rp.
2,600.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

68,900.00
12,090.00
2,138.40
4,365.00
87,493.40

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

58,500.00
42,750.00
4,950.00
3,375.00
109,575.00
197,068.40

Dibulatkan

= Rp

197,068.00

PLD 6.54a

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.9000
0.4500
0.0450
0.0450

Bh
Kg
M
Kg

x
x
x
x

Rp.
3,250.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

66,625.00
12,090.00
2,138.40
4,365.00
85,218.40

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

58,500.00
42,750.00
4,950.00
3,375.00
109,575.00
194,793.40

Dibulatkan

= Rp

194,793.00

73

PLD 6.54b

1 M Pasang dinding keramik 30 x 30 cm


SNI 7395:2008 / 6.54b
Bahan Keramik 30 x 30 cm
11.8700
PPC Cement
9.3000
Pasir pasang
0.0180
Semen warna
1.9400

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.9000
0.4500
0.0450
0.0450

Memasang 1 m2 dinding marmer (100x100) cm


SNI 7395:2008 / 6.55
Bahan Marmer
1.0600
Paku pancing
3.0000
PPC Cement
12.4400
Pasir pasang
0.0250
Semen warna
1.6500

Bh
Kg
M
Kg

x
x
x
x

Rp.
5,910.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

70,151.70
12,090.00
2,138.40
4,365.00
88,745.10

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

58,500.00
42,750.00
4,950.00
3,375.00
109,575.00
198,320.10

Dibulatkan

= Rp

198,320.00

PLD 6.55

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

1.3000
0.6500
0.0650
0.0650

PLD 6.56

Memasang 1 m2 dinding bata pelapis (7 x 3 x 24)


SNI 7395:2008 / 6.56
Bahan Bata pelapis dinding
63.0000
PPC Cement
12.4400
Pasir pasang
0.0250
Semen warna
1.6500

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

1.0000
0.5000
0.0500
0.0500

M
Bh
Kg
M
Kg

x
x
x
x
x

Rp.
330,000.00
Rp.
700.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

349,800.00
2,100.00
16,172.00
2,970.00
3,712.50
374,754.50

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

84,500.00
61,750.00
7,150.00
4,875.00
158,275.00
533,029.50

Dibulatkan

= Rp

533,029.00

cm
Bh
Kg
M
Kg

x
x
x
x

Rp.
1,818.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

114,534.00
16,172.00
2,970.00
3,712.50
137,388.50

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

65,000.00
47,500.00
5,500.00
3,750.00
121,750.00
259,138.50

Dibulatkan

= Rp

259,138.00

74

PLD 6.57

Memasang 1 m2 dinding batu poros


SNI 7395:2008 / 6.57
Bahan Batu poros
PPC Cement
Pasir pasang

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

1.0500
11.7500
0.0350

M
Kg
M

x Rp.
140,000.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

147,000.00
15,275.00
4,158.00
166,433.00

0.6200
0.3500
0.0350
0.0300

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

40,300.00
33,250.00
3,850.00
2,250.00
79,650.00
246,083.00

Dibulatkan

= Rp

246,083.00

PLD 6.58

Memasang 1 m2 dinding batu tempel hitam


SNI 7395:2008 / 6.58
Bahan Batu tempel hitam
1.1000
PPC Cement
11.7500
Pasir pasang
0.0350

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.7000
0.3500
0.0350
0.0350

M
Kg
M

x Rp.
104,500.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

114,950.00
15,275.00
4,158.00
134,383.00

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
219,608.00

Dibulatkan

= Rp

219,608.00

x Rp.
9,800.00
x Rp.
45,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

116,326.00
3,430.00
119,756.00

x
x
x
x

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,750.00
14,250.00
1,650.00
600.00
26,250.00
146,006.00

= Rp.
= Rp.
= Rp.

108,017.00
3,185.00
111,202.00

PLD 6.59

Memasang 1 m2 lantai vinyl karet 30 x 30 cm Kls I


SNI 7395:2008 / 6.59
Bahan Vinyl karet kls I
11.8700 Bh
Lem vinyl
0.3500 Kg

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.1500
0.1500
0.0150
0.0080

Oh
Oh
Oh
Oh

Memasang 1 m2 lantai vinyl karet 30 x 30 cm Kls II


SNI 7395:2008 / 6.59a
Bahan Vinyl karet kls II
11.8700 Bh
Lem vinyl
0.3500 Kg

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

PLD 6.59a

x Rp.
9,100.00
x Rp.
45,000.00
Jumlah (1)

75

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,750.00
14,250.00
1,650.00
600.00
26,250.00
137,452.00

2.2000 m2 x Rp.
33,600.00
0.2500 Kg x Rp.
45,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

73,920.00
8,400.00
82,320.00

0.3500
0.1750
0.0170
0.0020

Oh
Oh
Oh
Oh

x
x
x
x

=
=
=
=
=
=

1 M Pasang lantai vinyl asbes 30 x 30 cm


ABKPU 2005-PLD/ 6.77
Bahan Vinyl asbes 30 x 30 cm
11.0500
Lem vinyl
0.3500

Bh
Kg

Oh
Oh
Oh
Oh

Memasang 1 m2 wall paper, lebar 50cm


SNI 7395:2008 / 6.60
Bahan Wall paper
Lem

0.1500
0.1500
0.0150
0.0080

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

PLD 6.60

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,750.00
16,625.00
1,870.00
150.00
41,395.00
123,715.00

x Rp.
8,200.00
x Rp.
45,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

90,610.00
2,870.00
93,480.00

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Dibulatkan

= Rp

119,692.00

x Rp.
9,400.00
x Rp.
45,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

103,870.00
3,290.00
107,160.00

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

9,750.00
14,250.00
1,650.00
562.50
26,212.50
133,372.50

Dibulatkan

= Rp

133,372.00

= Rp.
= Rp.
= Rp.

71,500.00
16,250.00
87,750.00

PLD 6.77

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.1500
0.1500
0.0150
0.0075

Pasang 1 M lantai vinyl motif kembang 30 x 30 cm


ABKPU 2005-PLD/ 6.78
Bahan Vinyl motif kembang
11.0500 Bh
Lem vinyl
0.3500 Kg

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,750.00
14,250.00
1,650.00
562.50
26,212.50
119,692.50

PLD 6.78

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

0.1500
0.1500
0.0150
0.0075

Pasang 1 M wall corvering lebar 50 cm


ABKPU 2005-PLD/ 6.79
Bahan Covering L.50 cm
1.1000
Lem
0.2500

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PLD 6.79

M
Kg

x Rp.
65,000.00
x Rp.
45,000.00
Jumlah (1)

76

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

SNI T-15-2002
HIT

GU.2

GU.3

GU.4

GU.6

GU.8

CP.2

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Dibulatkan

= Rp

48,750.00
16,150.00
1,870.00
637.50
67,407.50
155,157.50
155,157.00

0.2100 M
0.2100 M

x Rp.
x Rp.
Jumlah (1)
Dibulatkan

50,625
16,858

=
=
=
=

Rp.
Rp.
Rp.
Rp.

10,631.25
3,540.18
14,171.43
14,171.00

0.2600 M
0.2600 M

x Rp.
x Rp.
Jumlah (1)
Dibulatkan

50,625
16,858

=
=
=
=

Rp.
Rp.
Rp.
Rp.

13,162.50
4,383.08
17,545.58
17,545.00

0.3000 M
0.3000 M

x Rp.
x Rp.
Jumlah (1)
Dibulatkan

50,625
16,858

=
=
=
=

Rp.
Rp.
Rp.
Rp.

15,187.50
5,057.40
20,244.90
20,244.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

17,060.63
5,681.15
22,741.77
22,741.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

18,984.38
6,321.75
25,306.13
25,306.00

Menggali dan mengurug tanah pasangan pipa PVC dia 6" sepanjang 1 m'
0.3370 M
0.3370 M

x Rp.
x Rp.
Jumlah (1)
Dibulatkan

50,625
16,858

Menggali dan mengurug tanah pasangan pipa PVC dia 8" sepanjang 1 m'

PT 6.1. Menggali tanah biasa


PT 6.9. Mengurug kembali

HIT

=
=
=
=
=
=

Menggali dan mengurug tanah pasangan pipa PVC dia 4" sepanjang 1 m'

PT 6.1. Menggali tanah biasa


PT 6.9. Mengurug kembali

HIT

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

Menggali dan mengurug tanah pasangan pipa PVC dia 3" sepanjang 1 m'

PT 6.1. Menggali tanah biasa


PT 6.9. Mengurug kembali

HIT

x
x
x
x

Menggali dan mengurug tanah pasangan pipa PVC dia 2" sepanjang 1 m'

PT 6.1. Menggali tanah biasa


PT 6.9. Mengurug kembali

HIT

Oh
Oh
Oh
Oh

PEKERJAAN SANITASI

PT 6.1. Menggali tanah biasa


PT 6.9. Mengurug kembali

HIT

0.7500
0.1700
0.0170
0.0085

0.3750 M
0.3750 M

x Rp.
x Rp.
Jumlah (1)
Dibulatkan

50,625
16,858

Menggali tanah memotong jalan (crossing jalan) untuk pasangan pipa PVC dia 2" sepanjang 1 m'
Menggali tanah memotong jalan (crossing jalan) dihitung 4 kali dari indeks menggali dan
mengurug tanah pada analisa HIT. GU2
4.0000
x Rp.
14,171 = Rp.
56,684.00
Jumlah (1)
= Rp.
56,684.00
Dibulatkan
= Rp.
56,684.00

77

HIT

CP.3

Menggali tanah memotong jalan (crossing jalan) untuk pasangan pipa PVC dia 3" sepanjang 1 m'
Menggali tanah memotong jalan (crossing jalan) dihitung 4 kali dari indeks menggali dan
mengurug tanah pada analisa HIT. GU3
4.0000

HIT

CP.4

x Rp.

Rp.

70,180.00

Jumlah (1)

17,545

Rp.

70,180.00

Dibulatkan

Rp.

70,180.00

Menggali tanah memotong jalan (crossing jalan) untuk pasangan pipa PVC dia 4" sepanjang 1 m'
Menggali tanah memotong jalan (crossing jalan) dihitung 4 kali dari indeks menggali dan
mengurug tanah pada analisa HIT. GU4
4.0000

HIT

CP.6

x Rp.

Rp.

80,976.00

Jumlah (1)

20,244

Rp.

80,976.00

Dibulatkan

Rp.

80,976.00

Menggali tanah memotong jalan (crossing jalan) untuk pasangan pipa PVC dia 6" sepanjang 1 m'
Menggali tanah memotong jalan (crossing jalan) dihitung 4 kali dari indeks menggali dan
mengurug tanah pada analisa HIT. GU6
4.0000

PS

Memasang 1 buah kloset duduk


SNI T-15-2002 / 6.1
Bahan Klosed duduk lengkap tabung
Perlengkapan

Rp.

90,964.00

Jumlah (1)

22,741

Rp.

90,964.00

Dibulatkan

Rp.

90,964.00

6.1.

Upah

PS

x Rp.

Pekerja
Tukang batu
Kepala tukang
Mandor

Memasang 1 buah kloset jongkok


SNI T-15-2002 / 6.3
Bahan Klosed jongkok
Bata merah 5x11x22 cm
Semen PPC
Pasir pasang

1.0000
6% harga klosed

Bh x Rp.
x Rp.

2,050,000.00
2,050,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

2,050,000.00
123,000.00
2,173,000.00

3.3000
1.5000
0.1500
0.1600

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

214,500.00
142,500.00
16,500.00
12,000.00
385,500.00
2,558,500.00

1.0000
7.0000
6.0000
0.0100

Bh
Bh
Kg
M

x
x
x
x

Rp.
Rp.
Rp.
Rp.

165,000.00
500.00
1,300.00
118,800.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

165,000.00
3,500.00
7,800.00
1,188.00
177,488.00

1.0000
1.5000
0.1500
0.1000

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

65,000.00
142,500.00
16,500.00
7,500.00
231,500.00
408,988.00

6.3.

Upah

Pekerja
Tukang batu
Kepala tukang
Mandor

78

PS

6.4

Memasang 1 buah urinoir


SNI T-15-2002 / 6.4
Bahan Urinoir
Perlengkapan
Semen PPC
Pasir pasang

Upah

PS

Memasang 1 buah wastafel


SNI T-15-2002 / 6.5
Bahan Wastafel
Perlengkapan
Semen PPC
Pasir pasang

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

522,500.00
78,375.00
7,800.00
1,188.00
609,863.00

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
11,000.00
7,500.00
178,500.00
788,363.00

1.0000
Bh
12% harga wastafel
6.0000
Kg
0.0100
M

x
x
x
x

Rp.
Rp.
Rp.
Rp.

425,000.00
425,000.00
1,300.00
118,800.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

425,000.00
51,000.00
7,800.00
1,188.00
484,988.00

Pekerja
Tukang batu
Kepala tukang
Mandor

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

78,000.00
137,750.00
16,500.00
7,500.00
239,750.00
724,738.00

400,000.00
400,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

400,000.00
72,000.00
472,000.00

1.2000
1.4500
0.1500
0.1000

Oh
Oh
Oh
Oh

6.7.

Memasang 1 buah bak mandi fibreglass volume 0,30 m


SNI T-15-2002 / 6.7
Bahan Bak fibreglass
1.0000
Bh x Rp.
Perlengkapan
18% Harga bak
x Rp.

Upah

PS

1.0000
1.0000
0.1000
0.1000

522,500.00
522,500.00
1,300.00
118,800.00
Jumlah (1)

6.5

Upah

PS

Pekerja
Tukang batu
Kepala tukang
Mandor

1.0000
Bh x Rp.
15% harga urinoir
x Rp.
6.0000
Kg x Rp.
0.0100
M x Rp.

Pekerja
Tukang batu
Kepala tukang
Mandor

1.8000
0.5400
0.0540
0.1100

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

117,000.00
51,300.00
5,940.00
8,250.00
182,490.00
654,490.00

Memasang 1 buah bak mandi batu bata volume 0,30 m


SNI T-15-2002 / 6.8
Bahan Batu bata
44.0000
Bh x
Semen PPC
120.0000
Kg x
Pasir pasang
0.3000
M x
Porselin (11x11) cm warna
360.0000
Bh x
Semen putih
6.0000
Kg x

Rp.
Rp.
Rp.
Rp.
Rp.

500.00
1,300.00
118,800.00
1,500.00
2,250.00
Jumlah (1)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,000.00
156,000.00
35,640.00
540,000.00
13,500.00
767,140.00

6.8.

79

Upah

PS

3.0000
3.0000
0.3000
0.3000

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

195,000.00
285,000.00
33,000.00
22,500.00
535,500.00
1,302,640.00

Memasang 1 m' pipa beton, diameter 30 cm


SNI T-15-2002 / 6.15
Bahan Pipa beton
1.1000
Batu bata
55.0000
Semen PPC
10.3000
Pasir pasang
0.0610
Pasir urug
0.0690

M'
Bh
Kg
M
M

x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.

50,000.00
500.00
1,300.00
118,800.00
105,200.00
Jumlah (1)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

55,000.00
27,500.00
13,390.00
7,246.80
7,258.80
110,395.60

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

24,700.00
18,050.00
2,090.00
1,425.00
46,265.00
156,660.60

Dibulatkan

= Rp

6.15.

Upah

PS

Pekerja
Tukang batu
Kepala tukang
Mandor

0.3800
0.1900
0.0190
0.0190

Memasang 1 buah Bak Kontrol pasangan batu bata uk.(30 x 30) cm tinggi 35 cm
SNI T-15-2002 / 6.16
Bahan Batu bata
145.0000
Bh x Rp.
500.00 =
Semen PPC
44.0000
Kg x Rp.
1,300.00 =
Pasir pasang
0.0700
M x Rp.
118,800.00 =
Batu kerikil
0.0700
M x Rp.
300,400.00 =
Besi beton
1.6000
Kg x Rp.
15,000.00 =
Pasir
0.0600
M x Rp.
118,800.00 =
Jumlah (1)
=

156,660.00

6.16.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

72,500.00
57,200.00
8,316.00
21,028.00
24,000.00
7,128.00
190,172.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

208,000.00
1,425.00
165.00
1,200.00
210,790.00
400,962.00

Memasang 1 buah Bak Kontrol pasangan batu bata uk.(45 x 45) cm tinggi 50 cm
SNI T-15-2002 / 6.17
Bahan Batu bata
250.0000
Bh x Rp.
500.00 =
Semen PPC
77.0000
Kg x Rp.
1,300.00 =
Pasir pasang
0.1300
M x Rp.
118,800.00 =
Batu kerikil
0.0200
M x Rp.
300,400.00 =
Besi beton
2.6000
Kg x Rp.
15,000.00 =
Pasir
0.0900
M x Rp.
118,800.00 =
Jumlah (1)
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

125,000.00
100,100.00
15,444.00
6,008.00
39,000.00
10,692.00
296,244.00

= Rp.
= Rp.
= Rp.

92,300.00
44,935.00
5,170.00

Upah

PS

Pekerja
Tukang batu
Kepala tukang
Mandor

Pekerja
Tukang batu
Kepala tukang
Mandor

3.2000
0.0150
0.0015
0.0160

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

6.17.

Upah

Pekerja
Tukang batu
Kepala tukang

1.4200
0.4730
0.0470

Oh x Rp.
Oh x Rp.
Oh x Rp.

65,000.00
95,000.00
110,000.00

80

Mandor

PS

75,000.00
Jumlah (2)
Jumlah (1) +(2)

= Rp.
= Rp.
= Rp.

Memasang 1 buah Bak Kontrol pasangan batu bata uk.(60 x 60) cm tinggi 65 cm
SNI T-15-2002 / 6.18
Bahan Batu bata
371.0000
Bh x Rp.
500.00 =
Semen PPC
114.0000
Kg x Rp.
1,300.00 =
Pasir pasang
0.1840
M x Rp.
118,800.00 =
Batu koral
0.0330
M x Rp.
300,400.00 =
Besi beton
4.8500
Kg x Rp.
15,000.00 =
Pasir beton
0.1200
M x Rp.
118,800.00 =
Jumlah (1)
=

5,325.00
147,730.00
443,974.00

Pekerja
Tukang batu
Kepala tukang
Mandor
Tukang gali

2.1600
0.7200
0.0720
0.1080
0.1000

Memasang 1 m' pipa galvanis diameter "


SNI T-15-2002 / 6.19
Bahan Pipa galvanis
1.2000
Perlengkapan
35% harga pipa

Oh
Oh
Oh
Oh
Oh

x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

185,500.00
148,200.00
21,859.20
9,913.20
72,750.00
14,256.00
452,478.40

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

140,400.00
68,400.00
7,920.00
8,100.00
6,500.00
231,320.00
683,798.40

65,000.00
95,000.00
110,000.00
75,000.00
65,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=
=

Dibulatkan

= Rp

683,798.00

M x Rp.
x Rp.

14,810.00
14,810.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

17,772.00
5,183.50
22,955.50

Oh
Oh
Oh
Oh

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

3,510.00
8,550.00
990.00
2,025.00
15,075.00
38,030.50

Dibulatkan

= Rp

38,030.00

M x Rp.
x Rp.

21,780.00
21,780.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

26,136.00
7,623.00
33,759.00

Oh
Oh
Oh
Oh

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

3,510.00
8,550.00
990.00
2,025.00
15,075.00
48,834.00

6.19.

Upah

PS

Oh x Rp.

6.18.

Upah

PS

0.0710

Pekerja
Tukang
Kepala tukang
Mandor

0.0540
0.0900
0.0090
0.0270

Memasang 1 m' pipa galvanis diameter 3/4"


SNI T-15-2002 / 6.20
Bahan Pipa galvanis
1.2000
Perlengkapan
35% harga pipa

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6.20.

Upah

Pekerja
Tukang
Kepala tukang
Mandor

0.0540
0.0900
0.0090
0.0270

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

81

PS

6.21.

Memasang 1 m' pipa galvanis diameter 1"


SNI T-15-2002 / 6.21
Bahan Pipa galvanis
1.2000
Perlengkapan
35% harga pipa

Upah

PS

= Rp.
= Rp.
= Rp.

33,444.00
9,754.50
43,198.50

Oh
Oh
Oh
Oh

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

3,510.00
8,550.00
990.00
2,025.00
15,075.00
58,273.50

Dibulatkan

= Rp

58,273.00

= Rp.
= Rp.
= Rp.

56,983.50
5,427.00
62,410.50

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

3,510.00
8,550.00
990.00
2,025.00
15,075.00
77,485.50

Dibulatkan

= Rp

77,485.00

M x Rp.
x Rp.

54,270.00
54,270.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

65,124.00
18,994.50
84,118.50

Oh
Oh
Oh
Oh

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Dibulatkan

= Rp

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Pekerja
Tukang
Kepala tukang
Mandor

0.0540
0.0900
0.0090
0.0270

Memasang 1 m' pipa galvanis diameter 1 "


SNI T-15-2002 / 6.22
Bahan Pipa galvanis
1.2000
Perlengkapan
35% harga pipa

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6.22.

Upah

PS

0.0540
0.0900
0.0090
0.0270

27,870.00
27,870.00
Jumlah (1)

6.21.b Memasang 1 m' pipa galvanis diameter 1" (untuk sistim perpipaan air bersih)
SNI T-15-2002 / 6.21b
Bahan Pipa galvanis
1.0500 M x Rp.
54,270.00
Perlengkapan
10% harga pipa
x Rp.
54,270.00
Jumlah (1)
Upah

PS

Pekerja
Tukang
Kepala tukang
Mandor

M x Rp.
x Rp.

Pekerja
Tukang
Kepala tukang
Mandor

0.1080
0.1800
0.0180
0.0054

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6.22.b Memasang 1 m' pipa galvanis diameter 1 " (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.22b
Bahan Pipa galvanis
1.0500 M x Rp.
34,500.00 = Rp.
Perlengkapan
10% harga pipa
x Rp.
34,500.00 = Rp.
Jumlah (1)
= Rp.

7,020.00
17,100.00
1,980.00
405.00
26,505.00
110,623.50
110,623.00

36,225.00
3,450.00
39,675.00

82

Upah

PS

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Dibulatkan

= Rp

66,180.00

M x Rp.
x Rp.

78,580.00
78,580.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

94,296.00
27,503.00
121,799.00

Oh
Oh
Oh
Oh

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,020.00
17,100.00
1,980.00
405.00
26,505.00
148,304.00

6.23.b Memasang 1 m' pipa galvanis diameter 2" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.23b
Bahan Pipa galvanis
1.0500 M x Rp.
78,580.00 = Rp.
Perlengkapan
10% harga pipa
x Rp.
78,580.00 = Rp.
Jumlah (1)
= Rp.

82,509.00
7,858.00
90,367.00

Memasang 1 m' pipa galvanis diameter 2"


SNI T-15-2002 / 6.23
Bahan Pipa galvanis
1.2000
Perlengkapan
35% harga pipa

Upah

PS

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,020.00
17,100.00
1,980.00
405.00
26,505.00
66,180.00

Pekerja
Tukang
Kepala tukang
Mandor

Pekerja
Tukang
Kepala tukang
Mandor

0.1080
0.1800
0.0180
0.0054

0.1080
0.1800
0.0180
0.0054

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,020.00
17,100.00
1,980.00
405.00
26,505.00
116,872.00

M x Rp.
x Rp.

102,800.00
102,800.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

123,360.00
35,980.00
159,340.00

Oh
Oh
Oh
Oh

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,020.00
17,100.00
1,980.00
405.00
26,505.00
185,845.00

6.24.b Memasang 1 m' pipa galvanis diameter 21/2" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.24b
Bahan Pipa galvanis
1.0500 M x Rp.
102,800.00 = Rp.
Perlengkapan
10% harga pipa
x Rp.
102,800.00 = Rp.
Jumlah (1)
= Rp.

107,940.00
10,280.00
118,220.00

Memasang 1 m' pipa galvanis diameter 21/2"


SNI T-15-2002 / 6.24
Bahan Pipa galvanis
1.2000
Perlengkapan
35% harga pipa

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

6.24.

Upah

PS

0.1080
0.1800
0.0180
0.0054

6.23.

Upah

PS

Pekerja
Tukang
Kepala tukang
Mandor

Pekerja
Tukang
Kepala tukang
Mandor

0.1080
0.1800
0.0180
0.0054

x
x
x
x

Rp.
Rp.
Rp.
Rp.

83

Upah

PS

Memasang 1 m' pipa PVC tipe AW diameter "


SNI T-15-2002 / 6.25
Bahan Pipa PVC
1.2000
Perlengkapan
35% harga pipa

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,020.00
17,100.00
1,980.00
405.00
26,505.00
144,725.00

M x Rp.
x Rp.

2,300.00
2,300.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

2,760.00
805.00
3,565.00

Oh
Oh
Oh
Oh

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

2,340.00
5,700.00
660.00
135.00
8,835.00
12,400.00

6.25.b Memasang 1 m' pipa PVC tipe AW diameter " (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.25b
Bahan Pipa PVC
1.0500 M x Rp.
2,300.00 = Rp.

2,415.00

Pekerja
Tukang
Kepala tukang
Mandor

Pekerja
Tukang
Kepala tukang
Mandor

0.0360
0.0600
0.0060
0.0018

0.0180
0.0300
0.0030
0.0009

Memasang 1 m' pipa PVC tipe AW diameter "


SNI T-15-2002 / 6.26
Bahan Pipa PVC
1.2000
Perlengkapan
35% harga pipa

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Jumlah (1)

= Rp.

2,415.00

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

1,170.00
2,850.00
330.00
67.50
4,417.50
6,832.50

Dibulatkan

= Rp

6,832.00

M x Rp.
x Rp.

3,632.00
3,632.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

4,358.40
1,271.20
5,629.60

Oh
Oh
Oh
Oh

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Dibulatkan

= Rp

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6.26.

Upah

PS

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Upah

PS

0.1080
0.1800
0.0180
0.0054

6.25.

Upah

PS

Pekerja
Tukang
Kepala tukang
Mandor

Pekerja
Tukang
Kepala tukang
Mandor

0.0360
0.0600
0.0060
0.0018

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6.26.b Memasang 1 m' pipa PVC tipe AW diameter " (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.26b
Bahan Pipa PVC
1.0500 M x Rp.
3,632.00 = Rp.
Perlengkapan
10% harga pipa
x Rp.
3,632.00 = Rp.
Jumlah (1)
= Rp.

2,340.00
5,700.00
660.00
135.00
8,835.00
14,464.60
14,464.00

3,813.60
363.20
4,176.80

84

Upah

PS

Memasang 1 m' pipa PVC tipe AW diameter 1"


SNI T-15-2002 / 6.27
Bahan Pipa PVC
1.2000
Perlengkapan
35% harga pipa

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Dibulatkan

= Rp

8,594.00

M x Rp.
x Rp.

5,615.00
5,615.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

6,738.00
1,965.25
8,703.25

Pekerja
Tukang
Kepala tukang
Mandor

0.0360
0.0600
0.0060
0.0018

Oh
Oh
Oh
Oh

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Dibulatkan

= Rp

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6.27.a Memasang 1 m' pipa PVC tipe AW diameter 1" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.27a
Bahan Pipa PVC
1.0500 M x Rp.
5,615.00 = Rp.

Upah

PS

0.0180
0.0300
0.0030
0.0009

1,170.00
2,850.00
330.00
67.50
4,417.50
8,594.30

6.27.

Upah

PS

Pekerja
Tukang
Kepala tukang
Mandor

Pekerja
Tukang
Kepala tukang
Mandor

0.0180
0.0300
0.0030
0.0009

6.27.b Memasang 1 m' pipa PVC tipe AW diameter 1"


SNI T-15-2002 / 6.27b
Bahan Pipa PVC
1.0500
Perlengkapan
35% harga pipa

Upah

Pekerja
Tukang
Kepala tukang
Mandor

0.0360
0.0600
0.0060
0.0018

2,340.00
5,700.00
660.00
135.00
8,835.00
17,538.25
17,538.00

5,895.75

Jumlah (1)

= Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Dibulatkan

= Rp

10,313.00

M x Rp.
x Rp.

8,864.00
8,864.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

9,307.20
3,102.40
12,409.60

Oh
Oh
Oh
Oh

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

2,340.00
5,700.00
660.00
135.00
8,835.00
21,244.60

Dibulatkan

= Rp

Oh
Oh
Oh
Oh

x
x
x
x

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,895.75
1,170.00
2,850.00
330.00
67.50
4,417.50
10,313.25

21,244.00

85

PS

6.27.c Memasang 1 m' pipa PVC tipe AW diameter 1" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.27c
Bahan Pipa PVC
1.0500 M x Rp.
8,864.00 = Rp.
Jumlah (1)
= Rp.
Upah

PS

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Dibulatkan

= Rp

13,724.00

M x Rp.
x Rp.

14,260.00
14,260.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

17,112.00
4,991.00
22,103.00

Oh
Oh
Oh
Oh

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,340.00
5,700.00
660.00
135.00
8,835.00
30,938.00

6.28.b Memasang 1 m' pipa PVC tipe AW diameter 1 " (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.28b
Bahan Pipa PVC
1.0500 M x Rp.
14,260.00 = Rp.

14,973.00

Memasang 1 m' pipa PVC tipe AW diameter 1 "


SNI T-15-2002 / 6.28
Bahan Pipa PVC
1.2000
Perlengkapan
35% harga pipa

Upah

PS

0.0180
0.0300
0.0030
0.0009

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,170.00
2,850.00
330.00
67.50
4,417.50
13,724.70

6.28.

Upah

PS

Pekerja
Tukang
Kepala tukang
Mandor

9,307.20
9,307.20

Pekerja
Tukang
Kepala tukang
Mandor

Pekerja
Tukang
Kepala tukang
Mandor

0.0360
0.0600
0.0060
0.0018

0.0180
0.0300
0.0030
0.0009

Memasang 1 m' pipa PVC tipe AW diameter 2"


SNI T-15-2002 / 6.29
Bahan Pipa PVC
1.2000
Perlengkapan
35% harga pipa

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Jumlah (1)

= Rp.

14,973.00

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

1,170.00
2,850.00
330.00
67.50
4,417.50
19,390.50

Dibulatkan

= Rp

19,390.00

M x Rp.
x Rp.

20,495.00
20,495.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

24,594.00
7,173.25
31,767.25

Oh
Oh
Oh
Oh

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

3,510.00
8,550.00
990.00
202.50
13,252.50
45,019.75

Dibulatkan

= Rp

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6.29.

Upah

Pekerja
Tukang
Kepala tukang
Mandor

0.0540
0.0900
0.0090
0.0027

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,019.00

86

PS

6.29.b Memasang 1 m' pipa PVC tipe AW diameter 2" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.29b
Bahan Pipa PVC
1.0500 M x Rp.
20,495.00 = Rp.

Upah

PS

Memasang 1 m' pipa PVC tipe AW diameter 2 "


SNI T-15-2002 / 6.30
Bahan Pipa PVC
1.2000
Perlengkapan
35% harga pipa

= Rp.

21,519.75

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

1,755.00
4,275.00
550.00
105.00
6,685.00
28,204.75

Dibulatkan

= Rp

28,204.00

M x Rp.
x Rp.

29,306.00
29,306.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

35,167.20
10,257.10
45,424.30

Oh
Oh
Oh
Oh

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

3,510.00
8,550.00
990.00
202.50
13,252.50
58,676.80

Dibulatkan

= Rp

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Pekerja
Tukang
Kepala tukang
Mandor

0.0540
0.0900
0.0090
0.0027

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6.30.b Memasang 1 m' pipa PVC tipe AW diameter 2 " (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.30b
Bahan Pipa PVC
1.0500 M x Rp.
29,306.00 = Rp.

Upah

PS

0.0270
0.0450
0.0050
0.0014

Jumlah (1)

6.30.

Upah

PS

Pekerja
Tukang
Kepala tukang
Mandor

21,519.75

Pekerja
Tukang
Kepala tukang
Mandor

0.0270
0.0450
0.0050
0.0014

Memasang 1 m' pipa PVC tipe AW diameter 3"


SNI T-15-2002 / 6.31
Bahan Pipa PVC
1.2000
Perlengkapan
35% harga pipa

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

58,676.00

30,771.30

Jumlah (1)

= Rp.

30,771.30

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

1,755.00
4,275.00
550.00
105.00
6,685.00
37,456.30

Dibulatkan

= Rp

37,456.00

42,499.00
42,499.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

50,998.80
14,874.65
65,873.45

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6.31.

M x Rp.
x Rp.

87

Upah

PS

Pekerja
Tukang
Kepala tukang
Mandor

0.0810
0.1350
0.0135
0.0041

Oh
Oh
Oh
Oh

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Dibulatkan

= Rp

85,755.00

M x Rp.
x Rp.

23,700.00
23,700.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

28,440.00
8,295.00
36,735.00

Oh
Oh
Oh
Oh

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

5,265.00
12,825.00
1,485.00
307.50
19,882.50
56,617.50

Dibulatkan

= Rp

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6.31.b Memasang 1 m' pipa PVC tipe AW diameter 3" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.31b
Bahan Pipa PVC
1.0500 M x Rp.
42,499.00 = Rp.

Upah

PS

0.0810
0.1350
0.0135
0.0041

6.31a. Memasang 1 m' pipa PVC biasa diameter 3"


SNI T-15-2002 / 6.31a
Bahan Pipa PVC biasa
1.2000
Perlengkapan
35% harga pipa

Upah

PS

Pekerja
Tukang
Kepala tukang
Mandor

Pekerja
Tukang
Kepala tukang
Mandor

0.0400
0.0650
0.0065
0.0020

Memasang 1 m' pipa PVC tipe AW diameter 4"


SNI T-15-2002 / 6.32
Bahan Pipa PVC
1.2000
Perlengkapan
35% harga pipa

5,265.00
12,825.00
1,485.00
307.50
19,882.50
85,755.95

56,617.00

44,623.95

Jumlah (1)

= Rp.

44,623.95

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

2,600.00
6,175.00
715.00
150.00
9,640.00
54,263.95

Dibulatkan

= Rp

54,263.00

M x Rp.
x Rp.

62,790.00
62,790.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

75,348.00
21,976.50
97,324.50

Oh
Oh
Oh
Oh

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6.32.

Upah

Pekerja
Tukang
Kepala tukang
Mandor

0.0810
0.1350
0.0135
0.0041

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,265.00
12,825.00
1,485.00
307.50
19,882.50
117,207.00

88

PS

6.32a. Memasang 1 m' pipa PVC biasa diameter 4"


SNI T-15-2002 / 6.32a
Bahan Pipa PVC biasa
1.2000
Perlengkapan
35% harga pipa

Upah

PS

= Rp.
= Rp.
= Rp.

40,800.00
11,900.00
52,700.00

Oh
Oh
Oh
Oh

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

5,265.00
12,825.00
1,485.00
307.50
19,882.50
72,582.50

Dibulatkan

= Rp

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Pekerja
Tukang
Kepala tukang
Mandor

0.0400
0.0650
0.0065
0.0020

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

= Rp.

65,929.50

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

2,600.00
6,175.00
715.00
150.00
9,640.00
75,569.50

Dibulatkan

= Rp

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

91,266.00

140,707.35

Oh
Oh
Oh
Oh

x
x
x
x

= Rp.

91,266.00

6.32.d Memasang 1 m' pipa PVC tipe AW diameter 6" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.32d
Bahan Pipa PVC
1.0500 M x Rp.
134,007.00 = Rp.

0.0400
0.0650
0.0065
0.0020

Oh
Oh
Oh
Oh

Jumlah (1)

75,569.00

2,600.00
6,175.00
715.00
150.00
9,640.00
100,906.00

Pekerja
Tukang
Kepala tukang
Mandor

0.0400
0.0650
0.0065
0.0020

65,929.50

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Upah

Pekerja
Tukang
Kepala tukang
Mandor

72,582.00

Jumlah (1)

6.32.c Memasang 1 m' pipa PVC tipe AW diameter 5" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.32c
Bahan Pipa PVC
1.0500 M x Rp.
86,920.00 = Rp.

Upah

PS

0.0810
0.1350
0.0135
0.0041

34,000.00
34,000.00
Jumlah (1)

6.32.b Memasang 1 m' pipa PVC tipe AW diameter 4" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.32b
Bahan Pipa PVC
1.0500 M x Rp.
62,790.00 = Rp.

Upah

PS

Pekerja
Tukang
Kepala tukang
Mandor

M x Rp.
x Rp.

Rp.
Rp.
Rp.
Rp.

Jumlah (1)

= Rp.

140,707.35

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

2,600.00
6,175.00
715.00
150.00
9,640.00
150,347.35

Dibulatkan

= Rp

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

150,347.00

89

PS

6.32.e Memasang 1 m' pipa PVC tipe AW diameter 8" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.32e
Bahan Pipa PVC
1.0500 M x Rp.
213,703.00 = Rp.

Upah

PS

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

= Rp.

224,388.15

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

3,900.00
9,595.00
660.00
225.00
14,380.00
238,768.15

Dibulatkan

= Rp

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

238,768.00

336,630.00

Jumlah (1)

= Rp.

336,630.00

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,900.00
9,595.00
660.00
225.00
14,380.00
351,010.00

6.32.g Memasang 1 m' pipa PVC tipe AW diameter 12" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.32g
Bahan Pipa PVC
1.0500 M x Rp.
509,795.00 = Rp.

535,284.75

Upah

PS

0.0600
0.1010
0.0060
0.0030

Jumlah (1)

6.32.f Memasang 1 m' pipa PVC tipe AW diameter 10" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.32f
Bahan Pipa PVC
1.0500 M x Rp.
320,600.00 = Rp.

Upah

PS

Pekerja
Tukang
Kepala tukang
Mandor

224,388.15

Pekerja
Tukang
Kepala tukang
Mandor

Pekerja
Tukang
Kepala tukang
Mandor

0.0600
0.1010
0.0060
0.0030

0.0600
0.1010
0.0060
0.0030

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

x
x
x
x

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Memasang 1 bh bak cuci piring stainles steel


SNI T-15-2002 / 6.33
Bahan Bak cuci stainless steel
1.0000
Bh x Rp.
Water drain asesories
1.0000 Set x Rp.

Jumlah (1)

= Rp.

535,284.75

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

3,900.00
9,595.00
660.00
225.00
14,380.00
549,664.75

Dibulatkan

= Rp

549,664.00

475,000.00
25,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

475,000.00
25,000.00
500,000.00

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

0.00
28,500.00
3,300.00
0.00
31,800.00
531,800.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6.33.

Upah

Pekerja
Tukang
Kepala tukang
Mandor

0.0000
0.3000
0.0300
0.0000

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

90

PS

6.34.

Memasang 1 bh bak cuci piring teraso


SNI T-15-2002 / 6.34
Bahan Bak cuci teraso
Water drain + asesories
Semen PPC
Pasir

Upah

PS

x
x
x
x

Rp.
Rp.
Rp.
Rp.

247,500.00
25,000.00
1,300.00
118,800.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

247,500.00
25,000.00
26,000.00
5,940.00
304,440.00

0.0000
0.5000
0.0500
0.0000

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

0.00
47,500.00
5,500.00
0.00
53,000.00
357,440.00

Bh x Rp.
Bh x Rp.

27,300.00
3,100.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

27,300.00
775.00
28,075.00

0.0000
0.1000
0.0100
0.0000

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

0.00
9,500.00
1,100.00
0.00
10,600.00
38,675.00

1.0000

Bh x Rp.

25,000.00
Jumlah (1)

= Rp.
= Rp.

25,000.00
25,000.00

0.0000
0.1000
0.0100
0.0000

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

0.00
9,500.00
1,100.00
0.00
10,600.00
35,600.00

1.1000
2.5750
0.0150

bh x Rp.
kg x Rp.
M3 x Rp.

27,000.00
1,300.00
118,800.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

29,700.00
3,347.50
1,782.00
34,829.50

Memasang 1 bh kran diameter " atau "


SNI T-15-2002 / 6.35
Bahan Kran air
1.0000
Seal tape
0.2500

Pekerja
Tukang
Kepala tukang
Mandor

Memasang 1 bh Floor drain


SNI T-15-2002 / 6.36
Bahan Floor drain

x
x
x
x

6.36.

Upah

PS

Bh
Bh
Kg
M

6.35.

Upah

PS

Pekerja
Tukang
Kepala tukang
Mandor

1.0000
1.0000
20.0000
0.0500

Pekerja
Tukang
Kepala tukang
Mandor

Memasang 1 m' bodem 30 cm


SNI T-15-2002 / 6.40
Bahan Bodem
Semen PPC
Pasir

x
x
x
x

6.40

91

HIT

HIT

HIT

HIT

Upah

Pekerja
Tukang
Kepala tukang
Mandor

0.1000
0.0500
0.0050
0.0050

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan

PS.4

Memasang 1 m' pipa steel diameter 4" (untuk sistem perpipaan air bersih)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

6,500.00
4,750.00
550.00
375.00
12,175.00
47,004.50
47,004.00

Bahan Pipa steel

1.0500

M x Rp.

154,770.00
Jumlah (1)

=
=

Rp.
Rp.

162,508.50
162,508.50

Upah

Pekerja
Tukang
Kepala tukang
Mandor

0.1080
0.1800
0.0180
0.0054

Oh
Oh
Oh
Oh

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,020.00
17,100.00
1,980.00
405.00
26,505.00
189,013.50
189,013.00

PS.5

Memasang 1 m' pipa steel diameter 5" (untuk sistem perpipaan air bersih)

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Bahan Pipa steel

1.0500

M x Rp.

240,000.00
Jumlah (1)

=
=

Rp.
Rp.

252,000.00
252,000.00

Upah

Pekerja
Tukang
Kepala tukang
Mandor

0.1080
0.1800
0.0180
0.0054

Oh
Oh
Oh
Oh

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,020.00
17,100.00
1,980.00
405.00
26,505.00
278,505.00

PS.6

Memasang 1 m' pipa steel diameter 6" (untuk sistem perpipaan air bersih)

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Bahan Pipa steel

1.0500

M x Rp.

327,250.00
Jumlah (1)

=
=

Rp.
Rp.

343,612.50
343,612.50

Upah

Pekerja
Tukang
Kepala tukang
Mandor

0.1080
0.1800
0.0180
0.0054

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,020.00
17,100.00
1,980.00
405.00
26,505.00
370,117.50
370,117.00

GV.6

Memasang 1 buah gate valve diameter 6"


1.0000

Bh x Rp.

1,800,000.00

Rp.

1,800,000.00

Rp.

1,800,000.00

Bahan Gate Valve

x
x
x
x

Jumlah (1)

92

HIT

Upah

Pekerja
Tukang
Mandor

GV.4

Memasang 1 buah gate valve diameter 4"

Bahan Gate Valve

HIT

Upah

Pekerja
Tukang
Mandor

GV.3

Memasang 1 buah gate valve diameter 3"

Bahan Gate Valve

HIT

HIT

Upah

Pekerja
Tukang
Mandor

MC.6

Memasang 1 buah collar diameter 6"

1.0000
0.5000
0.2500

Oh x Rp.
Oh x Rp.
Oh x Rp.

65,000.00
95,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

65,000.00
47,500.00
18,750.00
131,250.00
1,931,250.00

1.0000

Bh x Rp.

850,000.00

Rp.

850,000.00

Jumlah (1)

Rp.

850,000.00

1.0000
0.5000
0.2500

Oh x Rp.
Oh x Rp.
Oh x Rp.

65,000.00
95,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

65,000.00
47,500.00
18,750.00
131,250.00
981,250.00

1.0000

M x Rp.

726,000.00

Rp.

726,000.00

Jumlah (1)

Rp.

726,000.00

0.7500
0.3500
0.2500

Oh x Rp.
Oh x Rp.
Oh x Rp.

65,000.00
95,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

48,750.00
33,250.00
18,750.00
100,750.00
826,750.00

Bahan Collar

1.0000

Bh x Rp.

500,000.00
Jumlah (1)

=
=

Rp.
Rp.

500,000.00
500,000.00

Upah

Pekerja
Tukang
Mandor

0.5000
0.2500
0.1250

Oh x Rp.
Oh x Rp.
Oh x Rp.

65,000.00
95,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

32,500.00
23,750.00
9,375.00
65,625.00
565,625.00

MC.4

Memasang 1 buah collar diameter 4"

Bahan Collar

1.0000

Bh x Rp.

350,000.00
Jumlah (1)

=
=

Rp.
Rp.

350,000.00
350,000.00

Upah

0.5000
0.2500
0.1250

Oh x Rp.
Oh x Rp.
Oh x Rp.

65,000.00
95,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

32,500.00
23,750.00
9,375.00
65,625.00
415,625.00

Pekerja
Tukang
Mandor

93

HIT

HIT

HIT

MC.3

Bahan Collar

1.0000

Bh x Rp.

350,000.00
Jumlah (1)

=
=

Rp.
Rp.

350,000.00
350,000.00

Upah

Pekerja
Tukang
Mandor

0.5000
0.2500
0.1250

Oh x Rp.
Oh x Rp.
Oh x Rp.

65,000.00
95,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

32,500.00
23,750.00
9,375.00
65,625.00
415,625.00

PB.2
Upah

Pencucian pipa dengan pig busa 1 m' diameter 2" - 6"


Pekerja
0.0030 Oh
Tukang
0.0010 Oh
Transport
0.0010 Oh
Sewa pompa
0.0021
hr

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
300,000.00
100,000.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

195.00
95.00
300.00
210.00
800.00

0.7000
3.0000
0.4000
1.0000
0.4000

x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.

150,000.00
4,500.00
35,450.00
75,000.00
45,000.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

105,000.00
13,500.00
14,180.00
75,000.00
18,000.00
207,680.00

0.4000
0.2000
0.0200
1.0000

Oh x Rp.
Oh x Rp.
Oh x Rp.
Rp.

65,000.00
95,000.00
75,000.00
207,680.00
Jumlah (1) +(2)
Jumlah (1)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

26,000.00
19,000.00
1,500.00
207,680.00
254,180.00
461,860.00

x Rp.
x Rp.

55,000.00
125,000.00
Jumlah (1)

=
=
=

Rp.
Rp.
Rp.

5,940.00
7,875.00
13,815.00

0.2500
0.1880
0.1250

Oh x Rp.
Oh x Rp.
Oh x Rp.

65,000.00
95,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

16,250.00
17,860.00
9,375.00
43,485.00
57,300.00

Bahan Air Valve

1.0000

Bh x Rp.

2,750,000.00
Jumlah (1)

=
=

Rp.
Rp.

2,750,000.00
2,750,000.00

Upah

1.0000
0.5000
0.2500

Oh x Rp.
Oh x Rp.
Oh x Rp.

65,000.00
95,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

65,000.00
47,500.00
18,750.00
131,250.00
2,881,250.00

AP.7
Pengelasan penuh 1 m' tebal : 3 mm
Peralatan
Sewa mesin las
Ltr minyak solar
Ltr oli
Transport peralatan
Kawat las

Upah

HIT

HIT

Memasang 1 buah collar diameter 3"

Pekerja
Tukang
Mandor
Peralatan

PP.1
Pemotongan 1 m' plat steel menggunakan titik api
Peralatan
Isi tabung elpiji @ 50 kg
0.1080
Isi tabung zat asam
0.0630

Upah

Pekerja
Tukang
Mandor

AV.4

Memasang air 1 buah valve diameter 4"

Pekerja
Tukang
Mandor

94

HIT

HIT

AV.6

Memasang air 1 buah valve diameter 6"

Bahan Air Valve

1.0000

Bh x Rp.

4,680,000.00
Jumlah (1)

=
=

Rp.
Rp.

4,680,000.00
4,680,000.00

Upah

1.0000
0.5000
0.2500

Oh x Rp.
Oh x Rp.
Oh x Rp.

65,000.00
95,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

65,000.00
47,500.00
18,750.00
131,250.00
4,811,250.00

1.0000
1.0000
6.0000
5.0000
3.0000
1.0000
1.0000
2.0000
1.0000

Bh
Bh
M
Bh
Bh
Bh
Bh
rol
Bh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

295,000.00
81,250.00
14,810.00
14,500.00
15,625.00
11,000.00
46,875.00
3,125.00
14,500.00
Jumlah (1)

=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

295,000.00
81,250.00
88,860.00
72,500.00
46,875.00
11,000.00
46,875.00
6,250.00
14,500.00
663,110.00

0.0000
0.0000
0.0000

Oh x Rp.
Oh x Rp.
Oh x Rp.

65,000.00
95,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
0.00
0.00
663,110.00

x Rp.

17,300.00
Jumlah (1)

= Rp.
= Rp.

19,895.00
19,895.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,900.00
5,700.00
660.00
225.00
10,485.00
30,380.00

x Rp.

17,300.00
Jumlah (1)

= Rp.
= Rp.

19,895.00
19,895.00

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

3,900.00
5,700.00
660.00
225.00
10,485.00
30,380.00

Pekerja
Tukang
Mandor

SR.1
Sambungan 1 Set rumah
Bahan Water meter 1/2''
Cleam sadle 1/2"
Pipa GIP 1/2"
Elbow GIP 1/2"
Plengking 1/2"
Double naple 1/2"
Stop derat 1/2"
Seal tape
Elbow derat 1/2"

Upah

Pekerja
Tukang
Mandor

SNI 7393:2008
PEKERJAAN BESI DAN ALUMINIUM
PBA 6.1
Memasang 1 kg besi profil
SNI 7393:2008 /6.1
Bahan Besi profil WF
1.1500 Kg

Upah

Pekerja
Tukang las
Kepala tukang
Mandor

0.0600
0.0600
0.0060
0.0030

Oh
Oh
Oh
Oh

Memasang 1 kg rangka kuda-kuda baja IWF


SNI 7393:2008 /6.2
Bahan Besi baja IWF
1.1500 Kg

x
x
x
x
x
x
x
x
x

PBA 6.2

Upah

Pekerja
Tukang las
Kepala tukang
Mandor

0.0600
0.0600
0.0060
0.0030

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

95

PBA 6.3

Mengerjakan 1 kg pean perakitan


SNI 7393:2008 /6.3
Bahan Solar
Minyak pelumas

1.0000 Liter x Rp.


0.1000 Liter

4,500.00
44,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

0.1000
0.1000
0.0010
0.0050
0.0080

65,000.00
95,000.00
110,000.00
75,000.00
100,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,500.00
9,500.00
110.00
375.00
800.00
17,285.00
26,185.00

Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
SNI 7393:2008 /6.4
Bahan Besi siku L 30.30.3
15.0000 kg
x Rp.
17,300.00
Besi plat baja
32.8000 kg
x Rp.
17,300.00
kawat las
0.0500 kg
x Rp.
45,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

259,500.00
567,440.00
2,250.00
829,190.00

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,500.00
9,500.00
110.00
375.00
16,485.00
845,675.00

45,000.00
4,500.00
44,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

1,800.00
135.00
176.00
2,111.00

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,500.00
9,500.00
110.00
375.00
16,485.00
18,596.00

1.0000 M

x Rp.

467,000.00
Jumlah (1)

= Rp.
= Rp.

467,000.00
467,000.00

1.5000
1.0500
0.1050
0.0052

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

97,500.00
99,750.00
11,550.00
390.00
209,190.00
676,190.00

Upah

Pekerja
Tukang besi
Kepala tukang
Mandor
Sewa alat

Oh
Oh
Oh
Oh
jam

x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.

4,500.00
4,400.00
8,900.00

PBA 6.4

Upah

Pekerja
Tukang besi
Kepala tukang
Mandor

0.1000
0.1000
0.0010
0.0050

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

PBA 6.5

Mengerjakan 10 cm pengelasan dengan las listrik


SNI 7393:2008 /6.5
Bahan Kawat las listrik
0.0400 kg
x Rp.
Solar
0.0300 Liter x Rp.
Minyak pelumas
0.0040 Liter x Rp.

Upah

Pekerja
Tukang besi
Kepala tukang
Mandor

Memasang 1 m2 pintu rolling door besi


SNI 7393:2008 /6.7
Bahan Roll door besi

0.1000
0.1000
0.0010
0.0050

Oh
Oh
Oh
Oh

x
x
x
x

PBA 6.7

Upah

Pekerja
Tukang las biasa
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

96

PBA 6.8

Memasang 1 m2 pintu lipat (folding door) bahan plastik/PVC


SNI 7393:2008 /6.8
Bahan Pintu lipat
1.0000 M
x Rp.

Upah

Pekerja
Tukang
Kepala tukang
Mandor

Memasang 1 m kusen pintu alluminium


SNI 7393:2008 /6.11
Bahan Profil alluminium
Skrup fixer
Sealant

467,000.00
Jumlah (1)

= Rp.
= Rp.

467,000.00
467,000.00

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

28,600.00
41,800.00
4,840.00
1,650.00
76,890.00
543,890.00

1.1000 m
x Rp.
2.0000 Buah x Rp.
0.0600 Tube x Rp.

90,000.00
400.00
40,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

99,000.00
800.00
2,400.00
102,200.00

0.4300
0.4300
0.0043
0.0021

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

27,950.00
40,850.00
473.00
157.50
69,430.50
171,630.50

Dibulatkan

= Rp

171,630.00

x Rp.
x Rp.

90,000.00
30,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

396,000.00
438,000.00
834,000.00

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,525.00
8,075.00
935.00
315.00
14,850.00
848,850.00

x Rp.
x Rp.
x Rp.

132,000.00
156,000.00
40,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

580,800.00
171,600.00
10,800.00
763,200.00

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,525.00
8,075.00
990.00
375.00
14,965.00
778,165.00

0.4400
0.4400
0.0440
0.0220

Oh
Oh
Oh
Oh

x
x
x
x

PBA 6.11

Upah

Pekerja
Tukang
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

Memasang 1 m2 pintu alluminium strip lebar 8 cm


SNI 7393:2008 /6.12
Bahan Profil aluminium
4.4000 m
Alluminium strip
14.6000 m

x
x
x
x

Rp.
Rp.
Rp.
Rp.

PBA 6.12

Upah

Pekerja
Tukang
Kepala tukang
Mandor

0.0850
0.0850
0.0085
0.0042

Oh
Oh
Oh
Oh

PBA 6.13

Memasang 1 m2 pintu kaca rangka alluminium


SNI 7393:2008 /6.13
Bahan Profil Pintu alluminium
4.4000 m
Profil kaca rayben 5mm
1.1000 m2
Sealant
0.2700 Kg

Upah

Pekerja
Tukang
Kepala tukang
Mandor

0.0850
0.0850
0.0090
0.0050

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

97

PBA 6.13a

Memasang 1 m2 pintu kaca buram rangka alluminium


SNI 7393:2008 /6.13a
Bahan Profil Pintu alluminium
4.4000 m
x Rp.
Profil kaca buram 5mm
1.1000 m2
x Rp.
Sealant
0.2700 Kg
x Rp.

Upah

Pekerja
Tukang
Kepala tukang
Mandor

Memasang 1 m2 Venetions blinds


SNI 7393:2008 /6.14
Bahan Venetions blinds

132,000.00
120,000.00
40,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

580,800.00
132,000.00
10,800.00
723,600.00

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,525.00
8,075.00
990.00
375.00
14,965.00
738,565.00

1.0000 M

x Rp.

175,000.00
Jumlah (1)

= Rp.
= Rp.

175,000.00
175,000.00

0.3500
0.3500
0.0350
0.0180

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,750.00
33,250.00
3,850.00
1,350.00
61,200.00
236,200.00

1.0000 M

x Rp.

185,000.00
Jumlah (1)

= Rp.
= Rp.

185,000.00
185,000.00

0.3500
0.3500
0.0350
0.0180

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,750.00
33,250.00
3,850.00
1,350.00
61,200.00
246,200.00

x Rp.
x Rp.

17,250.00
1,859.60
Jumlah (1)

= Rp.
= Rp.
= Rp.

106,553.25
50,357.97
106,553.25

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

108,550.00
158,650.00
18,370.00
6,225.00
291,795.00
398,348.25

Dibulatkan

= Rp

0.0850
0.0850
0.0090
0.0050

Oh
Oh
Oh
Oh

x
x
x
x

PBA 6.14

Upah

Tukang kayu
Pekerja
Kepala tukang
Mandor

Pasang 1 M Vertikals blinds


SNI 7393:2008 /6.14a
Bahan Vertikals blinds

Oh
Oh
Oh
Oh

PBA 6.14a

Upah

Tukang kayu
Pekerja
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

PBA 6.15

Memasang 1 m2 terali besi (2 x 30) mm


SNI 7393:2008 /6.15
Bahan Besi strip
6.1770 Kg
Pengelasan
27.0800 cm

Upah

Tukang las
Pekerja
Kepala tukang
Mandor

1.6700
1.6700
0.1670
0.0830

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

398,348.00

98

PBA 6.16

Memasang 1 m2 kawat nyamuk


SNI 7393:2008 /6.16
Bahan Kawat nyamuk
Pengelasan
Baja strip (0,2 x 2) cm

Upah

Pekerja
Tukang
Kepala tukang
Mandor

1.1000 M
11.1100 cm
1.7600 m

0.1000
0.1000
0.0100
0.0050

Oh
Oh
Oh
Oh

Memasang 1 m2 jendela nako dan tralis


SNI 7393:2008 /6.17
Bahan Jendela nako (rangka + kaca 5mm)
1.1000 M
Paku skrup 1cm - 2,5cm
10.0000 bh
Baja strip
7.0000 Kg

x Rp.
x Rp.
x Rp.

19,000.00
1,859.60
17,250.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

20,900.00
20,660.16
30,360.00
71,920.16

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,500.00
9,500.00
1,100.00
375.00
17,475.00
89,395.16

Dibulatkan

= Rp

x Rp.
x Rp.
x Rp.

130,000.00
300.00
17,250.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

143,000.00
3,000.00
120,750.00
266,750.00

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,000.00
19,000.00
2,200.00
75.00
34,275.00
301,025.00

68,000.00
17,000.00
5,000,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

20,400.00
255.00
95,000.00
115,655.00

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,000.00
38,000.00
2,750.00
750.00
54,500.00
170,155.00

Dibulatkan

= Rp

170,155.00

=
=
=
=
=

184,950.00
34,672.50
20,000.00
74,384.00
314,006.50

Rp.
Rp.
Rp.
Rp.

89,395.00

PBA 6.17

Upah

Pekerja
Tukang
Kepala tukang
Mandor

0.2000
0.2000
0.0200
0.0010

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

PBA 6.18

Memasang 1 m talang datar/jurai seng bjls 28 lebar 90cm


SNI 7393:2008 /6.18
Bahan Seng plat
0.3000 Lbr x Rp.
Paku 1cm - 2,5cm
0.0150 Kg
x Rp.
Papan kayu kelas III
0.0190 M
x Rp.

Upah

Spl

Pekerja
Tukang kayu
Kepala tukang
Mandor

JJk
Memasang 1 m2 jerjak besi beton
Bahan Besi beton dia 10 mm
Besi strip 20.3,2
Asesories
Pengelasan

0.2000
0.4000
0.0250
0.0100

12.3300
2.0100
1.0000
40.0000

Oh
Oh
Oh
Oh

Kg
Kg
set
cm

x
x
x
x

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

15,000.00
17,250.00
20,000.00
1,859.60
Jumlah (1)

Rp.
Rp.
Rp.
Rp.
Rp.

99

Upah

Pemotongan dan pemasangan


Pengelasan

PBA 6.19

Memasang 1 m talang 1/2 lingkaran D-15


SNI 7393:2008 /6.19
Bahan Seng plat
Paku 1cm - 2,5cm
Besi strip

Upah

Pekerja
Tukang kayu
Kepala tukang
Mandor

Pasang 1 M kawat harmonika


ABKPU 2005-PBA/ 7.13
Bahan Kawat harmonika
Paku biasa " - 1"
Kayu Meranti

14.3400 Kg
40.0000 cm

x Rp.
x Rp.

1,048.50
1,648.50
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

15,035.49
65,940.00
80,975.49
394,981.99

Dibulatkan

= Rp

394,981.00

cm, seng bjls 30 lebar 45cm


0.3000 Lbr
0.0150 Kg
0.5000 Kg

x Rp.
x Rp.
x Rp.

70,000.00
17,000.00
17,250.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

21,000.00
255.00
8,625.00
29,880.00

0.1500
0.3000
0.0300
0.0080

x
x
x
x

Rp.
Rp.
Rp.
Rp.

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,750.00
28,500.00
3,300.00
600.00
42,150.00
72,030.00

1.1000 M
0.0200 Kg
0.0018 M

x Rp.
x Rp.
x Rp.

25,000.00
17,000.00
6,814,800.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

27,500.00
340.00
12,266.64
40,106.64

0.1000
0.1000
0.0100
0.0005

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,500.00
9,500.00
1,100.00
37.50
17,137.50
57,244.14

Dibulatkan

= Rp

57,244.00

Oh
Oh
Oh
Oh

PBA 7.13

Upah

Pekerja
Tukang kayu
Kepala tukang
Mandor

Pasang 1 M kawat kassa


ABKPU 2005-PBA/ 7.15
Bahan Kawat kassa
Paku biasa " - 1"
Baja strip (0,2 x 2) cm

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

PBA 7.15

Upah

Pekerja
Tukang kayu
Kepala tukang
Mandor

Pasang 1 M kawat burung


ABKPU 2005-PBA/ 7.16
Bahan Kawat burung
Paku biasa " - 1"

1.1000 M
0.0200 Kg
0.0018 Kg

x Rp.
x Rp.
x Rp.

13,000.00
17,000.00
17,250.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

14,300.00
340.00
31.05
14,671.05

0.1000
0.1000
0.0100
0.0005

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,500.00
9,500.00
1,100.00
37.50
17,137.50
31,808.55

Dibulatkan

= Rp

31,808.00

= Rp.
= Rp.

16,500.00
340.00

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

PBA 7.16

1.1000 M
0.0200 Kg

x Rp.
x Rp.

15,000.00
17,000.00

100

Upah

Baja strip (0,2 x 2) cm

0.0018 Kg

x Rp.

17,250.00
Jumlah (1)

= Rp.
= Rp.

31.05
16,871.05

Pekerja
Tukang kayu
Kepala tukang
Mandor

0.1000
0.1000
0.0100
0.0005

x
x
x
x

65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

6,500.00
9,500.00
1,100.00
37.50
17,137.50
34,008.55

Dibulatkan

= Rp

SNI 2002-ABK PC
PC

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

PEKERJAAN PENGECATAN

Mengikis/ mengerok 1M permukaan cat tembok lama


SNI 2002-ABK PC / 6.1
Bahan Soda api
0.0500
Kg x Rp.
12,100.00
Jumlah (1)
Pekerja
Mandor

0.1500 Oh
0.0025 Oh

x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

Mencuci bidang permukaan tembok 1M yang pernah di cat


SNI 2002-ABK PC / 6.2
Bahan Sabun
0.0500 Kg
x Rp.
10,300.00
Jumlah (1)
Pekerja
Mandor

0.1500 Oh
0.0025 Oh

x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp

605.00
605.00
9,750.00
187.50
9,937.50
10,542.50
10,542.00

Mengerok 1M karat cat lama permukaan baja dengan cara manual


SNI 2002-ABK PC / 6.3
Bahan Sabun
0.0500 Kg
x Rp.
10,300.00
Jumlah (1)

= Rp.
= Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp

515.00
515.00
9,750.00
187.50
9,937.50
10,452.50
10,452.00

6.3.

Upah

Pekerja
Mandor

0.1500 Oh
0.0025 Oh

x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

PC

= Rp.
= Rp.

6.2.

Upah

PC

34,008.00

6.1

Upah

PC

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Menyabun 1M permukaan tembok lama


SNI 2002-ABK PC / 6.4
Bahan Sabun
0.0500 Kg

= Rp.
= Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp

515.00
515.00
9,750.00
187.50
9,937.50
10,452.50
10,452.00

6.4

x Rp.
10,300.00
Jumlah (1)

= Rp.
= Rp.

515.00
515.00

101

Upah

Pekerja
Mandor

0.1500 Oh
0.0025 Oh

x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

PC

Mendempul dan menggosok kayu 1M


SNI 2002-ABK PC / 6.5
Bahan Dempul jadi
Minyak cat
Amplas

Pekerja
Tukang cat
Kepala tukang
Mandor

Pengecatan 1M bidang kayu lama


SNI 2002-ABK PC / 6.7
Bahan Plamir
Minyak cat
Cat minyak

10,452.00

0.0800 Kg
0.0200 Kg
0.1000 Lbr

x Rp.
31,600.00
x Rp.
15,000.00
x Rp.
1,800.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

2,528.00
300.00
180.00
3,008.00

0.0400
0.0400
0.0400
0.0025

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,600.00
3,800.00
4,400.00
187.50
10,987.50
13,995.50

Dibulatkan

= Rp

13,995.00

Oh
Oh
Oh
Oh

Pekerja
Tukang cat
Kepala tukang
Mandor

0.1500 Kg
0.1700 Kg
0.1700 Kg

x Rp.
15,700.00
x Rp.
15,000.00
x Rp.
59,100.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

2,355.00
2,550.00
10,047.00
14,952.00

0.0700
0.0750
0.0075
0.0025

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,550.00
7,125.00
825.00
187.50
12,687.50
27,639.50

Dibulatkan

= Rp

27,639.00

x Rp.
15,000.00
x Rp.
59,100.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

2,550.00
15,366.00
17,916.00

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

4,550.00
7,125.00
825.00
187.50
12,687.50
30,603.50

Dibulatkan

= Rp

Oh
Oh
Oh
Oh

6.7a

Pengecatan 1M bidang kayu 2 lps cat minyak


SNI 2002-ABK PC / 6.7a
Bahan Minyak cat
0.1700 Kg
Cat minyak
0.2600 Kg

Upah

PC

= Rp

9,750.00
187.50
9,937.50
10,452.50

6.7

Upah

PC

Rp.
Rp.
Rp.
Rp.

6.6

Upah

PC

=
=
=
=

Pekerja
Tukang cat
Kepala tukang
Mandor

0.0700
0.0750
0.0075
0.0025

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Pengecatan 1M bidang kayu baru 1 lps Plamir, 1 lps cat dasar, 2 lps cat minyak
SNI 2002-ABK PC / 6.8
Bahan Cat menie kayu
0.2000 Kg
x Rp.
43,000.00 = Rp.
Plamir
0.1500 Kg
x Rp.
15,700.00 = Rp.

30,603.00

6.8

8,600.00
2,355.00

102

Upah

PC

PC

0.1700 Kg
0.2600 Kg

x Rp.
22,300.00
x Rp.
59,100.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

3,791.00
15,366.00
30,112.00

Pekerja
Tukang cat
Kepala tukang
Mandor

0.0700
0.0900
0.0090
0.0025

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

4,550.00
8,550.00
990.00
187.50
14,277.50
44,389.50

Dibulatkan

= Rp

Oh
Oh
Oh
Oh

6.9

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

44,389.00

Pengecatan 1M bidang kayu baru 1 lps Plamir, 1 lps cat


SNI 2002-ABK PC / 6.9
Bahan Cat menie kayu
0.2000 Kg
x
Plamir
0.1500 Kg
x
Minyak cat
0.1700 Kg
x
Cat minyak
0.3500 Kg
x

dasar, 3 lps cat minyak


Rp.
43,000.00
Rp.
15,700.00
Rp.
22,300.00
Rp.
59,100.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

8,600.00
2,355.00
3,791.00
20,685.00
35,431.00

Upah

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,550.00
9,975.00
1,155.00
187.50
15,867.50
51,298.50

Dibulatkan

= Rp

51,298.00

Pekerja
Tukang cat
Kepala tukang
Mandor

Pelaburan 1M kayu dengan Politur


SNI 2002-ABK PC / 6.11
Bahan Minyak Politur
Politur jadi / vernis
Amplas

0.0700
0.1050
0.0105
0.0025

Oh
Oh
Oh
Oh

x
x
x
x

6.11

Upah

PC

Cat dasar
Cat minyak

Pekerja
Tukang cat
Kepala tukang
Mandor

Pelaburan 1M kayu dengan Residu


SNI 2002-ABK PC / 6.12
Bahan Residu

0.1500 Kg
0.3720 Kg
2.0000 Kg

x Rp.
15,000.00
x Rp.
50,000.00
x Rp.
1,800.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

2,250.00
18,600.00
3,600.00
24,450.00

0.0400
0.0600
0.0160
0.0025

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,600.00
5,700.00
1,760.00
187.50
10,247.50
34,697.50

Dibulatkan

= Rp

34,697.00

Oh
Oh
Oh
Oh

6.12

Upah

Pekerja
Mandor

0.3500 Kg

x Rp.
6,700.00
Jumlah (1)

= Rp.
= Rp.

2,345.00
2,345.00

0.1000 Oh
0.0060 Oh

x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=

6,500.00
450.00
6,950.00
9,295.00

Rp.
Rp.
Rp.
Rp.

103

PC

6.13

Peleburan 1M bidang kayu dan vernis


SNI 2002-ABK PC / 6.13
Bahan Vernis
Dempul
Ampelas
Kuas

Upah

PC

Ltr
Kg
Lbr
bh

x
x
x
x

Rp.
50,000.00
Rp.
31,600.00
Rp.
1,800.00
Rp.
15,000.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

7,500.00
1,580.00
180.00
150.00
9,410.00

0.1600
0.1600
0.0160
0.0025

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,400.00
15,200.00
1,760.00
187.50
27,547.50
36,957.50

Dibulatkan

= Rp

Pengecatan 1M tembok baru (1 lapis plamir,1 lapis cat dasar,2 lapis cat penutup)
SNI 2002-ABK PC / 6.14
Bahan Plamir
0.1200 Kg
x Rp.
15,700.00 = Rp.
Cat dasar
0.1200 Kg
x Rp.
22,300.00 = Rp.
Cat Tembok 2 x
0.2600 Kg
x Rp.
22,700.00 = Rp.
Jumlah (1)
= Rp.

36,957.00

6.14

Upah

PC

Pekerja
Tukang cat
Kepala tukang
Mandor

0.1500
0.0500
0.1000
0.0100

Pekerja
Tukang cat
Kepala tukang
Mandor

0.0400
0.1200
0.0120
0.0020

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

Pengecatan 1M tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup )


SNI 2002-ABK PC / 6.15
Bahan Cat dasar
0.1200 Kg
x Rp.
22,300.00
Cat Tembok 2 x
0.2600 Kg
x Rp.
22,700.00
Jumlah (1)

=
=
=
=
=
=

1,884.00
2,676.00
5,902.00
10,462.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,600.00
11,400.00
1,320.00
150.00
15,470.00
25,932.00

= Rp.
= Rp.
= Rp.

2,676.00
5,902.00
8,578.00

6.15

Upah

Pekerja
Tukang cat
Kepala tukang
Mandor

0.0300
0.0900
0.0090
0.0015

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Dibulatkan

= Rp

1,950.00
8,550.00
990.00
112.50
11,602.50
20,180.50
20,180.00

104

PC

6.15a

Pengecatan 1M tembok lama ( 2 lapis cat penutup )


SNI 2002-ABK PC / 6.15a
Bahan Cat Tembok 2 x
0.2600 Kg

x Rp.
22,700.00
Jumlah (1)

= Rp.
= Rp.

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Dibulatkan

= Rp

17,504.00

x Rp.
110,000.00
Jumlah (1)

= Rp.
= Rp.

28,600.00
28,600.00

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1,950.00
8,550.00
990.00
112.50
11,602.50
40,202.50

Dibulatkan

= Rp

40,202.00

x Rp.
43,000.00
x Rp.
15,000.00
Jumlah (1)

= Rp.
= Rp.
= Rp.

4,300.00
150.00
4,450.00

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

1,300.00
1,900.00
2,200.00
750.00
6,150.00
10,600.00
10,600.00

Pengecatan 1M permukaan baja dengan meni besi dan perancah


SNI 2002-ABK PC / 6.21
Bahan Meni besi
0.1000 Kg
x Rp.
43,000.00
Kuas
0.0100 Bh
x Rp.
15,000.00
Peranca kayu
0.0020 M
x Rp.
3,833,300.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

4,300.00
150.00
7,666.60
12,116.60

Upah

PC

Oh
Oh
Oh
Oh

Pengecatan 1M tembok ( 2 lapis cat setara ICI )


SNI 2002-ABK PC / 6.15b
Bahan Cat Tembok 2 x
0.2600 Kg

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,950.00
8,550.00
990.00
112.50
11,602.50
17,504.50

Pekerja
Tukang cat
Kepala tukang
Mandor

0.0300
0.0900
0.0090
0.0015

Oh
Oh
Oh
Oh

Pengecatan 1M permukaan baja dengan meni besi


SNI 2002-ABK PC / 6.20
Bahan Meni besi
0.1000 Kg
Kuas
0.0100 Bh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6.20

Upah

PC

0.0300
0.0900
0.0090
0.0015

6.15b

Upah

PC

Pekerja
Tukang cat
Kepala tukang
Mandor

5,902.00
5,902.00

Pekerja
Tukang cat
Kepala tukang
Mandor

0.0200
0.0200
0.0200
0.0100

Oh
Oh
Oh
Oh

6.21.

105

Upah

PC

Pekerja
Tukang cat
Kepala tukang
Mandor

Pengecatan 1M permukaan genteng


SNI 2002-ABK PC / 6.26
Bahan Cat genteng

0.2500
0.2250
0.0225
0.0075

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16,250.00
21,375.00
2,475.00
562.50
40,662.50
52,779.10

Dibulatkan

= Rp

52,779.00

6.26

Upah

Pekerja
Tukang cat
Kepala tukang
Mandor

0.3000 Kg

x Rp.
55,000.00
Jumlah (1)

= Rp.
= Rp.

16,500.00
16,500.00

0.0300
0.0900
0.0090
0.0015

x
x
x
x

Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

1,950.00
8,550.00
990.00
112.50
11,602.50
28,102.50

Dibulatkan

= Rp

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

28,102.00

BESI BETON POLOS (BJTP)


WEIGHT

SIZE
3
4
5
6
6.5
7
8
9
10
11
12
13
14
15
16
19
22
23
25
28
29
31
32

dia
dia

mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm

12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12

M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'

0.66
1.18
1.84
2.66
3.20
3.62
4.74
5.98
7.40
8.95
10.65
12.50
14.52
16.65
18.96
26.76
35.76
39.10
46.20
57.96
62.28
71.10
75.72

WEIGHT/M'

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

3"
2,5"

M5

0.055
0.098
0.153
0.222
0.267
0.302
0.395
0.498
0.617
0.746
0.888
1.042
1.210
1.388
1.580
2.230
2.980
3.258
3.850
4.830
5.190
5.925
6.310

4.52
2.4

2.1

5.1

10.71 M2
21.33 Kg/10,71m2
1.99 Kg/m2
1.99 Kg/m2
287730
26865.55

upah

#REF!

Harga pas /M2 wire mesh M5

10.71

#REF!
1227
39,951.50

250,200.00 /lbr
23,300.00 /m2
#REF!

287730
26865.55

WEIGHT/M'

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

613.50

13,085.96

26865.55

30895.378
39,951.50

#REF!

#REF!

No
1

Kode Analisa
2

Uraian Pekerjaan
3
Pagar sementara 1 m' dari seng gelombang tinggi 2
meter

Bahan

Upah

Jumlah Harga
4

406,165.20

48,700.00

454,865.20

73,172.70

17,475.00

90,647.70

1,002,727.00

280,750.00

1,283,477.00

6,875.00

6,875.00

PA 6.2

PA 6.4

Pengukuran dan Pemasangan bouwplank 1 m'

PA 6.5

Pembuatan Gudang Semen dan Alat-Alat 1 m2

PA 6.8

Membersihkan lapangan dan perataan 1 m

PA 6.13

Bongkaran beton betulang 1 m

458,330.00

458,330.00

PA 6.14

Bongkaran dinding tembok bata merah 1m

343,750.00

343,750.00

PA 6.15

Pasangan pagar kawat jaring galvanis 1m' , tinggi


1.00 m

7,310.00

115,810.00

PT 6.1

Menggali 1 m3 tanah biasa sedalam 1 meter

50,625.00

50,625.00

PT 6.2

Menggali 1 m3 tanah biasa sedalam 2 meter

61,875.00

61,875.00

10

PT 6.4

Menggali 1 m3 tanah keras sedalam 1 meter

67,400.00

67,400.00

11

PT 6.5

Menggali 1 m3 tanah cadas sedalam 1 meter

102,000.00

102,000.00

12

PT 6.6

Menggali tanah lumpur sedalam 1 meter

81,375.00

81,375.00

13

PT 6.7

Mengerjakan 1 m2 stripping tebing setinggi 1 meter

3,625.00

3,625.00

14

PT 6.8

Membuang 1 m3 tanah sejauh 15 meter

22,200.00

22,200.00

15

PT 6.9

Mengurug kembali 1m3 galian

16,858.00

16,858.00

16

PT 6.10

Memadatkan kembali 1 m3 tanah (per 20 cm)

36,250.00

36,250.00

17

PT 6.11

Mengurug 1 m3 pasir urug

126,240.00

20,250.00

146,490.00

160,749.20

100,400.00

261,149.20

176,675.20

100,400.00

277,075.20

Memasang 1 m3 Lapisan pudel camp. 1KP:3PP:7TL


untuk stabilisasi tanah
Memasang 1 m3 Lapisan pudel camp. 1KP:5TL untuk
stabilisasi tanah

108,500.00

18

PT 6.12

19

PT 6.13

20

PT 6.15

Mengurug 1 m3 sirtu padat

169,800.00

18,125.00

187,925.00

21

PT 6.15a

Menimbun 1 m3 tanah

98,880.00

18,125.00

117,005.00

22

PP 6.1

Memasang 1 M pondasi batu belah/kali, 1 PC : 3 PP

626,338.00

182,625.00

808,963.00

23

PP 6.2

Memasang 1 M pondasi batu belah/kali, 1 PC : 4 PP

579,796.00

182,625.00

762,421.00

24

PP 6.3

Memasang 1 M pondasi batu belah/kali, 1 PC : 5 PP

547,547.20

182,625.00

730,172.20

25

PP 6.4

Memasang 1 M pondasi batu belah/kali, 1 PC : 6 PP

524,866.80

182,625.00

707,491.80

26

PP 6.5

Memasang 1 M pondasi batu belah/kali, 1 PC :8 PP

493,799.20

182,625.00

676,424.20

27

PP 6.9

Memasang 1m3 batu kosong (anstamping)

351,566.40

94,965.00

446,531.40

28

PP 6.10

Memasang 1 M pondasi siklop, 60% beton camp.


1PC:2PB:3KR dan 40% batu belah/kali

2,475,960.80

323,850.00

2,799,810.80

29

PP 6.11

Memasang 1 M3 pondasi sumuran diameter 100 Cm

544,647.80

249,725.00

794,372.80

136,054.00

62,450.00

198,504.00

123,645.80

62,450.00

186,095.80

115,563.40

62,450.00

178,013.40

64,149.40

31,225.00

95,374.40

58,433.00

31,225.00

89,658.00

55,058.40

31,225.00

86,283.40

30
31
32
33

PD 6.1
PD 6.2
PD 6.4
PD 6.7

Memasang 1m2 dinding bata merah


camp. 1PC : 2 PP
Memasang 1m2 dinding bata merah
camp. 1PC : 3 PP
Memasang 1m2 dinding bata merah
camp. 1PC : 4 PP
Memasang 1m2 dinding bata merah
camp. 1PC : 2 PP
Memasang 1m2 dinding bata merah
camp. 1PC : 3 PP
Memasang 1m2 dinding bata merah
camp. 1PC : 4 PP

tebal 1 bata,
tebal 1 bata,
tebal 1 bata,
tebal 1/2 bata,
tebal 1/2 bata,

34

PD 6.8

35

PD 6.9

36

PD 6.9a

Memasang 1m2 dinding batako, camp. 1PC : 4 PP

63,851.00

31,225.00

95,076.00

37

PD 6.10

Memasang 1m2 dinding bata merah tebal 1/2 bata,


camp. 1PC : 5 PP

52,930.00

31,225.00

84,155.00

38

PD 6.30

1 m3 Pasangan dinding batu kali, 1Pc : 4 Ps

579,796.00

374,700.00

954,496.00

39

PD 7.1

Pekerjaan bronjong per 1 m3

592,600.00

140,375.00

732,975.00

40

PPL 6.1

Memasang 1 m2 Plesteran 1 PC : 1 PP, tebal 15 mm

22,056.00

36,525.00

58,581.00

41

PPL 6.2

Memasang 1 m2 Plesteran 1 PC : 2 PP, tebal 15 mm

15,667.20

36,525.00

52,192.20

42

PPL 6.3

Memasang 1 m2 Plesteran 1 PC : 3 PP, tebal 15 mm

12,841.20

36,525.00

49,366.20

tebal 1/2 bata,

No
1

Kode Analisa
2

43

PPL 6.4

44

Uraian Pekerjaan
3

Bahan

Upah

Memasang 1 m2 Plesteran 1 PC : 4 PP, tebal 15 mm

10,963.20

36,525.00

47,488.20

PPL 6.13

Memasang 1 m2 Plesteran 1 PC : 2 PP, tebal 20 mm

20,929.20

48,850.00

69,779.20

45

PPL 6.14

Memasang 1 m2 Plesteran 1 PC : 3 PP, tebal 20 mm

17,161.20

48,850.00

66,011.20

46

PPL 6.15

Memasang 1 m2 Plesteran 1 PC : 4 PP, tebal 20 mm

14,617.60

48,850.00

63,467.60

47

PPL 6.16

Memasang 1 m2 Plesteran 1 PC : 5 PP, tebal 20 mm

13,143.60

48,850.00

61,993.60

48

PPL 6.23

Memasang 1 m2 Plesteran Ciprat

6,328.80

31,225.00

37,553.80

49

PPL 6.26

Memasang 1 m2 finishing Siar pas. Batu kali adukan 1


PC : 2 PP

9,667.60

36,525.00

46,192.60

50

PPL 6.27

Memasang 1 m2 Acian

4,225.00

12,175.00

16,400.00

11,468,690.00

2,707,250.00

14,175,940.00

8,239,010.00

2,320,500.00

10,559,510.00

6,061,250.00

2,320,500.00

8,381,750.00

282,330.00

135,400.00

417,730.00

200,850.00

135,400.00

336,250.00

301,480.00

386,750.00

688,230.00

220,000.00

386,750.00

606,750.00

285,388.00

309,400.00

594,788.00

236,500.00

309,400.00

545,900.00

470,368.00

386,750.00

857,118.00

340,000.00

386,750.00

726,750.00

261,435.00

270,725.00

532,160.00

210,510.00

270,725.00

481,235.00

Membuat dan memasang 1m3 kusen pintu dan


jendela, kayu kelas I:
Membuat dan memasang 1m3 kusen pintu dan
jendela, kayu kelas II:
Membuat dan memasang 1m3 kusen pintu dan
jendela, kayu kelas III:
Membuat dan memasang 1m2 pintu klamp standar ,
kayu kelas II:
Membuat dan memasang 1 m2 pintu klamp
sederhana, kayu kelas III :
Membuat dan memasang 1m2 pintu panel, kayu kelas
II:
Membuat dan memasang 1m2 pintu panel, kayu kelas
III :
Membuat dan memasang 1 m2 pintu dan jendela
kaca, kayu kelas II:
Membuat dan memasang 1 m2 pintu dan jendela
kaca, kayu kelas III:
Membuat dan memasang 1 m2 pintu dan jendela
jalusi kayu kelas II:
Membuat dan memasang 1 m2 pintu dan jendela
jalusi kayu kelas III:
Membuat 1 m2 daun pintu plywood rangkap, rangka
tertutup, kayu kelas II (lbr sd 90cm):
Membuat 1 m2 daun pintu plywood rangkap, rangka
tertutup,kayu kelas III (lbr sd 90cm):

Jumlah Harga
4

51

PK 6.1

52

PK 6.2

53

PK 6.2a

54

PK 6.3

55

PK 6.4

56

PK 6.5

57

PK 6.5a

58

PK 6.6

59

PK 6.6a

60

PK 6.7

61

PK 6.7a

62

PK 6.8

63

PK 6.8a

64

PK 6.10

Memasang 1m2 jalusi kusen, kayu kelas II :

424,770.00

280,675.00

705,445.00

65

PK 6.10a

Memasang 1m2 jalusi kusen, kayu kelas III :

302,550.00

280,675.00

583,225.00

238,435.00

309,400.00

547,835.00

Memasang 1m2 teakwood rangkap, rangka expose


kayu kelas II:
Memasang 1m2 teakwood rangkap, rangka expose
kayu kelas III:
Memasang 1m3 konstruksi kuda-kuda konvensional,
kayu kelas I:
Memasang 1m3 konstruksi kuda-kuda konvensional,
kayu kelas II:
Memasang 1m3 konstruksi kuda-kuda konvensional,
kayu kelas III:

187,510.00

309,400.00

496,910.00

11,761,390.00

1,547,000.00

13,308,390.00

7,850,230.00

1,547,000.00

9,397,230.00

5,853,950.00

1,547,000.00

7,400,950.00

66

PK 6.11

67

PK 6.11a

68

PK 6.13

69

PK 6.13a

70

PK 6.13b

71

PK 6.15

Memasang 1 m3 konstruksi gordeng, kayu kelas I :

11,458,440.00

928,200.00

12,386,640.00

72

PK 6.15a

Memasang 1 m3 konstruksi gordeng, kayu kelas II :

7,547,280.00

928,200.00

8,475,480.00

186,769.04

17,475.00

204,244.04

124,190.48

17,475.00

141,665.48

148,723.76

17,475.00

166,198.76

1,127,842.00

20,970.00

1,148,812.00

80,400.00

47,175.00

127,575.00

85,750.00

45,550.00

131,300.00

52,366.40

28,075.00

80,441.40

37,700.00

28,075.00

65,775.00

78,257.00

28,075.00

106,332.00

142,550.00

58,050.00

200,600.00

220,850.00

77,350.00

298,200.00

26,850.00

9,705.00

36,555.00

73

PK 6.16

74

PK 6.16a

75

PK 6.17

76

PK 6.18

77

PK 6.19

78

PK 6.20

79

PK 6.21

80

PK 6.21a

81

PK 6.22

82

PK 6.23

83

PK 6.25

84

PK 6.27

Memasang 1m2 rangka atap genteng keramik, kayu


kelas I :
Memasang 1m2 rangka atap genteng keramik, kayu
kelas II :
memasang rangka atap genteng beton 1 m2 , kayu
kelas II:
memasang rangka atap sirap 1 m2 , kayu kelas II:
Pasang rangka langit-langit 1 m2 (0.50 x 1.00) m ,
kayu kelas III:
Pasang rangka langit-langit 1 m2 (0.60 x 0.60) m,
kayu kelas III :
Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu
kelas II :
Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu
kelas III :
Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu
kelas II :
Memasang 1 m2 rangka dinding pemisah (60 x 120)cm
, kayu kelas III :
Memasang 1 m2 dinding pemisah plywood rangkap,
rangka kayu kelas III:
Memasang 1 m2 dinding lambrizing dari plywood :

No
1

Kode Analisa
2

85

PK 6.28

86

PK 6.38

87

PB 6.1

88

PB 6.2

89

PB 6.3

90

PB 6.4

91

PB 6.5

92

PB 6.5a

93

PB 6.6

94

PB 6.7

95

PB 6.8

96

PB 6.9

97

PB 6.10

98

PB 6.11

99

PB 6.12

Uraian Pekerjaan
3
Memasang 1 m2 dinding bilik bambu, kayu kelas III :
Memasang 1 m2 rangka langit-langit (1.00x1.00)m,
kayu kelas III :
Membuat 1 m3 beton mutu fc = 7,4 MPa (K 100),
slump (12 2) cm, w/c = 0,87
Membuat 1 m3 beton mutu fc = 9,8 MPa (K 125),
slump (12 2) cm, w/c = 0,78
Membuat 1 m3 beton mutu fc = 12,2 MPa (K 150),
slump (C1216) cm, w/c = 0,72
Membuat 1 m3 lantai kerja beton mutu fc = 7,4 MPa
(K 100), slump (3-6)cm, w/c = 0,87
Membuat 1 m3 beton mutu fc = 14,5 MPa (K 175),
slump (12 2)cm, w/c = 0,66
Membuat dan menghampar 1 m3 mutu beton fc =
14,5 MPa (K 175), slump (122)cm, w/c=0,66
Membuat 1 m3 beton mutu fc = 16,9 MPa (K 200),
slump (12 2)cm, w/c = 0,61
Membuat 1 m3 beton mutu fc = 19,3 MPa (K 225),
slump (12 2)cm, w/c = 0,58
Membuat 1 m3 beton mutu fc = 21,7 MPa (K 250),
slump (12 2) cm, w/c = 0,56
Membuat 1 m3 beton mutu fc = 24, MPa (K 275),
slump (12 2) cm, w/c = 0,53
Membuat 1 m3 beton mutu fc = 26,4 MPa (K 300),
slump (12 2) cm, w/c = 0,52
Membuat 1 m3 beton mutu fc = 28,8 MPa (K 325),
slump (12 2) cm, w/c = 0,49
Membuat 1 m3 beton mutu fc = 31,2 MPa (K 350),
slump (12 2) cm, w/c = 0,48

Bahan

Upah

Jumlah Harga
4

106,204.00

12,175.00

118,379.00

61,700.00

41,875.00

103,575.00

633,957.00

139,430.00

773,387.00

670,661.00

139,430.00

810,091.00

698,921.00

142,680.00

841,601.00

619,856.00

103,700.00

723,556.00

732,992.00

142,680.00

875,672.00

732,992.00

428,040.00

1,161,032.00

764,483.00

142,680.00

907,163.00

789,616.00

142,680.00

932,296.00

804,162.00

142,680.00

946,842.00

829,103.00

142,680.00

971,783.00

836,803.00

142,680.00

979,483.00

866,213.00

181,475.00

1,047,688.00

876,290.00

181,475.00

1,057,765.00

100 PB 6.17

Pembesian 1 kg dengan besi beton

16,030.50

1,227.00

17,257.50

101 PB 6.20

Memasang 1 m2 bekisting untuk pondasi

79,531.00

63,310.00

142,841.00

102 PB 6.21

Memasang 1 m2 bekisting untuk sloof

89,114.25

63,310.00

152,424.25

103 PB 6.22

Memasang 1 M2 bekisting untuk Kolom

185,070.75

80,355.00

265,425.75

104 PB 6.23

Memasang 1 M2 bekisting untuk Balok

190,820.70

80,355.00

271,175.70

105 PB 6.24

Memasang 1 M2 bekisting untuk plat lantai

289,070.75

80,355.00

369,425.75

106 PB 6.25

Memasang 1 M2 bekisting untuk dinding

305,487.50

80,355.00

385,842.50

107 PB 6.26

Memasang 1 M2 bekisting untuk tangga

331,493.50

80,355.00

411,848.50

108 PB 6.27

Memasang 1 M2 jembatan untuk pengecoran beton

137,399.12

15,650.00

153,049.12

3,950,875.00

642,900.00

4,593,775.00

5,030,491.00

731,330.00

5,761,821.00

9,262,185.00

911,430.00

10,173,615.00

6,995,518.00

789,105.00

7,784,623.00

6,949,327.00

642,900.00

7,592,227.00

6,379,995.00

642,900.00

7,022,895.00

6,442,601.50

731,330.00

7,173,931.50

62,294.50

18,735.00

81,029.50

79,500.10

30,935.00

110,435.10

109 PB 6.28
110 PB 6.29
111 PB 6.30
112 PB 6.31
113 PB 6.32
114 PB 6.33
115 PB 6.34
116 PB 6.35
117 PB 6.36

Membuat 1 m3 pondasi beton bertulang (150 kg besi


+ bekisting)
Membuat 1 M3 sloof beton bertulang (200 kg besi +
bekisting)
Membuat 1 M3 kolom beton bertulang (300 kg besi +
bekisting)
Membuat 1 M3 balok beton bertulang (200 kg besi +
bekisting)
Membuat 1 M3 plat beton bertulang (150 kg besi +
bekisting)
Membuat 1 M3 dinding beton bertulang (150 kg besi +
bekisting)
Membuat 1 M3 dinding beton bertulang (200 kg besi +
bekisting)
Membuat 1 M' kolom praktis beton bertulang (11 x
11)cm
Membuat 1 M' ring balok beton bertulang (10 x 15)
cm

118 Supl BSl

Membuat 1 M' sloof 20x20 cm

146,408.04

37,090.72

183,498.76

119 Supl BKl

Membuat 1 M' kolom 20x30 cm

606,046.78

161,889.85

767,936.63

120 PB 7.1

Membuat 1 m3 beton tumbuk, 1 Pc : 3 Ps : 5 Kr

613,596.00

139,750.00

753,346.00

121 PB 7.2

Membuat 1 m3 beton tumbuk, 1 Pc : 3 Ps : 6 Kr

600,704.00

139,750.00

740,454.00

122 PB 7.6

Membuat beton camp. 1 m3 1 Pc : 2 Ps : 4 Kr

705,856.00

139,750.00

845,606.00

123 PB 7.6a

Membuat dan menghampar beton camp. 1 m3 1 Pc :


2 Ps : 4 Kr

705,856.00

279,500.00

985,356.00

124 PB 7.13

Membuat beton camp. 1 m3 1 Pc : 2 Ps : 3 Kr

751,620.00

139,750.00

891,370.00

751,620.00

419,250.00

1,170,870.00

22,380.00

16,760.00

39,140.00

125 PB 7.13a
126 PPA 6.15

Membuat dan menghampar beton camp. 1 m3 1 Pc :


2 Ps : 3 Kr
Pasang 1 M atap asbes gelombang ( 2,10 x 1,05 m ) x
4 mm

No
1

Kode Analisa
2

Uraian Pekerjaan
3

Bahan

Upah

Jumlah Harga
4

127 PPA 6.15a

Pasang 1 M atap Tylux

28,500.00

16,760.00

45,260.00

128 PPA 6.22

Pasang 1 M'bubung stel gelombang 0,92 m

62,100.00

19,065.00

81,165.00

129 PPA 6.29a

Pasang 1 M' nok Tylux

43,900.00

19,065.00

62,965.00

130 PPA 6.30

Pasang 1 M atap genteng beton

66,510.00

24,350.00

90,860.00

131 PPA 6.30a

Pasang atap genteng keramik 1 M

220,510.00

24,350.00

244,860.00

132 PPA 6.32

Pasang 1 M atap genteng metal / Multi Roof

69,700.00

23,675.00

93,375.00

133 PPA 6.33

Pasang atap sirap 1 M

59,800.00

37,890.00

97,690.00

134 PPA 6.34

Pasang nok genteng beton 1 M'

63,641.60

48,700.00

112,341.60

135 PPA 6.34a

Pasang nok genteng keramik 1 M'

143,441.60

48,700.00

192,141.60

136 PPA 6.34b

Pasang nok penutup / cabang genteng keramik 1 M'

374,495.50

24,350.00

398,845.50

137 PPA 6.36

nok genteng metal 1 M'

28,180.00

17,730.00

45,910.00

138 PPA 6.37

Pasang 1 M' nok sirap

51,870.00

35,075.00

86,945.00

139 PPA 6.38

Pasang 1 M2 atap seng gelombang

34,600.00

14,610.00

49,210.00

140 PPA 6.39

Pasang 1 M' rabung seng

12,500.00

17,730.00

30,230.00

141 PPA 6.39a

Pasang 1 M' rabung alumi zink warna

24,865.00

18,205.00

43,070.00

142 PPA 6.40

Pasang 1 M2 atap aluminium

103,720.00

18,205.00

121,925.00

143 PPA 6.40a

Pasang 1 M2 atap alumi zink warna 0,35mm

73,312.00

18,205.00

91,517.00

144 PPA 6.41

Pasang 1 M2 nok aluminium

63,860.00

17,850.00

81,710.00

145 PPA 6.42

Pasang 1 M2 aluminium foil / sisalation

21,000.00

15,650.00

36,650.00

146 PKK 6.1

pasang 1 buah kunci tanam antik

225,000.00

67,725.00

292,725.00

147 PKK 6.2

pasang 1 buah kunci tanam biasa

85,000.00

49,625.00

134,625.00

148 PKK 6.3

pasang 1 buah kunci tanam kamar mandi

50,000.00

48,562.50

98,562.50

149 PKK 6.4

pasang 1 buah kunci silinder

40,000.00

48,562.50

88,562.50

150 PKK 6.5

pasang 1 buah engsel pintu

15,000.00

17,437.50

32,437.50

151 PKK 6.6

pasang 1 buah engsel jendela kupu-kupu

11,000.00

11,625.00

22,625.00

152 PKK 6.7

pasang 1 buah engsel angin

25,000.00

23,250.00

48,250.00

153 PKK 6.8

pasang 1 buah spring knip

9,100.00

16,931.25

26,031.25

154 PKK 6.9

pasang 1 buah kait angin

15,000.00

16,931.25

31,931.25

155 PKK 6.10

pasang 1 buah door closer

110,000.00

56,437.50

166,437.50

156 PKK 6.11

pasang 1 buah kunci selot

35,000.00

22,575.00

57,575.00

157 PKK 6.12

pasang 1 buah pegangan pintu / door holder

115,000.00

56,437.50

171,437.50

158 PKK 6.13

pasang 1 buah door stop

40,000.00

11,287.50

51,287.50

159 PKK 6.14

pasang 1 buah rel pintu dorong

225,000.00

67,725.00

292,725.00

160 PKK 6.15

pasang 1 buah kunci lemari

12,500.00

28,218.75

40,718.75

161 PKK 6.16

pasang kaca 1 M , tebal 3 mm

88,000.00

16,931.25

104,931.25

162 PKK 6.17

pasang kaca 1 M , tebal 5 mm

143,000.00

17,493.75

160,493.75

163 PKK 6.18

pasang kaca 1 M , tebal 8 mm

236,500.00

18,622.50

255,122.50

164 PKK 6.19

pasang kaca buram 1 M , tebal 5 mm

134,000.00

17,493.75

151,493.75

165 PKK 6.20

pasang kaca cermin 1 M , tebal 5 mm

192,500.00

17,493.75

209,993.75

166 PKK 6.21

pasang kaca cermin 1 M , tebal 8 mm

308,000.00

18,622.50

326,622.50

167 PKK 6.23

pasang 1 M kaca "wireglass" , tebal 5 mm

166,430.00

17,493.75

183,923.75

168 PKK 6.24

pasang 1 M kaca patri, tebal 5 mm

302,500.00

28,218.75

330,718.75

No
1

Kode Analisa
2

Uraian Pekerjaan
3

Bahan

Upah

Jumlah Harga
4

169 PKK 6.24a

pasang 1 M kaca Reyben, tebal 5 mm

171,600.00

17,493.75

189,093.75

170 PKK II.16

pasang 1 M' jendela kaca nako polos + rangka

80,500.00

52,425.00

132,925.00

171 PKK II.16a

pasang 1 M' jendela kaca raybend polos + rangka

94,500.00

52,425.00

146,925.00

16,670.00

9,482.50

26,152.50

15,570.00

9,482.50

25,052.50

172 PLL 6.1


173 PLL 6.1a

Memasang 1 m2 langit - langit asbes semen tebal 4


mm
Memasang 1m2 langit - langit asbes semen tebal 3,5
mm

174 PLL 6.2

1 M Langit - langit akustik ( 30 x 30 ) cm

98,600.00

16,845.00

115,445.00

175 PLL 6.3

Memasang 1 M Langit - langit akustik ( 30 x 60 ) cm

100,030.00

14,725.00

114,755.00

176 PLL 6.4

Memasang 1 M Langit - langit akustik ( 60 x 120 ) cm

103,300.00

14,725.00

118,025.00

24,885.00

15,412.50

40,297.50

36,135.00

15,412.50

51,547.50

28,358.00

12,175.00

40,533.00

24,172.00

12,175.00

36,347.00

36,366.00

12,175.00

48,541.00

8,595.00

10,485.00

19,080.00

138,000.00

87,375.00

225,375.00

177 PLL 6.5


178 PLL 6.5a
179 PLL 6.7
180 PLL 6.7a
181 PLL 6.7b

Memasang 1 M Langit - langit tripleks ( 120 x 240 )


cm, tebal 4 mm
Pasang 1 M Langit - langit plywood ( 60 x 120 ) cm,
tebal 6 mm
Pasang 1 M Langit - langit gypsum board, tebal 9
mm
Pasang 1 M Langit - langit gypsum board, tebal 6
mm
Pasang 1 M Langit - langit gypsum board, tebal 12
mm

182 PLL 6.8

Memasang 1 m' plafond gypsum profil

183 PLL 6.9

Memasang 1 m' Langit - langit akustik 60 x 120 cm +


rangka alluminium

184 PLL 6.10

Memasang 1 m' List Langit - langit Kayu profil

7,320.00

8,775.00

16,095.00

185 PLL 6.20

1 M Langit - langit asbes (1,00 x 1,00) m, Rangka


Kayu SK

76,420.00

46,295.00

122,715.00

186 PLL 6.21

1 M Langit - langit plywood 4 mm + rangka kayu SK

85,520.00

60,962.50

146,482.50

187 PLL 7.1

Memasang 1 M2 Langit - langit besi furing

41,374.00

22,775.00

64,149.00

188 PLD 6.9

Memasang 1 m2 lantai ubin granit ukuran 40 x 40 cm

329,969.00

30,530.00

360,499.00

189 PLD 6.10

Memasang 1 m2 lantai ubin granit ukuran 30 x 30 cm

333,902.00

31,655.00

365,557.00

360,651.00

29,220.00

389,871.00

123,501.00

29,220.00

152,721.00

341,903.00

30,530.00

372,433.00

344,585.00

31,655.00

376,240.00

190 PLD 6.13


191 PLD 6.13a
192 PLD 6.14
193 PLD 6.15

Memasang 1 m2 lantai ubin teralux marmer ukuran


60 x 60 cm
Memasang 1 m2 lantai keramik standart ukuran 60 x
60 cm
Memasang 1 m2 lantai ubin teralux marmer ukuran
40 x 40 cm
Memasang 1 m2 lantai ubin teralux marmer ukuran
30 x 30 cm

194 PLD 6.24

Memasang 1 m' plint ubin granit ukuran 10 x 40 cm

168,483.40

15,765.00

184,248.40

195 PLD 6.25

Memasang 1 m' plint ubin granit ukuran 10 x 30 cm

100,903.40

15,765.00

116,668.40

269,303.40

15,765.00

285,068.40

36,513.40

15,765.00

52,278.40

37,363.40

15,765.00

53,128.40

196 PLD 6.28


197 PLD 6.29
198 PLD 6.30

Memasang 1 m' plint ubin teralux marmer ukuran 10


x 60 cm
Memasang 1 m' plint ubin teralux marmer ukuran 10
x 40 cm
Memasang 1 m' plint ubin teralux marmer ukuran 10
x 30 cm

199 PLD 6.32

Memasang 1 m2 lantai keramik artistik (10 x 20) cm

1,188,180.50

85,225.00

1,273,405.50

200 PLD 6.33

Memasang 1 m2 lantai keramik artistik (10 x 10) cm

1,613,193.00

85,225.00

1,698,418.00

201 PLD 6.33a

Memasang 1 m2 lantai keramik artistik (5 x 20) cm

553,193.00

85,225.00

638,418.00

202 PLD 6.34

Memasang 1 m2 lantai keramik 33 x 33 cm

86,721.00

85,225.00

171,946.00

203 PLD 6.35

Memasang 1 m2 lantai keramik 30 x 30 cm

91,872.70

85,225.00

177,097.70

204 PLD 6.35a

Memasang 1 m2 lantai keramik 30 x 30 cm anti slip

102,437.00

85,225.00

187,662.00

205 PLD 6.35b

Memasang 1 m2 lantai keramik 40 x 40 cm

96,721.00

85,225.00

181,946.00

206 PLD 6.36

Memasang 1 m2 lantai keramik 20 x 20 cm

91,411.00

85,225.00

176,636.00

207 PLD 6.38

Memasang 1 m2 lantai mosaik 30 x 30 cm, campuran


1PC : 3 PP

209,020.50

85,225.00

294,245.50

208 PLD 6.39

Memasang 1 m' plint keramik ukuran 10 x 20 cm

8,165.16

15,727.50

23,892.66

209 PLD 6.43

Memasang 1 m2 lantai marmer (100 x 100) cm

377,328.20

79,650.00

456,978.20

210 G 67a

Pasang lantai paving block 1 M

99,880.00

19,443.00

119,323.00

No
1

Kode Analisa
2

Uraian Pekerjaan
3

Bahan

Upah

Jumlah Harga
4

211 G 67b

Pasang Cabstone (pengikat paving block)

36,880.40

5,380.00

42,260.40

212 PLD 6.44

Memasang 1 m2 lantai karpet

35,000.00

29,745.00

64,745.00

213 PLD 6.44a

1 M Pasang lantai karpet 100% wool

108,500.00

29,745.00

138,245.00

214 PLD 6.45

Memasang 1 M underlayer / pelapis bawah karpet

129,500.00

20,970.00

150,470.00

215 PLD 6.46

Memasang 1 m2 lantai parquet jati

410,925.00

85,225.00

496,150.00

216 PLD 6.48

Memasang 1 m2 dinding porselin 11 x 11 cm

117,203.40

95,550.00

212,753.40

217 PLD 6.48a

Memasang 1 m2 dinding porselin 11 x 11 cm, warna

142,103.40

95,550.00

237,653.40

218 PLD 6.48b

1 M Pasang dinding porselin 15 x 15 cm, putih

121,103.40

88,950.00

210,053.40

219 PLD 6.48c

1 M Pasang dinding porselin 15 x 15 cm, warna

130,103.40

88,950.00

219,053.40

220 PLD 6.51

Memasang 1 m2 dinding keramik artistik 10 x 20 cm

1,186,415.90

109,575.00

1,295,990.90

221 PLD 6.52

Memasang 1 m2 dinding keramik artistik 5 x 20 cm

1,610,753.40

109,575.00

1,720,328.40

222 PLD 6.53

Memasang 1 m2 dinding keramik (10 x 20) cm

89,315.90

109,575.00

198,890.90

223 PLD 6.54

Memasang 1 m2 dinding keramik (20 x 20) cm

87,493.40

109,575.00

197,068.40

224 PLD 6.54a

1 M Pasang dinding keramik 20 x 25 cm

85,218.40

109,575.00

194,793.40

225 PLD 6.54b

1 M Pasang dinding keramik 30 x 30 cm

88,745.10

109,575.00

198,320.10

226 PLD 6.55

Memasang 1 m2 dinding marmer (100x100) cm

374,754.50

158,275.00

533,029.50

227 PLD 6.56

Memasang 1 m2 dinding bata pelapis (7 x 3 x 24) cm

137,388.50

121,750.00

259,138.50

228 PLD 6.57

Memasang 1 m2 dinding batu poros

166,433.00

79,650.00

246,083.00

229 PLD 6.58

Memasang 1 m2 dinding batu tempel hitam

134,383.00

85,225.00

219,608.00

230 PLD 6.59

Memasang 1 m2 lantai vinyl karet 30 x 30 cm Kls I

119,756.00

26,250.00

146,006.00

231 PLD 6.59a

Memasang 1 m2 lantai vinyl karet 30 x 30 cm Kls II

111,202.00

26,250.00

137,452.00

232 PLD 6.60

Memasang 1 m2 wall paper, lebar 50cm

82,320.00

41,395.00

123,715.00

233 PLD 6.77

Pasang 1 M lantai vinyl asbes 30 x 30 cm

93,480.00

26,212.50

119,692.50

234 PLD 6.78

Pasang 1 M lantai vinyl motif kembang 30 x 30 cm

107,160.00

26,212.50

133,372.50

235 PLD 6.79

Pasang 1 M wall corvering lebar 50 cm

87,750.00

67,407.50

155,157.50

14,171.00

14,171.00

17,545.00

17,545.00

20,244.00

20,244.00

22,741.00

22,741.00

25,306.00

25,306.00

56,684.00

56,684.00

70,180.00

70,180.00

80,976.00

80,976.00

236 Hit GU.2


237 Hit GU.3
238 Hit GU.4
239 Hit GU.6
240 Hit GU.8
241 Hit CP.2
242 Hit CP.3
243 Hit CP.4
244 Hit CP.6

Menggali dan mengurug tanah pasangan pipa PVC dia


2" sepanjang 1 m'
Menggali dan mengurug tanah pasangan pipa PVC dia
3" sepanjang 1 m'
Menggali dan mengurug tanah pasangan pipa PVC dia
4" sepanjang 1 m'
Menggali dan mengurug tanah pasangan pipa PVC dia
6" sepanjang 1 m'
Menggali dan mengurug tanah pasangan pipa PVC dia
8" sepanjang 1 m'
Menggali tanah memotong jalan (crossing jalan)
untuk pasangan pipa PVC dia 2" sepanjang 1 m'
Menggali tanah memotong jalan (crossing jalan)
untuk pasangan pipa PVC dia 3" sepanjang 1 m'
Menggali tanah memotong jalan (crossing jalan)
untuk pasangan pipa PVC dia 4" sepanjang 1 m'
Menggali tanah memotong jalan (crossing jalan)
untuk pasangan pipa PVC dia 6" sepanjang 1 m'

90,964.00

90,964.00

2,173,000.00

385,500.00

2,558,500.00

Memasang 1 buah kloset jongkok

177,488.00

231,500.00

408,988.00

247 PS 6.4

Memasang 1 buah urinoir

609,863.00

178,500.00

788,363.00

248 PS 6.5

Memasang 1 buah wastafel

484,988.00

239,750.00

724,738.00

472,000.00

182,490.00

654,490.00

767,140.00

535,500.00

1,302,640.00

245 PS 6.1

Memasang 1 buah kloset duduk

246 PS 6.3

249 PS 6.7
250 PS 6.8

Memasang 1 buah bak mandi fibreglass volume 0,30


m
Memasang 1 buah bak mandi batu bata volume 0,30
m

251 PS 6.15

Memasang 1 m' pipa beton, diameter 30 cm

110,395.60

46,265.00

156,660.60

252 PS 6.16

Memasang 1 buah Bak Kontrol pasangan batu bata


uk.(30 x 30) cm tinggi 35 cm

190,172.00

210,790.00

400,962.00

No
1

Kode Analisa
2

Uraian Pekerjaan
3
Memasang 1 buah Bak Kontrol pasangan batu bata
uk.(45 x 45) cm tinggi 50 cm
Memasang 1 buah Bak Kontrol pasangan batu bata
uk.(60 x 60) cm tinggi 65 cm

296,244.00

147,730.00

443,974.00

452,478.40

231,320.00

683,798.40

255 PS 6.19

Memasang 1 m' pipa galvanis diameter "

22,955.50

15,075.00

38,030.50

256 PS 6.20

Memasang 1 m' pipa galvanis diameter 3/4"

33,759.00

15,075.00

48,834.00

257 PS 6.21

Memasang 1 m' pipa galvanis diameter 1"

43,198.50

15,075.00

58,273.50

258 PS 6.21b

Memasang 1 m' pipa galvanis diameter 1" (untuk


sistim perpipaan air bersih)

62,410.50

15,075.00

77,485.50

259 PS 6.22

Memasang 1 m' pipa galvanis diameter 1 "

84,118.50

26,505.00

110,623.50

260 PS 6.22b

Memasang 1 m' pipa galvanis diameter 1 " (untuk


sistem perpipaan air bersih)

39,675.00

26,505.00

66,180.00

261 PS 6.23

Memasang 1 m' pipa galvanis diameter 2"

121,799.00

26,505.00

148,304.00

262 PS 6.23b

Memasang 1 m' pipa galvanis diameter 2" (untuk


sistem perpipaan air bersih)

90,367.00

26,505.00

116,872.00

263 PS 6.24

Memasang 1 m' pipa galvanis diameter 21/2"

159,340.00

26,505.00

185,845.00

264 PS 6.24b

Memasang 1 m' pipa galvanis diameter 21/2" (untuk


sistem perpipaan air bersih)

118,220.00

26,505.00

144,725.00

265 PS 6.25

Memasang 1 m' pipa PVC tipe AW diameter "

3,565.00

8,835.00

12,400.00

266 PS 6.25b

Memasang 1 m' pipa PVC tipe AW diameter " (untuk


sistem perpipaan air bersih)

2,415.00

4,417.50

6,832.50

267 PS 6.26

Memasang 1 m' pipa PVC tipe AW diameter "

5,629.60

8,835.00

14,464.60

268 PS 6.26b

Memasang 1 m' pipa PVC tipe AW diameter " (untuk


sistem perpipaan air bersih)

4,176.80

4,417.50

8,594.30

269 PS 6.27

Memasang 1 m' pipa PVC tipe AW diameter 1"

8,703.25

8,835.00

17,538.25

270 PS 6.27a

Memasang 1 m' pipa PVC tipe AW diameter 1" (untuk


sistem perpipaan air bersih)

5,895.75

4,417.50

10,313.25

271 PS 6.27b

Memasang 1 m' pipa PVC tipe AW diameter 1"

12,409.60

8,835.00

21,244.60

272 PS 6.27c

Memasang 1 m' pipa PVC tipe AW diameter 1"


(untuk sistem perpipaan air bersih)

9,307.20

4,417.50

13,724.70

273 PS 6.28

Memasang 1 m' pipa PVC tipe AW diameter 1 "

22,103.00

8,835.00

30,938.00

274 PS 6.28b

Memasang 1 m' pipa PVC tipe AW diameter 1 "


(untuk sistem perpipaan air bersih)

14,973.00

4,417.50

19,390.50

275 PS 6.29

Memasang 1 m' pipa PVC tipe AW diameter 2"

31,767.25

13,252.50

45,019.75

276 PS 6.29b

Memasang 1 m' pipa PVC tipe AW diameter 2" (untuk


sistem perpipaan air bersih)

21,519.75

6,685.00

28,204.75

277 PS 6.30

Memasang 1 m' pipa PVC tipe AW diameter 2 "

45,424.30

13,252.50

58,676.80

278 PS 6.30b

Memasang 1 m' pipa PVC tipe AW diameter 2 "


(untuk sistem perpipaan air bersih)

30,771.30

6,685.00

37,456.30

279 PS 6.31

Memasang 1 m' pipa PVC tipe AW diameter 3"

65,873.45

19,882.50

85,755.95

280 PS 6.31a

Memasang 1 m' pipa PVC biasa diameter 3"

36,735.00

19,882.50

56,617.50

281 PS 6.31b

Memasang 1 m' pipa PVC tipe AW diameter 3" (untuk


sistem perpipaan air bersih)

44,623.95

9,640.00

54,263.95

282 PS 6.32

Memasang 1 m' pipa PVC tipe AW diameter 4"

97,324.50

19,882.50

117,207.00

283 PS 6.32a

Memasang 1 m' pipa PVC biasa diameter 4"

52,700.00

19,882.50

72,582.50

65,929.50

9,640.00

75,569.50

91,266.00

9,640.00

100,906.00

140,707.35

9,640.00

150,347.35

224,388.15

14,380.00

238,768.15

336,630.00

14,380.00

351,010.00

535,284.75

14,380.00

549,664.75

253 PS 6.17
254 PS 6.18

284 PS 6.32b
285 PS 6.32c
286 PS 6.32d
287 PS 6.32e
288 PS 6.32f
289 PS 6.32g

Memasang 1 m' pipa PVC tipe AW diameter


sistem perpipaan air bersih)
Memasang 1 m' pipa PVC tipe AW diameter
sistem perpipaan air bersih)
Memasang 1 m' pipa PVC tipe AW diameter
sistem perpipaan air bersih)
Memasang 1 m' pipa PVC tipe AW diameter
sistem perpipaan air bersih)
Memasang 1 m' pipa PVC tipe AW diameter
(untuk sistem perpipaan air bersih)
Memasang 1 m' pipa PVC tipe AW diameter
(untuk sistem perpipaan air bersih)

4" (untuk
5" (untuk
6" (untuk
8" (untuk
10"
12"

Bahan

Upah

Jumlah Harga
4

290 PS 6.33

Memasang 1 bh bak cuci piring stainles steel

500,000.00

31,800.00

531,800.00

291 PS 6.34

Memasang 1 bh bak cuci piring teraso

304,440.00

53,000.00

357,440.00

292 PS 6.35

Memasang 1 bh kran diameter " atau "

28,075.00

10,600.00

38,675.00

293 PS 6.36

Memasang 1 bh Floor drain

25,000.00

10,600.00

35,600.00

294 PS 6.40

Memasang 1 m' bodem 30 cm

34,829.50

12,175.00

47,004.50

No
1

Kode Analisa
2

295 HIT PS.4


296 HIT PS.5
297 HIT PS.6

Uraian Pekerjaan
3
Memasang 1 m' pipa steel diameter 4" (untuk sistem
perpipaan air bersih)
Memasang 1 m' pipa steel diameter 5" (untuk sistem
perpipaan air bersih)
Memasang 1 m' pipa steel diameter 6" (untuk sistem
perpipaan air bersih)

Bahan

Upah

Jumlah Harga
4

162,508.50

26,505.00

189,013.50

252,000.00

26,505.00

278,505.00

343,612.50

26,505.00

370,117.50

298 HIT GV.6

Memasang 1 buah gate valve diameter 6"

1,800,000.00

131,250.00

1,931,250.00

299 HIT GV.4

Memasang 1 buah gate valve diameter 4"

850,000.00

131,250.00

981,250.00

300 HIT GV.3

Memasang 1 buah gate valve diameter 3"

726,000.00

100,750.00

826,750.00

301 HIT MC.6

Memasang 1 buah collar diameter 6"

500,000.00

65,625.00

565,625.00

302 HIT MC.4

Memasang 1 buah collar diameter 4"

350,000.00

65,625.00

415,625.00

303 HIT MC.3

Memasang 1 buah collar diameter 3"

350,000.00

65,625.00

415,625.00

304 HIT PB.2

Pencucian pipa dengan pig busa 1 m' diameter 2" 6"

800.00

800.00

305 HIT AP.7

Pengelasan penuh 1 m' tebal : 3 mm

207,680.00

254,180.00

461,860.00

306 HIT PP.1

Pemotongan 1 m' plat steel menggunakan titik api

13,815.00

43,485.00

57,300.00

307 HIT AV.4

Memasang air 1 buah valve diameter 4"

2,750,000.00

131,250.00

2,881,250.00

308 HIT AV.6

Memasang air 1 buah valve diameter 6"

4,680,000.00

131,250.00

4,811,250.00

309 HIT SR.1

Sambungan 1 Set rumah

663,110.00

310 PBA 6.1

Memasang 1 kg besi profil

19,895.00

10,485.00

30,380.00

311 PBA 6.2

Memasang 1 kg rangka kuda-kuda baja IWF

19,895.00

10,485.00

30,380.00

312 PBA 6.3

Mengerjakan 1 kg pean perakitan

8,900.00

17,285.00

26,185.00

313 PBA 6.4

Membuat 1 m2 pintu besi plat baja tebal 2 mm


rangkap, rangka baja siku

829,190.00

16,485.00

845,675.00

314 PBA 6.5

Mengerjakan 10 cm pengelasan dengan las listrik

2,111.00

16,485.00

18,596.00

315 PBA 6.7

Memasang 1 m2 pintu rolling door besi

467,000.00

209,190.00

676,190.00

316 PBA 6.8

Memasang 1 m2 pintu lipat (folding door) bahan


plastik/PVC

467,000.00

76,890.00

543,890.00

317 PBA 6.11

Memasang 1 m kusen pintu alluminium

102,200.00

69,430.50

171,630.50

318 PBA 6.12

Memasang 1 m2 pintu alluminium strip lebar 8 cm

834,000.00

14,850.00

848,850.00

319 PBA 6.13

Memasang 1 m2 pintu kaca rangka alluminium

763,200.00

14,965.00

778,165.00

320 PBA 6.13a

Memasang 1 m2 pintu kaca buram rangka


alluminium

723,600.00

14,965.00

738,565.00

321 PBA 6.14

Memasang 1 m2 Venetions blinds

175,000.00

61,200.00

236,200.00

322 PBA 6.14a

Pasang 1 M Vertikals blinds

185,000.00

61,200.00

246,200.00

323 PBA 6.15

Memasang 1 m2 terali besi (2 x 30) mm

106,553.25

291,795.00

398,348.25

324 PBA 6.16

Memasang 1 m2 kawat nyamuk

71,920.16

17,475.00

89,395.16

325 PBA 6.17

Memasang 1 m2 jendela nako dan tralis

266,750.00

34,275.00

301,025.00

326 PBA 6.18

Memasang 1 m talang datar/jurai seng bjls 28 lebar


90cm

115,655.00

54,500.00

170,155.00

327 Spl.jjk

Memasang 1 m2 jerjak besi beton

314,006.50

80,975.49

394,981.99

328 PBA 6.19

Memasang 1 m talang 1/2 lingkaran D-15 cm, seng


bjls 30 lebar 45cm

29,880.00

42,150.00

72,030.00

329 PBA 7.13

Pasang 1 M kawat harmonika

40,106.64

17,137.50

57,244.14

330 PBA 7.15

Pasang 1 M kawat kassa

14,671.05

17,137.50

31,808.55

331 PBA 7.16

Pasang 1 M kawat burung

16,871.05

17,137.50

34,008.55

605.00

9,937.50

10,542.50

515.00

9,937.50

10,452.50

515.00

9,937.50

10,452.50

515.00

9,937.50

10,452.50

3,008.00

10,987.50

13,995.50

332 PC 6.1
333 PC 6.2
334 PC 6.3

Mengikis/ mengerok 1M permukaan cat tembok


lama
Mencuci bidang permukaan tembok 1M yang pernah
di cat
Mengerok 1M karat cat lama permukaan baja
dengan cara manual

335 PC 6.4

Menyabun 1M permukaan tembok lama

336 PC 6.6

Mendempul dan menggosok kayu 1M

663,110.00

No
1

Kode Analisa
2

Uraian Pekerjaan
3

Bahan

Upah

Jumlah Harga
4

337 PC 6.7

Pengecatan 1M bidang kayu lama

14,952.00

12,687.50

27,639.50

338 PC 6.7a

Pengecatan 1M bidang kayu 2 lps cat minyak

17,916.00

12,687.50

30,603.50

30,112.00

14,277.50

44,389.50

35,431.00

15,867.50

51,298.50

338 PC 6.8
339 PC 6.9

Pengecatan 1M bidang kayu baru 1 lps Plamir, 1 lps


cat dasar, 2 lps cat minyak
Pengecatan 1M bidang kayu baru 1 lps Plamir, 1 lps
cat dasar, 3 lps cat minyak

340 PC 6.11

Pelaburan 1M kayu dengan Politur

24,450.00

10,247.50

34,697.50

341 PC 6.12

Pelaburan 1M kayu dengan Residu

2,345.00

6,950.00

9,295.00

342 PC 6.13

Peleburan 1M bidang kayu dan vernis

9,410.00

27,547.50

36,957.50

10,462.00

15,470.00

25,932.00

8,578.00

11,602.50

20,180.50

5,902.00

11,602.50

17,504.50

343 PC 6.14
344 PC 6.15

Pengecatan 1M tembok baru (1 lapis plamir,1 lapis


cat dasar,2 lapis cat penutup)
Pengecatan 1M tembok lama ( 1 lapis cat dasar, 2
lapis cat penutup )

345 PC 6.15a

Pengecatan 1M tembok lama ( 2 lapis cat penutup

346 PC 6.15b

Pengecatan 1M tembok ( 2 lapis cat setara ICI )

28,600.00

11,602.50

40,202.50

347 PC 6.20

Pengecatan 1M permukaan baja dengan meni besi

4,450.00

6,150.00

10,600.00

348 PC 6.21

Pengecatan 1M permukaan baja dengan meni besi


dan perancah

12,116.60

40,662.50

52,779.10

349 PC 6.26

Pengecatan 1M permukaan genteng

16,500.00

11,602.50

28,102.50

KECAMATAN LUBUK PAKAM

Pekerjaan

Lokasi
Tahun Aggaran

:
:

PEKERJAAN

PERHITUNGAN
Panjang

Lbr/ls bid

Tinggi

Pondasi menerus

32.00

0.60

0.60

Pondasi umpak

0.60

0.60

0.60

9.00

9.00

0.15

Pondasi menerus batu kali 1 PC : 3 PP

32.00

0.40

0.55

Pondasi umpak

0.40

0.40

0.60

45.00

0.40

PEKERJAAN PERSIAPAN

Papan Nama Proyek

Photo Dokumentasi & Administrasi

Listrik dan Air Kerja

P3k/Keamanan

Bowplank & Pengukuran

Pembersihan Awal dan Akhir

Pembuatan Gudang Semen dan alat alat (sewa)

PEMBANGUNAN RUANG LABORATORIUM

PEKERJAAN TANAH

Galian Tanah Pondasi

Mengurug kembali

Menimbun tanah T=15 cm

II

PEKERJAAN BETON

Pondasi menerus batu kali 1 PC : 3 PP

Sloof beton bertulang 15 x 20 cm (200 kg besi + bekisting)

Bekisting untuk sloof

Pembesian dengan besi polos atau besi ulir


Tul Utama 12

45.00

Tul sengkang 6

0.53

Beton mutu K175 untuk sloof 15x20 cm

45.00

0.15

3.45

0.80

Kolom 20 x 20 cm beton bertulang

Bekisting untuk kolom


Bangunan

0.20

Teras
*

2.00

0.80

Pembesian dengan besi polos atau besi ulir


Tul Utama 12

4.10
2.65

Tul sengkang 6

0.63
0.63

Beton mutu K175 untuk kolom 20x20 cm


Bangunan

3.45

0.20

0.20

2.00

0.20

0.20

7.00

Kolom Praktis beton bertulang 15 x 15 cm

3.45

Ring Balok 10 x 15

9.00

9.00

Balok 15x20 cm teras

Bekisting untuk balok 15x20

13.00

0.55

Pembesian dengan besi polos atau besi ulir


Tul Utama 12

13.00

Tul sengkang 6

0.53

Beton mutu K175 untuk balok 15x20 cm

13.00

0.15

Meja beton

Bekisting Meja beton

0.60

3.50

Pembesian meja beton

125.00

0.42

Beton cor 1:2:3 untuk meja beton

0.10

3.50

III

PEKERJAAN DINDING

Dinding bata merah tebal 1/2 bata, 1 PC : 2 PP


30.00

0.50

Tombak Layar bangunan

7.00

1.90

0.50

Tombak layar teras

1.70

0.97

0.50

Bangunan

32.00

3.30

Dinding Trasram (t=50cm)


2

0.20

0.60

Dinding bata merah tebal 1/2 bata, 1 PC : 4 PP

pengurang (lubang kusen)


Lubang kusen

Pintu

2.10

1.00

Jendela

1.75

2.30

IV

PEKERJAAN PLESTERAN

Plesteran 1 PC : 2 PP

Plesteran 1 PC : 4 PP

15.00

Tombak Layar bangunan

13.30

Tombak layar teras

1.64

Bangunan

105.60

pengurang (lubang kusen)

-20.30

Acian

VI

PEKERJAAN KAYU

Kusen Pintu Dan Jendela , kayu kelas II


Kusen Pintu
sb y

5.10

0.15

0.05

sb x

1.90

0.15

0.05

Sb y

6.60

0.15

0.05

Sb x

6.70

0.15

0.05

Daun Pintu Panel, kayu kelas II

2.10

0.90

Daun Jendela Kaca , kayu kelas II

1.20

0.70

Lisplank kayu uk. 3 x 20 kelas II

Kusen jendela

depan dan belakang

11.00

Miring

4.90

Miring

6.45

Jalusi Kusen Kayu kelas II


Jendela

0.68

0.40

Pintu

0.88

0.40

VII

PEKERJAAN PENUTUP LANTAI DAN DINDING

Lantai keramik ukuran (40 x 40) cm

9.00

9.00

Urugan Pasir di bawah keramik T=5 cm

81.00

0.05

VIII PEKERJAAN LANGIT-LANGIT


1

Plafond Gypsum tebal 9 mm


Dalam ruangan

7.00

9.00

Belakang

0.80

9.00

teras

2.00

9.00

Miring

0.80

4.90

0.80

6.45

5.08

11.00

6.60

11.00

Rangka furing ceiling gypsum

IX

PEKERJAAN PENUTUP ATAP

Atap Seng Genteng Multi Roof


Miring

Rangka baja ringan terpasang

Rabung seng genteng

PEKERJAAN ELEKTRIKAL DAN SANITASI

Instalasi Penerangan (titik lampu)

Instalasi Stop Kontak

Stop Kontak

Saklar Tunggal

Saklar Ganda

Lampu TL 20 watt (Komplit)

Lampu XL 18 Wat + Sarang

Pipa 1/2" (Pipa Air Bersih)

6.00

Pipa 2,5" (Pipa Air Kotor)

5.00

10

Kran Air 1/2"

11

Instakasi Air Bersih

KECAMATAN LUBUK PAKAM


2012
0

PERHITUNGAN
Berat

Jumlah

Unit

Volume

Satuan

1.00

unit

1.00

Ls

1.00

Ls

1.00

Ls

1.00

Ls

1.00

Ls

1.00

Ls

12.38

m3

11.52
4.00
12.38

0.86
0.30

11.52
0.864

11.52
0.86

m3

3.714

3.71

12.15

m3

12.15

12.15

7.42

m3

7.04
0.384

7.04

18

18

159.75
35.245

159.75

1.35

1.35

11.04

11.04

0.38

18.00

m2

194.99

Kg

0.89

4.00

159.75

0.22

300.00

35.24

4.00

3.71

7.04
4.00

0.00

1.35

m3

17.44

m2

11.04

0.38

35.24

4.00

6.40
120.81

0.89

4.00

4.00

58.22

1.04

4.00

4.00

44.16

0.22

20.00

4.00

11.17

0.22

13.00

4.00

7.26
0.87

6.4

6.4

58.22
44.16667
11.172
7.2618

58.22

0.552
0.32

0.55

Kg
44.16
11.17
7.26

m3

4.00

0.55

4.00

0.32

6.00

20.70

m'

20.7

20.7

32.00

m'

32.00

32

7.15

m2

7.15

7.15

56.25

Kg

46.15
10.10357

46.15

7.00

0.89

4.00

46.15

0.22

86.00

10.10

2.00
2.00

0.32

10.1

0.39

m3

0.39

0.39

4.20

Ls

4.2

52.50

Kg

52.5

0.42

m3

4.2
52.5
0.42

15.00

m2

15

15

100.24

m2

13.3
1.649
105.6

13.3

2.00

13.30

2.00

1.64
105.60
-20.30
20.30

0.42

1.64
105.6

2.00

4.20

4.00

16.10

2.00

30.00

m2

185.54

m2

1.00

13.30

1.00

1.64

2.00

211.20

2.00

-40.60
215.54

m2

0.48

m3

4.2
16.1

16.1

30

30

13.3
1.64
211.2
-40.6

13.3

4.2

1.64
211.2
-40.6

0.09
2.00

0.07

2.00

0.02

0.0765
0.0285

0.07

0.198
0.201

0.19

0.02

0.39
4.00

0.19

4.00

0.20

2.00

3.78

m2

3.78

3.78

12.00

10.08

m2

10.08

10.08

44.70

m'

22
9.8
12.9

9.8

2.00

22.00

2.00

9.80

2.00

12.90
3.96

12.00

3.26

2.00

0.70

0.2

22
12.9

m2

3.264
0.704

81.00

m2

4.05

m2

81
4.05

3.26
0.7

81
4.05

106.36

m2

63.00

63
7.2
18
7.84
10.32

7.20
18.00
2.00

7.84

2.00

10.32
106.36

m2

128.48

m2

55.88
72.60
128.48

m2

11.00

m'

5.00

ttk

4.00

ttk

4.00

bh

1.00

bh

2.00

bh

4.00

bh

1.00

bh

4.00

24.00

m'

6.00

30.00

m'

4.00

bh

63
7.2
18
7.84
10.32

55.88
72.6

55.88

24
30

24

72.6

30

RENCANA ANGGARAN BIAYA (RAB)


PEKERJAAN : PEMBANGUNAN GEDUNG LABORATORIUM SMP
LOKASI
: SMP NEGERI 1 GUNUNG MERIAH
KECAMATAN : GUNUNG MERIAH
HARGA SATUAN
(Rp)
6

No

URAIAN PEKERJAAN

VOLUME

SAT

ANALISA

1.000
1.000
1.000
1.000
1.000
1.000
1.000

Unit
Ls
Ls
Ls
Ls
Ls
Ls

Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir

12.380
3.710
12.150

m
m
m

PT 6.1
PT 6.9
PT 6.15a

50,625.00
16,858.00
117,005.00

7.420

PP 6.2

762,421.00

18.000
179.990
1.350

m
Kg
m

PB 6.21
PB 6.17
PB 6.5

152,424.25
17,257.50
875,672.00

17.440
120.810
0.870

m
Kg
m

265,425.75
17,257.50
875,672.00

A
1
2
3
4
5
6
7

PEKERJAAN PERSIAPAN
Papan Nama Proyek
Photo Dokumentasi & Administrasi
Listrik dan Air Kerja
P3k/Keamanan
Bowplank & Pengukuran
Pembersihan Awal dan Akhir
Pembuatan Gudang Semen dan alat alat (sewa)

B
I
1
2
3

PEMBANGUNAN RUANG LABORATORIUM


PEKERJAAN TANAH
Galian Tanah Pondasi
Mengurug kembali
Menimbun tanah T=15 cm

II
1
2

PEKERJAAN BETON
Pondasi menerus batu kali 1 PC : 3 PP
Sloof beton bertulang 15 x 20 cm (200 kg besi + bekisting)
Bekisting untuk sloof
Pembesian dengan besi polos atau besi ulir
Beton mutu K175 untuk sloof 15x20 cm
Kolom 20 x 20 cm beton bertulang
Bekisting untuk kolom
Pembesian dengan besi polos atau besi ulir
Beton mutu K175 untuk kolom 20x20 cm

300,000.00
300,000.00
300,000.00
300,000.00
1,000,000.00
400,000.00
500,000.00

Kolom Praktis beton bertulang 15 x 15 cm

32.000

m'

PB 6.22
PB 6.17
PB 6.5
PB 6.35

5
6

Ring Balok 10 x 15
Balok 15x20 cm teras
Bekisting untuk balok 15x20
Pembesian dengan besi polos atau besi ulir
Beton mutu K175 untuk balok 15x20 cm
Meja beton
Bekisting Meja beton
Pembesian meja beton
Beton cor 1:2:3 untuk meja beton

32.000

m'

PB 6.36

110,435.10

7.150
56.250
0.390

m
Kg
m

PB 6.23
PB 6.17
PB 6.5

271,175.70
17,257.50
875,672.00

3.200
52.500
0.420

m2
Kg
m

PB 6.24
PB 6.17
PB 7.13

369,425.75
17,257.50
891,370.00

81,029.50

III
1
2

PEKERJAAN DINDING
Dinding bata merah tebal 1/2 bata, 1 PC : 4 PP
Dinding bata merah tebal 1/2 bata, 1 PC : 4 PP

15.000
100.240

m
m

PD 6.7
PD 6.9

95,374.40
86,283.40

IV
1
2
3

PEKERJAAN PLESTERAN
Plesteran 1 PC : 2 PP
Plesteran 1 PC : 4 PP
Acian

30.000
185.540
185.540

m
m
m

PPL 6.2
PPL 6.4
PPL 6.27

52,192.20
47,488.20
16,400.00

VI
1
2
3
4
5

PEKERJAAN KAYU
Kusen Pintu Dan Jendela , kayu kelas II
Daun Pintu Panel, kayu kelas II
Daun Jendela Kaca , kayu kelas II
Lisplank kayu uk. 3 x 20 kelas III
Jalusi Kusen Kayu kelas II

0.480
3.780
10.080
44.700
3.960

m
m
m
m'
m

PK 6.2
PK 6.5
PK 6.6
PK 6.21a
PK 6.10

10,559,510.00
688,230.00
594,788.00
65,775.00
705,445.00

VII
1
2

PEKERJAAN PENUTUP LANTAI DAN DINDING


Lantai keramik ukuran (40 x 40) cm
Urugan Pasir di bawah keramik T=5 cm

81.000
4.050

m
m

PLD 6.35b
PT 6.11

181,946.00
146,490.00

VIII
1
2

PEKERJAAN LANGIT-LANGIT
Plafond Gypsum tebal 9 mm
Rangka furing ceiling gypsum

106.360
106.360

m
m

PLL 6.7
PLL 7.1

40,533.00
64,149.00

IX
1
2
3

PEKERJAAN PENUTUP ATAP


Atap Seng Genteng Multi Roof
Rangka baja ringan terpasang
Rabung seng genteng

128.480
128.480
11.000

m
m
m'

PPA 6.32
Bhn+Upah
PPA 6.36

93,375.00
120,000.00
45,910.00

X
1
2
3
4
5
6
7
8
9
10

PEKERJAAN ELEKTRIKAL DAN SANITASI


Instalasi Penerangan (titik lampu)
Instalasi Stop Kontak
Stop Kontak
Saklar Tunggal
Saklar Ganda
Lampu TL 20 watt (Komplit)
Lampu XL 18 Wat + Sarang
Pipa 1/2" (Pipa Air Bersih)
Pipa 2,5" (Pipa Air Kotor)
Kran Air 1/2"

5.000
4.000
4.000
1.000
2.000
4.000
1.000
18.000
24.000
4.000

Titik
Titik
Bh
Bh
Bh
Bh
Bh
m'
m'
bh

Bhn+upah
Bhn+upah
Bhn+upah
Bhn+upah
Bhn+upah
Bhn+upah
Bhn+upah
PS 6.25b
PS 6.30b
PS 6.35

90,000.00
90,000.00
9,200.00
16,400.00
21,800.00
54,400.00
33,900.00
6,832.50
37,456.30
38,675.00

XI
1
2
3
4
5

PEKERJAAN KUNCI DAN KACA


Kunci Pintu
Engsel Pintu 4"
Engsel Jendela 3"
Gerendel Jendela ( Kunci Kodok)
Hak Angin

2.000
4.000
24.000
12.000
24.000

Bh
Bh
Bh
Bh
Bh

PKK 6.2
PKK 6.5
PKK 6.6
Taksir
PKK 6.9

134,625.00
32,437.50
22,625.00
10,000.00
31,931.25

XII

PEKERJAAN PENGECATAN

1
2
3
XIII
1
2
3
4
5
6
7

Mengecatan Bidang Kayu dengan cat minyak


Mengecatan Tembok Baru (1 lps cat dsr, 2 lps cat penutup)
Mengecatan Plafond Baru (1 lps cat dsr, 2 lps cat penutup)

29.094
185.540
106.360

m
m
m

PC 6.7a
PC 6.15
PC 6.15

30,603.50
20,180.50
20,180.50

30.000
8.000
1.000
1.000
4.000
4.000
4.000

bh
bh
bh
bh
bh
bh
set

Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
PS 6.5

140,000.00
180,000.00
250,000.00
550,000.00
2,000,000.00
1,350,000.00
724,738.00

PEKERJAAN MEUBELAIR
Kursi Murid Kayu Kelas II
Meja Murid Kayu Kelas II
Kursi Guru Kayu Kelas II
Papan Tulis Whiteboard uk. 1,2 x 2,4
Lemari Uk. 0,8 x 1,2 m (2 Pintu) L - 02
Lemari Uk. 0,7 x 0,6 m (2 Pintu) L - 01
Pas Westafel Keramik
JUMLAH
PPN 10%
TOTAL
DIBULATKAN

Diperiksa Oleh:
Kasi Gedung & Bangunan Pemerintah
Kab. Deli Serdang

( Ari Martiansyah, ST )

Lubuk Pakam,
Juli 2013
Dihitung Oleh :

( Rinaldi, ST )

Penata Muda Tk.I,III/d

Nip: 19760324 200903 1 002

Disetujui Oleh:
Kepala Bidang Cipta Karya
Kab. Deli Serdang

Diketahui Oleh:
Kadis Cipta Karya dan Pertambangan
Kab. Deli Serdang

( Hj. Rostina, ST )

( Ir. Abdul Haris, MM)

Penata Tk.I,III/d

Nip: 1900201 199203 1 003

Nip: 19610203 198510 2 010

JUMLAH (Rp)
7

JUMLAH BESAR
(Rp)
8
3,100,000.00

300,000.00
300,000.00
300,000.00
300,000.00
1,000,000.00
400,000.00
500,000.00

2,110,891.43
626,737.50
62,543.18
1,421,610.75
32,005,449.70
5,657,163.82

168,182,452
2,743,636.50
3,106,177.43
1,182,157.20
4,629,025.08
2,084,878.58
761,834.64
2,592,944.00
3,533,923.20
1,938,906.26
970,734.38
341,512.08
1,182,162.40
906,018.75
374,375.40

10,079,664.02
1,430,616.00
8,649,048.02
13,419,582.63
1,565,766.00
8,810,960.63
3,042,856.00
19,399,241.94
5,068,564.80
2,601,509.40
5,995,463.04
2,940,142.50
2,793,562.20
15,330,910.50
14,737,626.00
593,284.50
11,133,977.52
4,311,089.88
6,822,887.64
27,919,430.00
11,996,820.00
15,417,600.00
505,010.00
2,334,936.20
450,000.00
360,000.00
36,800.00
16,400.00
43,600.00
217,600.00
33,900.00
122,985.00
898,951.20
154,700.00
1,828,350.00
269,250.00
129,750.00
543,000.00
120,000.00
766,350.00
6,781,066.18

890,378.23
3,744,289.97
2,146,397.98
22,738,952.00
4,200,000.00
1,440,000.00
250,000.00
550,000.00
8,000,000.00
5,400,000.00
2,898,952.00
168,182,452
16,818,245
185,000,697
185,000,000

Juli 2013

an Pertambangan

Haris, MM)

199203 1 003