NO.
HARGA
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
Pekerja
Mandor
Tukang Batu
Tukang Kayu
Tukang Besi
Tukang Keramik
Tukang Plafond
Tukang Pasang Pipa
Tukang Cat
Tukang Las
Tukang Sumur Bor
Pembantu Ahli Bor
Operator terampil
Kepala Tukang
Jaga Malam
1
2
3
4
5
6
TIMBUNAN / GALIAN
Tanah Timbun
Pasir Timbun / urug
Pasir
Pasir Beton
Sirtu
Tanah Humus
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
82,400.00
105,200.00
118,800.00
132,400.00
141,500.00
250,000.00
M3
M3
M3
M3
M3
M3
B.
1
2
3
4
5
6
7
8
9
10
BAHAN PEREKAT
Semen PPC
Cement Putih/ Warna
Lem Kayu
Lem Vinyl / Karet
Perekat Kaca
Waterproof
Lem pipa
Lem pipa
Seal tape
Air kerja
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
1,300.00
2,250.00
40,000.00
45,000.00
85,000.00
60,000.00
78,000.00
12,000.00
3,100.00
35.00
Kg
Kg
Kg
Kg
Kg
Kg
Kg
tube
roll
Ltr
C.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
300,400.00
255,100.00
288,800.00
285,200.00
276,200.00
268,900.00
231,000.00
203,100.00
213,100.00
230,000.00
500.00
3,800.00
3,600.00
5,000.00
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Bh
Bh
Bh
Bh
65,000.00
75,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
75,000.00
75,000.00
110,000.00
70,000.00
SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
HARGA
Org/Hari
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OM
SATUAN
NO.
HARGA
SATUAN
15
16
17
18
19
20
21
22
23
24
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
5,500.00
40,000.00
2,000.00
13,800.00
1,600.00
1,600.00
1,600.00
2,200.00
2,500.00
27,000.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
D.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
KAYU / LANGIT-LANGIT
Balok Kayu Damar Laut / Kelas I
Papan Kayu Damar Laut / Kelas I
Balok Kayu Meranti / Kelas II
Papan Kayu Meranti / Kelas II
Kayu Sembarang Keras / Kelas III
Kayu Bekisting
Papan Sembarang
Kayu Lat Asbes 5x30x400 mm
Kayu Dolken / kayu laut 7,5 - 10
Bambu 6 - 8 / 600 cm
Bilik bambu
Kayu Profil 1"
Kayu Profil 2"
Kayu Profil 3"
Kayu Profil 4"
Profil Gypsum 2"
Profil Gypsum 3"
Profil Gypsum 4"
Profil Gypsum 6"
Plywood 120 x 240 tbl. 9 mm
Plywood 120 x 240 tbl. 6 mm
Plywood 120 x 240 tbl. 4 mm
Teakwood 120 x 240 tbl. 3 mm
Triplek Jati 120 x 240 tbl. 3 mm
Triplek Sungkai 120 x 240 tbl.3 mm
Formica 120 x 240 cm
Gypsum 120 x 240 tbl. 6 mm
Gypsum 120 x 240 tbl. 9 mm
Gypsum 120 x 240 tbl.12 mm
Beeding gypsum
Tepung gypsum
Asbes Lokal 100 x 100 cm
Asbes Atrisco 100 x 100 cm t= 4 mm
Akustik 30 x 30 cm
Akustik 30 x 60 cm
Akustik 60 x 120 cm
Rangka Furing Ceiling Gypsum
Rangka Furing Dinding Gypsum
Tepung Dempul
Kain Kasa/Paper Tape
@Rp. 10,370,400.00
@Rp. 10,370,000.00
@Rp. 6,814,800.00
@Rp. 7,037,000.00
@Rp. 5,000,000.00
@Rp. 3,833,300.00
@Rp.
80,700.00
@Rp.
7,400.00
@Rp.
52,000.00
@Rp.
13,800.00
@Rp.
14,000.00
@Rp.
6,500.00
@Rp.
12,500.00
@Rp.
18,800.00
@Rp.
25,100.00
@Rp.
4,600.00
@Rp.
5,400.00
@Rp.
6,700.00
@Rp.
8,500.00
@Rp.
135,000.00
@Rp.
95,000.00
@Rp.
65,000.00
@Rp.
50,000.00
@Rp.
120,000.00
@Rp.
120,000.00
@Rp.
74,300.00
@Rp.
60,000.00
@Rp.
71,500.00
@Rp.
93,500.00
@Rp.
7,000.00
@Rp.
10,400.00
@Rp.
14,000.00
@Rp.
15,000.00
@Rp.
8,500.00
@Rp.
17,100.00
@Rp.
68,300.00
@Rp.
50,000.00
@Rp.
60,000.00
@Rp.
10,500.00
@Rp.
60,000.00
M3
M3
M3
M3
M3
M3
Kpg
Btg
Btg
Btg
M2
M'
M'
M'
M'
M'
M'
M'
M'
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Btg
Kg
Lbr
Lbr
Lbr
Lbr
Lbr
M2
M2
Kg
Roll
NO.
E.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
HARGA
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
15,000.00
16,000.00
17,300.00
17,250.00
17,250.00
18,700.00
22,500.00
4,500.00
19,000.00
13,000.00
25,000.00
15,000.00
45,000.00
250,000.00
820,000.00
830,000.00
840,000.00
467,000.00
467,000.00
382,030.00
350,000.00
450,000.00
420,000.00
350,000.00
320,000.00
750,000.00
650,000.00
8,500.00
132,000.00
30,000.00
90,000.00
85,000.00
175,000.00
185,000.00
195,000.00
165,000.00
300.00
500.00
17,000.00
17,000.00
250.00
21,200.00
300.00
400.00
20,000.00
45,400.00
1,500.00
300,000.00
352,000.00
605,000.00
34,100.00
34,800.00
SATUAN
Kg
Kg
Kg
Kg
Kg
Kg
Kg
M'
M2
M2
M2
M2
Kg
Lbr
M2
M2
M2
M2
M2
M2
M2
Bh
Bh
Bh
Bh
Bh
Bh
M'
M'
M'
M'
M'
M2
M2
M2
M2
Bh
Bh
Kg
Kg
Bh
Kg
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
Btg
Btg
NO.
53
54
55
F.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
HARGA
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
SATUAN
8,300.00
1,000.00
13,200.00
Btg
set
set
26,300.00
46,600.00
104,700.00
15,290.00
330,000.00
27,200.00
48,400.00
109,500.00
33,000.00
1,300.00
2,600.00
3,250.00
3,750.00
5,910.00
6,800.00
6,500.00
12,000.00
5,000.00
15,000.00
15,000.00
22,000.00
21,200.00
37,600.00
1,200.00
1,500.00
2,300.00
2,500.00
10,000.00
13,000.00
20,000.00
28,000.00
62,800.00
157,200.00
4,200.00
5,600.00
8,400.00
6,300.00
8,400.00
12,600.00
1,818.00
40,000.00
104,500.00
140,000.00
20,000.00
90,000.00
90,000.00
110,000.00
8,200.00
9,800.00
Bh
Bh
Bh
Bh
M2
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
M2
M2
M2
M2
Bh
Bh
NO.
50
51
52
53
54
55
56
57
Vynil karet 30 x 30 cm KL II
Vynil motif kembang ex DN 30 x 30 cm
Vynil wall covering lebar 50 cm
Paku Pancing 60 - 230
Wallpaper
Sekrup 3,5"
Perquet Jati
Gymfloor
G.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
PENUTUP ATAP
Atap Genteng Beton
Atap Genteng Keramik
Atap Sirap
Atap Genteng Metal/Multi Roof ( 4 tingkat )
Atap Genteng Asbes Cement 0,32
Atap Aluminium gelombang tebal 0,55
Atap Seng Alumi Zinc warna 0,35
Atap Twin Light
Atap Seng gelombang 6' bjls
Atap Seng gelombang 7' bjls
Atap Seng gelombang 8' bjls
Atap Seng Super Deck 3' x 6' tbl.0,30
Roof light fibreglass gelombang 180 x 90 cm
Atap Asbes gelombang 2,1 x 1,05 tbl.4 mm
Genteng bubung palentong
Genteng bubung palentong super
Genteng bubung kodok
Atap tylux
Nok genteng Beton
Nok genteng Keramik
Nok sudut genteng Keramik
Nok genteng Asbes gelombang Cement 0,35
Nok Alluminium standart 40 cm 18 swg 22
Rabung tylux
Rabung seng 7"
Rabung/ Nok genteng
Rabung/ Nok genteng warna
Rabung genteng metal
Rabung Alumi Zinc warna
Rangka atap baja ringan sederhana (siap pasang)
Rangka atap baja ringan (siap pasang)
Seng plat bjls 32
Seng plat bjls 30
Seng plat bjls 28
Sisalation / aluminium foil
Paku Seng + Ring karet
Paku Seng + Ring karet
Paku hak panjang 15 cm
HARGA
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
SATUAN
9,100.00
9,400.00
65,000.00
700.00
33,600.00
20,400.00
368,500.00
79,800.00
Bh
Bh
M2
Bh
M2
Kg
M2
M2
6,000.00
20,000.00
940.00
65,000.00
66,000.00
98,200.00
69,240.00
90,000.00
48,000.00
56,000.00
61,000.00
68,800.00
46,400.00
38,000.00
9,400.00
12,700.00
9,600.00
50,000.00
12,200.00
35,000.00
105,000.00
25,000.00
52,200.00
38,000.00
20,000.00
4,000.00
5,000.00
25,000.00
23,100.00
120,000.00
140,000.00
75,000.00
70,000.00
68,000.00
20,000.00
25,000.00
350.00
30,500.00
Bh
Bh
Bh
Lbr
Lbr
Lbr
M2
M2
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Bh
Bh
Bh
Lbr
Bh
Bh
Bh
Lbr
M2
Lbr
Lbr
Bh
Bh
Bh
Bh
M2
M2
Lbr
Lbr
Lbr
M2
Kg
Bh
Kg
NO.
HARGA
SATUAN
H.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
225,000.00
85,000.00
50,000.00
40,000.00
35,000.00
12,500.00
15,000.00
11,000.00
25,000.00
15,000.00
225,000.00
40,000.00
9,100.00
110,000.00
115,000.00
40,000.00
88,500.00
30,000.00
80,000.00
130,000.00
215,000.00
156,000.00
265,000.00
96,000.00
120,000.00
265,000.00
175,000.00
210,000.00
280,000.00
275,000.00
151,300.00
17,000.00
146,000.00
60,000.00
170,000.00
13,500.00
11,500.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Kg
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
Set
Set
Set
Set
Lbr
kaki
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
CAT / MINYAK
Cat Dasar
Cat Tembok setara Vinilex
Cat Tembok setara ICI
Cat Minyak
Cat Menie Kayu
Cat Menie Besi
Cat Sending
Cat Melamix
Cat Vernis Jadi
Cat genteng
Plamir
Dempul Gypsum
Dempul Cat
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
22,300.00
22,700.00
110,000.00
59,100.00
43,000.00
43,000.00
60,000.00
65,000.00
50,000.00
55,000.00
15,700.00
10,400.00
31,600.00
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
NO.
HARGA
SATUAN
14
15
16
17
18
19
20
21
22
Minyak Cat
Minyak Bekisting
Residu / Kolter
Soda Api
Sabun
Kuas kecil
Ampelas/Kertas Pasir
Solar
Minyak pelumas
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
15,000.00
6,300.00
6,700.00
12,100.00
10,300.00
15,000.00
1,800.00
4,500.00
44,000.00
Kg
Ltr
Ltr
Kg
Kg
Bh
Lbr
Ltr
Ltr
J.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
SANITASI / PIPA
Kloset duduk / monoblok Lengkap tangki
Kloset duduk / monoblok tanpa tangki
Kloset jongkok biasa
Bakkif Porselen
Wastafel warna (standard)
Urinoir
Kran air 1/2" - 3/4"
Kran air leher angsa 1/2"
Kran Shower
Kran Cebok
Bak fibre 0,3 M3
Bak fibre 1 M3
Bak cuci piring steinless 2 Lobang
Bak cuci piring teraso 2 Lobang
Tempat sabun keramik
Floor Drain 4" standard
Tutup Bak air 1" Kuningan
Instalasi air Bersih
Instalasi air Kotor/Limbah
Buis Beton 1/2 15 cm
Buis Beton 1/2 20 cm
Buis Beton 1/2 30 cm
Buis Beton 15 cm
Buis Beton 20 cm
Buis Beton 30 cm
Buis Beton 40 cm
Buis Beton 50 cm
Buis Beton 60 cm
Buis Beton 80 cm
Buis Beton 100 cm
Bodem pracetak 1/2 30 cm
Pipa PVC Tipe AW 1/2"
Pipa PVC Tipe AW 3/4"
Pipa PVC Tipe AW 1"
Pipa PVC Tipe AW 11/4"
Pipa PVC Tipe AW 11/2"
Pipa PVC Tipe AW 2"
Pipa PVC Tipe AW 21/2"
Pipa PVC Tipe AW 3"
Pipa PVC Tipe AW 4"
Pipa PVC Tipe AW 5"
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
2,050,000.00
1,350,000.00
165,000.00
2,750,000.00
425,000.00
522,500.00
27,300.00
77,200.00
50,000.00
114,000.00
400,000.00
591,000.00
475,000.00
247,500.00
45,000.00
25,000.00
13,800.00
100,000.00
125,000.00
11,300.00
17,800.00
33,000.00
20,000.00
30,000.00
50,000.00
80,000.00
90,000.00
176,000.00
242,000.00
360,000.00
33,000.00
2,300.00
3,632.00
5,615.00
8,864.00
14,260.00
20,495.00
29,306.00
42,499.00
62,790.00
86,920.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Ttk
Ttk
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
Bh
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
NO.
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
HARGA
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
134,007.00
213,703.00
320,600.00
509,795.00
11,500.00
23,700.00
34,000.00
14,800.00
20,100.00
29,500.00
37,600.00
47,600.00
50,200.00
230,000.00
14,810.00
21,780.00
27,870.00
34,500.00
54,270.00
78,580.00
102,800.00
154,770.00
240,000.00
327,250.00
19,250.00
19,250.00
267,850.00
267,850.00
22,000.00
8,250.00
8,250.00
9,625.00
35,000.00
70,000.00
110,000.00
225,000.00
1,800,000.00
850,000.00
726,000.00
500,000.00
350,000.00
250,000.00
435,600.00
405,000.00
381,150.00
326,700.00
105,700.00
105,700.00
58,900.00
58,900.00
846,660.00
632,440.00
495,950.00
390,000.00
SATUAN
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
btg
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
NO.
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
HARGA
@Rp.
58,000.00
@Rp.
29,000.00
@Rp.
16,500.00
@Rp.
190,000.00
@Rp.
320,000.00
@Rp.
265,000.00
@Rp.
215,000.00
@Rp.
120,000.00
@Rp.
107,000.00
@Rp.
82,000.00
@Rp.
71,000.00
@Rp.
47,500.00
@Rp.
44,000.00
@Rp.
114,000.00
@Rp.
99,000.00
@Rp. 2,750,000.00
@Rp. 4,680,000.00
@Rp.
390,000.00
@Rp.
196,730.00
@Rp.
152,330.00
@Rp.
570,000.00
@Rp.
380,000.00
@Rp.
72,600.00
@Rp.
145,000.00
@Rp.
255,000.00
@Rp.
500,000.00
@Rp.
400,000.00
@Rp.
418,800.00
@Rp.
191,440.00
@Rp.
94,000.00
@Rp.
78,000.00
@Rp.
5,500.00
@Rp.
262,000.00
@Rp.
295,000.00
@Rp.
81,250.00
@Rp.
14,810.00
@Rp.
14,500.00
@Rp.
15,625.00
@Rp.
11,000.00
@Rp.
46,875.00
@Rp.
3,125.00
@Rp.
14,500.00
@Rp.
100,000.00
@Rp. 2,700,000.00
@Rp.
262,000.00
@Rp.
100,000.00
@Rp.
50,000.00
@Rp.
20,000.00
@Rp. 3,900,000.00
@Rp.
146,000.00
@Rp.
20,000.00
@Rp. 13,000,000.00
@Rp.
15,000.00
@Rp. 4,350,000.00
SATUAN
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
m2
kg
bh
Bh
Bh
Bh
M
Bh
Bh
Bh
Bh
rol
Bh
Hari
Unit
Bh
Hari
Hari
Hari
Unit
M3
Kg
Unit
Bh
Set
NO.
HARGA
SATUAN
150
151
152
153
154
155
156
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
900,000.00
5,200.00
7,200.00
4,700.00
24,800.00
7,400.00
18,200.00
Set
Bh
Bh
Bh
Bh
Bh
Bh
K.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
LISTRIK / ACSESORIES
Lampu TL 1 x 20 W Lengkap kotak
Lampu TL 1 x 40 W Lengkap kotak
Lampu TL 2 x 20 W Lengkap kotak
Lampu TL 2 x 40 W Lengkap kotak
Lampu TL 2 x 20 W + sarang sisir
Lampu TL 2 x 40 W + sarang sisir
Lampu TL Bambu 1 x 20 W Lengkap
Lampu TL Bambu 1 x 40 W Lengkap
Lampu XL 5 W
Lampu XL10 W
Lampu XL18 W
Lampu XL24 W
Lampu Downlight 5 W Lengkap
Fitting lampu pijar
Fitting lampu XL biasa
Fitting lampu downlight 3"
Fitting lampu downlight 4"
Lampu Pijar 5 w
Lampu Pijar 10 w
Lampu Pijar 15 w
Lampu Pijar 20 w
Lampu Pijar 25 w
Lampu Pijar 40 w
Stop Kontak Tanam
Saklar Tunggal
Saklar Ganda
Saklar Triple
Zekring box 1 grup
Zekring box 2 grup
Zekring box 3 grup
Zekring box 4 grup
MCB 2 Ampere
MCB 4 Ampere
MCB 6 Ampere
MCB 8 Ampere
Kabel Listrik NYA 1,5 mm
Kabel Listrik NYA 2,5 mm
Kabel Listrik NYA 4 mm
Kabel Listrik NYM 2 1,5 mm
Kabel Listrik NYM 2 2,5 mm
Kabel Listrik NYM 2 4 mm
Instalasi listrik titik api / Lampu Nyala
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
@Rp.
54,400.00
60,500.00
163,400.00
183,900.00
365,000.00
435,000.00
108,900.00
123,400.00
25,400.00
29,000.00
33,900.00
38,700.00
54,500.00
7,500.00
10,000.00
33,000.00
40,000.00
7,500.00
8,000.00
8,500.00
9,000.00
9,500.00
10,500.00
9,200.00
16,400.00
21,800.00
24,200.00
26,600.00
31,400.00
38,500.00
46,200.00
32,000.00
35,455.00
44,627.00
90,182.00
1,270.00
2,160.00
3,420.00
4,920.00
9,540.00
10,340.00
90,000.00
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Bh
Bh
Bh
Bh
Unt
Unt
Unt
Unt
Unt
Unt
Unt
Unt
M'
M'
M'
M'
M'
M'
Ttk
11
6.2.
PA
Tukang kayu
Pekerja
Kepala tukang
Mandor
0.2000
0.4000
0.0200
0.0200
Oh
Oh
Oh
Oh
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
65,000.00
3,250.00
57,600.00
594.00
2,703.60
275,997.60
1,020.00
406,165.20
Rp
95,000.00
Rp
65,000.00
Rp
110,000.00
Rp
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
19,000.00
26,000.00
2,200.00
1,500.00
48,700.00
454,865.20
454,865.00
x Rp
3,833,300.00
x Rp
17,000.00
x Rp
3,833,300.00
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
45,999.60
340.00
26,833.10
73,172.70
x
x
x
x
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
9,500.00
6,500.00
1,100.00
375.00
17,475.00
90,647.70
90,647.00
52,000.00 =
Rp
88,400.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
804,993.00
5,100.00
13,650.00
3,564.00
15,020.00
72,000.00
1,002,727.00
x
x
x
x
6.4
Upah
PA
PEKERJAAN PERSIAPAN
Tukang kayu
Pekerja
Kepala tukang
Mandor
0.1000
0.1000
0.0100
0.0050
Oh
Oh
Oh
Oh
Rp
95,000.00
Rp
65,000.00
Rp
110,000.00
Rp
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
6.5
Kayu
Paku Biasa
Semen PPC
Pasir
Kerikil
Seng Gelombang bjls
0.2100
0.3000
10.5000
0.0300
0.0500
1.5000
m3
kg
kg
m3
m3
lbr
x Rp
x
x
x
x
x
x
Rp
3,833,300.00
Rp
17,000.00
Rp
1,300.00
Rp
118,800.00
Rp
300,400.00
Rp
48,000.00
Jumlah (1)
=
=
=
=
=
=
=
12
PA
Upah
Tukang kayu
Pekerja
Kepala tukang
Mandor
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
190,000.00
65,000.00
22,000.00
3,750.00
280,750.00
1,283,477.00
1,283,477.00
6.8
x Rp
x Rp
Jumlah
65,000.00 =
75,000.00 =
=
Rp
Rp
Rp
6,500.00
375.00
6,875.00
x Rp
x Rp
Jumlah
65,000.00 =
75,000.00 =
=
Rp
Rp
Rp
433,355.00
24,975.00
458,330.00
x Rp
x Rp
Jumlah
65,000.00 =
75,000.00 =
=
Rp
Rp
Rp
325,000.00
18,750.00
343,750.00
Rp
Rp
108,500.00
108,500.00
Rp
Rp
Rp
Rp
Rp
Rp
2,730.00
440.00
3,990.00
150.00
7,310.00
115,810.00
Upah
PA
6.13
Upah
PA
6.14
Upah
PA
6.6670 Oh
0.3330 Oh
Pekerja
Kepala tukang
Tukang
Mandor
SNI 2835:2008
6.1.
Upah
PT
Oh
Oh
Oh
Oh
x
x
x
x
Rp
95,000.00
Rp
65,000.00
Rp
110,000.00
Rp
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
6.15
Upah
PT
2.0000
1.0000
0.2000
0.0500
6.2.
Upah
0.0420
0.0040
0.0420
0.0020
Oh
Oh
Oh
Oh
x
x
x
x
Rp
65,000.00
Rp
110,000.00
Rp
95,000.00
Rp
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
48,750.00
1,875.00
50,625.00
x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
58,500.00
3,375.00
61,875.00
13
PT
6.4.
Upah
PT
6.5.
Upah
PT
6.6.
Upah
PT
6.7.
Upah
PT
6.8.
Upah
PT
PT
6.9.
6.10.
Upah
PT
x Rp.
x Rp.
Jumlah
65,000.00
75,000.00
= Rp.
= Rp.
= Rp.
65,000.00
2,400.00
67,400.00
x Rp.
x Rp.
Jumlah
65,000.00
75,000.00
= Rp.
= Rp.
= Rp.
97,500.00
4,500.00
102,000.00
x Rp.
x Rp.
Jumlah
65,000.00
75,000.00
= Rp.
= Rp.
= Rp.
78,000.00
3,375.00
81,375.00
x Rp.
x Rp.
Jumlah
65,000.00
75,000.00
= Rp.
= Rp.
= Rp.
3,250.00
375.00
3,625.00
x Rp.
x Rp.
Jumlah
65,000.00
75,000.00
= Rp.
Rp.
= Rp.
21,450.00
750.00
22,200.00
16,858.13
16,858.00
0.3300 Oh
0.0100 Oh
x Rp.
x Rp.
Jumlah
65,000.00
75,000.00
= Rp.
= Rp.
= Rp.
32,500.00
3,750.00
36,250.00
1.2000 M
x Rp.
105,200.00
Jumlah (1)
= Rp.
= Rp.
126,240.00
126,240.00
0.3000 Oh
0.0100 Oh
x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
19,500.00
750.00
20,250.00
146,490.00
6.11.
Upah
Pekerja
Mandor
Rp.
Rp.
Rp.
Rp.
14
PT
6.12.
PT
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
40,554.00
42,080.00
78,115.20
160,749.20
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
52,000.00
38,000.00
4,400.00
6,000.00
100,400.00
261,149.20
261,149.00
= Rp.
= Rp.
= Rp.
74,499.20
102,176.00
176,675.20
Pekerja
Tukang batu
Kepala tukang
Mandor
0.8000
0.4000
0.0400
0.0800
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
52,000.00
38,000.00
4,400.00
6,000.00
100,400.00
277,075.20
277,075.00
6.15.
Upah
PT
0.8000
0.4000
0.0400
0.0800
Rp.
Rp.
Rp.
Rp.
6.13
Upah
PT
Pekerja
Tukang batu
Kepala tukang
Mandor
=
=
=
=
Pekerja
Mandor
Menimbun 1 m3 tanah
SNI 2835:2008 / 6.15a
Bahan Tanah timbun
1.2000 M
x Rp.
141,500.00
Jumlah (1)
= Rp.
= Rp.
169,800.00
169,800.00
0.2500 Oh
0.0250 Oh
x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
16,250.00
1,875.00
18,125.00
187,925.00
1.2000 M
x Rp.
82,400.00
Jumlah (1)
= Rp.
= Rp.
98,880.00
98,880.00
0.2500 Oh
0.0250 Oh
x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
6.15a
Upah
Pekerja
Mandor
Rp.
Rp.
Rp.
Rp.
16,250.00
1,875.00
18,125.00
117,005.00
15
SNI 2835:2008
PP
6.1.
Upah
PP
1.5000
0.7500
0.0750
0.0750
Oh
Oh
Oh
Oh
=
=
=
=
Rp.
Rp.
Rp.
Rp.
306,120.00
262,600.00
57,618.00
626,338.00
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
97,500.00
71,250.00
8,250.00
5,625.00
182,625.00
808,963.00
x Rp.
255,100.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
306,120.00
211,900.00
61,776.00
579,796.00
Pekerja
Tukang batu
Kepala tukang
Mandor
1.5000
0.7500
0.0750
0.0750
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
97,500.00
71,250.00
8,250.00
5,625.00
182,625.00
762,421.00
x Rp.
255,100.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
306,120.00
176,800.00
64,627.20
547,547.20
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
97,500.00
71,250.00
8,250.00
5,625.00
182,625.00
730,172.20
730,172.00
x Rp.
255,100.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
306,120.00
152,100.00
66,646.80
524,866.80
6.3.
Upah
PP
Pekerja
Tukang batu
Kepala tukang
Mandor
x Rp.
255,100.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
6.2.
Upah
PP
Pekerja
Tukang batu
Kepala tukang
Mandor
1.5000
0.7500
0.0750
0.0750
Oh
Oh
Oh
Oh
6.4.
16
Upah
PP
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
97,500.00
71,250.00
8,250.00
5,625.00
182,625.00
707,491.80
707,491.00
x Rp.
255,100.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
306,120.00
118,300.00
69,379.20
493,799.20
Pekerja
Tukang batu
Kepala tukang
Mandor
1.5000
0.7500
0.0750
0.0750
Oh
Oh
Oh
Oh
x
x
x
x
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
97,500.00
71,250.00
8,250.00
5,625.00
182,625.00
676,424.20
676,424.00
x Rp.
255,100.00
x Rp.
105,200.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
306,120.00
45,446.40
351,566.40
x
x
x
x
=
=
=
=
=
=
=
50,700.00
37,050.00
4,290.00
2,925.00
94,965.00
446,531.40
446,531.00
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan
6.9.
Upah
PP
1.5000
0.7500
0.0750
0.0750
6.5.
Upah
PP
Pekerja
Tukang batu
Kepala tukang
Mandor
Pekerja
Tukang batu
Kepala tukang
Mandor
0.7800
0.3900
0.0390
0.0390
Oh
Oh
Oh
Oh
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
6.10.
Memasang 1 M pondasi siklop, 60% beton camp. 1PC:2PB:3KR dan 40% batu belah/kali
SNI 2835:2008 / 6.10
Bahan Batu kali 15/20 cm
0.4800 M
x Rp.
255,100.00 = Rp.
Besi beton
126.0000 Kg
x Rp.
15,000.00 = Rp.
Semen PPC
194.0000 Kg
x Rp.
1,300.00 = Rp.
Pasir
0.3120 M
x Rp.
118,800.00 = Rp.
Kerikil
0.4680 M
x Rp.
300,400.00 = Rp.
Kawat beton
1.8000 Kg
x Rp.
18,700.00 = Rp.
Jumlah (1)
= Rp.
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
3.4000
0.8500
0.0850
0.1700
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
122,448.00
1,890,000.00
252,200.00
37,065.60
140,587.20
33,660.00
2,475,960.80
221,000.00
80,750.00
9,350.00
12,750.00
323,850.00
2,799,810.80
2,799,810.00
17
PP
6.11.
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
SNI 6897:2008
PD
PD
2.4000
0.8000
0.0800
0.1190
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
255,100.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
300,400.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
114,795.00
252,200.00
37,065.60
140,587.20
544,647.80
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
156,000.00
76,000.00
8,800.00
8,925.00
249,725.00
794,372.80
794,372.00
PEKERJAAN DINDING
6.1
camp. 1PC : 2 PP
Bh
Kg
M
x Rp.
500.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
70,000.00
56,550.00
9,504.00
136,054.00
Upah
Oh
Oh
Oh
Oh
x
x
x
x
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
39,000.00
19,000.00
2,200.00
2,250.00
62,450.00
198,504.00
198,504.00
Pekerja
Tukang batu
Kepala tukang
Mandor
0.6000
0.2000
0.0200
0.0300
6.2
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
camp. 1PC : 3 PP
Bh
Kg
M
x Rp.
500.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
70,000.00
42,835.00
10,810.80
123,645.80
Upah
Oh
Oh
Oh
Oh
x
x
x
x
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
39,000.00
19,000.00
2,200.00
2,250.00
62,450.00
186,095.80
186,095.00
Pekerja
Tukang batu
Kepala tukang
Mandor
0.6000
0.2000
0.0200
0.0300
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
18
PD
PD
6.4
camp. 1PC : 4 PP
Bh
Kg
M
x Rp.
500.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
70,000.00
34,515.00
11,048.40
115,563.40
Upah
Oh
Oh
Oh
Oh
x
x
x
x
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
39,000.00
19,000.00
2,200.00
2,250.00
62,450.00
178,013.40
178,013.00
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
Memasang 1m2 dinding bata merah tebal 1/2 bata, camp. 1PC : 2 PP
SNI 6897:2008 / 6.7
Bahan Bata merah
70.0000 Bh x Rp.
500.00
Semen PPC
18.9500 Kg x Rp.
1,300.00
Pasir pasang
0.0380 M x Rp.
118,800.00
Jumlah (1)
Pekerja
Tukang batu
Kepala tukang
Mandor
0.3000
0.1000
0.0100
0.0150
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
Memasang 1m2 dinding bata merah tebal 1/2 bata, camp. 1PC : 3 PP
SNI 6897:2008 / 6.8
Bahan Bata merah
70.0000 Bh x Rp.
500.00
Semen PPC
14.3700 Kg x Rp.
1,300.00
Pasir pasang
0.0400 M x Rp.
118,800.00
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
35,000.00
24,635.00
4,514.40
64,149.40
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
19,500.00
9,500.00
1,100.00
1,125.00
31,225.00
95,374.40
95,374.00
=
=
=
=
Rp
Rp
Rp
Rp
35,000.00
18,681.00
4,752.00
58,433.00
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
19,500.00
9,500.00
1,100.00
1,125.00
31,225.00
89,658.00
89,658.00
=
=
=
=
35,000.00
14,950.00
5,108.40
55,058.40
6.8.
Upah
PD
0.6000
0.2000
0.0200
0.0300
6.7.
Upah
PD
Pekerja
Tukang batu
Kepala tukang
Mandor
Pekerja
Tukang batu
Kepala tukang
Mandor
0.3000
0.1000
0.0100
0.0150
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
6.9.
Memasang 1m2 dinding bata merah tebal 1/2 bata, camp. 1PC : 4 PP
SNI 6897:2008 / 6.9
Bahan Bata merah
70.0000 Bh x Rp.
500.00
Semen PPC
11.5000 Kg x Rp.
1,300.00
Pasir pasang
0.0430 M x Rp.
118,800.00
Jumlah (1)
Rp
Rp
Rp
Rp
19
Upah
PD
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
19,500.00
9,500.00
1,100.00
1,125.00
31,225.00
86,283.40
86,283.00
x Rp.
3,600.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
54,000.00
7,475.00
2,376.00
63,851.00
Pekerja
Tukang batu
Kepala tukang
Mandor
0.3000
0.1000
0.0100
0.0150
Oh
Oh
Oh
Oh
x
x
x
x
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
= Rp
19,500.00
9,500.00
1,100.00
1,125.00
31,225.00
95,076.00
95,076.00
=
=
=
=
Rp
Rp
Rp
Rp
35,000.00
12,584.00
5,346.00
52,930.00
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
19,500.00
9,500.00
1,100.00
1,125.00
31,225.00
84,155.00
x Rp.
255,100.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
306,120.00
211,900.00
61,776.00
579,796.00
x
x
x
x
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
234,000.00
114,000.00
13,200.00
13,500.00
374,700.00
954,496.00
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
6.10
Memasang 1m2 dinding bata merah tebal 1/2 bata, camp. 1PC : 5 PP
SNI 6897:2008 / 6.10
Bahan Bata merah
70.0000 Bh x Rp.
500.00
Semen PPC
9.6800 Kg x Rp.
1,300.00
Pasir pasang
0.0450 M x Rp.
118,800.00
Jumlah (1)
Upah
PD
0.3000
0.1000
0.0100
0.0150
6.9.a
Upah
PD
Pekerja
Tukang batu
Kepala tukang
Mandor
Pekerja
Tukang batu
Kepala tukang
Mandor
0.3000
0.1000
0.0100
0.0150
Oh
Oh
Oh
Oh
x
x
x
x
6.30.
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
3.6000
1.2000
0.1200
0.1800
Oh
Oh
Oh
Oh
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
20
PD
7.10
3m3 - Pekerjaan pembangunan penempatan bronjong termasuk penyediaan batu dan kawat
Upah
a.
b.
Penganyam
Pekerja
Mandor
Pengisian dan penempatan
Pekerja
Mandor
Pekerjaan bronjong 1 m3
SNI 2837:2008
PPL
Rp
Rp
Rp
1,012,500.00
765,300.00
1,777,800.00
1.8000 Oh
0.0800 Oh
x Rp.
x Rp.
65,000.00
75,000.00
=
=
Rp
Rp
117,000.00
6,000.00
4.5000 Oh
0.0750 Oh
x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
Rp
Rp
Rp
Rp
292,500.00
5,625.00
421,125.00
2,198,925.00
0.3333
Rp.
Rp
732,975.00
732,975.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
20,155.20
1,900.80
22,056.00
x
x
x
x
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
19,500.00
14,250.00
1,650.00
1,125.00
36,525.00
58,581.00
58,581.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
13,291.20
2,376.00
15,667.20
x
x
x
x
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
19,500.00
14,250.00
1,650.00
1,125.00
36,525.00
52,192.20
52,192.00
= Rp.
= Rp.
= Rp.
10,108.80
2,732.40
12,841.20
2,198,925.00 =
Dibulatkan
=
Pekerja
Tukang batu
Kepala tukang
Mandor
0.3000
0.1500
0.0150
0.0150
Oh
Oh
Oh
Oh
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
6.2.
Upah
PPL
=
=
=
6.1.
Upah
PPL
x Rp.
22,500.00
x Rp.
255,100.00
Jumlah (1)
Pekerja
Tukang batu
Kepala tukang
Mandor
0.3000
0.1500
0.0150
0.0150
Oh
Oh
Oh
Oh
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
6.3.
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
21
Upah
PPL
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
19,500.00
14,250.00
1,650.00
1,125.00
36,525.00
49,366.20
49,366.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
8,112.00
2,851.20
10,963.20
Pekerja
Tukang batu
Kepala tukang
Mandor
0.3000
0.1500
0.0150
0.0150
Oh
Oh
Oh
Oh
x
x
x
x
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
19,500.00
14,250.00
1,650.00
1,125.00
36,525.00
47,488.20
47,488.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
17,721.60
3,207.60
20,929.20
x
x
x
x
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
26,000.00
19,000.00
2,200.00
1,650.00
48,850.00
69,779.20
69,779.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
13,478.40
3,682.80
17,161.20
x
x
x
x
=
=
=
=
=
=
=
26,000.00
19,000.00
2,200.00
1,650.00
48,850.00
66,011.20
66,011.00
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
6.13.
Upah
PPL
0.3000
0.1500
0.0150
0.0150
6.4.
Upah
PPL
Pekerja
Tukang batu
Kepala tukang
Mandor
Pekerja
Tukang batu
Kepala tukang
Mandor
0.4000
0.2000
0.0200
0.0220
Oh
Oh
Oh
Oh
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
6.14.
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.4000
0.2000
0.0200
0.0220
Oh
Oh
Oh
Oh
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
22
PPL
6.15.
Upah
PPL
Oh
Oh
Oh
Oh
10,816.00
3,801.60
14,617.60
x
x
x
x
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
26,000.00
19,000.00
2,200.00
1,650.00
48,850.00
63,467.60
63,467.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
8,985.60
4,158.00
13,143.60
x
x
x
x
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
26,000.00
19,000.00
2,200.00
1,650.00
48,850.00
61,993.60
61,993.00
5,616.00
712.80
6,328.80
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
Pekerja
Tukang batu
Kepala tukang
Mandor
0.4000
0.2000
0.0200
0.0220
Oh
Oh
Oh
Oh
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
6.23.
Upah
PPL
0.4000
0.2000
0.0200
0.0220
= Rp.
= Rp.
= Rp.
6.16.
Upah
PPL
Pekerja
Tukang batu
Kepala tukang
Mandor
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
Pekerja
Tukang batu
Kepala tukang
Mandor
4.3200 Kg
0.0060 M
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
0.3000
0.1000
0.0100
0.0150
x
x
x
x
=
=
=
=
=
=
=
Oh
Oh
Oh
Oh
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
19,500.00
9,500.00
1,100.00
1,125.00
31,225.00
37,553.80
37,553.00
= Rp.
= Rp.
= Rp.
8,242.00
1,425.60
9,667.60
6.26.
23
Upah
PPL
Pekerja
Tukang batu
Kepala tukang
Mandor
Memasang 1 m2 Acian
SNI 2837:2008 / 6.27
Bahan Semen PPC
0.3000
0.1500
0.0150
0.0150
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
19,500.00
14,250.00
1,650.00
1,125.00
36,525.00
46,192.60
46,192.00
4,225.00
4,225.00
6.27.
3.2500 Kg
x Rp.
1,300.00
Jumlah (1)
= Rp.
= Rp.
0.1000
0.0500
0.0050
0.0050
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
6,500.00
4,750.00
550.00
375.00
12,175.00
16,400.00
16,400.00
SNI 3434:2008
HARGA SATUAN PEKERJAAN KAYU
PK
6.1.
Membuat dan memasang 1m3 kusen pintu dan jendela, kayu kelas I:
SNI 3434:2008 / 6.1
Bahan Balok kayu
1.1000 M
x Rp. 10,370,400.00
Paku 10cm
1.2500 Kg
x Rp.
17,000.00
Lem Kayu
1.0000 Kg
x Rp.
40,000.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
11,407,440.00
21,250.00
40,000.00
11,468,690.00
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
455,000.00
1,995,000.00
231,000.00
26,250.00
2,707,250.00
14,175,940.00
Membuat dan memasang 1m3 kusen pintu dan jendela, kayu kelas II:
SNI 3434:2008 / 6.2
Bahan Balok Kayu
1.2000 M
x Rp.
6,814,800.00
Paku 10cm
1.2500 Kg
x Rp.
17,000.00
Lem Kayu
1.0000 Kg
x Rp.
40,000.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
8,177,760.00
21,250.00
40,000.00
8,239,010.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
390,000.00
1,710,000.00
198,000.00
22,500.00
2,320,500.00
10,559,510.00
Upah
Upah
PK
Pekerja
Tukang batu
Kepala tukang
Mandor
Pekerja
Tukang kayu
Kepala tukang
Mandor
7.0000
21.0000
2.1000
0.3500
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
6.2.
Upah
Pekerja
Tukang kayu
Kepala tukang
Mandor
6.0000
18.0000
1.8000
0.3000
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
24
PK
6.2a.
Membuat dan memasang 1m3 kusen pintu dan jendela, kayu kelas III:
SNI 3434:2008 / 6.2a
Bahan Balok Kayu
1.2000 M
x Rp.
5,000,000.00
Paku 10cm
1.2500 Kg
x Rp.
17,000.00
Lem Kayu
1.0000 Kg
x Rp.
40,000.00
Jumlah (1)
Upah
PK
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Membuat dan memasang 1m2 pintu klamp standar , kayu kelas II:
SNI 3434:2008 / 6.3
Bahan Papan Kayu
0.0400 M
x Rp.
7,037,000.00
Paku 5 cm - 7cm
0.0500 Kg
x Rp.
17,000.00
Jumlah (1)
6,000,000.00
21,250.00
40,000.00
6,061,250.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
390,000.00
1,710,000.00
198,000.00
22,500.00
2,320,500.00
8,381,750.00
= Rp.
= Rp.
= Rp.
281,480.00
850.00
282,330.00
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.3500
1.0500
0.1050
0.0180
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
22,750.00
99,750.00
11,550.00
1,350.00
135,400.00
417,730.00
= Rp.
= Rp.
= Rp.
200,000.00
850.00
200,850.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
22,750.00
99,750.00
11,550.00
1,350.00
135,400.00
336,250.00
= Rp.
= Rp.
281,480.00
20,000.00
301,480.00
=
=
=
=
=
=
65,000.00
285,000.00
33,000.00
3,750.00
386,750.00
688,230.00
6.4.
PK
6.0000
18.0000
1.8000
0.3000
Rp.
Rp.
Rp.
Rp.
6.3.
Upah
PK
Pekerja
Tukang kayu
Kepala tukang
Mandor
=
=
=
=
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.3500
1.0500
0.1050
0.0180
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
6.5.
Pekerja
Tukang kayu
Kepala tukang
Mandor
1.0000
3.0000
0.3000
0.0500
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
25
PK
6.5a
PK
PK
PK
Pekerja
Tukang kayu
Kepala tukang
Mandor
1.0000
3.0000
0.3000
0.0500
Oh
Oh
Oh
Oh
6.6.
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
= Rp.
= Rp.
= Rp.
200,000.00
20,000.00
220,000.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
65,000.00
285,000.00
33,000.00
3,750.00
386,750.00
606,750.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
168,888.00
84,500.00
32,000.00
285,388.00
Upah
x
x
x
x
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
52,000.00
228,000.00
26,400.00
3,000.00
309,400.00
594,788.00
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.8000
2.4000
0.2400
0.0400
Oh
Oh
Oh
Oh
6.6a.
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
120,000.00
84,500.00
32,000.00
236,500.00
Upah
x
x
x
x
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
52,000.00
228,000.00
26,400.00
3,000.00
309,400.00
545,900.00
= Rp.
= Rp.
= Rp.
450,368.00
20,000.00
470,368.00
=
=
=
=
=
=
65,000.00
285,000.00
33,000.00
3,750.00
386,750.00
857,118.00
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.8000
2.4000
0.2400
0.0400
Oh
Oh
Oh
Oh
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
6.7.
Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas II:
SNI 3434:2008 / 6.7
Bahan Papan Kayu
0.0640 M
x Rp.
7,037,000.00
Lem Kayu
0.5000 Kg
x Rp.
40,000.00
Jumlah (1)
Upah
Pekerja
Tukang kayu
Kepala tukang
Mandor
1.0000
3.0000
0.3000
0.0500
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26
PK
6.7a
Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas III:
SNI 3434:2008 / 6.7a
Bahan Papan Kayu
0.0640 M
x Rp.
5,000,000.00
Lem Kayu
0.5000 Kg
x Rp.
40,000.00
Jumlah (1)
Upah
PK
PK
PK
Pekerja
Tukang kayu
Kepala tukang
Mandor
1.0000
3.0000
0.3000
0.0500
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
= Rp.
= Rp.
= Rp.
320,000.00
20,000.00
340,000.00
=
=
=
=
=
=
65,000.00
285,000.00
33,000.00
3,750.00
386,750.00
726,750.00
6.8.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Membuat 1 m2 daun pintu plywood rangkap, rangka tertutup, kayu kelas II (lbr sd
SNI 3434:2008 / 6.8
Bahan Papan kayu
0.0250 M
x Rp.
7,037,000.00 =
Paku 1cm - 2,5cm
0.0300 Kg
x Rp.
17,000.00 =
Lem kayu
0.5000 Kg
x Rp.
40,000.00 =
Plywood tbl 4mm
1.0000 Lbr x Rp.
65,000.00 =
Jumlah (1)
=
90cm):
Rp.
Rp.
Rp.
Rp.
Rp.
175,925.00
510.00
20,000.00
65,000.00
261,435.00
Upah
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45,500.00
199,500.00
23,100.00
2,625.00
270,725.00
532,160.00
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.7000
2.1000
0.2100
0.0350
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
6.8a.
Membuat 1 m2 daun pintu plywood rangkap, rangka tertutup,kayu kelas III (lbr sd
SNI 3434:2008 / 6.8a
Bahan Papan kayu
0.0250 M
x Rp.
5,000,000.00 =
Paku 1cm - 2,5cm
0.0300 Kg
x Rp.
17,000.00 =
Lem kayu
0.5000 Kg
x Rp.
40,000.00 =
Plywood tbl 4mm
1.0000 Lbr x Rp.
65,000.00 =
Jumlah (1)
=
90cm):
Rp.
Rp.
Rp.
Rp.
Rp.
125,000.00
510.00
20,000.00
65,000.00
210,510.00
Upah
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
45,500.00
199,500.00
23,100.00
2,625.00
270,725.00
481,235.00
481,235.00
= Rp.
= Rp.
= Rp.
422,220.00
2,550.00
424,770.00
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.7000
2.1000
0.2100
0.0350
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan
=
=
=
=
=
=
=
6.10.
x Rp.
x Rp.
7,037,000.00
17,000.00
Jumlah (1)
27
Upah
PK
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
43,550.00
190,000.00
22,000.00
25,125.00
280,675.00
705,445.00
x Rp.
x Rp.
5,000,000.00
17,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
300,000.00
2,550.00
302,550.00
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
43,550.00
190,000.00
22,000.00
25,125.00
280,675.00
583,225.00
Oh
Oh
Oh
Oh
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
175,925.00
510.00
12,000.00
50,000.00
238,435.00
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
52,000.00
228,000.00
26,400.00
3,000.00
309,400.00
547,835.00
6.11a. Memasang 1m2 teakwood rangkap, rangka expose kayu kelas III:
SNI 3434:2008 / 6.11a
Bahan Papan kayu
0.0250 M
x Rp.
5,000,000.00
Paku 1cm - 2,5cm
0.0300 Kg
x Rp.
17,000.00
Lem kayu
0.3000 Lt
x Rp.
40,000.00
Teakwood (120 x 240 x 3 mm)
1.0000 Lbr x Rp.
50,000.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
125,000.00
510.00
12,000.00
50,000.00
187,510.00
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
52,000.00
228,000.00
26,400.00
3,000.00
309,400.00
496,910.00
496,910.00
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.6700
2.0000
0.2000
0.3350
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
6.11.
Upah
PK
0.6700
2.0000
0.2000
0.3350
Upah
PK
Pekerja
Tukang kayu
Kepala tukang
Mandor
Upah
Pekerja
Tukang kayu
Kepala tukang
Mandor
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.8000
2.4000
0.2400
0.0400
0.8000
2.4000
0.2400
0.0400
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan
28
PK
6.13.
=
=
=
=
Rp.
Rp.
Rp.
Rp.
11,407,440.00
258,750.00
95,200.00
11,761,390.00
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
260,000.00
1,140,000.00
132,000.00
15,000.00
1,547,000.00
13,308,390.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
7,496,280.00
258,750.00
95,200.00
7,850,230.00
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
260,000.00
1,140,000.00
132,000.00
15,000.00
1,547,000.00
9,397,230.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
5,500,000.00
258,750.00
95,200.00
5,853,950.00
Upah
PK
Upah
PK
4.0000
12.0000
1.2000
0.2000
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
6.13a
Upah
PK
Pekerja
Tukang kayu
Kepala tukang
Mandor
Pekerja
Tukang kayu
Kepala tukang
Mandor
Pekerja
Tukang kayu
Kepala tukang
Mandor
4.0000
12.0000
1.2000
0.2000
4.0000
12.0000
1.2000
0.2000
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
260,000.00
1,140,000.00
132,000.00
15,000.00
1,547,000.00
7,400,950.00
x Rp.
x Rp.
10,370,400.00
17,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
11,407,440.00
51,000.00
11,458,440.00
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
156,000.00
684,000.00
79,200.00
9,000.00
928,200.00
12,386,640.00
6.15.
Upah
Pekerja
Tukang kayu
Kepala tukang
Mandor
2.4000
7.2000
0.7200
0.1200
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
29
PK
6.15a
Upah
PK
Oh
Oh
Oh
Oh
= Rp.
= Rp.
= Rp.
7,496,280.00
51,000.00
7,547,280.00
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
156,000.00
684,000.00
79,200.00
9,000.00
928,200.00
8,475,480.00
10,370,400.00
10,370,400.00
17,000.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
145,185.60
37,333.44
4,250.00
186,769.04
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
6,500.00
9,500.00
1,100.00
375.00
17,475.00
204,244.04
204,244.00
6,814,800.00
6,814,800.00
17,000.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
95,407.20
24,533.28
4,250.00
124,190.48
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
6,500.00
9,500.00
1,100.00
375.00
17,475.00
141,665.48
141,665.00
6,814,800.00
6,814,800.00
17,000.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
95,407.20
49,066.56
4,250.00
148,723.76
Rp.
Rp.
Rp.
Rp.
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.1000
0.1000
0.0100
0.0050
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Upah
PK
2.4000
7.2000
0.7200
0.1200
6,814,800.00
17,000.00
Jumlah (1)
6.16.
Upah
PK
Pekerja
Tukang kayu
Kepala tukang
Mandor
x Rp.
x Rp.
6.17.
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.1000
0.1000
0.0100
0.0050
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
m2 :
x Rp.
x Rp.
x Rp.
30
Upah
PK
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
6,500.00
9,500.00
1,100.00
375.00
17,475.00
166,198.76
166,198.00
x Rp.
x Rp.
6,814,800.00
17,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
1,124,442.00
3,400.00
1,127,842.00
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.1200
0.1200
0.0120
0.0060
Oh
Oh
Oh
Oh
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,800.00
11,400.00
1,320.00
450.00
20,970.00
1,148,812.00
= Rp.
= Rp.
= Rp.
77,000.00
3,400.00
80,400.00
Rp.
Rp.
Rp.
Rp.
6.19.
0.1500
0.3000
0.0300
0.0750
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
9,750.00
28,500.00
3,300.00
5,625.00
47,175.00
127,575.00
127,575.00
= Rp.
= Rp.
= Rp.
81,500.00
4,250.00
85,750.00
6.20.
Upah
PK
Oh
Oh
Oh
Oh
Upah
PK
0.1000
0.1000
0.0100
0.0050
6.18.
Upah
PK
Pekerja
Tukang kayu
Kepala tukang
Mandor
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.2000
0.3000
0.0300
0.0100
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
13,000.00
28,500.00
3,300.00
750.00
45,550.00
131,300.00
131,300.00
7,037,000.00
17,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
50,666.40
1,700.00
52,366.40
6.21.
31
Upah
PK
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.1000
0.2000
0.0200
0.0050
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
6,500.00
19,000.00
2,200.00
375.00
28,075.00
80,441.40
80,441.00
5,000,000.00
17,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
36,000.00
1,700.00
37,700.00
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
6,500.00
19,000.00
2,200.00
375.00
28,075.00
65,775.00
65,775.00
7,037,000.00
17,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
77,407.00
850.00
78,257.00
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
6.22.
Upah
PK
0.1000
0.2000
0.0200
0.0050
6.21a. Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas III :
SNI 3434:2008 / 6.21a
Bahan Papan Kayu
0.0072 M
x Rp.
Paku 5cm dan 7cm
0.1000 Kg
x Rp.
Upah
PK
Pekerja
Tukang kayu
Kepala tukang
Mandor
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.1000
0.2000
0.0200
0.0050
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,500.00
19,000.00
2,200.00
375.00
28,075.00
106,332.00
= Rp.
= Rp.
= Rp.
140,000.00
2,550.00
142,550.00
=
=
=
=
=
=
9,750.00
42,750.00
4,950.00
600.00
58,050.00
200,600.00
6.23.
Upah
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.1500
0.4500
0.0450
0.0080
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
32
PK
6.25.
PK
Oh
Oh
Oh
Oh
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13,000.00
57,000.00
6,600.00
750.00
77,350.00
298,200.00
x Rp.
x Rp.
65,000.00
17,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
26,000.00
850.00
26,850.00
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,625.00
7,125.00
880.00
75.00
9,705.00
36,555.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
14,000.00
5,000,000.00
17,000.00
5,000,000.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
21,000.00
70,000.00
204.00
15,000.00
106,204.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
6,500.00
4,750.00
550.00
375.00
12,175.00
118,379.00
118,379.00
= Rp.
= Rp.
= Rp.
60,000.00
1,700.00
61,700.00
x
x
x
x
140,000.00
2,550.00
22,400.00
55,900.00
220,850.00
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
6.27.
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.0250
0.0750
0.0080
0.0010
6.28.
Upah
PK
0.2000
0.6000
0.0600
0.0100
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Upah
PK
Pekerja
Tukang kayu
Kepala tukang
Mandor
=
=
=
=
=
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.1000
0.0500
0.0050
0.0050
Oh
Oh
Oh
Oh
6.38.
33
Upah
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.1500
0.2500
0.0250
0.0750
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,750.00
23,750.00
2,750.00
5,625.00
41,875.00
103,575.00
Rp.
Rp.
Rp.
Rp.
Rp.
321,100.00
82,555.00
222,777.00
7,525.00
633,957.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
104,000.00
26,125.00
3,080.00
6,225.00
139,430.00
773,387.00
Rp.
Rp.
Rp.
Rp.
Rp.
358,800.00
78,660.00
225,676.00
7,525.00
670,661.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
104,000.00
26,125.00
3,080.00
6,225.00
139,430.00
810,091.00
Rp.
Rp.
Rp.
Rp.
Rp.
388,700.00
75,905.00
226,791.00
7,525.00
698,921.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
107,250.00
26,125.00
3,080.00
6,225.00
142,680.00
841,601.00
SNI 7394:2008
PEKERJAAN BETON
catatan :
Bobot isi pasir = 1.400kg/m3, Bobot isi kerikil = 1.350 kg/m3, bukling factor = 20%
PB
6.1.
Membuat 1 m3 beton mutu fc = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87
SNI 7394:2008 / 6.1
Bahan Semen PPC
247.0000 Kg
x Rp.
1,300.00 =
Pasir
869.0000 Kg
x Rp.
95.00 =
Kerikil (maksimum 3 mm)
999.0000 Kg
x Rp.
223.00 =
Air
215.0000 Ltr
x Rp.
35.00 =
Jumlah (1)
=
Upah
PB
1.6000
0.2750
0.0280
0.0830
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
6.2.
Membuat 1 m3 beton mutu fc = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78
SNI 7394:2008 / 6.2
Bahan Semen PPC
276.0000 Kg
x Rp.
1,300.00 =
Pasir
828.0000 Kg
x Rp.
95.00 =
Kerikil (maksimum 3 mm)
1012.0000 Kg
x Rp.
223.00 =
Air
215.0000 Ltr
x Rp.
35.00 =
Jumlah (1)
=
Upah
PB
Pekerja
Tukang batu
Kepala tukang
Mandor
Pekerja
Tukang batu
Kepala tukang
Mandor
1.6000
0.2750
0.0280
0.0830
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
6.3.
Membuat 1 m3 beton mutu fc = 12,2 MPa (K 150), slump (C1216) cm, w/c = 0,72
SNI 7394:2008 / 6.3
Bahan Semen PPC
299.0000 Kg
x Rp.
1,300.00 =
Pasir
799.0000 Kg
x Rp.
95.00 =
Kerikil (maksimum 3 mm)
1017.0000 Kg
x Rp.
223.00 =
Air
215.0000 Ltr
x Rp.
35.00 =
Jumlah (1)
=
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
1.6500
0.2750
0.0280
0.0830
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
34
PB
PB
6.4.
x
x
x
x
Rp.
Rp.
Rp.
Rp.
1,300.00
95.00
223.00
35.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
299,000.00
84,835.00
229,021.00
7,000.00
619,856.00
Upah
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
78,000.00
19,000.00
2,200.00
4,500.00
103,700.00
723,556.00
Membuat 1 m3 beton mutu fc = 14,5 MPa (K 175), slump (12 2)cm, w/c = 0,66
SNI 7394:2008 / 6.5
Bahan Semen PPC
326.0000 Kg
x Rp.
1,300.00 = Rp.
Pasir
760.0000 Kg
x Rp.
95.00 = Rp.
Kerikil (maksimum 3 mm)
1029.0000 Kg
x Rp.
223.00 = Rp.
Air
215.0000 Ltr
x Rp.
35.00 = Rp.
Jumlah (1)
= Rp.
423,800.00
72,200.00
229,467.00
7,525.00
732,992.00
Pekerja
Tukang batu
Kepala tukang
Mandor
1.6500
0.2750
0.0280
0.0830
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
107,250.00
26,125.00
3,080.00
6,225.00
142,680.00
875,672.00
6.5.a
Membuat dan menghampar 1 m3 mutu beton fc = 14,5 MPa (K 175), slump (122)cm, w/c=0,66
SNI 7394:2008, ABKPU2005-6.35 / 6.5a
Bahan Semen PPC
326.0000 Kg
x Rp.
1,300.00 = Rp.
423,800.00
Pasir
760.0000 Kg
x Rp.
95.00 = Rp.
72,200.00
Kerikil (maksimum 3 mm)
1029.0000 Kg
x Rp.
223.00 = Rp.
229,467.00
Air
215.0000 Ltr
x Rp.
35.00 = Rp.
7,525.00
Jumlah (1)
732,992.00
Upah
PB
1.2000
0.2000
0.0200
0.0600
6.5.
Upah
PB
Pekerja
Tukang batu
Kepala tukang
Mandor
Pekerja
Tukang batu
Kepala tukang
Mandor
4.9500
0.8250
0.0840
0.2490
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
321,750.00
78,375.00
9,240.00
18,675.00
428,040.00
1,161,032.00
Membuat 1 m3 beton mutu fc = 16,9 MPa (K 200), slump (12 2)cm, w/c = 0,61
SNI 7394:2008 / 6.6
Bahan Semen PPC
352.0000 Kg
x Rp.
1,300.00 = Rp.
Pasir
731.0000 Kg
x Rp.
95.00 = Rp.
Kerikil (maksimum 3 mm)
1031.0000 Kg
x Rp.
223.00 = Rp.
Air
215.0000 Ltr
x Rp.
35.00 = Rp.
Jumlah (1)
= Rp.
457,600.00
69,445.00
229,913.00
7,525.00
764,483.00
6.6.
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
1.6500
0.2750
0.0280
0.0830
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
107,250.00
26,125.00
3,080.00
6,225.00
142,680.00
907,163.00
35
PB
6.7.
Membuat 1 m3 beton mutu fc = 19,3 MPa (K 225), slump (12 2)cm, w/c = 0,58
SNI 7394:2008 / 6.7
Bahan Semen PPC
371.0000 Kg
x Rp.
1,300.00 = Rp.
Pasir
698.0000 Kg
x Rp.
95.00 = Rp.
Kerikil (maksimum 3 mm)
1047.0000 Kg
x Rp.
223.00 = Rp.
Air
215.0000 Ltr
x Rp.
35.00 = Rp.
Jumlah (1)
= Rp.
Upah
PB
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Membuat 1 m3 beton mutu fc = 21,7 MPa (K 250), slump (12 2) cm, w/c =
SNI 7394:2008 / 6.8
Bahan Semen PPC
384.0000 Kg
x Rp.
1,300.00
Pasir
692.0000 Kg
x Rp.
95.00
Kerikil (maksimum 3 mm)
1039.0000 Kg
x Rp.
223.00
Air
215.0000 Ltr
x Rp.
35.00
Jumlah (1)
Pekerja
Tukang batu
Kepala tukang
Mandor
1.6500
0.2750
0.0280
0.0830
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
107,250.00
26,125.00
3,080.00
6,225.00
142,680.00
932,296.00
0,56
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
499,200.00
65,740.00
231,697.00
7,525.00
804,162.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
107,250.00
26,125.00
3,080.00
6,225.00
142,680.00
946,842.00
Rp.
Rp.
Rp.
Rp.
Rp.
527,800.00
64,980.00
228,798.00
7,525.00
829,103.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
107,250.00
26,125.00
3,080.00
6,225.00
142,680.00
971,783.00
6.9.
Membuat 1 m3 beton mutu fc = 24, MPa (K 275), slump (12 2) cm, w/c = 0,53
SNI 7394:2008 / 6.9
Bahan Semen PPC
406.0000 Kg
x Rp.
1,300.00 =
Pasir
684.0000 Kg
x Rp.
95.00 =
Kerikil (maksimum 3 mm)
1026.0000 Kg
x Rp.
223.00 =
Air
215.0000 Ltr
x Rp.
35.00 =
Jumlah (1)
=
Upah
PB
1.6500
0.2750
0.0280
0.0830
6.8.
Upah
PB
Pekerja
Tukang batu
Kepala tukang
Mandor
482,300.00
66,310.00
233,481.00
7,525.00
789,616.00
Pekerja
Tukang batu
Kepala tukang
Mandor
1.6500
0.2750
0.0280
0.0830
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
6.10.
Membuat 1 m3 beton mutu fc = 26,4 MPa (K 300), slump (12 2) cm, w/c =
SNI 7394:2008 / 6.10
Bahan Semen PPC
413.0000 Kg
x Rp.
1,300.00
Pasir
681.0000 Kg
x Rp.
95.00
Kerikil (maksimum 3 mm)
1021.0000 Kg
x Rp.
223.00
Air
215.0000 Ltr
x Rp.
35.00
Jumlah (1)
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
1.6500
0.2750
0.0280
0.0830
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
0,52
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
536,900.00
64,695.00
227,683.00
7,525.00
836,803.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
107,250.00
26,125.00
3,080.00
6,225.00
142,680.00
979,483.00
36
PB
6.11.
Membuat 1 m3 beton mutu fc = 28,8 MPa (K 325), slump (12 2) cm, w/c =
SNI 7394:2008 / 6.11
Bahan Semen PPC
439.0000 Kg
x Rp.
1,300.00
Pasir
670.0000 Kg
x Rp.
95.00
Kerikil (maksimum 3 mm)
1006.0000 Kg
x Rp.
223.00
Air
215.0000 Ltr
x Rp.
35.00
Jumlah (1)
Upah
PB
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Membuat 1 m3 beton mutu fc = 31,2 MPa (K 350), slump (12 2) cm, w/c =
SNI 7394:2008 / 6.12
Bahan Semen PPC
448.0000 Kg
x Rp.
1,300.00
Pasir
667.0000 Kg
x Rp.
95.00
Kerikil (maksimum 3 mm)
1000.0000 Kg
x Rp.
223.00
Air
215.0000 Ltr
x Rp.
35.00
Jumlah (1)
Pekerja
Tukang batu
Kepala tukang
Mandor
2.1000
0.3500
0.0350
0.1050
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
570,700.00
63,650.00
224,338.00
7,525.00
866,213.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
136,500.00
33,250.00
3,850.00
7,875.00
181,475.00
1,047,688.00
0,48
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
582,400.00
63,365.00
223,000.00
7,525.00
876,290.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
136,500.00
33,250.00
3,850.00
7,875.00
181,475.00
1,057,765.00
6.17
Upah
PB
2.1000
0.3500
0.0350
0.1050
6.12.
Upah
PB
Pekerja
Tukang batu
Kepala tukang
Mandor
0,49
10.5000 Kg
0.1500 Kg
Pekerja
Tukang besi
Kepala tukang
Mandor
0.0700
0.0700
0.0070
0.0040
0.1000
Oh
Oh
Oh
Oh
x Rp.
x Rp.
15,000.00 =
18,700.00 =
Jumlah (1)
=
Rp.
Rp.
Rp.
157,500.00
2,805.00
160,305.00
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
172,575.00
Dibulatkan
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
4,550.00
6,650.00
770.00
300.00
12,270.00
172,575.00
17,257.50
17,257.00
3,833,300.00
17,000.00
6,300.00
Jumlah (1)
x Rp.
159,062.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
153,332.00
5,100.00
630.00
159,062.00
79,531.00
Rp.
Rp.
Rp.
Rp.
6.20.
0.5000
x Rp.
x Rp.
x Rp.
37
Upah
PB
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
33,800.00
24,700.00
2,860.00
1,950.00
63,310.00
142,841.00
0.0450 M
0.3000 Kg
0.1000 Ltr
3,833,300.00
17,000.00
6,300.00
Jumlah (1)
x Rp.
178,228.50
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
172,498.50
5,100.00
630.00
178,228.50
89,114.25
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
33,800.00
24,700.00
2,860.00
1,950.00
63,310.00
152,424.25
152,424.00
x Rp.
x Rp.
x Rp.
0.5000
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.5200
0.2600
0.0260
0.0260
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.0400
0.4000
0.2000
0.0150
0.3500
2.0000
M
Kg
Ltr
M
Lbr
Btg
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,833,300.00
17,000.00
6,300.00
3,833,300.00
135,000.00
52,000.00
Jumlah (1)
x Rp.
370,141.50
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
153,332.00
6,800.00
1,260.00
57,499.50
47,250.00
104,000.00
370,141.50
185,070.75
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah total
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
42,900.00
31,350.00
3,630.00
2,475.00
80,355.00
265,425.75
265,425.00
3,833,300.00
17,000.00
6,300.00
3,833,300.00
135,000.00
52,000.00
Jumlah (1)
x Rp.
381,641.40
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
153,332.00
6,800.00
1,260.00
68,999.40
47,250.00
104,000.00
381,641.40
190,820.70
6.22.
Upah
PB
0.5200
0.2600
0.0260
0.0260
6.21.
Upah
PB
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.5000
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.6600
0.3300
0.0330
0.0330
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.0400
0.4000
0.2000
0.0180
0.3500
2.0000
M
Kg
Ltr
M
Lbr
Btg
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6.23.
0.5000
38
Upah
PB
0.6600
0.3300
0.0330
0.0330
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah total
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
42,900.00
31,350.00
3,630.00
2,475.00
80,355.00
271,175.70
271,175.00
M
Kg
Ltr
M
Lbr
Btg
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,833,300.00
17,000.00
6,300.00
3,833,300.00
135,000.00
52,000.00
Jumlah (1)
x Rp.
578,141.50
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
153,332.00
6,800.00
1,260.00
57,499.50
47,250.00
312,000.00
578,141.50
289,070.75
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah total
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
42,900.00
31,350.00
3,630.00
2,475.00
80,355.00
369,425.75
369,425.00
6.24.
0.5000
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.6600
0.3300
0.0330
0.0330
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.0300
0.4000
0.2000
0.0200
0.3500
3.0000
4.0000
M
Kg
Ltr
M
Lbr
Btg
Btg
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
0.5000
3,833,300.00
17,000.00
6,300.00
3,833,300.00
135,000.00
52,000.00
52,000.00
Jumlah (1)
x Rp.
610,975.00
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
114,999.00
6,800.00
1,260.00
76,666.00
47,250.00
156,000.00
208,000.00
610,975.00
305,487.50
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.6600
0.3300
0.0330
0.0330
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
42,900.00
31,350.00
3,630.00
2,475.00
80,355.00
385,842.50
385,842.00
Upah
PB
Pekerja
Tukang kayu
Kepala tukang
Mandor
6.25.
Upah
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah total
Dibulatkan
39
PB
6.26.
0.0300
0.4000
0.1500
0.0150
0.3500
2.0000
M
Kg
Ltr
M
Lbr
Btg
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,833,300.00
17,000.00
6,300.00
3,833,300.00
135,000.00
52,000.00
Jumlah (1)
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
114,999.00
6,800.00
945.00
57,499.50
47,250.00
104,000.00
331,493.50
0.6600
0.3300
0.0330
0.0330
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah total
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
42,900.00
31,350.00
3,630.00
2,475.00
80,355.00
411,848.50
411,848.00
x Rp.
x Rp.
x Rp.
3,833,300.00
17,000.00
52,000.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
101,199.12
10,200.00
26,000.00
137,399.12
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
9,750.00
4,750.00
550.00
600.00
15,650.00
153,049.12
153,049.00
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
766,660.00
25,500.00
2,520.00
2,362,500.00
42,075.00
436,800.00
71,496.00
243,324.00
3,950,875.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
344,500.00
26,125.00
123,500.00
99,750.00
29,150.00
19,875.00
642,900.00
4,593,775.00
Upah
PB
6.27.
Upah
PB
Pekerja
Tukang kayu
Kepala tukang
Mandor
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.1500
0.0500
0.0050
0.0080
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
6.28.
Upah
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
5.3000
0.2750
1.3000
1.0500
0.2650
0.2650
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
95,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
40
PB
6.29.
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,034,991.00
34,000.00
3,780.00
3,150,000.00
56,100.00
436,800.00
71,496.00
243,324.00
5,030,491.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
367,250.00
26,125.00
148,200.00
133,000.00
35,530.00
21,225.00
731,330.00
5,761,821.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,533,320.00
68,000.00
12,600.00
4,725,000.00
84,150.00
436,800.00
71,496.00
243,324.00
574,995.00
472,500.00
1,040,000.00
9,262,185.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
458,250.00
26,125.00
156,750.00
199,500.00
44,330.00
26,475.00
911,430.00
10,173,615.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,226,656.00
54,400.00
10,080.00
3,150,000.00
56,100.00
436,800.00
71,496.00
Upah
PB
5.6500
0.2750
1.5600
1.4000
0.3230
0.2830
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
95,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
6.30.
Upah
PB
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
7.0500
0.2750
1.6500
2.1000
0.4030
0.3530
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
95,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
6.31.
41
Kerikil
Kayu sembarang balok
Plywood 9 mm
Kayu Dolken/Laut 3'-4'/4 m
Upah
PB
M
M
Lbr
Btg
x
x
x
x
Rp.
Rp.
Rp.
Rp.
300,400.00
3,833,300.00
135,000.00
52,000.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
243,324.00
536,662.00
378,000.00
832,000.00
6,995,518.00
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
95,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
412,750.00
26,125.00
156,750.00
133,000.00
36,630.00
23,850.00
789,105.00
7,784,623.00
3,833,300.00
17,000.00
6,300.00
15,000.00
18,700.00
1,300.00
132,400.00
300,400.00
3,833,300.00
135,000.00
52,000.00
Jumlah (1)
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,226,656.00
54,400.00
10,080.00
2,362,500.00
42,075.00
436,800.00
71,496.00
243,324.00
459,996.00
378,000.00
1,664,000.00
6,949,327.00
65,000.00
95,000.00
95,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
344,500.00
26,125.00
123,500.00
99,750.00
29,150.00
19,875.00
642,900.00
7,592,227.00
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
919,992.00
54,400.00
10,080.00
2,362,500.00
42,075.00
436,800.00
71,496.00
243,324.00
613,328.00
378,000.00
1,248,000.00
6,379,995.00
6.32.
Upah
PB
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
0.8100
0.1400
2.8000
16.0000
6.33.
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
5.3000
0.2750
1.3000
1.0500
0.2650
0.2650
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
bekisting)
x
x
x
x
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,833,300.00
17,000.00
6,300.00
15,000.00
18,700.00
1,300.00
132,400.00
300,400.00
3,833,300.00
135,000.00
52,000.00
Jumlah (1)
42
Upah
PB
PB
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
5.3000
0.2750
1.3000
1.0500
0.2650
0.2650
Oh
Oh
Oh
Oh
Oh
Oh
6.34.
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
95,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
344,500.00
26,125.00
123,500.00
99,750.00
29,150.00
19,875.00
642,900.00
7,022,895.00
bekisting)
x
x
x
x
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,833,300.00
17,000.00
6,300.00
15,000.00
18,700.00
1,300.00
132,400.00
300,400.00
3,833,300.00
135,000.00
52,000.00
Jumlah (1)
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
958,325.00
51,000.00
7,560.00
3,150,000.00
56,100.00
436,800.00
71,496.00
243,324.00
402,496.50
337,500.00
728,000.00
6,442,601.50
Upah
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
95,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
367,250.00
26,125.00
148,200.00
133,000.00
35,530.00
21,225.00
731,330.00
7,173,931.50
7,173,931.00
3,833,300.00
17,000.00
15,000.00
18,700.00
1,300.00
118,800.00
300,400.00
Jumlah (1)
65,000.00
95,000.00
95,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
7,666.60
170.00
45,000.00
841.50
5,200.00
712.80
2,703.60
62,294.50
11,700.00
1,900.00
1,900.00
1,900.00
660.00
675.00
18,735.00
81,029.50
81,029.00
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
5.6500
0.2750
1.5600
1.4000
0.3230
0.2830
Oh
Oh
Oh
Oh
Oh
Oh
6.35.
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
0.1800
0.0200
0.0200
0.0200
0.0060
0.0090
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
43
PB
6.36.
(10 x 15) cm
0.0030
0.0200
3.6000
0.0500
5.5000
0.0090
0.0150
M
Kg
Kg
Kg
Kg
M
M
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Upah
0.2970
0.0330
0.0330
0.0330
0.0100
0.0150
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Supl. BSl
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
11,499.90
340.00
54,000.00
935.00
7,150.00
1,069.20
4,506.00
79,500.10
19,305.00
3,135.00
3,135.00
3,135.00
1,100.00
1,125.00
30,935.00
110,435.10
110,435.00
2
0.4000 M
5.0340 Kg
0.0400 M
x Rp.
x Rp.
x Rp.
89,114.25
16,030.50
751,620.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
35,645.70
80,697.54
30,064.80
146,408.04
Upah
2
0.4000 M
5.0340 Kg
0.0400 M
x Rp.
x Rp.
x Rp.
63,310.00
1,227.00
139,750.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
25,324.00
6,176.72
5,590.00
37,090.72
183,498.76
183,498.00
2
1.5500 M
12.5500 Kg
0.1570 M
x Rp.
x Rp.
x Rp.
185,070.75
16,030.50
751,620.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
286,859.66
201,182.78
118,004.34
606,046.78
Upah
2
1.5500 M
12.5500 Kg
0.1570 M
x Rp.
x Rp.
x Rp.
80,355.00
1,227.00
139,750.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
124,550.25
15,398.85
21,940.75
161,889.85
767,936.63
767,936.00
x Rp.
x Rp.
x Rp.
1,300.00
132,400.00
300,400.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
283,400.00
68,848.00
261,348.00
613,596.00
Supl. BKl
PB
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
3,833,300.00
17,000.00
15,000.00
18,700.00
1,300.00
118,800.00
300,400.00
Jumlah (1)
65,000.00
95,000.00
95,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
Bekisting/mal sloof
Besi beton
Beton camp. 1:2:3
7.1.
44
Upah
PB
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
107,250.00
23,750.00
2,750.00
6,000.00
139,750.00
753,346.00
x Rp.
x Rp.
x Rp.
1,300.00
132,400.00
300,400.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
256,100.00
62,228.00
282,376.00
600,704.00
Pekerja
Tukang batu
Kepala tukang
Mandor
1.6500
0.2500
0.0250
0.0800
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
107,250.00
23,750.00
2,750.00
6,000.00
139,750.00
740,454.00
x Rp.
x Rp.
x Rp.
1,300.00
132,400.00
300,400.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
364,000.00
71,496.00
270,360.00
705,856.00
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
107,250.00
23,750.00
2,750.00
6,000.00
139,750.00
845,606.00
7.6.
Upah
PB
1.6500
0.2500
0.0250
0.0800
7.2.
Upah
PB
Pekerja
Tukang batu
Kepala tukang
Mandor
Pekerja
Tukang batu
Kepala tukang
Mandor
1.6500
0.2500
0.0250
0.0800
Oh
Oh
Oh
Oh
7.6a.
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
3.3000
0.5000
0.0500
0.1600
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
2 Ps : 4 Kr
x Rp.
x Rp.
x Rp.
1,300.00
132,400.00
300,400.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
364,000.00
71,496.00
270,360.00
705,856.00
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
214,500.00
47,500.00
5,500.00
12,000.00
279,500.00
985,356.00
Rp.
Rp.
Rp.
Rp.
45
PB
7.13.
Upah
PB
Pekerja
Tukang batu
Kepala tukang
Mandor
1.6500
0.2500
0.0250
0.0800
Oh
Oh
Oh
Oh
7.13a
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
SNI 03-3436-1994
4.9500
0.7500
0.0750
0.2400
Oh
Oh
Oh
Oh
x Rp.
x Rp.
x Rp.
1,300.00
132,400.00
300,400.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
436,800.00
71,496.00
243,324.00
751,620.00
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
107,250.00
23,750.00
2,750.00
6,000.00
139,750.00
891,370.00
Rp.
Rp.
Rp.
Rp.
2 Ps : 3 Kr
x Rp.
x Rp.
x Rp.
1,300.00
132,400.00
300,400.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
436,800.00
71,496.00
243,324.00
751,620.00
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
321,750.00
71,250.00
8,250.00
18,000.00
419,250.00
1,170,870.00
= Rp.
= Rp.
= Rp.
19,380.00
3,000.00
22,380.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,100.00
6,365.00
770.00
525.00
16,760.00
39,140.00
= Rp.
= Rp.
= Rp.
25,500.00
3,000.00
28,500.00
Rp.
Rp.
Rp.
Rp.
PPA 6.15
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1400
0.0670
0.0070
0.0070
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
PPA 6.15a
46
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1400
0.0670
0.0070
0.0070
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,100.00
6,365.00
770.00
525.00
16,760.00
45,260.00
= Rp.
= Rp.
= Rp.
60,000.00
2,100.00
62,100.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,460.00
11,875.00
1,430.00
300.00
19,065.00
81,165.00
PPA 6.22
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0840
0.1250
0.0130
0.0040
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
1.1000
6.0000
Bh
Bh
x Rp.
38,000.00
x Rp.
350.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
41,800.00
2,100.00
43,900.00
0.0840
0.1250
0.0130
0.0040
Oh
Oh
Oh
Oh
x
x
x
x
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,460.00
11,875.00
1,430.00
300.00
19,065.00
62,965.00
11.0000
0.0300
Bh
Kg
x Rp.
6,000.00
x Rp.
17,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
66,000.00
510.00
66,510.00
0.2000
0.1000
0.0100
0.0100
Oh
Oh
Oh
Oh
x
x
x
x
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13,000.00
9,500.00
1,100.00
750.00
24,350.00
90,860.00
11.0000
0.0300
Bh
Kg
x Rp.
20,000.00
x Rp.
17,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
220,000.00
510.00
220,510.00
PPA 6.29a
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
PPA 6.30
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
PPA 6.30a
47
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.2000
0.1000
0.0100
0.0100
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13,000.00
9,500.00
1,100.00
750.00
24,350.00
244,860.00
= Rp.
= Rp.
= Rp.
66,300.00
3,400.00
69,700.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13,000.00
9,500.00
1,100.00
75.00
23,675.00
93,375.00
PPA 6.32
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.2000
0.1000
0.0100
0.0010
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
60.0000
0.2000
Bh
Kg
x Rp.
940.00
x Rp.
17,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
56,400.00
3,400.00
59,800.00
0.1660
0.2500
0.0250
0.0080
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,790.00
23,750.00
2,750.00
600.00
37,890.00
97,690.00
3.5000
0.0500
10.8000
0.0320
1.0000
Bh
Kg
Kg
M
Kg
x
x
x
x
x
Rp.
12,200.00
Rp.
17,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
42,700.00
850.00
14,040.00
3,801.60
2,250.00
63,641.60
0.4000
0.2000
0.0200
0.0200
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
19,000.00
2,200.00
1,500.00
48,700.00
112,341.60
Dibulatkan
= Rp
112,341.00
= Rp.
= Rp.
122,500.00
850.00
PPA 6.33
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
PPA 6.34
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
PPA 6.34a
3.5000
0.0500
Bh
Kg
x Rp.
x Rp.
35,000.00
17,000.00
48
Upah
Semen PC
Pasir pasang
Semen warna
10.8000
0.0320
1.0000
Kg
M
Kg
x Rp.
1,300.00
x Rp.
118,800.00
x Rp.
2,250.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
14,040.00
3,801.60
2,250.00
143,441.60
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.4000
0.2000
0.0200
0.0200
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
19,000.00
2,200.00
1,500.00
48,700.00
192,141.60
Dibulatkan
= Rp
192,141.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
367,500.00
340.00
4,680.00
1,188.00
787.50
374,495.50
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13,000.00
9,500.00
1,100.00
750.00
24,350.00
398,845.50
Dibulatkan
= Rp
398,845.00
= Rp.
= Rp.
= Rp.
27,500.00
680.00
28,180.00
0.1500
0.0700
0.0080
0.0060
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,750.00
6,650.00
880.00
450.00
17,730.00
45,910.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
30,000.00
1,020.00
850.00
20,000.00
51,870.00
PPA 6.34b
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.2000
0.1000
0.0100
0.0100
Oh
Oh
Oh
Oh
x
x
x
x
PPA 6.36
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
x
x
x
x
PPA 6.37
49
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1250
0.2500
0.0250
0.0060
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
8,125.00
23,750.00
2,750.00
450.00
35,075.00
86,945.00
= Rp.
= Rp.
= Rp.
33,600.00
1,000.00
34,600.00
0.1200
0.0600
0.0060
0.0060
Oh
Oh
Oh
Oh
x
x
x
x
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,800.00
5,700.00
660.00
450.00
14,610.00
49,210.00
0.6000
0.0200
Bh
Kg
x Rp.
20,000.00
x Rp.
25,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
12,000.00
500.00
12,500.00
0.1500
0.0700
0.0080
0.0060
Oh
Oh
Oh
Oh
x
x
x
x
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,750.00
6,650.00
880.00
450.00
17,730.00
30,230.00
1.0500
0.0200
Bh
Kg
x Rp.
23,100.00
x Rp.
30,500.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
24,255.00
610.00
24,865.00
0.1500
0.0750
0.0080
0.0060
Oh
Oh
Oh
Oh
x
x
x
x
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,750.00
7,125.00
880.00
450.00
18,205.00
43,070.00
1.0500
0.0200
M
Kg
x Rp.
98,200.00
x Rp.
30,500.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
103,110.00
610.00
103,720.00
PPA 6.38
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
PPA 6.39
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
PPA 6.39a
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
PPA 6.40
50
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1500
0.0750
0.0080
0.0060
Oh
Oh
Oh
Oh
x
x
x
x
M
Kg
0.1500
0.0750
0.0080
0.0060
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,750.00
7,125.00
880.00
450.00
18,205.00
121,925.00
x Rp.
69,240.00
x Rp.
30,500.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
72,702.00
610.00
73,312.00
Oh
Oh
Oh
Oh
x
x
x
x
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,750.00
7,125.00
880.00
450.00
18,205.00
91,517.00
1.2000
0.0400
M
Kg
x Rp.
52,200.00
x Rp.
30,500.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
62,640.00
1,220.00
63,860.00
0.1000
0.1000
0.0100
0.0100
Oh
Oh
Oh
Oh
x
x
x
x
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,500.00
9,500.00
1,100.00
750.00
17,850.00
81,710.00
1.0500
x Rp.
20,000.00
Jumlah (1)
= Rp.
= Rp.
21,000.00
21,000.00
0.1500
0.0500
0.0050
0.0080
Oh
Oh
Oh
Oh
x
x
x
x
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,750.00
4,750.00
550.00
600.00
15,650.00
36,650.00
= Rp.
= Rp.
225,000.00
225,000.00
PPA 6.40a
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
PPA 6.41.
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
PPA 6.42
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
PKK 6.1
1.0000
Bh
x Rp.
225,000.00
Jumlah (1)
51
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0600
0.6000
0.0600
0.0030
Oh
Oh
Oh
Oh
x
x
x
x
1.0000
Bh
0.0100
0.5000
0.0100
0.0050
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,900.00
57,000.00
6,600.00
225.00
67,725.00
292,725.00
x Rp.
85,000.00
Jumlah (1)
= Rp.
= Rp.
85,000.00
85,000.00
Oh
Oh
Oh
Oh
x
x
x
x
=
=
=
=
=
=
Bh
Oh
Oh
Oh
Oh
PKK 6.2
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
650.00
47,500.00
1,100.00
375.00
49,625.00
134,625.00
x Rp.
50,000.00
Jumlah (1)
= Rp.
= Rp.
50,000.00
50,000.00
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
325.00
47,500.00
550.00
187.50
48,562.50
98,562.50
Dibulatkan
= Rp
98,562.00
PKK 6.3
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0050
0.5000
0.0050
0.0025
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PKK 6.4
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1.0000
Bh
x Rp.
40,000.00
Jumlah (1)
= Rp.
= Rp.
40,000.00
40,000.00
0.0050
0.5000
0.0050
0.0025
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
325.00
47,500.00
550.00
187.50
48,562.50
88,562.50
Dibulatkan
= Rp
88,562.00
= Rp.
= Rp.
15,000.00
15,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PKK 6.5
1.0000
Bh
x Rp.
15,000.00
Jumlah (1)
52
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0150
0.1500
0.0150
0.0075
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
975.00
14,250.00
1,650.00
562.50
17,437.50
32,437.50
Dibulatkan
= Rp
32,437.00
PKK 6.6
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Bh
x Rp.
11,000.00
Jumlah (1)
= Rp.
= Rp.
11,000.00
11,000.00
0.0100
0.1000
0.0100
0.0050
Oh
Oh
Oh
Oh
x
x
x
x
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
650.00
9,500.00
1,100.00
375.00
11,625.00
22,625.00
1.0000
Bh
x Rp.
25,000.00
Jumlah (1)
= Rp.
= Rp.
25,000.00
25,000.00
0.0200
0.2000
0.0200
0.0100
Oh
Oh
Oh
Oh
x
x
x
x
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,300.00
19,000.00
2,200.00
750.00
23,250.00
48,250.00
1.0000
Bh
x Rp.
9,100.00
Jumlah (1)
= Rp.
= Rp.
9,100.00
9,100.00
0.0150
0.1500
0.0150
0.0008
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Dibulatkan
= Rp
26,031.00
= Rp.
= Rp.
15,000.00
15,000.00
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
PKK 6.7
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
PKK 6.8
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
975.00
14,250.00
1,650.00
56.25
16,931.25
26,031.25
PKK 6.9
1.0000
Bh
x Rp.
15,000.00
Jumlah (1)
53
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0150
0.1500
0.0150
0.0008
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
975.00
14,250.00
1,650.00
56.25
16,931.25
31,931.25
Dibulatkan
= Rp
31,931.00
PKK 6.10
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1.0000
Bh
x Rp.
110,000.00
Jumlah (1)
= Rp.
= Rp.
110,000.00
110,000.00
0.0500
0.5000
0.0500
0.0025
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
3,250.00
47,500.00
5,500.00
187.50
56,437.50
166,437.50
Dibulatkan
= Rp
166,437.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PKK 6.11
1.0000
Bh
x Rp.
35,000.00
Jumlah (1)
= Rp.
= Rp.
35,000.00
35,000.00
0.0200
0.2000
0.0200
0.0010
Oh
Oh
Oh
Oh
x
x
x
x
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,300.00
19,000.00
2,200.00
75.00
22,575.00
57,575.00
Bh
x Rp.
115,000.00
Jumlah (1)
= Rp.
= Rp.
115,000.00
115,000.00
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
3,250.00
47,500.00
5,500.00
187.50
56,437.50
171,437.50
Dibulatkan
= Rp
171,437.00
= Rp.
= Rp.
40,000.00
40,000.00
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
PKK 6.12
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0500
0.5000
0.0500
0.0025
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PKK 6.13
1.0000
Bh
x Rp.
40,000.00
Jumlah (1)
54
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0100
0.1000
0.0100
0.0005
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
650.00
9,500.00
1,100.00
37.50
11,287.50
51,287.50
Dibulatkan
= Rp
51,287.00
PKK 6.14
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1.0000
Bh
x Rp.
225,000.00
Jumlah (1)
= Rp.
= Rp.
225,000.00
225,000.00
0.0600
0.6000
0.0600
0.0030
Oh
Oh
Oh
Oh
x
x
x
x
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,900.00
57,000.00
6,600.00
225.00
67,725.00
292,725.00
1.0000
Bh
x Rp.
12,500.00
Jumlah (1)
= Rp.
= Rp.
12,500.00
12,500.00
0.0250
0.2500
0.0250
0.0013
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
1,625.00
23,750.00
2,750.00
93.75
28,218.75
40,718.75
Dibulatkan
= Rp
40,718.00
88,000.00
88,000.00
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
PKK 6.15
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PKK 6.16
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1.1000
x Rp.
80,000.00
Jumlah (1)
= Rp.
= Rp.
0.0150
0.1500
0.0150
0.0008
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Dibulatkan
= Rp
104,931.00
= Rp.
= Rp.
143,000.00
143,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
975.00
14,250.00
1,650.00
56.25
16,931.25
104,931.25
PKK 6.17
1.1000
x Rp.
130,000.00
Jumlah (1)
55
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0155
0.1550
0.0155
0.0008
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,007.50
14,725.00
1,705.00
56.25
17,493.75
160,493.75
Dibulatkan
= Rp
160,493.00
PKK 6.18
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1.1000
x Rp.
215,000.00
Jumlah (1)
= Rp.
= Rp.
236,500.00
236,500.00
0.0165
0.1650
0.0165
0.0008
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
1,072.50
15,675.00
1,815.00
60.00
18,622.50
255,122.50
Dibulatkan
= Rp
255,122.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PKK 6.19
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1.1000
0.0500
M
Kg
x Rp.
120,000.00
x Rp.
40,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
132,000.00
2,000.00
134,000.00
0.0155
0.1550
0.0155
0.0008
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
1,007.50
14,725.00
1,705.00
56.25
17,493.75
151,493.75
Dibulatkan
= Rp
151,493.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PKK 6.20
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1.1000
x Rp.
175,000.00
Jumlah (1)
= Rp.
= Rp.
192,500.00
192,500.00
0.0155
0.1550
0.0155
0.0008
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
1,007.50
14,725.00
1,705.00
56.25
17,493.75
209,993.75
Dibulatkan
= Rp
209,993.00
= Rp.
= Rp.
308,000.00
308,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PKK 6.21
1.1000
x Rp.
280,000.00
Jumlah (1)
56
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0165
0.1650
0.0165
0.0008
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,072.50
15,675.00
1,815.00
60.00
18,622.50
326,622.50
Dibulatkan
= Rp
326,622.00
PKK 6.23
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0155
0.1550
0.0155
0.0008
x Rp.
151,300.00
Jumlah (1)
= Rp.
= Rp.
166,430.00
166,430.00
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
1,007.50
14,725.00
1,705.00
56.25
17,493.75
183,923.75
Dibulatkan
= Rp
183,923.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PKK 6.24
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1.1000
x Rp.
275,000.00
Jumlah (1)
= Rp.
= Rp.
302,500.00
302,500.00
0.0250
0.2500
0.0250
0.0013
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
1,625.00
23,750.00
2,750.00
93.75
28,218.75
330,718.75
Dibulatkan
= Rp
330,718.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PKK 6.24a
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1.1000
x Rp.
156,000.00
Jumlah (1)
= Rp.
= Rp.
171,600.00
171,600.00
0.0155
0.1550
0.0155
0.0008
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
1,007.50
14,725.00
1,705.00
56.25
17,493.75
189,093.75
Dibulatkan
= Rp
189,093.00
= Rp.
= Rp.
= Rp.
80,500.00
119,000.00
80,500.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PKK II.16
57
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.3000
0.3000
0.0300
0.0150
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
19,500.00
28,500.00
3,300.00
1,125.00
52,425.00
132,925.00
= Rp.
= Rp.
= Rp.
94,500.00
119,000.00
94,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
19,500.00
28,500.00
3,300.00
1,125.00
52,425.00
146,925.00
15,000.00
17,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
16,500.00
170.00
16,670.00
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
1,950.00
6,650.00
770.00
112.50
9,482.50
26,152.50
Dibulatkan
= Rp
26,152.00
14,000.00
17,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
15,400.00
170.00
15,570.00
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
1,950.00
6,650.00
770.00
112.50
9,482.50
25,052.50
Dibulatkan
= Rp
=
=
=
=
=
=
PKK II.16a
Upah
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
SNI 2839:2008
PLL
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
6.1
Upah
PLL
0.3000
0.3000
0.0300
0.0150
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.0300
0.0700
0.0070
0.0015
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6.1a
Upah
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.0300
0.0700
0.0070
0.0015
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
25,052.00
58
PLL
6.2
Upah
PLL
Oh
Oh
Oh
Oh
= Rp.
= Rp.
= Rp.
97,750.00
850.00
98,600.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,900.00
11,400.00
1,320.00
225.00
16,845.00
115,445.00
x Rp.
x Rp.
17,100.00
17,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
99,180.00
850.00
100,030.00
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.0600
0.1000
0.0100
0.0030
Oh
Oh
Oh
Oh
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,900.00
9,500.00
1,100.00
225.00
14,725.00
114,755.00
68,300.00
17,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
102,450.00
850.00
103,300.00
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,900.00
9,500.00
1,100.00
225.00
14,725.00
118,025.00
= Rp.
= Rp.
= Rp.
24,375.00
510.00
24,885.00
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
4,550.00
9,500.00
1,100.00
262.50
15,412.50
40,297.50
Dibulatkan
= Rp
Rp.
Rp.
Rp.
Rp.
6.4
Upah
PLL
0.0600
0.1200
0.0120
0.0030
8,500.00
17,000.00
Jumlah (1)
6.3
Upah
PLL
Pekerja
Tukang kayu
Kepala tukang
Mandor
x Rp.
x Rp.
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.0600
0.1000
0.0100
0.0030
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
6.5
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.0700
0.1000
0.0100
0.0035
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
40,297.00
59
PLL
6.5a
Upah
PLL
Oh
Oh
Oh
Oh
35,625.00
510.00
36,135.00
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
4,550.00
9,500.00
1,100.00
262.50
15,412.50
51,547.50
Dibulatkan
= Rp
51,547.00
x Rp.
x Rp.
71,500.00
21,200.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
26,026.00
2,332.00
28,358.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,500.00
4,750.00
550.00
375.00
12,175.00
40,533.00
x Rp.
x Rp.
60,000.00
21,200.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
21,840.00
2,332.00
24,172.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,500.00
4,750.00
550.00
375.00
12,175.00
36,347.00
x Rp.
x Rp.
93,500.00
21,200.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
34,034.00
2,332.00
36,366.00
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
6,500.00
4,750.00
550.00
375.00
12,175.00
48,541.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.1000
0.0500
0.0050
0.0050
Oh
Oh
Oh
Oh
6.7a
Upah
PLL
0.0700
0.1000
0.0100
0.0035
= Rp.
= Rp.
= Rp.
6.7
Upah
PLL
Pekerja
Tukang kayu
Kepala tukang
Mandor
95,000.00
17,000.00
Jumlah (1)
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.1000
0.0500
0.0050
0.0050
Oh
Oh
Oh
Oh
6.7b
Upah
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.1000
0.0500
0.0050
0.0050
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
60
PLL
6.8
Upah
PLL
6.9
Upah
PLL
Pekerja
Tukang besi
Kepala tukang
Mandor
0.0600
0.0600
0.0060
0.0030
Oh
Oh
Oh
Oh
6,700.00
10,400.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,900.00
5,700.00
660.00
225.00
10,485.00
19,080.00
Rp.
Rp.
Rp.
Rp.
7,035.00
1,560.00
8,595.00
M'
Kg
Bh
Lbr
x
x
x
x
Rp.
Rp.
Rp.
Rp.
8,500.00
22,500.00
1,500.00
68,300.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
30,600.00
3,375.00
1,575.00
102,450.00
138,000.00
0.5000
0.5000
0.0500
0.0250
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
32,500.00
47,500.00
5,500.00
1,875.00
87,375.00
225,375.00
x Rp.
x Rp.
6,500.00
17,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
7,150.00
170.00
7,320.00
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,250.00
4,750.00
550.00
225.00
8,775.00
16,095.00
6.10
Upah
PLL
Pekerja
Tukang kayu
Kepala tukang
Mandor
x Rp.
x Rp.
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.0500
0.0500
0.0050
0.0030
Oh
Oh
Oh
Oh
6.20
Rp.
Rp.
Rp.
Rp.
Rangka Kayu SK
x Rp.
x Rp.
x Rp.
5,000,000.00
17,000.00
14,000.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
60,000.00
1,020.00
15,400.00
76,420.00
Upah
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,700.00
30,400.00
3,520.00
675.00
46,295.00
122,715.00
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.1800
0.3200
0.0320
0.0090
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
61
PLL
6.21
PLL
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.2700
0.4000
0.0400
0.0135
=
=
=
=
Rp.
Rp.
Rp.
Rp.
65,000.00
1,020.00
19,500.00
85,520.00
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
17,550.00
38,000.00
4,400.00
1,012.50
60,962.50
146,482.50
146,482.00
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
34,100.00
34,800.00
8,300.00
1,000.00
1,500.00
300.00
13,200.00
Jumlah (1)
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,207.00
13,572.00
1,162.00
1,680.00
1,275.00
222.00
14,256.00
41,374.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,500.00
14,250.00
1,650.00
375.00
22,775.00
64,149.00
7.1
Upah
Pekerja
Tukang kayu
Kepala tukang
Mandor
SNI 7395:2008
0.1000
0.1500
0.0150
0.0050
Oh
Oh
Oh
Oh
PLD 6.9
cm
Bh
Kg
M
Kg
x
x
x
x
Rp.
46,600.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
308,958.00
12,740.00
5,346.00
2,925.00
329,969.00
Upah
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
16,250.00
11,875.00
1,430.00
975.00
30,530.00
360,499.00
Pekerja
Tukang batu
Kepala tukang
Mandor
0.2500
0.1250
0.0130
0.0130
62
PLD 6.10
cm
Bh
Kg
M
Kg
x
x
x
x
Rp.
26,300.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
312,181.00
13,000.00
5,346.00
3,375.00
333,902.00
Upah
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
16,900.00
12,350.00
1,430.00
975.00
31,655.00
365,557.00
Pekerja
Tukang batu
Kepala tukang
Mandor
0.2600
0.1300
0.0130
0.0130
PLD 6.13
x 60 cm
x
x
x
x
Rp.
109,500.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
339,450.00
12,480.00
5,346.00
3,375.00
360,651.00
Upah
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
15,600.00
11,400.00
1,320.00
900.00
29,220.00
389,871.00
Pekerja
Tukang batu
Kepala tukang
Mandor
PLD 6.13a
Upah
PLD 6.14
Pekerja
Tukang batu
Kepala tukang
Mandor
0.2400
0.1200
0.0120
0.0120
Oh
Oh
Oh
Oh
ukuran 60 x 60 cm
3.1000
9.6000
0.0450
1.5000
Bh
Kg
M
Kg
x
x
x
x
Rp.
33,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
102,300.00
12,480.00
5,346.00
3,375.00
123,501.00
0.2400
0.1200
0.0120
0.0120
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
15,600.00
11,400.00
1,320.00
900.00
29,220.00
152,721.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
320,892.00
12,740.00
5,346.00
2,925.00
341,903.00
x 40 cm
x
x
x
x
Rp.
48,400.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
63
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.2500
0.1250
0.0130
0.0130
Oh
Oh
Oh
Oh
PLD 6.15
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
16,250.00
11,875.00
1,430.00
975.00
30,530.00
372,433.00
x 30 cm
x
x
x
x
Rp.
27,200.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
322,864.00
13,000.00
5,346.00
3,375.00
344,585.00
Upah
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
16,900.00
12,350.00
1,430.00
975.00
31,655.00
376,240.00
x
x
x
x
Rp.
62,800.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
166,420.00
1,482.00
356.40
225.00
168,483.40
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,850.00
8,550.00
990.00
375.00
15,765.00
184,248.40
Dibulatkan
= Rp
184,248.00
x
x
x
x
Rp.
28,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
98,840.00
1,482.00
356.40
225.00
100,903.40
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,850.00
8,550.00
990.00
375.00
15,765.00
116,668.40
Dibulatkan
= Rp
Pekerja
Tukang batu
Kepala tukang
Mandor
0.2600
0.1300
0.0130
0.0130
PLD 6.24
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.0900
0.0900
0.0090
0.0050
Oh
Oh
Oh
Oh
PLD 6.25
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.0900
0.0900
0.0090
0.0050
Oh
Oh
Oh
Oh
116,668.00
64
PLD 6.28
60 cm
x
x
x
x
Rp.
157,200.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
267,240.00
1,482.00
356.40
225.00
269,303.40
Upah
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,850.00
8,550.00
990.00
375.00
15,765.00
285,068.40
Dibulatkan
= Rp
Pekerja
Tukang batu
Kepala tukang
Mandor
0.0900
0.0900
0.0090
0.0050
Oh
Oh
Oh
Oh
PLD 6.29
285,068.00
40 cm
x
x
x
x
Rp.
13,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
34,450.00
1,482.00
356.40
225.00
36,513.40
Upah
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,850.00
8,550.00
990.00
375.00
15,765.00
52,278.40
Dibulatkan
= Rp
52,278.00
Pekerja
Tukang batu
Kepala tukang
Mandor
0.0900
0.0900
0.0090
0.0050
Oh
Oh
Oh
Oh
PLD 6.30
30 cm
x
x
x
x
Rp.
10,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
35,300.00
1,482.00
356.40
225.00
37,363.40
Upah
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,850.00
8,550.00
990.00
375.00
15,765.00
53,128.40
Dibulatkan
= Rp
Pekerja
Tukang batu
Kepala tukang
Mandor
0.0900
0.0900
0.0090
0.0050
Oh
Oh
Oh
Oh
53,128.00
65
PLD 6.32
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.7000
0.3500
0.0350
0.0350
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
22,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
1,166,000.00
10,647.00
5,346.00
6,187.50
1,188,180.50
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
1,273,405.50
Dibulatkan
= Rp
1,273,405.00
x
x
x
x
Rp.
15,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
1,590,000.00
10,647.00
5,346.00
7,200.00
1,613,193.00
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
1,698,418.00
Dibulatkan
= Rp
x
x
x
x
Rp.
5,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
530,000.00
10,647.00
5,346.00
7,200.00
553,193.00
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
638,418.00
Dibulatkan
= Rp
PLD 6.33
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.7000
0.3500
0.0350
0.0350
Oh
Oh
Oh
Oh
1,698,418.00
PLD 6.33a
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.7000
0.3500
0.0350
0.0350
Oh
Oh
Oh
Oh
638,418.00
66
PLD 6.34
Bh
Kg
M
Kg
x
x
x
x
Rp.
6,500.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
65,000.00
13,000.00
5,346.00
3,375.00
86,721.00
0.7000
0.3500
0.0350
0.0350
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
171,946.00
Bh
Kg
M
Kg
x
x
x
x
Rp.
5,910.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
70,151.70
13,000.00
5,346.00
3,375.00
91,872.70
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
177,097.70
Dibulatkan
= Rp
177,097.00
x
x
x
x
Rp.
6,800.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
80,716.00
13,000.00
5,346.00
3,375.00
102,437.00
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
PLD 6.35
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.7000
0.3500
0.0350
0.0350
PLD 6.35a
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.7000
0.3500
0.0350
0.0350
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
187,662.00
Bh
Kg
M
Kg
x
x
x
x
Rp.
12,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
75,000.00
13,000.00
5,346.00
3,375.00
96,721.00
PLD 6.35b
67
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.7000
0.3500
0.0350
0.0350
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
181,946.00
Bh
Kg
M
Kg
x
x
x
x
Rp.
2,600.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
68,900.00
13,520.00
5,346.00
3,645.00
91,411.00
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
176,636.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
181,492.30
18,395.00
4,633.20
4,500.00
209,020.50
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
294,245.50
Dibulatkan
= Rp
PLD 6.36
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.7000
0.3500
0.0350
0.0350
PLD 6.38
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
PLD 6.39
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.7000
0.3500
0.0350
0.0350
Oh
Oh
Oh
Oh
x
x
x
x
294,245.00
x 20 cm
5.0000
0.8500
0.0032
0.0800
Bh
Kg
M
Kg
x
x
x
x
Rp.
1,300.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
6,500.00
1,105.00
380.16
180.00
8,165.16
0.0900
0.0900
0.0090
0.0045
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,850.00
8,550.00
990.00
337.50
15,727.50
23,892.66
Dibulatkan
= Rp
23,892.00
68
PLD 6.43
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.6200
0.3500
0.0350
0.0300
Bh
Kg
M
Kg
x
x
x
x
Rp.
330,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
349,800.00
18,395.00
4,633.20
4,500.00
377,328.20
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
40,300.00
33,250.00
3,850.00
2,250.00
79,650.00
456,978.20
Dibulatkan
= Rp
456,978.00
88,000.00
11,880.00
99,880.00
G. 67.a
Upah
G. 67.b
Pekerja
Tukang
Kepala tukang
Mandor
44.0000
0.1000
Bh
M
x Rp.
2,000.00
x Rp.
118,800.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
0.1250
0.0625
0.0063
0.0625
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
8,125.00
5,937.50
693.00
4,687.50
19,443.00
119,323.00
2.5000
0.0080
1.1000
Bh
M
M
x Rp.
13,800.00
x Rp.
118,800.00
x Rp.
1,300.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
34,500.00
950.40
1,430.00
36,880.40
Upah
0.0410
0.0150
0.0015
0.0150
Oh
Oh
Oh
Oh
x
x
x
x
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,665.00
1,425.00
165.00
1,125.00
5,380.00
42,260.40
42,260.00
1.0500
0.3500
M
Kg
x Rp.
20,000.00
x Rp.
40,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
21,000.00
14,000.00
35,000.00
Pekerja
Tukang
Kepala tukang
Mandor
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
PLD 6.44
69
Upah
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.1700
0.1700
0.0170
0.0090
Oh
Oh
Oh
Oh
x
x
x
x
1.0500
0.3500
M
Kg
0.1700
0.1700
0.0170
0.0090
Oh
Oh
Oh
Oh
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,050.00
16,150.00
1,870.00
675.00
29,745.00
64,745.00
x Rp.
90,000.00
x Rp.
40,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
94,500.00
14,000.00
108,500.00
x
x
x
x
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,050.00
16,150.00
1,870.00
675.00
29,745.00
138,245.00
x Rp.
110,000.00
x Rp.
40,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
115,500.00
14,000.00
129,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,800.00
11,400.00
1,320.00
450.00
20,970.00
150,470.00
PLD 6.44a
Upah
Pekerja
Tukang
Kepala tukang
Mandor
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
PLD 6.45
Upah
Pekerja
Tukang
Kepala tukang
Mandor
0.1200
0.1200
0.0120
0.0060
Oh
Oh
Oh
Oh
x
x
x
x
1.0500
0.6000
M
Kg
x Rp.
368,500.00
x Rp.
40,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
386,925.00
24,000.00
410,925.00
0.7000
0.3500
0.0350
0.0350
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
496,150.00
Bh
Kg
M
Kg
x
x
x
x
Rp.
1,200.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
99,600.00
12,090.00
2,138.40
3,375.00
117,203.40
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
PLD 6.46
Upah
Pekerja
Tukang
Kepala tukang
Mandor
PLD 6.48
70
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.6200
0.5000
0.0500
0.0300
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
40,300.00
47,500.00
5,500.00
2,250.00
95,550.00
212,753.40
Dibulatkan
= Rp
212,753.00
x
x
x
x
Rp.
1,500.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
124,500.00
12,090.00
2,138.40
3,375.00
142,103.40
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
40,300.00
47,500.00
5,500.00
2,250.00
95,550.00
237,653.40
Dibulatkan
= Rp
237,653.00
PLD 6.48a
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.6200
0.5000
0.0500
0.0300
Oh
Oh
Oh
Oh
PLD 6.48b
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.6000
0.4500
0.0450
0.0300
Bh
Kg
M
Kg
x
x
x
x
Rp.
2,300.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
103,500.00
12,090.00
2,138.40
3,375.00
121,103.40
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
39,000.00
42,750.00
4,950.00
2,250.00
88,950.00
210,053.40
Dibulatkan
= Rp
210,053.00
Rp.
2,500.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
112,500.00
12,090.00
2,138.40
3,375.00
130,103.40
PLD 6.48c
Bh
Kg
M
Kg
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
71
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.6000
0.4500
0.0450
0.0300
PLD 6.51
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.9000
0.4500
0.0450
0.0450
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Dibulatkan
= Rp
39,000.00
42,750.00
4,950.00
2,250.00
88,950.00
219,053.40
219,053.00
cm
Bh
Kg
M
Kg
x
x
x
x
Rp.
22,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
1,166,000.00
12,090.00
2,138.40
6,187.50
1,186,415.90
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
58,500.00
42,750.00
4,950.00
3,375.00
109,575.00
1,295,990.90
Dibulatkan
= Rp
1,295,990.00
x
x
x
x
Rp.
15,000.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
1,590,000.00
12,090.00
2,138.40
6,525.00
1,610,753.40
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
58,500.00
42,750.00
4,950.00
3,375.00
109,575.00
1,720,328.40
Dibulatkan
= Rp
PLD 6.52
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.9000
0.4500
0.0450
0.0450
Oh
Oh
Oh
Oh
1,720,328.00
72
PLD 6.53
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.9000
0.4500
0.0450
0.0450
Bh
Kg
M
Kg
x
x
x
x
Rp.
1,300.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
68,900.00
12,090.00
2,138.40
6,187.50
89,315.90
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
58,500.00
42,750.00
4,950.00
3,375.00
109,575.00
198,890.90
Dibulatkan
= Rp
198,890.00
PLD 6.54
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.9000
0.4500
0.0450
0.0450
Bh
Kg
M
Kg
x
x
x
x
Rp.
2,600.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
68,900.00
12,090.00
2,138.40
4,365.00
87,493.40
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
58,500.00
42,750.00
4,950.00
3,375.00
109,575.00
197,068.40
Dibulatkan
= Rp
197,068.00
PLD 6.54a
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.9000
0.4500
0.0450
0.0450
Bh
Kg
M
Kg
x
x
x
x
Rp.
3,250.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
66,625.00
12,090.00
2,138.40
4,365.00
85,218.40
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
58,500.00
42,750.00
4,950.00
3,375.00
109,575.00
194,793.40
Dibulatkan
= Rp
194,793.00
73
PLD 6.54b
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.9000
0.4500
0.0450
0.0450
Bh
Kg
M
Kg
x
x
x
x
Rp.
5,910.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
70,151.70
12,090.00
2,138.40
4,365.00
88,745.10
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
58,500.00
42,750.00
4,950.00
3,375.00
109,575.00
198,320.10
Dibulatkan
= Rp
198,320.00
PLD 6.55
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
1.3000
0.6500
0.0650
0.0650
PLD 6.56
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
1.0000
0.5000
0.0500
0.0500
M
Bh
Kg
M
Kg
x
x
x
x
x
Rp.
330,000.00
Rp.
700.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
349,800.00
2,100.00
16,172.00
2,970.00
3,712.50
374,754.50
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
84,500.00
61,750.00
7,150.00
4,875.00
158,275.00
533,029.50
Dibulatkan
= Rp
533,029.00
cm
Bh
Kg
M
Kg
x
x
x
x
Rp.
1,818.00
Rp.
1,300.00
Rp.
118,800.00
Rp.
2,250.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
114,534.00
16,172.00
2,970.00
3,712.50
137,388.50
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
65,000.00
47,500.00
5,500.00
3,750.00
121,750.00
259,138.50
Dibulatkan
= Rp
259,138.00
74
PLD 6.57
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
1.0500
11.7500
0.0350
M
Kg
M
x Rp.
140,000.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
147,000.00
15,275.00
4,158.00
166,433.00
0.6200
0.3500
0.0350
0.0300
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
40,300.00
33,250.00
3,850.00
2,250.00
79,650.00
246,083.00
Dibulatkan
= Rp
246,083.00
PLD 6.58
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.7000
0.3500
0.0350
0.0350
M
Kg
M
x Rp.
104,500.00
x Rp.
1,300.00
x Rp.
118,800.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
114,950.00
15,275.00
4,158.00
134,383.00
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45,500.00
33,250.00
3,850.00
2,625.00
85,225.00
219,608.00
Dibulatkan
= Rp
219,608.00
x Rp.
9,800.00
x Rp.
45,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
116,326.00
3,430.00
119,756.00
x
x
x
x
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,750.00
14,250.00
1,650.00
600.00
26,250.00
146,006.00
= Rp.
= Rp.
= Rp.
108,017.00
3,185.00
111,202.00
PLD 6.59
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.1500
0.1500
0.0150
0.0080
Oh
Oh
Oh
Oh
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
PLD 6.59a
x Rp.
9,100.00
x Rp.
45,000.00
Jumlah (1)
75
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,750.00
14,250.00
1,650.00
600.00
26,250.00
137,452.00
2.2000 m2 x Rp.
33,600.00
0.2500 Kg x Rp.
45,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
73,920.00
8,400.00
82,320.00
0.3500
0.1750
0.0170
0.0020
Oh
Oh
Oh
Oh
x
x
x
x
=
=
=
=
=
=
Bh
Kg
Oh
Oh
Oh
Oh
0.1500
0.1500
0.0150
0.0080
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
PLD 6.60
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
22,750.00
16,625.00
1,870.00
150.00
41,395.00
123,715.00
x Rp.
8,200.00
x Rp.
45,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
90,610.00
2,870.00
93,480.00
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Dibulatkan
= Rp
119,692.00
x Rp.
9,400.00
x Rp.
45,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
103,870.00
3,290.00
107,160.00
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
9,750.00
14,250.00
1,650.00
562.50
26,212.50
133,372.50
Dibulatkan
= Rp
133,372.00
= Rp.
= Rp.
= Rp.
71,500.00
16,250.00
87,750.00
PLD 6.77
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.1500
0.1500
0.0150
0.0075
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,750.00
14,250.00
1,650.00
562.50
26,212.50
119,692.50
PLD 6.78
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
0.1500
0.1500
0.0150
0.0075
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PLD 6.79
M
Kg
x Rp.
65,000.00
x Rp.
45,000.00
Jumlah (1)
76
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
SNI T-15-2002
HIT
GU.2
GU.3
GU.4
GU.6
GU.8
CP.2
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Dibulatkan
= Rp
48,750.00
16,150.00
1,870.00
637.50
67,407.50
155,157.50
155,157.00
0.2100 M
0.2100 M
x Rp.
x Rp.
Jumlah (1)
Dibulatkan
50,625
16,858
=
=
=
=
Rp.
Rp.
Rp.
Rp.
10,631.25
3,540.18
14,171.43
14,171.00
0.2600 M
0.2600 M
x Rp.
x Rp.
Jumlah (1)
Dibulatkan
50,625
16,858
=
=
=
=
Rp.
Rp.
Rp.
Rp.
13,162.50
4,383.08
17,545.58
17,545.00
0.3000 M
0.3000 M
x Rp.
x Rp.
Jumlah (1)
Dibulatkan
50,625
16,858
=
=
=
=
Rp.
Rp.
Rp.
Rp.
15,187.50
5,057.40
20,244.90
20,244.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
17,060.63
5,681.15
22,741.77
22,741.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
18,984.38
6,321.75
25,306.13
25,306.00
Menggali dan mengurug tanah pasangan pipa PVC dia 6" sepanjang 1 m'
0.3370 M
0.3370 M
x Rp.
x Rp.
Jumlah (1)
Dibulatkan
50,625
16,858
Menggali dan mengurug tanah pasangan pipa PVC dia 8" sepanjang 1 m'
HIT
=
=
=
=
=
=
Menggali dan mengurug tanah pasangan pipa PVC dia 4" sepanjang 1 m'
HIT
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Menggali dan mengurug tanah pasangan pipa PVC dia 3" sepanjang 1 m'
HIT
x
x
x
x
Menggali dan mengurug tanah pasangan pipa PVC dia 2" sepanjang 1 m'
HIT
Oh
Oh
Oh
Oh
PEKERJAAN SANITASI
HIT
0.7500
0.1700
0.0170
0.0085
0.3750 M
0.3750 M
x Rp.
x Rp.
Jumlah (1)
Dibulatkan
50,625
16,858
Menggali tanah memotong jalan (crossing jalan) untuk pasangan pipa PVC dia 2" sepanjang 1 m'
Menggali tanah memotong jalan (crossing jalan) dihitung 4 kali dari indeks menggali dan
mengurug tanah pada analisa HIT. GU2
4.0000
x Rp.
14,171 = Rp.
56,684.00
Jumlah (1)
= Rp.
56,684.00
Dibulatkan
= Rp.
56,684.00
77
HIT
CP.3
Menggali tanah memotong jalan (crossing jalan) untuk pasangan pipa PVC dia 3" sepanjang 1 m'
Menggali tanah memotong jalan (crossing jalan) dihitung 4 kali dari indeks menggali dan
mengurug tanah pada analisa HIT. GU3
4.0000
HIT
CP.4
x Rp.
Rp.
70,180.00
Jumlah (1)
17,545
Rp.
70,180.00
Dibulatkan
Rp.
70,180.00
Menggali tanah memotong jalan (crossing jalan) untuk pasangan pipa PVC dia 4" sepanjang 1 m'
Menggali tanah memotong jalan (crossing jalan) dihitung 4 kali dari indeks menggali dan
mengurug tanah pada analisa HIT. GU4
4.0000
HIT
CP.6
x Rp.
Rp.
80,976.00
Jumlah (1)
20,244
Rp.
80,976.00
Dibulatkan
Rp.
80,976.00
Menggali tanah memotong jalan (crossing jalan) untuk pasangan pipa PVC dia 6" sepanjang 1 m'
Menggali tanah memotong jalan (crossing jalan) dihitung 4 kali dari indeks menggali dan
mengurug tanah pada analisa HIT. GU6
4.0000
PS
Rp.
90,964.00
Jumlah (1)
22,741
Rp.
90,964.00
Dibulatkan
Rp.
90,964.00
6.1.
Upah
PS
x Rp.
Pekerja
Tukang batu
Kepala tukang
Mandor
1.0000
6% harga klosed
Bh x Rp.
x Rp.
2,050,000.00
2,050,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
2,050,000.00
123,000.00
2,173,000.00
3.3000
1.5000
0.1500
0.1600
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
214,500.00
142,500.00
16,500.00
12,000.00
385,500.00
2,558,500.00
1.0000
7.0000
6.0000
0.0100
Bh
Bh
Kg
M
x
x
x
x
Rp.
Rp.
Rp.
Rp.
165,000.00
500.00
1,300.00
118,800.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
165,000.00
3,500.00
7,800.00
1,188.00
177,488.00
1.0000
1.5000
0.1500
0.1000
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
65,000.00
142,500.00
16,500.00
7,500.00
231,500.00
408,988.00
6.3.
Upah
Pekerja
Tukang batu
Kepala tukang
Mandor
78
PS
6.4
Upah
PS
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
522,500.00
78,375.00
7,800.00
1,188.00
609,863.00
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
11,000.00
7,500.00
178,500.00
788,363.00
1.0000
Bh
12% harga wastafel
6.0000
Kg
0.0100
M
x
x
x
x
Rp.
Rp.
Rp.
Rp.
425,000.00
425,000.00
1,300.00
118,800.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
425,000.00
51,000.00
7,800.00
1,188.00
484,988.00
Pekerja
Tukang batu
Kepala tukang
Mandor
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
78,000.00
137,750.00
16,500.00
7,500.00
239,750.00
724,738.00
400,000.00
400,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
400,000.00
72,000.00
472,000.00
1.2000
1.4500
0.1500
0.1000
Oh
Oh
Oh
Oh
6.7.
Upah
PS
1.0000
1.0000
0.1000
0.1000
522,500.00
522,500.00
1,300.00
118,800.00
Jumlah (1)
6.5
Upah
PS
Pekerja
Tukang batu
Kepala tukang
Mandor
1.0000
Bh x Rp.
15% harga urinoir
x Rp.
6.0000
Kg x Rp.
0.0100
M x Rp.
Pekerja
Tukang batu
Kepala tukang
Mandor
1.8000
0.5400
0.0540
0.1100
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
117,000.00
51,300.00
5,940.00
8,250.00
182,490.00
654,490.00
Rp.
Rp.
Rp.
Rp.
Rp.
500.00
1,300.00
118,800.00
1,500.00
2,250.00
Jumlah (1)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
22,000.00
156,000.00
35,640.00
540,000.00
13,500.00
767,140.00
6.8.
79
Upah
PS
3.0000
3.0000
0.3000
0.3000
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
195,000.00
285,000.00
33,000.00
22,500.00
535,500.00
1,302,640.00
M'
Bh
Kg
M
M
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
500.00
1,300.00
118,800.00
105,200.00
Jumlah (1)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
55,000.00
27,500.00
13,390.00
7,246.80
7,258.80
110,395.60
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
24,700.00
18,050.00
2,090.00
1,425.00
46,265.00
156,660.60
Dibulatkan
= Rp
6.15.
Upah
PS
Pekerja
Tukang batu
Kepala tukang
Mandor
0.3800
0.1900
0.0190
0.0190
Memasang 1 buah Bak Kontrol pasangan batu bata uk.(30 x 30) cm tinggi 35 cm
SNI T-15-2002 / 6.16
Bahan Batu bata
145.0000
Bh x Rp.
500.00 =
Semen PPC
44.0000
Kg x Rp.
1,300.00 =
Pasir pasang
0.0700
M x Rp.
118,800.00 =
Batu kerikil
0.0700
M x Rp.
300,400.00 =
Besi beton
1.6000
Kg x Rp.
15,000.00 =
Pasir
0.0600
M x Rp.
118,800.00 =
Jumlah (1)
=
156,660.00
6.16.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
72,500.00
57,200.00
8,316.00
21,028.00
24,000.00
7,128.00
190,172.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
208,000.00
1,425.00
165.00
1,200.00
210,790.00
400,962.00
Memasang 1 buah Bak Kontrol pasangan batu bata uk.(45 x 45) cm tinggi 50 cm
SNI T-15-2002 / 6.17
Bahan Batu bata
250.0000
Bh x Rp.
500.00 =
Semen PPC
77.0000
Kg x Rp.
1,300.00 =
Pasir pasang
0.1300
M x Rp.
118,800.00 =
Batu kerikil
0.0200
M x Rp.
300,400.00 =
Besi beton
2.6000
Kg x Rp.
15,000.00 =
Pasir
0.0900
M x Rp.
118,800.00 =
Jumlah (1)
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
125,000.00
100,100.00
15,444.00
6,008.00
39,000.00
10,692.00
296,244.00
= Rp.
= Rp.
= Rp.
92,300.00
44,935.00
5,170.00
Upah
PS
Pekerja
Tukang batu
Kepala tukang
Mandor
Pekerja
Tukang batu
Kepala tukang
Mandor
3.2000
0.0150
0.0015
0.0160
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
6.17.
Upah
Pekerja
Tukang batu
Kepala tukang
1.4200
0.4730
0.0470
Oh x Rp.
Oh x Rp.
Oh x Rp.
65,000.00
95,000.00
110,000.00
80
Mandor
PS
75,000.00
Jumlah (2)
Jumlah (1) +(2)
= Rp.
= Rp.
= Rp.
Memasang 1 buah Bak Kontrol pasangan batu bata uk.(60 x 60) cm tinggi 65 cm
SNI T-15-2002 / 6.18
Bahan Batu bata
371.0000
Bh x Rp.
500.00 =
Semen PPC
114.0000
Kg x Rp.
1,300.00 =
Pasir pasang
0.1840
M x Rp.
118,800.00 =
Batu koral
0.0330
M x Rp.
300,400.00 =
Besi beton
4.8500
Kg x Rp.
15,000.00 =
Pasir beton
0.1200
M x Rp.
118,800.00 =
Jumlah (1)
=
5,325.00
147,730.00
443,974.00
Pekerja
Tukang batu
Kepala tukang
Mandor
Tukang gali
2.1600
0.7200
0.0720
0.1080
0.1000
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
185,500.00
148,200.00
21,859.20
9,913.20
72,750.00
14,256.00
452,478.40
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
140,400.00
68,400.00
7,920.00
8,100.00
6,500.00
231,320.00
683,798.40
65,000.00
95,000.00
110,000.00
75,000.00
65,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
=
Dibulatkan
= Rp
683,798.00
M x Rp.
x Rp.
14,810.00
14,810.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
17,772.00
5,183.50
22,955.50
Oh
Oh
Oh
Oh
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
3,510.00
8,550.00
990.00
2,025.00
15,075.00
38,030.50
Dibulatkan
= Rp
38,030.00
M x Rp.
x Rp.
21,780.00
21,780.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
26,136.00
7,623.00
33,759.00
Oh
Oh
Oh
Oh
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
3,510.00
8,550.00
990.00
2,025.00
15,075.00
48,834.00
6.19.
Upah
PS
Oh x Rp.
6.18.
Upah
PS
0.0710
Pekerja
Tukang
Kepala tukang
Mandor
0.0540
0.0900
0.0090
0.0270
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6.20.
Upah
Pekerja
Tukang
Kepala tukang
Mandor
0.0540
0.0900
0.0090
0.0270
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
81
PS
6.21.
Upah
PS
= Rp.
= Rp.
= Rp.
33,444.00
9,754.50
43,198.50
Oh
Oh
Oh
Oh
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
3,510.00
8,550.00
990.00
2,025.00
15,075.00
58,273.50
Dibulatkan
= Rp
58,273.00
= Rp.
= Rp.
= Rp.
56,983.50
5,427.00
62,410.50
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
3,510.00
8,550.00
990.00
2,025.00
15,075.00
77,485.50
Dibulatkan
= Rp
77,485.00
M x Rp.
x Rp.
54,270.00
54,270.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
65,124.00
18,994.50
84,118.50
Oh
Oh
Oh
Oh
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Dibulatkan
= Rp
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Pekerja
Tukang
Kepala tukang
Mandor
0.0540
0.0900
0.0090
0.0270
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6.22.
Upah
PS
0.0540
0.0900
0.0090
0.0270
27,870.00
27,870.00
Jumlah (1)
6.21.b Memasang 1 m' pipa galvanis diameter 1" (untuk sistim perpipaan air bersih)
SNI T-15-2002 / 6.21b
Bahan Pipa galvanis
1.0500 M x Rp.
54,270.00
Perlengkapan
10% harga pipa
x Rp.
54,270.00
Jumlah (1)
Upah
PS
Pekerja
Tukang
Kepala tukang
Mandor
M x Rp.
x Rp.
Pekerja
Tukang
Kepala tukang
Mandor
0.1080
0.1800
0.0180
0.0054
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6.22.b Memasang 1 m' pipa galvanis diameter 1 " (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.22b
Bahan Pipa galvanis
1.0500 M x Rp.
34,500.00 = Rp.
Perlengkapan
10% harga pipa
x Rp.
34,500.00 = Rp.
Jumlah (1)
= Rp.
7,020.00
17,100.00
1,980.00
405.00
26,505.00
110,623.50
110,623.00
36,225.00
3,450.00
39,675.00
82
Upah
PS
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Dibulatkan
= Rp
66,180.00
M x Rp.
x Rp.
78,580.00
78,580.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
94,296.00
27,503.00
121,799.00
Oh
Oh
Oh
Oh
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,020.00
17,100.00
1,980.00
405.00
26,505.00
148,304.00
6.23.b Memasang 1 m' pipa galvanis diameter 2" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.23b
Bahan Pipa galvanis
1.0500 M x Rp.
78,580.00 = Rp.
Perlengkapan
10% harga pipa
x Rp.
78,580.00 = Rp.
Jumlah (1)
= Rp.
82,509.00
7,858.00
90,367.00
Upah
PS
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,020.00
17,100.00
1,980.00
405.00
26,505.00
66,180.00
Pekerja
Tukang
Kepala tukang
Mandor
Pekerja
Tukang
Kepala tukang
Mandor
0.1080
0.1800
0.0180
0.0054
0.1080
0.1800
0.0180
0.0054
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,020.00
17,100.00
1,980.00
405.00
26,505.00
116,872.00
M x Rp.
x Rp.
102,800.00
102,800.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
123,360.00
35,980.00
159,340.00
Oh
Oh
Oh
Oh
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,020.00
17,100.00
1,980.00
405.00
26,505.00
185,845.00
6.24.b Memasang 1 m' pipa galvanis diameter 21/2" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.24b
Bahan Pipa galvanis
1.0500 M x Rp.
102,800.00 = Rp.
Perlengkapan
10% harga pipa
x Rp.
102,800.00 = Rp.
Jumlah (1)
= Rp.
107,940.00
10,280.00
118,220.00
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
6.24.
Upah
PS
0.1080
0.1800
0.0180
0.0054
6.23.
Upah
PS
Pekerja
Tukang
Kepala tukang
Mandor
Pekerja
Tukang
Kepala tukang
Mandor
0.1080
0.1800
0.0180
0.0054
x
x
x
x
Rp.
Rp.
Rp.
Rp.
83
Upah
PS
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,020.00
17,100.00
1,980.00
405.00
26,505.00
144,725.00
M x Rp.
x Rp.
2,300.00
2,300.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
2,760.00
805.00
3,565.00
Oh
Oh
Oh
Oh
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
2,340.00
5,700.00
660.00
135.00
8,835.00
12,400.00
6.25.b Memasang 1 m' pipa PVC tipe AW diameter " (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.25b
Bahan Pipa PVC
1.0500 M x Rp.
2,300.00 = Rp.
2,415.00
Pekerja
Tukang
Kepala tukang
Mandor
Pekerja
Tukang
Kepala tukang
Mandor
0.0360
0.0600
0.0060
0.0018
0.0180
0.0300
0.0030
0.0009
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (1)
= Rp.
2,415.00
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
1,170.00
2,850.00
330.00
67.50
4,417.50
6,832.50
Dibulatkan
= Rp
6,832.00
M x Rp.
x Rp.
3,632.00
3,632.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
4,358.40
1,271.20
5,629.60
Oh
Oh
Oh
Oh
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Dibulatkan
= Rp
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6.26.
Upah
PS
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Upah
PS
0.1080
0.1800
0.0180
0.0054
6.25.
Upah
PS
Pekerja
Tukang
Kepala tukang
Mandor
Pekerja
Tukang
Kepala tukang
Mandor
0.0360
0.0600
0.0060
0.0018
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6.26.b Memasang 1 m' pipa PVC tipe AW diameter " (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.26b
Bahan Pipa PVC
1.0500 M x Rp.
3,632.00 = Rp.
Perlengkapan
10% harga pipa
x Rp.
3,632.00 = Rp.
Jumlah (1)
= Rp.
2,340.00
5,700.00
660.00
135.00
8,835.00
14,464.60
14,464.00
3,813.60
363.20
4,176.80
84
Upah
PS
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Dibulatkan
= Rp
8,594.00
M x Rp.
x Rp.
5,615.00
5,615.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
6,738.00
1,965.25
8,703.25
Pekerja
Tukang
Kepala tukang
Mandor
0.0360
0.0600
0.0060
0.0018
Oh
Oh
Oh
Oh
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Dibulatkan
= Rp
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6.27.a Memasang 1 m' pipa PVC tipe AW diameter 1" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.27a
Bahan Pipa PVC
1.0500 M x Rp.
5,615.00 = Rp.
Upah
PS
0.0180
0.0300
0.0030
0.0009
1,170.00
2,850.00
330.00
67.50
4,417.50
8,594.30
6.27.
Upah
PS
Pekerja
Tukang
Kepala tukang
Mandor
Pekerja
Tukang
Kepala tukang
Mandor
0.0180
0.0300
0.0030
0.0009
Upah
Pekerja
Tukang
Kepala tukang
Mandor
0.0360
0.0600
0.0060
0.0018
2,340.00
5,700.00
660.00
135.00
8,835.00
17,538.25
17,538.00
5,895.75
Jumlah (1)
= Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Dibulatkan
= Rp
10,313.00
M x Rp.
x Rp.
8,864.00
8,864.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
9,307.20
3,102.40
12,409.60
Oh
Oh
Oh
Oh
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
2,340.00
5,700.00
660.00
135.00
8,835.00
21,244.60
Dibulatkan
= Rp
Oh
Oh
Oh
Oh
x
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,895.75
1,170.00
2,850.00
330.00
67.50
4,417.50
10,313.25
21,244.00
85
PS
6.27.c Memasang 1 m' pipa PVC tipe AW diameter 1" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.27c
Bahan Pipa PVC
1.0500 M x Rp.
8,864.00 = Rp.
Jumlah (1)
= Rp.
Upah
PS
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Dibulatkan
= Rp
13,724.00
M x Rp.
x Rp.
14,260.00
14,260.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
17,112.00
4,991.00
22,103.00
Oh
Oh
Oh
Oh
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,340.00
5,700.00
660.00
135.00
8,835.00
30,938.00
6.28.b Memasang 1 m' pipa PVC tipe AW diameter 1 " (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.28b
Bahan Pipa PVC
1.0500 M x Rp.
14,260.00 = Rp.
14,973.00
Upah
PS
0.0180
0.0300
0.0030
0.0009
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,170.00
2,850.00
330.00
67.50
4,417.50
13,724.70
6.28.
Upah
PS
Pekerja
Tukang
Kepala tukang
Mandor
9,307.20
9,307.20
Pekerja
Tukang
Kepala tukang
Mandor
Pekerja
Tukang
Kepala tukang
Mandor
0.0360
0.0600
0.0060
0.0018
0.0180
0.0300
0.0030
0.0009
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (1)
= Rp.
14,973.00
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
1,170.00
2,850.00
330.00
67.50
4,417.50
19,390.50
Dibulatkan
= Rp
19,390.00
M x Rp.
x Rp.
20,495.00
20,495.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
24,594.00
7,173.25
31,767.25
Oh
Oh
Oh
Oh
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
3,510.00
8,550.00
990.00
202.50
13,252.50
45,019.75
Dibulatkan
= Rp
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6.29.
Upah
Pekerja
Tukang
Kepala tukang
Mandor
0.0540
0.0900
0.0090
0.0027
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45,019.00
86
PS
6.29.b Memasang 1 m' pipa PVC tipe AW diameter 2" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.29b
Bahan Pipa PVC
1.0500 M x Rp.
20,495.00 = Rp.
Upah
PS
= Rp.
21,519.75
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
1,755.00
4,275.00
550.00
105.00
6,685.00
28,204.75
Dibulatkan
= Rp
28,204.00
M x Rp.
x Rp.
29,306.00
29,306.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
35,167.20
10,257.10
45,424.30
Oh
Oh
Oh
Oh
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
3,510.00
8,550.00
990.00
202.50
13,252.50
58,676.80
Dibulatkan
= Rp
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Pekerja
Tukang
Kepala tukang
Mandor
0.0540
0.0900
0.0090
0.0027
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6.30.b Memasang 1 m' pipa PVC tipe AW diameter 2 " (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.30b
Bahan Pipa PVC
1.0500 M x Rp.
29,306.00 = Rp.
Upah
PS
0.0270
0.0450
0.0050
0.0014
Jumlah (1)
6.30.
Upah
PS
Pekerja
Tukang
Kepala tukang
Mandor
21,519.75
Pekerja
Tukang
Kepala tukang
Mandor
0.0270
0.0450
0.0050
0.0014
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
58,676.00
30,771.30
Jumlah (1)
= Rp.
30,771.30
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
1,755.00
4,275.00
550.00
105.00
6,685.00
37,456.30
Dibulatkan
= Rp
37,456.00
42,499.00
42,499.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
50,998.80
14,874.65
65,873.45
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6.31.
M x Rp.
x Rp.
87
Upah
PS
Pekerja
Tukang
Kepala tukang
Mandor
0.0810
0.1350
0.0135
0.0041
Oh
Oh
Oh
Oh
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Dibulatkan
= Rp
85,755.00
M x Rp.
x Rp.
23,700.00
23,700.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
28,440.00
8,295.00
36,735.00
Oh
Oh
Oh
Oh
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
5,265.00
12,825.00
1,485.00
307.50
19,882.50
56,617.50
Dibulatkan
= Rp
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6.31.b Memasang 1 m' pipa PVC tipe AW diameter 3" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.31b
Bahan Pipa PVC
1.0500 M x Rp.
42,499.00 = Rp.
Upah
PS
0.0810
0.1350
0.0135
0.0041
Upah
PS
Pekerja
Tukang
Kepala tukang
Mandor
Pekerja
Tukang
Kepala tukang
Mandor
0.0400
0.0650
0.0065
0.0020
5,265.00
12,825.00
1,485.00
307.50
19,882.50
85,755.95
56,617.00
44,623.95
Jumlah (1)
= Rp.
44,623.95
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
2,600.00
6,175.00
715.00
150.00
9,640.00
54,263.95
Dibulatkan
= Rp
54,263.00
M x Rp.
x Rp.
62,790.00
62,790.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
75,348.00
21,976.50
97,324.50
Oh
Oh
Oh
Oh
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6.32.
Upah
Pekerja
Tukang
Kepala tukang
Mandor
0.0810
0.1350
0.0135
0.0041
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,265.00
12,825.00
1,485.00
307.50
19,882.50
117,207.00
88
PS
Upah
PS
= Rp.
= Rp.
= Rp.
40,800.00
11,900.00
52,700.00
Oh
Oh
Oh
Oh
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
5,265.00
12,825.00
1,485.00
307.50
19,882.50
72,582.50
Dibulatkan
= Rp
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Pekerja
Tukang
Kepala tukang
Mandor
0.0400
0.0650
0.0065
0.0020
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
= Rp.
65,929.50
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
2,600.00
6,175.00
715.00
150.00
9,640.00
75,569.50
Dibulatkan
= Rp
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
91,266.00
140,707.35
Oh
Oh
Oh
Oh
x
x
x
x
= Rp.
91,266.00
6.32.d Memasang 1 m' pipa PVC tipe AW diameter 6" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.32d
Bahan Pipa PVC
1.0500 M x Rp.
134,007.00 = Rp.
0.0400
0.0650
0.0065
0.0020
Oh
Oh
Oh
Oh
Jumlah (1)
75,569.00
2,600.00
6,175.00
715.00
150.00
9,640.00
100,906.00
Pekerja
Tukang
Kepala tukang
Mandor
0.0400
0.0650
0.0065
0.0020
65,929.50
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Upah
Pekerja
Tukang
Kepala tukang
Mandor
72,582.00
Jumlah (1)
6.32.c Memasang 1 m' pipa PVC tipe AW diameter 5" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.32c
Bahan Pipa PVC
1.0500 M x Rp.
86,920.00 = Rp.
Upah
PS
0.0810
0.1350
0.0135
0.0041
34,000.00
34,000.00
Jumlah (1)
6.32.b Memasang 1 m' pipa PVC tipe AW diameter 4" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.32b
Bahan Pipa PVC
1.0500 M x Rp.
62,790.00 = Rp.
Upah
PS
Pekerja
Tukang
Kepala tukang
Mandor
M x Rp.
x Rp.
Rp.
Rp.
Rp.
Rp.
Jumlah (1)
= Rp.
140,707.35
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
2,600.00
6,175.00
715.00
150.00
9,640.00
150,347.35
Dibulatkan
= Rp
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
150,347.00
89
PS
6.32.e Memasang 1 m' pipa PVC tipe AW diameter 8" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.32e
Bahan Pipa PVC
1.0500 M x Rp.
213,703.00 = Rp.
Upah
PS
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
= Rp.
224,388.15
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
3,900.00
9,595.00
660.00
225.00
14,380.00
238,768.15
Dibulatkan
= Rp
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
238,768.00
336,630.00
Jumlah (1)
= Rp.
336,630.00
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,900.00
9,595.00
660.00
225.00
14,380.00
351,010.00
6.32.g Memasang 1 m' pipa PVC tipe AW diameter 12" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.32g
Bahan Pipa PVC
1.0500 M x Rp.
509,795.00 = Rp.
535,284.75
Upah
PS
0.0600
0.1010
0.0060
0.0030
Jumlah (1)
6.32.f Memasang 1 m' pipa PVC tipe AW diameter 10" (untuk sistem perpipaan air bersih)
SNI T-15-2002 / 6.32f
Bahan Pipa PVC
1.0500 M x Rp.
320,600.00 = Rp.
Upah
PS
Pekerja
Tukang
Kepala tukang
Mandor
224,388.15
Pekerja
Tukang
Kepala tukang
Mandor
Pekerja
Tukang
Kepala tukang
Mandor
0.0600
0.1010
0.0060
0.0030
0.0600
0.1010
0.0060
0.0030
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Jumlah (1)
= Rp.
535,284.75
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
3,900.00
9,595.00
660.00
225.00
14,380.00
549,664.75
Dibulatkan
= Rp
549,664.00
475,000.00
25,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
475,000.00
25,000.00
500,000.00
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
0.00
28,500.00
3,300.00
0.00
31,800.00
531,800.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6.33.
Upah
Pekerja
Tukang
Kepala tukang
Mandor
0.0000
0.3000
0.0300
0.0000
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
90
PS
6.34.
Upah
PS
x
x
x
x
Rp.
Rp.
Rp.
Rp.
247,500.00
25,000.00
1,300.00
118,800.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
247,500.00
25,000.00
26,000.00
5,940.00
304,440.00
0.0000
0.5000
0.0500
0.0000
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
0.00
47,500.00
5,500.00
0.00
53,000.00
357,440.00
Bh x Rp.
Bh x Rp.
27,300.00
3,100.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
27,300.00
775.00
28,075.00
0.0000
0.1000
0.0100
0.0000
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
0.00
9,500.00
1,100.00
0.00
10,600.00
38,675.00
1.0000
Bh x Rp.
25,000.00
Jumlah (1)
= Rp.
= Rp.
25,000.00
25,000.00
0.0000
0.1000
0.0100
0.0000
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
0.00
9,500.00
1,100.00
0.00
10,600.00
35,600.00
1.1000
2.5750
0.0150
bh x Rp.
kg x Rp.
M3 x Rp.
27,000.00
1,300.00
118,800.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
29,700.00
3,347.50
1,782.00
34,829.50
Pekerja
Tukang
Kepala tukang
Mandor
x
x
x
x
6.36.
Upah
PS
Bh
Bh
Kg
M
6.35.
Upah
PS
Pekerja
Tukang
Kepala tukang
Mandor
1.0000
1.0000
20.0000
0.0500
Pekerja
Tukang
Kepala tukang
Mandor
x
x
x
x
6.40
91
HIT
HIT
HIT
HIT
Upah
Pekerja
Tukang
Kepala tukang
Mandor
0.1000
0.0500
0.0050
0.0050
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan
PS.4
Memasang 1 m' pipa steel diameter 4" (untuk sistem perpipaan air bersih)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
6,500.00
4,750.00
550.00
375.00
12,175.00
47,004.50
47,004.00
1.0500
M x Rp.
154,770.00
Jumlah (1)
=
=
Rp.
Rp.
162,508.50
162,508.50
Upah
Pekerja
Tukang
Kepala tukang
Mandor
0.1080
0.1800
0.0180
0.0054
Oh
Oh
Oh
Oh
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,020.00
17,100.00
1,980.00
405.00
26,505.00
189,013.50
189,013.00
PS.5
Memasang 1 m' pipa steel diameter 5" (untuk sistem perpipaan air bersih)
x
x
x
x
Rp.
Rp.
Rp.
Rp.
1.0500
M x Rp.
240,000.00
Jumlah (1)
=
=
Rp.
Rp.
252,000.00
252,000.00
Upah
Pekerja
Tukang
Kepala tukang
Mandor
0.1080
0.1800
0.0180
0.0054
Oh
Oh
Oh
Oh
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,020.00
17,100.00
1,980.00
405.00
26,505.00
278,505.00
PS.6
Memasang 1 m' pipa steel diameter 6" (untuk sistem perpipaan air bersih)
x
x
x
x
Rp.
Rp.
Rp.
Rp.
1.0500
M x Rp.
327,250.00
Jumlah (1)
=
=
Rp.
Rp.
343,612.50
343,612.50
Upah
Pekerja
Tukang
Kepala tukang
Mandor
0.1080
0.1800
0.0180
0.0054
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,020.00
17,100.00
1,980.00
405.00
26,505.00
370,117.50
370,117.00
GV.6
Bh x Rp.
1,800,000.00
Rp.
1,800,000.00
Rp.
1,800,000.00
x
x
x
x
Jumlah (1)
92
HIT
Upah
Pekerja
Tukang
Mandor
GV.4
HIT
Upah
Pekerja
Tukang
Mandor
GV.3
HIT
HIT
Upah
Pekerja
Tukang
Mandor
MC.6
1.0000
0.5000
0.2500
Oh x Rp.
Oh x Rp.
Oh x Rp.
65,000.00
95,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
65,000.00
47,500.00
18,750.00
131,250.00
1,931,250.00
1.0000
Bh x Rp.
850,000.00
Rp.
850,000.00
Jumlah (1)
Rp.
850,000.00
1.0000
0.5000
0.2500
Oh x Rp.
Oh x Rp.
Oh x Rp.
65,000.00
95,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
65,000.00
47,500.00
18,750.00
131,250.00
981,250.00
1.0000
M x Rp.
726,000.00
Rp.
726,000.00
Jumlah (1)
Rp.
726,000.00
0.7500
0.3500
0.2500
Oh x Rp.
Oh x Rp.
Oh x Rp.
65,000.00
95,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
48,750.00
33,250.00
18,750.00
100,750.00
826,750.00
Bahan Collar
1.0000
Bh x Rp.
500,000.00
Jumlah (1)
=
=
Rp.
Rp.
500,000.00
500,000.00
Upah
Pekerja
Tukang
Mandor
0.5000
0.2500
0.1250
Oh x Rp.
Oh x Rp.
Oh x Rp.
65,000.00
95,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
32,500.00
23,750.00
9,375.00
65,625.00
565,625.00
MC.4
Bahan Collar
1.0000
Bh x Rp.
350,000.00
Jumlah (1)
=
=
Rp.
Rp.
350,000.00
350,000.00
Upah
0.5000
0.2500
0.1250
Oh x Rp.
Oh x Rp.
Oh x Rp.
65,000.00
95,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
32,500.00
23,750.00
9,375.00
65,625.00
415,625.00
Pekerja
Tukang
Mandor
93
HIT
HIT
HIT
MC.3
Bahan Collar
1.0000
Bh x Rp.
350,000.00
Jumlah (1)
=
=
Rp.
Rp.
350,000.00
350,000.00
Upah
Pekerja
Tukang
Mandor
0.5000
0.2500
0.1250
Oh x Rp.
Oh x Rp.
Oh x Rp.
65,000.00
95,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
32,500.00
23,750.00
9,375.00
65,625.00
415,625.00
PB.2
Upah
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
300,000.00
100,000.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
195.00
95.00
300.00
210.00
800.00
0.7000
3.0000
0.4000
1.0000
0.4000
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
150,000.00
4,500.00
35,450.00
75,000.00
45,000.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
105,000.00
13,500.00
14,180.00
75,000.00
18,000.00
207,680.00
0.4000
0.2000
0.0200
1.0000
Oh x Rp.
Oh x Rp.
Oh x Rp.
Rp.
65,000.00
95,000.00
75,000.00
207,680.00
Jumlah (1) +(2)
Jumlah (1)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
19,000.00
1,500.00
207,680.00
254,180.00
461,860.00
x Rp.
x Rp.
55,000.00
125,000.00
Jumlah (1)
=
=
=
Rp.
Rp.
Rp.
5,940.00
7,875.00
13,815.00
0.2500
0.1880
0.1250
Oh x Rp.
Oh x Rp.
Oh x Rp.
65,000.00
95,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
16,250.00
17,860.00
9,375.00
43,485.00
57,300.00
1.0000
Bh x Rp.
2,750,000.00
Jumlah (1)
=
=
Rp.
Rp.
2,750,000.00
2,750,000.00
Upah
1.0000
0.5000
0.2500
Oh x Rp.
Oh x Rp.
Oh x Rp.
65,000.00
95,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
65,000.00
47,500.00
18,750.00
131,250.00
2,881,250.00
AP.7
Pengelasan penuh 1 m' tebal : 3 mm
Peralatan
Sewa mesin las
Ltr minyak solar
Ltr oli
Transport peralatan
Kawat las
Upah
HIT
HIT
Pekerja
Tukang
Mandor
Peralatan
PP.1
Pemotongan 1 m' plat steel menggunakan titik api
Peralatan
Isi tabung elpiji @ 50 kg
0.1080
Isi tabung zat asam
0.0630
Upah
Pekerja
Tukang
Mandor
AV.4
Pekerja
Tukang
Mandor
94
HIT
HIT
AV.6
1.0000
Bh x Rp.
4,680,000.00
Jumlah (1)
=
=
Rp.
Rp.
4,680,000.00
4,680,000.00
Upah
1.0000
0.5000
0.2500
Oh x Rp.
Oh x Rp.
Oh x Rp.
65,000.00
95,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
65,000.00
47,500.00
18,750.00
131,250.00
4,811,250.00
1.0000
1.0000
6.0000
5.0000
3.0000
1.0000
1.0000
2.0000
1.0000
Bh
Bh
M
Bh
Bh
Bh
Bh
rol
Bh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
295,000.00
81,250.00
14,810.00
14,500.00
15,625.00
11,000.00
46,875.00
3,125.00
14,500.00
Jumlah (1)
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
295,000.00
81,250.00
88,860.00
72,500.00
46,875.00
11,000.00
46,875.00
6,250.00
14,500.00
663,110.00
0.0000
0.0000
0.0000
Oh x Rp.
Oh x Rp.
Oh x Rp.
65,000.00
95,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
0.00
0.00
0.00
0.00
663,110.00
x Rp.
17,300.00
Jumlah (1)
= Rp.
= Rp.
19,895.00
19,895.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,900.00
5,700.00
660.00
225.00
10,485.00
30,380.00
x Rp.
17,300.00
Jumlah (1)
= Rp.
= Rp.
19,895.00
19,895.00
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
3,900.00
5,700.00
660.00
225.00
10,485.00
30,380.00
Pekerja
Tukang
Mandor
SR.1
Sambungan 1 Set rumah
Bahan Water meter 1/2''
Cleam sadle 1/2"
Pipa GIP 1/2"
Elbow GIP 1/2"
Plengking 1/2"
Double naple 1/2"
Stop derat 1/2"
Seal tape
Elbow derat 1/2"
Upah
Pekerja
Tukang
Mandor
SNI 7393:2008
PEKERJAAN BESI DAN ALUMINIUM
PBA 6.1
Memasang 1 kg besi profil
SNI 7393:2008 /6.1
Bahan Besi profil WF
1.1500 Kg
Upah
Pekerja
Tukang las
Kepala tukang
Mandor
0.0600
0.0600
0.0060
0.0030
Oh
Oh
Oh
Oh
x
x
x
x
x
x
x
x
x
PBA 6.2
Upah
Pekerja
Tukang las
Kepala tukang
Mandor
0.0600
0.0600
0.0060
0.0030
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
95
PBA 6.3
4,500.00
44,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
0.1000
0.1000
0.0010
0.0050
0.0080
65,000.00
95,000.00
110,000.00
75,000.00
100,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,500.00
9,500.00
110.00
375.00
800.00
17,285.00
26,185.00
Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
SNI 7393:2008 /6.4
Bahan Besi siku L 30.30.3
15.0000 kg
x Rp.
17,300.00
Besi plat baja
32.8000 kg
x Rp.
17,300.00
kawat las
0.0500 kg
x Rp.
45,000.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
259,500.00
567,440.00
2,250.00
829,190.00
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,500.00
9,500.00
110.00
375.00
16,485.00
845,675.00
45,000.00
4,500.00
44,000.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
1,800.00
135.00
176.00
2,111.00
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,500.00
9,500.00
110.00
375.00
16,485.00
18,596.00
1.0000 M
x Rp.
467,000.00
Jumlah (1)
= Rp.
= Rp.
467,000.00
467,000.00
1.5000
1.0500
0.1050
0.0052
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
97,500.00
99,750.00
11,550.00
390.00
209,190.00
676,190.00
Upah
Pekerja
Tukang besi
Kepala tukang
Mandor
Sewa alat
Oh
Oh
Oh
Oh
jam
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
4,500.00
4,400.00
8,900.00
PBA 6.4
Upah
Pekerja
Tukang besi
Kepala tukang
Mandor
0.1000
0.1000
0.0010
0.0050
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
PBA 6.5
Upah
Pekerja
Tukang besi
Kepala tukang
Mandor
0.1000
0.1000
0.0010
0.0050
Oh
Oh
Oh
Oh
x
x
x
x
PBA 6.7
Upah
Pekerja
Tukang las biasa
Kepala tukang
Mandor
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
96
PBA 6.8
Upah
Pekerja
Tukang
Kepala tukang
Mandor
467,000.00
Jumlah (1)
= Rp.
= Rp.
467,000.00
467,000.00
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
28,600.00
41,800.00
4,840.00
1,650.00
76,890.00
543,890.00
1.1000 m
x Rp.
2.0000 Buah x Rp.
0.0600 Tube x Rp.
90,000.00
400.00
40,000.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
99,000.00
800.00
2,400.00
102,200.00
0.4300
0.4300
0.0043
0.0021
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,950.00
40,850.00
473.00
157.50
69,430.50
171,630.50
Dibulatkan
= Rp
171,630.00
x Rp.
x Rp.
90,000.00
30,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
396,000.00
438,000.00
834,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,525.00
8,075.00
935.00
315.00
14,850.00
848,850.00
x Rp.
x Rp.
x Rp.
132,000.00
156,000.00
40,000.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
580,800.00
171,600.00
10,800.00
763,200.00
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,525.00
8,075.00
990.00
375.00
14,965.00
778,165.00
0.4400
0.4400
0.0440
0.0220
Oh
Oh
Oh
Oh
x
x
x
x
PBA 6.11
Upah
Pekerja
Tukang
Kepala tukang
Mandor
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
PBA 6.12
Upah
Pekerja
Tukang
Kepala tukang
Mandor
0.0850
0.0850
0.0085
0.0042
Oh
Oh
Oh
Oh
PBA 6.13
Upah
Pekerja
Tukang
Kepala tukang
Mandor
0.0850
0.0850
0.0090
0.0050
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
97
PBA 6.13a
Upah
Pekerja
Tukang
Kepala tukang
Mandor
132,000.00
120,000.00
40,000.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
580,800.00
132,000.00
10,800.00
723,600.00
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,525.00
8,075.00
990.00
375.00
14,965.00
738,565.00
1.0000 M
x Rp.
175,000.00
Jumlah (1)
= Rp.
= Rp.
175,000.00
175,000.00
0.3500
0.3500
0.0350
0.0180
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
22,750.00
33,250.00
3,850.00
1,350.00
61,200.00
236,200.00
1.0000 M
x Rp.
185,000.00
Jumlah (1)
= Rp.
= Rp.
185,000.00
185,000.00
0.3500
0.3500
0.0350
0.0180
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
22,750.00
33,250.00
3,850.00
1,350.00
61,200.00
246,200.00
x Rp.
x Rp.
17,250.00
1,859.60
Jumlah (1)
= Rp.
= Rp.
= Rp.
106,553.25
50,357.97
106,553.25
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
108,550.00
158,650.00
18,370.00
6,225.00
291,795.00
398,348.25
Dibulatkan
= Rp
0.0850
0.0850
0.0090
0.0050
Oh
Oh
Oh
Oh
x
x
x
x
PBA 6.14
Upah
Tukang kayu
Pekerja
Kepala tukang
Mandor
Oh
Oh
Oh
Oh
PBA 6.14a
Upah
Tukang kayu
Pekerja
Kepala tukang
Mandor
Oh
Oh
Oh
Oh
PBA 6.15
Upah
Tukang las
Pekerja
Kepala tukang
Mandor
1.6700
1.6700
0.1670
0.0830
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
398,348.00
98
PBA 6.16
Upah
Pekerja
Tukang
Kepala tukang
Mandor
1.1000 M
11.1100 cm
1.7600 m
0.1000
0.1000
0.0100
0.0050
Oh
Oh
Oh
Oh
x Rp.
x Rp.
x Rp.
19,000.00
1,859.60
17,250.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
20,900.00
20,660.16
30,360.00
71,920.16
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,500.00
9,500.00
1,100.00
375.00
17,475.00
89,395.16
Dibulatkan
= Rp
x Rp.
x Rp.
x Rp.
130,000.00
300.00
17,250.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
143,000.00
3,000.00
120,750.00
266,750.00
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13,000.00
19,000.00
2,200.00
75.00
34,275.00
301,025.00
68,000.00
17,000.00
5,000,000.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
20,400.00
255.00
95,000.00
115,655.00
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13,000.00
38,000.00
2,750.00
750.00
54,500.00
170,155.00
Dibulatkan
= Rp
170,155.00
=
=
=
=
=
184,950.00
34,672.50
20,000.00
74,384.00
314,006.50
Rp.
Rp.
Rp.
Rp.
89,395.00
PBA 6.17
Upah
Pekerja
Tukang
Kepala tukang
Mandor
0.2000
0.2000
0.0200
0.0010
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
PBA 6.18
Upah
Spl
Pekerja
Tukang kayu
Kepala tukang
Mandor
JJk
Memasang 1 m2 jerjak besi beton
Bahan Besi beton dia 10 mm
Besi strip 20.3,2
Asesories
Pengelasan
0.2000
0.4000
0.0250
0.0100
12.3300
2.0100
1.0000
40.0000
Oh
Oh
Oh
Oh
Kg
Kg
set
cm
x
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
15,000.00
17,250.00
20,000.00
1,859.60
Jumlah (1)
Rp.
Rp.
Rp.
Rp.
Rp.
99
Upah
PBA 6.19
Upah
Pekerja
Tukang kayu
Kepala tukang
Mandor
14.3400 Kg
40.0000 cm
x Rp.
x Rp.
1,048.50
1,648.50
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
15,035.49
65,940.00
80,975.49
394,981.99
Dibulatkan
= Rp
394,981.00
x Rp.
x Rp.
x Rp.
70,000.00
17,000.00
17,250.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
21,000.00
255.00
8,625.00
29,880.00
0.1500
0.3000
0.0300
0.0080
x
x
x
x
Rp.
Rp.
Rp.
Rp.
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,750.00
28,500.00
3,300.00
600.00
42,150.00
72,030.00
1.1000 M
0.0200 Kg
0.0018 M
x Rp.
x Rp.
x Rp.
25,000.00
17,000.00
6,814,800.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
27,500.00
340.00
12,266.64
40,106.64
0.1000
0.1000
0.0100
0.0005
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,500.00
9,500.00
1,100.00
37.50
17,137.50
57,244.14
Dibulatkan
= Rp
57,244.00
Oh
Oh
Oh
Oh
PBA 7.13
Upah
Pekerja
Tukang kayu
Kepala tukang
Mandor
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
PBA 7.15
Upah
Pekerja
Tukang kayu
Kepala tukang
Mandor
1.1000 M
0.0200 Kg
0.0018 Kg
x Rp.
x Rp.
x Rp.
13,000.00
17,000.00
17,250.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
14,300.00
340.00
31.05
14,671.05
0.1000
0.1000
0.0100
0.0005
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,500.00
9,500.00
1,100.00
37.50
17,137.50
31,808.55
Dibulatkan
= Rp
31,808.00
= Rp.
= Rp.
16,500.00
340.00
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
PBA 7.16
1.1000 M
0.0200 Kg
x Rp.
x Rp.
15,000.00
17,000.00
100
Upah
0.0018 Kg
x Rp.
17,250.00
Jumlah (1)
= Rp.
= Rp.
31.05
16,871.05
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.1000
0.1000
0.0100
0.0005
x
x
x
x
65,000.00
95,000.00
110,000.00
75,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
6,500.00
9,500.00
1,100.00
37.50
17,137.50
34,008.55
Dibulatkan
= Rp
SNI 2002-ABK PC
PC
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
PEKERJAAN PENGECATAN
0.1500 Oh
0.0025 Oh
x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
0.1500 Oh
0.0025 Oh
x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
=
=
=
=
Rp.
Rp.
Rp.
Rp.
= Rp
605.00
605.00
9,750.00
187.50
9,937.50
10,542.50
10,542.00
= Rp.
= Rp.
=
=
=
=
Rp.
Rp.
Rp.
Rp.
= Rp
515.00
515.00
9,750.00
187.50
9,937.50
10,452.50
10,452.00
6.3.
Upah
Pekerja
Mandor
0.1500 Oh
0.0025 Oh
x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
PC
= Rp.
= Rp.
6.2.
Upah
PC
34,008.00
6.1
Upah
PC
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
= Rp.
= Rp.
=
=
=
=
Rp.
Rp.
Rp.
Rp.
= Rp
515.00
515.00
9,750.00
187.50
9,937.50
10,452.50
10,452.00
6.4
x Rp.
10,300.00
Jumlah (1)
= Rp.
= Rp.
515.00
515.00
101
Upah
Pekerja
Mandor
0.1500 Oh
0.0025 Oh
x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
PC
Pekerja
Tukang cat
Kepala tukang
Mandor
10,452.00
0.0800 Kg
0.0200 Kg
0.1000 Lbr
x Rp.
31,600.00
x Rp.
15,000.00
x Rp.
1,800.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
2,528.00
300.00
180.00
3,008.00
0.0400
0.0400
0.0400
0.0025
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,600.00
3,800.00
4,400.00
187.50
10,987.50
13,995.50
Dibulatkan
= Rp
13,995.00
Oh
Oh
Oh
Oh
Pekerja
Tukang cat
Kepala tukang
Mandor
0.1500 Kg
0.1700 Kg
0.1700 Kg
x Rp.
15,700.00
x Rp.
15,000.00
x Rp.
59,100.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
2,355.00
2,550.00
10,047.00
14,952.00
0.0700
0.0750
0.0075
0.0025
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,550.00
7,125.00
825.00
187.50
12,687.50
27,639.50
Dibulatkan
= Rp
27,639.00
x Rp.
15,000.00
x Rp.
59,100.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
2,550.00
15,366.00
17,916.00
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
4,550.00
7,125.00
825.00
187.50
12,687.50
30,603.50
Dibulatkan
= Rp
Oh
Oh
Oh
Oh
6.7a
Upah
PC
= Rp
9,750.00
187.50
9,937.50
10,452.50
6.7
Upah
PC
Rp.
Rp.
Rp.
Rp.
6.6
Upah
PC
=
=
=
=
Pekerja
Tukang cat
Kepala tukang
Mandor
0.0700
0.0750
0.0075
0.0025
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Pengecatan 1M bidang kayu baru 1 lps Plamir, 1 lps cat dasar, 2 lps cat minyak
SNI 2002-ABK PC / 6.8
Bahan Cat menie kayu
0.2000 Kg
x Rp.
43,000.00 = Rp.
Plamir
0.1500 Kg
x Rp.
15,700.00 = Rp.
30,603.00
6.8
8,600.00
2,355.00
102
Upah
PC
PC
0.1700 Kg
0.2600 Kg
x Rp.
22,300.00
x Rp.
59,100.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
3,791.00
15,366.00
30,112.00
Pekerja
Tukang cat
Kepala tukang
Mandor
0.0700
0.0900
0.0090
0.0025
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
4,550.00
8,550.00
990.00
187.50
14,277.50
44,389.50
Dibulatkan
= Rp
Oh
Oh
Oh
Oh
6.9
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
44,389.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
8,600.00
2,355.00
3,791.00
20,685.00
35,431.00
Upah
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,550.00
9,975.00
1,155.00
187.50
15,867.50
51,298.50
Dibulatkan
= Rp
51,298.00
Pekerja
Tukang cat
Kepala tukang
Mandor
0.0700
0.1050
0.0105
0.0025
Oh
Oh
Oh
Oh
x
x
x
x
6.11
Upah
PC
Cat dasar
Cat minyak
Pekerja
Tukang cat
Kepala tukang
Mandor
0.1500 Kg
0.3720 Kg
2.0000 Kg
x Rp.
15,000.00
x Rp.
50,000.00
x Rp.
1,800.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
2,250.00
18,600.00
3,600.00
24,450.00
0.0400
0.0600
0.0160
0.0025
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,600.00
5,700.00
1,760.00
187.50
10,247.50
34,697.50
Dibulatkan
= Rp
34,697.00
Oh
Oh
Oh
Oh
6.12
Upah
Pekerja
Mandor
0.3500 Kg
x Rp.
6,700.00
Jumlah (1)
= Rp.
= Rp.
2,345.00
2,345.00
0.1000 Oh
0.0060 Oh
x Rp.
65,000.00
x Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
6,500.00
450.00
6,950.00
9,295.00
Rp.
Rp.
Rp.
Rp.
103
PC
6.13
Upah
PC
Ltr
Kg
Lbr
bh
x
x
x
x
Rp.
50,000.00
Rp.
31,600.00
Rp.
1,800.00
Rp.
15,000.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
7,500.00
1,580.00
180.00
150.00
9,410.00
0.1600
0.1600
0.0160
0.0025
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,400.00
15,200.00
1,760.00
187.50
27,547.50
36,957.50
Dibulatkan
= Rp
Pengecatan 1M tembok baru (1 lapis plamir,1 lapis cat dasar,2 lapis cat penutup)
SNI 2002-ABK PC / 6.14
Bahan Plamir
0.1200 Kg
x Rp.
15,700.00 = Rp.
Cat dasar
0.1200 Kg
x Rp.
22,300.00 = Rp.
Cat Tembok 2 x
0.2600 Kg
x Rp.
22,700.00 = Rp.
Jumlah (1)
= Rp.
36,957.00
6.14
Upah
PC
Pekerja
Tukang cat
Kepala tukang
Mandor
0.1500
0.0500
0.1000
0.0100
Pekerja
Tukang cat
Kepala tukang
Mandor
0.0400
0.1200
0.0120
0.0020
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
1,884.00
2,676.00
5,902.00
10,462.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,600.00
11,400.00
1,320.00
150.00
15,470.00
25,932.00
= Rp.
= Rp.
= Rp.
2,676.00
5,902.00
8,578.00
6.15
Upah
Pekerja
Tukang cat
Kepala tukang
Mandor
0.0300
0.0900
0.0090
0.0015
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Dibulatkan
= Rp
1,950.00
8,550.00
990.00
112.50
11,602.50
20,180.50
20,180.00
104
PC
6.15a
x Rp.
22,700.00
Jumlah (1)
= Rp.
= Rp.
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Dibulatkan
= Rp
17,504.00
x Rp.
110,000.00
Jumlah (1)
= Rp.
= Rp.
28,600.00
28,600.00
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
1,950.00
8,550.00
990.00
112.50
11,602.50
40,202.50
Dibulatkan
= Rp
40,202.00
x Rp.
43,000.00
x Rp.
15,000.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
4,300.00
150.00
4,450.00
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
Dibulatkan
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
1,300.00
1,900.00
2,200.00
750.00
6,150.00
10,600.00
10,600.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
4,300.00
150.00
7,666.60
12,116.60
Upah
PC
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,950.00
8,550.00
990.00
112.50
11,602.50
17,504.50
Pekerja
Tukang cat
Kepala tukang
Mandor
0.0300
0.0900
0.0090
0.0015
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6.20
Upah
PC
0.0300
0.0900
0.0090
0.0015
6.15b
Upah
PC
Pekerja
Tukang cat
Kepala tukang
Mandor
5,902.00
5,902.00
Pekerja
Tukang cat
Kepala tukang
Mandor
0.0200
0.0200
0.0200
0.0100
Oh
Oh
Oh
Oh
6.21.
105
Upah
PC
Pekerja
Tukang cat
Kepala tukang
Mandor
0.2500
0.2250
0.0225
0.0075
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
16,250.00
21,375.00
2,475.00
562.50
40,662.50
52,779.10
Dibulatkan
= Rp
52,779.00
6.26
Upah
Pekerja
Tukang cat
Kepala tukang
Mandor
0.3000 Kg
x Rp.
55,000.00
Jumlah (1)
= Rp.
= Rp.
16,500.00
16,500.00
0.0300
0.0900
0.0090
0.0015
x
x
x
x
Rp.
65,000.00
Rp.
95,000.00
Rp.
110,000.00
Rp.
75,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
1,950.00
8,550.00
990.00
112.50
11,602.50
28,102.50
Dibulatkan
= Rp
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
28,102.00
SIZE
3
4
5
6
6.5
7
8
9
10
11
12
13
14
15
16
19
22
23
25
28
29
31
32
dia
dia
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
0.66
1.18
1.84
2.66
3.20
3.62
4.74
5.98
7.40
8.95
10.65
12.50
14.52
16.65
18.96
26.76
35.76
39.10
46.20
57.96
62.28
71.10
75.72
WEIGHT/M'
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
3"
2,5"
M5
0.055
0.098
0.153
0.222
0.267
0.302
0.395
0.498
0.617
0.746
0.888
1.042
1.210
1.388
1.580
2.230
2.980
3.258
3.850
4.830
5.190
5.925
6.310
4.52
2.4
2.1
5.1
10.71 M2
21.33 Kg/10,71m2
1.99 Kg/m2
1.99 Kg/m2
287730
26865.55
upah
#REF!
10.71
#REF!
1227
39,951.50
250,200.00 /lbr
23,300.00 /m2
#REF!
287730
26865.55
WEIGHT/M'
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
613.50
13,085.96
26865.55
30895.378
39,951.50
#REF!
#REF!
No
1
Kode Analisa
2
Uraian Pekerjaan
3
Pagar sementara 1 m' dari seng gelombang tinggi 2
meter
Bahan
Upah
Jumlah Harga
4
406,165.20
48,700.00
454,865.20
73,172.70
17,475.00
90,647.70
1,002,727.00
280,750.00
1,283,477.00
6,875.00
6,875.00
PA 6.2
PA 6.4
PA 6.5
PA 6.8
PA 6.13
458,330.00
458,330.00
PA 6.14
343,750.00
343,750.00
PA 6.15
7,310.00
115,810.00
PT 6.1
50,625.00
50,625.00
PT 6.2
61,875.00
61,875.00
10
PT 6.4
67,400.00
67,400.00
11
PT 6.5
102,000.00
102,000.00
12
PT 6.6
81,375.00
81,375.00
13
PT 6.7
3,625.00
3,625.00
14
PT 6.8
22,200.00
22,200.00
15
PT 6.9
16,858.00
16,858.00
16
PT 6.10
36,250.00
36,250.00
17
PT 6.11
126,240.00
20,250.00
146,490.00
160,749.20
100,400.00
261,149.20
176,675.20
100,400.00
277,075.20
108,500.00
18
PT 6.12
19
PT 6.13
20
PT 6.15
169,800.00
18,125.00
187,925.00
21
PT 6.15a
Menimbun 1 m3 tanah
98,880.00
18,125.00
117,005.00
22
PP 6.1
626,338.00
182,625.00
808,963.00
23
PP 6.2
579,796.00
182,625.00
762,421.00
24
PP 6.3
547,547.20
182,625.00
730,172.20
25
PP 6.4
524,866.80
182,625.00
707,491.80
26
PP 6.5
493,799.20
182,625.00
676,424.20
27
PP 6.9
351,566.40
94,965.00
446,531.40
28
PP 6.10
2,475,960.80
323,850.00
2,799,810.80
29
PP 6.11
544,647.80
249,725.00
794,372.80
136,054.00
62,450.00
198,504.00
123,645.80
62,450.00
186,095.80
115,563.40
62,450.00
178,013.40
64,149.40
31,225.00
95,374.40
58,433.00
31,225.00
89,658.00
55,058.40
31,225.00
86,283.40
30
31
32
33
PD 6.1
PD 6.2
PD 6.4
PD 6.7
tebal 1 bata,
tebal 1 bata,
tebal 1 bata,
tebal 1/2 bata,
tebal 1/2 bata,
34
PD 6.8
35
PD 6.9
36
PD 6.9a
63,851.00
31,225.00
95,076.00
37
PD 6.10
52,930.00
31,225.00
84,155.00
38
PD 6.30
579,796.00
374,700.00
954,496.00
39
PD 7.1
592,600.00
140,375.00
732,975.00
40
PPL 6.1
22,056.00
36,525.00
58,581.00
41
PPL 6.2
15,667.20
36,525.00
52,192.20
42
PPL 6.3
12,841.20
36,525.00
49,366.20
No
1
Kode Analisa
2
43
PPL 6.4
44
Uraian Pekerjaan
3
Bahan
Upah
10,963.20
36,525.00
47,488.20
PPL 6.13
20,929.20
48,850.00
69,779.20
45
PPL 6.14
17,161.20
48,850.00
66,011.20
46
PPL 6.15
14,617.60
48,850.00
63,467.60
47
PPL 6.16
13,143.60
48,850.00
61,993.60
48
PPL 6.23
6,328.80
31,225.00
37,553.80
49
PPL 6.26
9,667.60
36,525.00
46,192.60
50
PPL 6.27
Memasang 1 m2 Acian
4,225.00
12,175.00
16,400.00
11,468,690.00
2,707,250.00
14,175,940.00
8,239,010.00
2,320,500.00
10,559,510.00
6,061,250.00
2,320,500.00
8,381,750.00
282,330.00
135,400.00
417,730.00
200,850.00
135,400.00
336,250.00
301,480.00
386,750.00
688,230.00
220,000.00
386,750.00
606,750.00
285,388.00
309,400.00
594,788.00
236,500.00
309,400.00
545,900.00
470,368.00
386,750.00
857,118.00
340,000.00
386,750.00
726,750.00
261,435.00
270,725.00
532,160.00
210,510.00
270,725.00
481,235.00
Jumlah Harga
4
51
PK 6.1
52
PK 6.2
53
PK 6.2a
54
PK 6.3
55
PK 6.4
56
PK 6.5
57
PK 6.5a
58
PK 6.6
59
PK 6.6a
60
PK 6.7
61
PK 6.7a
62
PK 6.8
63
PK 6.8a
64
PK 6.10
424,770.00
280,675.00
705,445.00
65
PK 6.10a
302,550.00
280,675.00
583,225.00
238,435.00
309,400.00
547,835.00
187,510.00
309,400.00
496,910.00
11,761,390.00
1,547,000.00
13,308,390.00
7,850,230.00
1,547,000.00
9,397,230.00
5,853,950.00
1,547,000.00
7,400,950.00
66
PK 6.11
67
PK 6.11a
68
PK 6.13
69
PK 6.13a
70
PK 6.13b
71
PK 6.15
11,458,440.00
928,200.00
12,386,640.00
72
PK 6.15a
7,547,280.00
928,200.00
8,475,480.00
186,769.04
17,475.00
204,244.04
124,190.48
17,475.00
141,665.48
148,723.76
17,475.00
166,198.76
1,127,842.00
20,970.00
1,148,812.00
80,400.00
47,175.00
127,575.00
85,750.00
45,550.00
131,300.00
52,366.40
28,075.00
80,441.40
37,700.00
28,075.00
65,775.00
78,257.00
28,075.00
106,332.00
142,550.00
58,050.00
200,600.00
220,850.00
77,350.00
298,200.00
26,850.00
9,705.00
36,555.00
73
PK 6.16
74
PK 6.16a
75
PK 6.17
76
PK 6.18
77
PK 6.19
78
PK 6.20
79
PK 6.21
80
PK 6.21a
81
PK 6.22
82
PK 6.23
83
PK 6.25
84
PK 6.27
No
1
Kode Analisa
2
85
PK 6.28
86
PK 6.38
87
PB 6.1
88
PB 6.2
89
PB 6.3
90
PB 6.4
91
PB 6.5
92
PB 6.5a
93
PB 6.6
94
PB 6.7
95
PB 6.8
96
PB 6.9
97
PB 6.10
98
PB 6.11
99
PB 6.12
Uraian Pekerjaan
3
Memasang 1 m2 dinding bilik bambu, kayu kelas III :
Memasang 1 m2 rangka langit-langit (1.00x1.00)m,
kayu kelas III :
Membuat 1 m3 beton mutu fc = 7,4 MPa (K 100),
slump (12 2) cm, w/c = 0,87
Membuat 1 m3 beton mutu fc = 9,8 MPa (K 125),
slump (12 2) cm, w/c = 0,78
Membuat 1 m3 beton mutu fc = 12,2 MPa (K 150),
slump (C1216) cm, w/c = 0,72
Membuat 1 m3 lantai kerja beton mutu fc = 7,4 MPa
(K 100), slump (3-6)cm, w/c = 0,87
Membuat 1 m3 beton mutu fc = 14,5 MPa (K 175),
slump (12 2)cm, w/c = 0,66
Membuat dan menghampar 1 m3 mutu beton fc =
14,5 MPa (K 175), slump (122)cm, w/c=0,66
Membuat 1 m3 beton mutu fc = 16,9 MPa (K 200),
slump (12 2)cm, w/c = 0,61
Membuat 1 m3 beton mutu fc = 19,3 MPa (K 225),
slump (12 2)cm, w/c = 0,58
Membuat 1 m3 beton mutu fc = 21,7 MPa (K 250),
slump (12 2) cm, w/c = 0,56
Membuat 1 m3 beton mutu fc = 24, MPa (K 275),
slump (12 2) cm, w/c = 0,53
Membuat 1 m3 beton mutu fc = 26,4 MPa (K 300),
slump (12 2) cm, w/c = 0,52
Membuat 1 m3 beton mutu fc = 28,8 MPa (K 325),
slump (12 2) cm, w/c = 0,49
Membuat 1 m3 beton mutu fc = 31,2 MPa (K 350),
slump (12 2) cm, w/c = 0,48
Bahan
Upah
Jumlah Harga
4
106,204.00
12,175.00
118,379.00
61,700.00
41,875.00
103,575.00
633,957.00
139,430.00
773,387.00
670,661.00
139,430.00
810,091.00
698,921.00
142,680.00
841,601.00
619,856.00
103,700.00
723,556.00
732,992.00
142,680.00
875,672.00
732,992.00
428,040.00
1,161,032.00
764,483.00
142,680.00
907,163.00
789,616.00
142,680.00
932,296.00
804,162.00
142,680.00
946,842.00
829,103.00
142,680.00
971,783.00
836,803.00
142,680.00
979,483.00
866,213.00
181,475.00
1,047,688.00
876,290.00
181,475.00
1,057,765.00
100 PB 6.17
16,030.50
1,227.00
17,257.50
101 PB 6.20
79,531.00
63,310.00
142,841.00
102 PB 6.21
89,114.25
63,310.00
152,424.25
103 PB 6.22
185,070.75
80,355.00
265,425.75
104 PB 6.23
190,820.70
80,355.00
271,175.70
105 PB 6.24
289,070.75
80,355.00
369,425.75
106 PB 6.25
305,487.50
80,355.00
385,842.50
107 PB 6.26
331,493.50
80,355.00
411,848.50
108 PB 6.27
137,399.12
15,650.00
153,049.12
3,950,875.00
642,900.00
4,593,775.00
5,030,491.00
731,330.00
5,761,821.00
9,262,185.00
911,430.00
10,173,615.00
6,995,518.00
789,105.00
7,784,623.00
6,949,327.00
642,900.00
7,592,227.00
6,379,995.00
642,900.00
7,022,895.00
6,442,601.50
731,330.00
7,173,931.50
62,294.50
18,735.00
81,029.50
79,500.10
30,935.00
110,435.10
109 PB 6.28
110 PB 6.29
111 PB 6.30
112 PB 6.31
113 PB 6.32
114 PB 6.33
115 PB 6.34
116 PB 6.35
117 PB 6.36
146,408.04
37,090.72
183,498.76
606,046.78
161,889.85
767,936.63
120 PB 7.1
613,596.00
139,750.00
753,346.00
121 PB 7.2
600,704.00
139,750.00
740,454.00
122 PB 7.6
705,856.00
139,750.00
845,606.00
123 PB 7.6a
705,856.00
279,500.00
985,356.00
124 PB 7.13
751,620.00
139,750.00
891,370.00
751,620.00
419,250.00
1,170,870.00
22,380.00
16,760.00
39,140.00
125 PB 7.13a
126 PPA 6.15
No
1
Kode Analisa
2
Uraian Pekerjaan
3
Bahan
Upah
Jumlah Harga
4
28,500.00
16,760.00
45,260.00
62,100.00
19,065.00
81,165.00
43,900.00
19,065.00
62,965.00
66,510.00
24,350.00
90,860.00
220,510.00
24,350.00
244,860.00
69,700.00
23,675.00
93,375.00
59,800.00
37,890.00
97,690.00
63,641.60
48,700.00
112,341.60
143,441.60
48,700.00
192,141.60
374,495.50
24,350.00
398,845.50
28,180.00
17,730.00
45,910.00
51,870.00
35,075.00
86,945.00
34,600.00
14,610.00
49,210.00
12,500.00
17,730.00
30,230.00
24,865.00
18,205.00
43,070.00
103,720.00
18,205.00
121,925.00
73,312.00
18,205.00
91,517.00
63,860.00
17,850.00
81,710.00
21,000.00
15,650.00
36,650.00
225,000.00
67,725.00
292,725.00
85,000.00
49,625.00
134,625.00
50,000.00
48,562.50
98,562.50
40,000.00
48,562.50
88,562.50
15,000.00
17,437.50
32,437.50
11,000.00
11,625.00
22,625.00
25,000.00
23,250.00
48,250.00
9,100.00
16,931.25
26,031.25
15,000.00
16,931.25
31,931.25
110,000.00
56,437.50
166,437.50
35,000.00
22,575.00
57,575.00
115,000.00
56,437.50
171,437.50
40,000.00
11,287.50
51,287.50
225,000.00
67,725.00
292,725.00
12,500.00
28,218.75
40,718.75
88,000.00
16,931.25
104,931.25
143,000.00
17,493.75
160,493.75
236,500.00
18,622.50
255,122.50
134,000.00
17,493.75
151,493.75
192,500.00
17,493.75
209,993.75
308,000.00
18,622.50
326,622.50
166,430.00
17,493.75
183,923.75
302,500.00
28,218.75
330,718.75
No
1
Kode Analisa
2
Uraian Pekerjaan
3
Bahan
Upah
Jumlah Harga
4
171,600.00
17,493.75
189,093.75
80,500.00
52,425.00
132,925.00
94,500.00
52,425.00
146,925.00
16,670.00
9,482.50
26,152.50
15,570.00
9,482.50
25,052.50
98,600.00
16,845.00
115,445.00
100,030.00
14,725.00
114,755.00
103,300.00
14,725.00
118,025.00
24,885.00
15,412.50
40,297.50
36,135.00
15,412.50
51,547.50
28,358.00
12,175.00
40,533.00
24,172.00
12,175.00
36,347.00
36,366.00
12,175.00
48,541.00
8,595.00
10,485.00
19,080.00
138,000.00
87,375.00
225,375.00
7,320.00
8,775.00
16,095.00
76,420.00
46,295.00
122,715.00
85,520.00
60,962.50
146,482.50
41,374.00
22,775.00
64,149.00
329,969.00
30,530.00
360,499.00
333,902.00
31,655.00
365,557.00
360,651.00
29,220.00
389,871.00
123,501.00
29,220.00
152,721.00
341,903.00
30,530.00
372,433.00
344,585.00
31,655.00
376,240.00
168,483.40
15,765.00
184,248.40
100,903.40
15,765.00
116,668.40
269,303.40
15,765.00
285,068.40
36,513.40
15,765.00
52,278.40
37,363.40
15,765.00
53,128.40
1,188,180.50
85,225.00
1,273,405.50
1,613,193.00
85,225.00
1,698,418.00
553,193.00
85,225.00
638,418.00
86,721.00
85,225.00
171,946.00
91,872.70
85,225.00
177,097.70
102,437.00
85,225.00
187,662.00
96,721.00
85,225.00
181,946.00
91,411.00
85,225.00
176,636.00
209,020.50
85,225.00
294,245.50
8,165.16
15,727.50
23,892.66
377,328.20
79,650.00
456,978.20
210 G 67a
99,880.00
19,443.00
119,323.00
No
1
Kode Analisa
2
Uraian Pekerjaan
3
Bahan
Upah
Jumlah Harga
4
211 G 67b
36,880.40
5,380.00
42,260.40
35,000.00
29,745.00
64,745.00
108,500.00
29,745.00
138,245.00
129,500.00
20,970.00
150,470.00
410,925.00
85,225.00
496,150.00
117,203.40
95,550.00
212,753.40
142,103.40
95,550.00
237,653.40
121,103.40
88,950.00
210,053.40
130,103.40
88,950.00
219,053.40
1,186,415.90
109,575.00
1,295,990.90
1,610,753.40
109,575.00
1,720,328.40
89,315.90
109,575.00
198,890.90
87,493.40
109,575.00
197,068.40
85,218.40
109,575.00
194,793.40
88,745.10
109,575.00
198,320.10
374,754.50
158,275.00
533,029.50
137,388.50
121,750.00
259,138.50
166,433.00
79,650.00
246,083.00
134,383.00
85,225.00
219,608.00
119,756.00
26,250.00
146,006.00
111,202.00
26,250.00
137,452.00
82,320.00
41,395.00
123,715.00
93,480.00
26,212.50
119,692.50
107,160.00
26,212.50
133,372.50
87,750.00
67,407.50
155,157.50
14,171.00
14,171.00
17,545.00
17,545.00
20,244.00
20,244.00
22,741.00
22,741.00
25,306.00
25,306.00
56,684.00
56,684.00
70,180.00
70,180.00
80,976.00
80,976.00
90,964.00
90,964.00
2,173,000.00
385,500.00
2,558,500.00
177,488.00
231,500.00
408,988.00
247 PS 6.4
609,863.00
178,500.00
788,363.00
248 PS 6.5
484,988.00
239,750.00
724,738.00
472,000.00
182,490.00
654,490.00
767,140.00
535,500.00
1,302,640.00
245 PS 6.1
246 PS 6.3
249 PS 6.7
250 PS 6.8
251 PS 6.15
110,395.60
46,265.00
156,660.60
252 PS 6.16
190,172.00
210,790.00
400,962.00
No
1
Kode Analisa
2
Uraian Pekerjaan
3
Memasang 1 buah Bak Kontrol pasangan batu bata
uk.(45 x 45) cm tinggi 50 cm
Memasang 1 buah Bak Kontrol pasangan batu bata
uk.(60 x 60) cm tinggi 65 cm
296,244.00
147,730.00
443,974.00
452,478.40
231,320.00
683,798.40
255 PS 6.19
22,955.50
15,075.00
38,030.50
256 PS 6.20
33,759.00
15,075.00
48,834.00
257 PS 6.21
43,198.50
15,075.00
58,273.50
258 PS 6.21b
62,410.50
15,075.00
77,485.50
259 PS 6.22
84,118.50
26,505.00
110,623.50
260 PS 6.22b
39,675.00
26,505.00
66,180.00
261 PS 6.23
121,799.00
26,505.00
148,304.00
262 PS 6.23b
90,367.00
26,505.00
116,872.00
263 PS 6.24
159,340.00
26,505.00
185,845.00
264 PS 6.24b
118,220.00
26,505.00
144,725.00
265 PS 6.25
3,565.00
8,835.00
12,400.00
266 PS 6.25b
2,415.00
4,417.50
6,832.50
267 PS 6.26
5,629.60
8,835.00
14,464.60
268 PS 6.26b
4,176.80
4,417.50
8,594.30
269 PS 6.27
8,703.25
8,835.00
17,538.25
270 PS 6.27a
5,895.75
4,417.50
10,313.25
271 PS 6.27b
12,409.60
8,835.00
21,244.60
272 PS 6.27c
9,307.20
4,417.50
13,724.70
273 PS 6.28
22,103.00
8,835.00
30,938.00
274 PS 6.28b
14,973.00
4,417.50
19,390.50
275 PS 6.29
31,767.25
13,252.50
45,019.75
276 PS 6.29b
21,519.75
6,685.00
28,204.75
277 PS 6.30
45,424.30
13,252.50
58,676.80
278 PS 6.30b
30,771.30
6,685.00
37,456.30
279 PS 6.31
65,873.45
19,882.50
85,755.95
280 PS 6.31a
36,735.00
19,882.50
56,617.50
281 PS 6.31b
44,623.95
9,640.00
54,263.95
282 PS 6.32
97,324.50
19,882.50
117,207.00
283 PS 6.32a
52,700.00
19,882.50
72,582.50
65,929.50
9,640.00
75,569.50
91,266.00
9,640.00
100,906.00
140,707.35
9,640.00
150,347.35
224,388.15
14,380.00
238,768.15
336,630.00
14,380.00
351,010.00
535,284.75
14,380.00
549,664.75
253 PS 6.17
254 PS 6.18
284 PS 6.32b
285 PS 6.32c
286 PS 6.32d
287 PS 6.32e
288 PS 6.32f
289 PS 6.32g
4" (untuk
5" (untuk
6" (untuk
8" (untuk
10"
12"
Bahan
Upah
Jumlah Harga
4
290 PS 6.33
500,000.00
31,800.00
531,800.00
291 PS 6.34
304,440.00
53,000.00
357,440.00
292 PS 6.35
28,075.00
10,600.00
38,675.00
293 PS 6.36
25,000.00
10,600.00
35,600.00
294 PS 6.40
34,829.50
12,175.00
47,004.50
No
1
Kode Analisa
2
Uraian Pekerjaan
3
Memasang 1 m' pipa steel diameter 4" (untuk sistem
perpipaan air bersih)
Memasang 1 m' pipa steel diameter 5" (untuk sistem
perpipaan air bersih)
Memasang 1 m' pipa steel diameter 6" (untuk sistem
perpipaan air bersih)
Bahan
Upah
Jumlah Harga
4
162,508.50
26,505.00
189,013.50
252,000.00
26,505.00
278,505.00
343,612.50
26,505.00
370,117.50
1,800,000.00
131,250.00
1,931,250.00
850,000.00
131,250.00
981,250.00
726,000.00
100,750.00
826,750.00
500,000.00
65,625.00
565,625.00
350,000.00
65,625.00
415,625.00
350,000.00
65,625.00
415,625.00
800.00
800.00
207,680.00
254,180.00
461,860.00
13,815.00
43,485.00
57,300.00
2,750,000.00
131,250.00
2,881,250.00
4,680,000.00
131,250.00
4,811,250.00
663,110.00
19,895.00
10,485.00
30,380.00
19,895.00
10,485.00
30,380.00
8,900.00
17,285.00
26,185.00
829,190.00
16,485.00
845,675.00
2,111.00
16,485.00
18,596.00
467,000.00
209,190.00
676,190.00
467,000.00
76,890.00
543,890.00
102,200.00
69,430.50
171,630.50
834,000.00
14,850.00
848,850.00
763,200.00
14,965.00
778,165.00
723,600.00
14,965.00
738,565.00
175,000.00
61,200.00
236,200.00
185,000.00
61,200.00
246,200.00
106,553.25
291,795.00
398,348.25
71,920.16
17,475.00
89,395.16
266,750.00
34,275.00
301,025.00
115,655.00
54,500.00
170,155.00
327 Spl.jjk
314,006.50
80,975.49
394,981.99
29,880.00
42,150.00
72,030.00
40,106.64
17,137.50
57,244.14
14,671.05
17,137.50
31,808.55
16,871.05
17,137.50
34,008.55
605.00
9,937.50
10,542.50
515.00
9,937.50
10,452.50
515.00
9,937.50
10,452.50
515.00
9,937.50
10,452.50
3,008.00
10,987.50
13,995.50
332 PC 6.1
333 PC 6.2
334 PC 6.3
335 PC 6.4
336 PC 6.6
663,110.00
No
1
Kode Analisa
2
Uraian Pekerjaan
3
Bahan
Upah
Jumlah Harga
4
337 PC 6.7
14,952.00
12,687.50
27,639.50
338 PC 6.7a
17,916.00
12,687.50
30,603.50
30,112.00
14,277.50
44,389.50
35,431.00
15,867.50
51,298.50
338 PC 6.8
339 PC 6.9
340 PC 6.11
24,450.00
10,247.50
34,697.50
341 PC 6.12
2,345.00
6,950.00
9,295.00
342 PC 6.13
9,410.00
27,547.50
36,957.50
10,462.00
15,470.00
25,932.00
8,578.00
11,602.50
20,180.50
5,902.00
11,602.50
17,504.50
343 PC 6.14
344 PC 6.15
345 PC 6.15a
346 PC 6.15b
28,600.00
11,602.50
40,202.50
347 PC 6.20
4,450.00
6,150.00
10,600.00
348 PC 6.21
12,116.60
40,662.50
52,779.10
349 PC 6.26
16,500.00
11,602.50
28,102.50
Pekerjaan
Lokasi
Tahun Aggaran
:
:
PEKERJAAN
PERHITUNGAN
Panjang
Lbr/ls bid
Tinggi
Pondasi menerus
32.00
0.60
0.60
Pondasi umpak
0.60
0.60
0.60
9.00
9.00
0.15
32.00
0.40
0.55
Pondasi umpak
0.40
0.40
0.60
45.00
0.40
PEKERJAAN PERSIAPAN
P3k/Keamanan
PEKERJAAN TANAH
Mengurug kembali
II
PEKERJAAN BETON
45.00
Tul sengkang 6
0.53
45.00
0.15
3.45
0.80
0.20
Teras
*
2.00
0.80
4.10
2.65
Tul sengkang 6
0.63
0.63
3.45
0.20
0.20
2.00
0.20
0.20
7.00
3.45
Ring Balok 10 x 15
9.00
9.00
13.00
0.55
13.00
Tul sengkang 6
0.53
13.00
0.15
Meja beton
0.60
3.50
125.00
0.42
0.10
3.50
III
PEKERJAAN DINDING
0.50
7.00
1.90
0.50
1.70
0.97
0.50
Bangunan
32.00
3.30
0.20
0.60
Pintu
2.10
1.00
Jendela
1.75
2.30
IV
PEKERJAAN PLESTERAN
Plesteran 1 PC : 2 PP
Plesteran 1 PC : 4 PP
15.00
13.30
1.64
Bangunan
105.60
-20.30
Acian
VI
PEKERJAAN KAYU
5.10
0.15
0.05
sb x
1.90
0.15
0.05
Sb y
6.60
0.15
0.05
Sb x
6.70
0.15
0.05
2.10
0.90
1.20
0.70
Kusen jendela
11.00
Miring
4.90
Miring
6.45
0.68
0.40
Pintu
0.88
0.40
VII
9.00
9.00
81.00
0.05
7.00
9.00
Belakang
0.80
9.00
teras
2.00
9.00
Miring
0.80
4.90
0.80
6.45
5.08
11.00
6.60
11.00
IX
Stop Kontak
Saklar Tunggal
Saklar Ganda
6.00
5.00
10
11
PERHITUNGAN
Berat
Jumlah
Unit
Volume
Satuan
1.00
unit
1.00
Ls
1.00
Ls
1.00
Ls
1.00
Ls
1.00
Ls
1.00
Ls
12.38
m3
11.52
4.00
12.38
0.86
0.30
11.52
0.864
11.52
0.86
m3
3.714
3.71
12.15
m3
12.15
12.15
7.42
m3
7.04
0.384
7.04
18
18
159.75
35.245
159.75
1.35
1.35
11.04
11.04
0.38
18.00
m2
194.99
Kg
0.89
4.00
159.75
0.22
300.00
35.24
4.00
3.71
7.04
4.00
0.00
1.35
m3
17.44
m2
11.04
0.38
35.24
4.00
6.40
120.81
0.89
4.00
4.00
58.22
1.04
4.00
4.00
44.16
0.22
20.00
4.00
11.17
0.22
13.00
4.00
7.26
0.87
6.4
6.4
58.22
44.16667
11.172
7.2618
58.22
0.552
0.32
0.55
Kg
44.16
11.17
7.26
m3
4.00
0.55
4.00
0.32
6.00
20.70
m'
20.7
20.7
32.00
m'
32.00
32
7.15
m2
7.15
7.15
56.25
Kg
46.15
10.10357
46.15
7.00
0.89
4.00
46.15
0.22
86.00
10.10
2.00
2.00
0.32
10.1
0.39
m3
0.39
0.39
4.20
Ls
4.2
52.50
Kg
52.5
0.42
m3
4.2
52.5
0.42
15.00
m2
15
15
100.24
m2
13.3
1.649
105.6
13.3
2.00
13.30
2.00
1.64
105.60
-20.30
20.30
0.42
1.64
105.6
2.00
4.20
4.00
16.10
2.00
30.00
m2
185.54
m2
1.00
13.30
1.00
1.64
2.00
211.20
2.00
-40.60
215.54
m2
0.48
m3
4.2
16.1
16.1
30
30
13.3
1.64
211.2
-40.6
13.3
4.2
1.64
211.2
-40.6
0.09
2.00
0.07
2.00
0.02
0.0765
0.0285
0.07
0.198
0.201
0.19
0.02
0.39
4.00
0.19
4.00
0.20
2.00
3.78
m2
3.78
3.78
12.00
10.08
m2
10.08
10.08
44.70
m'
22
9.8
12.9
9.8
2.00
22.00
2.00
9.80
2.00
12.90
3.96
12.00
3.26
2.00
0.70
0.2
22
12.9
m2
3.264
0.704
81.00
m2
4.05
m2
81
4.05
3.26
0.7
81
4.05
106.36
m2
63.00
63
7.2
18
7.84
10.32
7.20
18.00
2.00
7.84
2.00
10.32
106.36
m2
128.48
m2
55.88
72.60
128.48
m2
11.00
m'
5.00
ttk
4.00
ttk
4.00
bh
1.00
bh
2.00
bh
4.00
bh
1.00
bh
4.00
24.00
m'
6.00
30.00
m'
4.00
bh
63
7.2
18
7.84
10.32
55.88
72.6
55.88
24
30
24
72.6
30
No
URAIAN PEKERJAAN
VOLUME
SAT
ANALISA
1.000
1.000
1.000
1.000
1.000
1.000
1.000
Unit
Ls
Ls
Ls
Ls
Ls
Ls
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
12.380
3.710
12.150
m
m
m
PT 6.1
PT 6.9
PT 6.15a
50,625.00
16,858.00
117,005.00
7.420
PP 6.2
762,421.00
18.000
179.990
1.350
m
Kg
m
PB 6.21
PB 6.17
PB 6.5
152,424.25
17,257.50
875,672.00
17.440
120.810
0.870
m
Kg
m
265,425.75
17,257.50
875,672.00
A
1
2
3
4
5
6
7
PEKERJAAN PERSIAPAN
Papan Nama Proyek
Photo Dokumentasi & Administrasi
Listrik dan Air Kerja
P3k/Keamanan
Bowplank & Pengukuran
Pembersihan Awal dan Akhir
Pembuatan Gudang Semen dan alat alat (sewa)
B
I
1
2
3
II
1
2
PEKERJAAN BETON
Pondasi menerus batu kali 1 PC : 3 PP
Sloof beton bertulang 15 x 20 cm (200 kg besi + bekisting)
Bekisting untuk sloof
Pembesian dengan besi polos atau besi ulir
Beton mutu K175 untuk sloof 15x20 cm
Kolom 20 x 20 cm beton bertulang
Bekisting untuk kolom
Pembesian dengan besi polos atau besi ulir
Beton mutu K175 untuk kolom 20x20 cm
300,000.00
300,000.00
300,000.00
300,000.00
1,000,000.00
400,000.00
500,000.00
32.000
m'
PB 6.22
PB 6.17
PB 6.5
PB 6.35
5
6
Ring Balok 10 x 15
Balok 15x20 cm teras
Bekisting untuk balok 15x20
Pembesian dengan besi polos atau besi ulir
Beton mutu K175 untuk balok 15x20 cm
Meja beton
Bekisting Meja beton
Pembesian meja beton
Beton cor 1:2:3 untuk meja beton
32.000
m'
PB 6.36
110,435.10
7.150
56.250
0.390
m
Kg
m
PB 6.23
PB 6.17
PB 6.5
271,175.70
17,257.50
875,672.00
3.200
52.500
0.420
m2
Kg
m
PB 6.24
PB 6.17
PB 7.13
369,425.75
17,257.50
891,370.00
81,029.50
III
1
2
PEKERJAAN DINDING
Dinding bata merah tebal 1/2 bata, 1 PC : 4 PP
Dinding bata merah tebal 1/2 bata, 1 PC : 4 PP
15.000
100.240
m
m
PD 6.7
PD 6.9
95,374.40
86,283.40
IV
1
2
3
PEKERJAAN PLESTERAN
Plesteran 1 PC : 2 PP
Plesteran 1 PC : 4 PP
Acian
30.000
185.540
185.540
m
m
m
PPL 6.2
PPL 6.4
PPL 6.27
52,192.20
47,488.20
16,400.00
VI
1
2
3
4
5
PEKERJAAN KAYU
Kusen Pintu Dan Jendela , kayu kelas II
Daun Pintu Panel, kayu kelas II
Daun Jendela Kaca , kayu kelas II
Lisplank kayu uk. 3 x 20 kelas III
Jalusi Kusen Kayu kelas II
0.480
3.780
10.080
44.700
3.960
m
m
m
m'
m
PK 6.2
PK 6.5
PK 6.6
PK 6.21a
PK 6.10
10,559,510.00
688,230.00
594,788.00
65,775.00
705,445.00
VII
1
2
81.000
4.050
m
m
PLD 6.35b
PT 6.11
181,946.00
146,490.00
VIII
1
2
PEKERJAAN LANGIT-LANGIT
Plafond Gypsum tebal 9 mm
Rangka furing ceiling gypsum
106.360
106.360
m
m
PLL 6.7
PLL 7.1
40,533.00
64,149.00
IX
1
2
3
128.480
128.480
11.000
m
m
m'
PPA 6.32
Bhn+Upah
PPA 6.36
93,375.00
120,000.00
45,910.00
X
1
2
3
4
5
6
7
8
9
10
5.000
4.000
4.000
1.000
2.000
4.000
1.000
18.000
24.000
4.000
Titik
Titik
Bh
Bh
Bh
Bh
Bh
m'
m'
bh
Bhn+upah
Bhn+upah
Bhn+upah
Bhn+upah
Bhn+upah
Bhn+upah
Bhn+upah
PS 6.25b
PS 6.30b
PS 6.35
90,000.00
90,000.00
9,200.00
16,400.00
21,800.00
54,400.00
33,900.00
6,832.50
37,456.30
38,675.00
XI
1
2
3
4
5
2.000
4.000
24.000
12.000
24.000
Bh
Bh
Bh
Bh
Bh
PKK 6.2
PKK 6.5
PKK 6.6
Taksir
PKK 6.9
134,625.00
32,437.50
22,625.00
10,000.00
31,931.25
XII
PEKERJAAN PENGECATAN
1
2
3
XIII
1
2
3
4
5
6
7
29.094
185.540
106.360
m
m
m
PC 6.7a
PC 6.15
PC 6.15
30,603.50
20,180.50
20,180.50
30.000
8.000
1.000
1.000
4.000
4.000
4.000
bh
bh
bh
bh
bh
bh
set
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
PS 6.5
140,000.00
180,000.00
250,000.00
550,000.00
2,000,000.00
1,350,000.00
724,738.00
PEKERJAAN MEUBELAIR
Kursi Murid Kayu Kelas II
Meja Murid Kayu Kelas II
Kursi Guru Kayu Kelas II
Papan Tulis Whiteboard uk. 1,2 x 2,4
Lemari Uk. 0,8 x 1,2 m (2 Pintu) L - 02
Lemari Uk. 0,7 x 0,6 m (2 Pintu) L - 01
Pas Westafel Keramik
JUMLAH
PPN 10%
TOTAL
DIBULATKAN
Diperiksa Oleh:
Kasi Gedung & Bangunan Pemerintah
Kab. Deli Serdang
( Ari Martiansyah, ST )
Lubuk Pakam,
Juli 2013
Dihitung Oleh :
( Rinaldi, ST )
Disetujui Oleh:
Kepala Bidang Cipta Karya
Kab. Deli Serdang
Diketahui Oleh:
Kadis Cipta Karya dan Pertambangan
Kab. Deli Serdang
( Hj. Rostina, ST )
Penata Tk.I,III/d
JUMLAH (Rp)
7
JUMLAH BESAR
(Rp)
8
3,100,000.00
300,000.00
300,000.00
300,000.00
300,000.00
1,000,000.00
400,000.00
500,000.00
2,110,891.43
626,737.50
62,543.18
1,421,610.75
32,005,449.70
5,657,163.82
168,182,452
2,743,636.50
3,106,177.43
1,182,157.20
4,629,025.08
2,084,878.58
761,834.64
2,592,944.00
3,533,923.20
1,938,906.26
970,734.38
341,512.08
1,182,162.40
906,018.75
374,375.40
10,079,664.02
1,430,616.00
8,649,048.02
13,419,582.63
1,565,766.00
8,810,960.63
3,042,856.00
19,399,241.94
5,068,564.80
2,601,509.40
5,995,463.04
2,940,142.50
2,793,562.20
15,330,910.50
14,737,626.00
593,284.50
11,133,977.52
4,311,089.88
6,822,887.64
27,919,430.00
11,996,820.00
15,417,600.00
505,010.00
2,334,936.20
450,000.00
360,000.00
36,800.00
16,400.00
43,600.00
217,600.00
33,900.00
122,985.00
898,951.20
154,700.00
1,828,350.00
269,250.00
129,750.00
543,000.00
120,000.00
766,350.00
6,781,066.18
890,378.23
3,744,289.97
2,146,397.98
22,738,952.00
4,200,000.00
1,440,000.00
250,000.00
550,000.00
8,000,000.00
5,400,000.00
2,898,952.00
168,182,452
16,818,245
185,000,697
185,000,000
Juli 2013
an Pertambangan
Haris, MM)
199203 1 003