AL-WAHA PETROCHEMICAL COMPANY Doc. No.: WAH-TRS-FMS-RBS-092
TECHNICAL & RELIABILITY SERVICES DEPARTMENT Revision No.: 92 Equipment-Piping Thickness Measurement Record Date: MAY 2014
REPORT NO: INS/PLANTXXX/RPTXXX/Year Page 1 of 2
PLANT: PDH PP UTILITY Tag No.:
Description:
Criticality: SHE
Non-SHE
Service:
Insulation Type: Hot
Cold
Coating:
Corrosion Allowance:
X
Reason for Inspection: ( )Regular Inspection ( )MOC ( )Repair ( )Shut down( )Base Survey Drawing / Sketch (See Page 2) TML NO. ORIGINAL THICK (mm) AS FOUND THICKNESS READING (mm) REMARKS T B N W S E Other Location SHELL A MIN 6.04 MAX 6.69 B MIN 6.24 MAX 6.69 C MIN 6.25 MAX 6.35 D MIN 6.2 MAX 6.8 E MIN 6.25 MAX 6.35 F MIN 6.24 MAX 6.85 G MIN 6.2 MAX 6.88 H MIN 6 MAX 6.45 I MIN 5.57 MAX 6.89 J MIN 5.59 MAX 6.35
TOP MIN 5.53 MAX 6.86
BOT MIN 5.6 MAX 6.29
NOZZLE 1 MIN 4.03 MAX 4.18 2 MIN 4.11 MAX 4.7 3 MIN 3.62 MAX 4.38
A) UT Meter SL No: DMS 2 / 024YNH B) Calibration Date 11/6/2013 C) Probe & Frequency 5MHZ D) Equipment Material CARBON STEEL E) Surface Temp during Inspection 40C F) Reference Procedure used ASME VIII Date : 16/06/2014 Signature
Name M.EMYZULHAZIM VAJID M. ABDULKAREEM ABDULLAH A. AL-QARNI Plant Inspector/ Contractors Engineer Verified by SK inspection Representative SAHARA Inspector Stationary & Equipment Engineer WAN/PP/92/2014
AL-WAHA PETROCHEMICAL COMPANY Doc. No.: WAH-TRS-FMS-RBS-092 TECHNICAL & RELIABILITY SERVICES DEPARTMENT Revision No.: 92 Equipment-Piping Thickness Measurement Record Date: MAY 2014