Use 10Mpa
for Fill
Loose sand
Table of Contents
Dense sand
Soft clay
Stiff clay
Notes :
Relative Density
Medium Dense
Dense
4 - 10
10 - 30
30 - 50
2.2
6.6
17.6
1.3
4.4
10.7
Note :
Table of Contents
Loose
Table of Contents
Table of Contents
Firm clay
10
20
30
LO
65
0.9
0.8
0.7
0.6
0.9
0.8
0.7
0.5
0.5
0.4
0.L
0.3
0.3
>
>
>
>
0.2
>
7-
>
0.1
0.1
Logarithmic spiral
Failure surface
Logarithmic spiral
1
0.9
0.8
0.7
0.6
I
0.9
0.8
0.7
0.6
0.5
0.5
0.4
0.4
0.3
0.3
0.2
0.2
0.1
0
10
20
30
40
0.1
45
Legend :
6 =2
3
Note :
10
20
30
LO
L5
Note :
Version 4.1
Section 5-5
By :
Job No.:
Chkd :
Date:
18-04-14
h1
Soil 1
h2
Excavation Level
1'
h4
4'
7'
h5
5'
Soil
h3
8'
9'
Soil
h6
2'
10
Water
Soil
2'
Surcharge
1'
6'
Soil
Wate
nd
1. All calcultaion of pipe pile comply with Geoguide 1 2 Edition"Guide To Retaining Wall Design, 1993".
2. Grade 275 MPa of steel is used for all types of soldier piles, sheetpiles and channel piles.
3. "PLAXIS"is used for structural analysis.(B.D. Ref. No.
G0133 )
Soil 2
Version 4.1
Section 5-5
By :
Job No.:
Chkd :
Date:
18-04-14
cf' = c'/m
c'
'
'
'
-1
(kPa)
(kPa)
()
(Degree)
(kN/m3)
(kN/m3)
Soil 1
CDV
4.00
3.33
35.00
30.26
20.00
20.00
Soil 2
C/HDV
8.00
6.67
35.00
30.26
20.00
20.00
Material Parameters
1.00
1.00
1.20
52.50
mPD
GEOGuide 1, Table 7
of the retaining height.
100.00 kPa is applied on the ground at the back of pipe pile wall.
Loading
Surcharge
1.50
qf = surcharge x f
GEOGuide 1, Table 6
= 100.00 x 1.50
150.00 kPa
(Surcharge)
6.60
m.
Wall Dimension
Retained ground level =
52.50
mPD
49.00
mPD
44.00
=
3.50
mPD
44.00
10.10
h1 =
h5 =
h3 =
0.00
5.00
h2 =
h6 =
0.00
1.60
mPD
49.00
mPD
10.10
h4 =
0.00
Version 4.1
Section 5-5
By :
Job No.:
Chkd :
Date:
18-04-14
Determination of Ka and Kp
Ka
Kah
Kph
'sat
(kN/m3)
Type
CDV
15.13 -15.13
0.27
6.90
0.26
6.66
10.19
C/HDV
15.13 -15.13
0.27
6.90
0.26
6.66
10.19
39.53
kPa
39.53
kPa
-3.42
kPa
-3.42
kPa
-6.84
kPa
20.28
kPa
99.08
kPa
0.00
kPa
356.57
kPa
373.78
kPa
482.37
kPa
64.75
kPa
1/2
Version 4.1
Section 5-5
By :
Job No.:
Chkd :
Date:
18-04-14
Surcharge q
P3
0.00
3.50
P1
Soil 1
P4
Excavation Level
0.00
P5
P9
0.00
P10
5.00
Soil
P11
P2
P1
Soil
P8
P6
10.10
Soil 2
P7
P1
P1
1.60
Water
Soil
Surcharge
Soil
Wate
0.00
0.00
kPa
10.10
P3 = 1/2 x 3' x 0.00
P4 = 3 ' x
0.00
399.25
kPa
0.00
kPa
0.00
kPa
0.00
kPa
-69.13
kPa
136.97
kPa
500.36
kPa
0.00
kPa
0.00
kPa
891.43
kPa
598.04
kPa
86.88
kPa
213.66
kPa
0.00
10.10
1.60
Version 4.1
Section 5-5
By :
Job No.:
Chkd :
Date:
18-04-14
Force
Moment Arm
Moment
(kN/m)
(m)
(kNm/m)
P1
0.00
10.10
0.00
P2
399.25
P3
0.00
10.1/2
1/3 x 0.00 + 0.00 + 10.1
5.05
2016.24
10.10
0.00
P4
0.00
0.00/2 + 10.1
10.10
0.00
P5
0.00
10.10
0.00
P6
-69.13
10.1/2
5.05
-349.12
P7
136.97
1/3 x 10.1
3.37
461.13
P8
500.36
3.37
1684.54
MO =
## ##
3812.79
Resisting Forces
Region
Force
Moment Arm
Moment
(kN/m)
(m)
(kNm/m)
P9
0.00
1/3 x 0 + 5 + 1.60
6.60
0.00
10
P10 =
0.00
5/2 + 1.60
4.10
0.00
11
P11 =
891.43
1/3 x 5 + 1.60
3.27
2912.00
12
P12 =
598.04
1.60/2
0.80
478.43
13
P13 =
86.88
1/3 x 1.60
0.53
46.33
14
P14 =
213.66
1/3 x (5 + 1.60)
2.20
470.06
MR
MR / Mo
= 3,906.82 / 3,812.79 =
1.02
>
3906.82
1.00
O.K.
Since the simplified pressure distribution is adopted, the depth of embedment should be increased by 20%.
The embedment depth of wall
Toe level =
41.00
mPD
= 6.60 x 120%
8.00
PLAXIS V8
-15.00
-10.00
-5.00
0.00
5.00
10.00
15.00
20.00
25.00
60.00
AA
A
A
BB
A
B
A B BB
B B
55.00
50.00
A
45.00
40.00
35.00
30.00
Deformed Mesh
Extreme total displacement 38.77*10 -3 m
(displacements at true scale)
PLAXIS
Project description
13-117G_r4
Step
Date
396
18/04/14
User name
30.00
35.00
40.00
REPORT
18.04.2014
User:
Title:
13-117-G
Table of Contents
1. General Information
Table [1]
Units
Type
Unit
Length
Force
kN
Time
Table [2]
Model dimensions
min.
max.
0.000
23.860
30.000
56.000
Table [3]
Model
Model
Plane strain
Element
15-Noded
2. Geometry
Table [4]
Node no.
x-coord.
y-coord.
Node no.
x-coord.
y-coord.
3093
0.000
30.000
265
10.060
52.200
4708
5.500
30.000
631
9.040
51.450
5870
9.040
30.000
741
5.500
49.000
6224
10.060
30.000
802
0.000
49.000
6546
10.940
30.000
1725
13.500
51.500
7122
13.500
30.000
1739
13.820
51.500
7426
15.070
30.000
365
13.820
56.000
7700
17.970
30.000
1256
18.320
56.000
7986
19.980
30.000
1236
17.000
56.000
Node no.
x-coord.
y-coord.
Node no.
x-coord.
y-coord.
8012
22.990
30.000
9.040
56.000
8050
23.860
30.000
4698
9.040
41.000
2444
23.860
56.000
139
11.040
56.000
2440
22.990
56.000
12
9.040
54.500
1896
19.980
56.000
457
13.500
54.500
1249
17.970
56.000
17
9.040
53.500
408
15.070
56.000
1041
13.500
53.500
349
13.500
56.000
1455
0.000
44.000
1150
13.500
52.500
6454
23.860
44.000
336
10.940
52.500
2464
9.040
44.000
Table [5]
Table of clusters
Cluster no.
Nodes
3093, 4708, 5870, 6224, 6546, 7122, 7426, 7700, 7986, 8012, 8050, 4698, 1455, 6454, 2464.
2444, 2440, 1896, 1150, 336, 265, 631, 1725, 1739, 1256, 6454, 2464.
Cluster no.
Nodes
3. Structures
Table [6]
Beams
Plate no.
Data set
Length
Nodes
[m]
1
Table [7]
Pipe Pile
15.000
Interfaces
Interface
Data set
Nodes
no.
1
CDV
1150, 336, 336, 265, 265, 1256, 1739, 1725, 1150, 1739,
1725.
Interface
Data set
Nodes
no.
2
H/CDV
CDV
2464, 631.
CDV
631, 2464.
No Fine Concrete
17, 631.
No Fine Concrete
12, 17.
No Fine Concrete
4, 12.
4. Material data
Table [8]
Linear Elastic
existing No fine
concrete
Type
Drained
Drained
unsat
[kN/m]
24.00
20.00
sat
[kN/m]
24.00
20.00
kx
[m/s]
0.000
0.000
ky
[m/s]
0.000
0.000
einit
[-]
0.500
0.500
ck
[-]
1E15
1E15
10
existing No fine
Linear Elastic
concrete
2
Eref
[kN/m ]
13000000.00
186835.00
[-]
0.200
0.200
Gref
[kN/m ]
5416666.667
77847.917
14444444.444
207594.444
Eoed
[kN/ m ]
Eincr
[kN/ m /m]
0.00
0.00
yref
[m]
0.000
0.000
Rinter
[-]
0.670
0.670
Neutral
Neutral
No Fine Concrete
CDV
H/CDV
Drained
Drained
Drained
Interface
permeability
Mohr-Coulomb
Type
unsat
[kN/m]
20.00
20.00
20.00
sat
[kN/m]
20.00
20.00
20.00
kx
[m/s]
0.000
0.000
0.000
ky
[m/s]
0.000
0.000
0.000
einit
[-]
0.500
0.500
0.500
ck
[-]
1E15
1E15
1E15
Eref
[kN/m ]
186835.000
32000.000
50000.000
[-]
0.200
0.300
0.300
Gref
[kN/m ]
77847.917
12307.692
19230.769
207594.444
43076.923
67307.692
Eoed
[kN/m ]
cref
[kN/m ]
10.00
4.00
8.00
[]
40.00
35.00
35.00
[]
0.00
0.00
0.00
Einc
[kN/ m /m]
0.00
0.00
0.00
yref
[m]
0.000
0.000
0.000
0.00
0.00
0.00
cincrement
[kN/ m /m]
Tstr.
[kN/m ]
0.00
0.00
0.00
Rinter.
[-]
0.67
0.67
0.67
Neutral
Neutral
Neutral
Interface
permeability
Table [9]
11
No.
Identification
EA
EI
Mp
Np
[kN/m]
[kNm?m]
[kN/m/m]
[-]
[kNm/m]
[kN/m]
Pipe Pile
1.104E7
1.412E5
6.70
0.20
1E15
1E15
Soldier Pile
1.221E7
90290.00
7.88
0.20
1E15
1E15
Job No.:
By :
Section 5-5
Chkd :
Date :
18-04-14
Design Summary
Existing Ground Level
Retaining Height
Embedded Depth
Formation Level
=
=
=
=
52.50
3.50
8.00
49.00
mPD
m
m
mPD
41.00
mPD
Wall Properties
Wall Type
-
E
kPa
EI
kNm2
EA
kN
2.05E+08
1.10E+07
1.41E+05
Strut Properties
Strut
No.
S1
S2
Strut Size
-
Level
mPD
E
kPa
A
cm2
S
m
L
m
EA
kN
Stiffness
kN/m/m
Pre-Load
kN/m
Excavation Sequence
Phase 0
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
Phase 6
Phase 7
Initial phase
Total Multiplier
Activate Surcharge
Install Pipe Pile
Backfilling to +53.5mPD
Backfilling to +54.5mPD
Backfilling to +56.0mPD
Building Load
Job No.:
By :
Section 5-5
Chkd :
Date :
18-04-14
MAX
Shear
kN /m
13.17
17.14
23.86
38.25
38.25
Strut
No.
-
Pre-Load
kN /m
-
S2
kN /m
0.00
kN /m
0.00
PLAXIS 8.0
-2.00
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
20.00
22.00
24.00
[kNm/m]
56.00
480.000
400.000
54.00
360.000
52.00
320.000
280.000
50.00
240.000
48.00
200.000
160.000
46.00
120.000
44.00
80.000
40.000
42.00
0.000
PLAXIS
Project description
13-117G_r4
Step
Date
396
18/04/14
User name
PLAXIS 8.0
-4.00
-2.00
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
20.00
22.00
24.00
[kN/m]
180.000
56.00
140.000
54.00
120.000
52.00
100.000
50.00
80.000
48.00
60.000
46.00
40.000
44.00
20.000
42.00
0.000
PLAXIS
Project description
13-117G_r4
Step
Date
396
18/04/14
User name
PLAXIS 8.0
-6.00
-4.00
-2.00
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
20.00
[kN/m]
56.00
480.000
400.000
54.00
360.000
52.00
320.000
280.000
50.00
240.000
48.00
200.000
160.000
46.00
120.000
44.00
80.000
40.000
42.00
0.000
PLAXIS
Project description
13-117G_r4
Step
Date
396
18/04/14
User name
PLAXIS V8
-15.00
-10.00
-5.00
0.00
5.00
10.00
15.00
20.00
25.00
60.00
BB
AA
B
A
B BB
B B
55.00
50.00
A
45.00
40.00
35.00
30.00
Deformed Mesh
Extreme total displacement 84.67*10 -3 m
(displacements at true scale)
PLAXIS
Project description
13-117-G (Phase 2)
Project name
13-117G_r4
Step
Date
43
18/04/14
User name
30.00
35.00
40.00
PLAXIS V8
-15.00
-10.00
-5.00
0.00
5.00
10.00
15.00
20.00
25.00
60.00
BB
AA
B
A
B BB
B B
55.00
50.00
A
45.00
40.00
35.00
30.00
Deformed Mesh
Extreme total displacement 2.93*10 -3 m
(displacements at true scale)
PLAXIS
Project description
13-117-G (Phase 3)
Project name
13-117G_r4
Step
Date
50
18/04/14
User name
30.00
35.00
40.00
PLAXIS V8
-15.00
-10.00
-5.00
0.00
5.00
10.00
15.00
20.00
25.00
60.00
BB
AA
B
A
B BB
B B
55.00
50.00
A
45.00
40.00
35.00
30.00
Deformed Mesh
Extreme total displacement 9.73*10 -3 m
(displacements at true scale)
PLAXIS
Project description
13-117-G (Phase 4)
Project name
13-117G_r4
Step
Date
80
18/04/14
User name
30.00
35.00
40.00
PLAXIS V8
-15.00
-10.00
-5.00
0.00
5.00
10.00
15.00
20.00
25.00
60.00
BB
AA
B
A
B BB
B B
55.00
50.00
A
45.00
40.00
35.00
30.00
Deformed Mesh
Extreme total displacement 16.26*10 -3 m
(displacements at true scale)
PLAXIS
Project description
13-117-G (Phase 5)
Project name
13-117G_r4
Step
Date
116
18/04/14
User name
30.00
35.00
40.00
PLAXIS V8
-15.00
-10.00
-5.00
0.00
5.00
10.00
15.00
20.00
25.00
60.00
BB
A
AA
B
A
B BB
B B
55.00
50.00
A
45.00
40.00
35.00
30.00
Deformed Mesh
Extreme total displacement 27.85*10 -3 m
(displacements at true scale)
PLAXIS
Project description
13-117-G (Phase 6)
Project name
13-117G_r4
Step
Date
202
18/04/14
User name
30.00
35.00
40.00
PLAXIS V8
-15.00
-10.00
-5.00
0.00
5.00
10.00
15.00
20.00
25.00
60.00
AA
A
A
BB
A
B
A B BB
B B
55.00
50.00
A
45.00
40.00
35.00
30.00
Deformed Mesh
Extreme total displacement 38.77*10 -3 m
(displacements at true scale)
PLAXIS
Project description
13-117-G (Phase 7)
Project name
13-117G_r4
Step
Date
396
18/04/14
User name
30.00
35.00
40.00
: 13-117-G
PLAXIS 8.x
User name
Project name
: 13-117G_r4
Output
ID
Name
Type
Date : 18/4/2014
Step : 285
unsat
sat
k
x
[kN/m 3]
[kN/m 3]
[m/s]
k
y
Page : 1
E
ref
c
ref
[m/s]
[-]
[kN/m 2]
[kN/m 2]
[ ]
[ ]
No Fine Concrete
Drained
20.0
20.0
0.0000
0.0000
0.20
1.8684E5
10.0
40.0
0.0
CDV
Drained
20.0
20.0
0.0000
0.0000
0.30
32000.0
4.0
35.0
0.0
H/CDV
Drained
20.0
20.0
0.0000
0.0000
0.30
50000.0
8.0
35.0
0.0
: 13-117-G
PLAXIS 8.x
User name
Project name
: 13-117G_r4
Date : 18/4/2014
Output
Step : 285
E
incr
c
incr
y
ref
T-Strength
[kN/m 3]
[kN/m 3]
[m]
[kN/m 2]
[-]
0.0
0.0
0.0
0.0
0.67
0.0
0.0
0.0
0.0
0.67
0.0
0.0
0.0
0.0
0.67
ID
inter
Page : 2
: 13-117-G
PLAXIS 8.x
User name
Project name
: 13-117G_r4
Output
ID
Name
Date : 18/4/2014
Type
Step : 285
Page : 1
unsat
sat
k
x
k
y
E
ref
E
incr
y
ref
[kN/m 3]
[kN/m 3]
[m/s]
[m/s]
[-]
[kN/m 2]
[kN/m 3]
[m]
[-]
inter
Drained
24.0
24.0
0.0000
0.0000
0.20
1.3E7
0.0
0.0
0.67
Drained
20.0
20.0
0.0000
0.0000
0.20
1.8684E5
0.0
0.0
0.67
: 13-117-G
PLAXIS 8.x
User name
Project name
: 13-117G_r4
Output
ID
Name
Type
Date : 18/4/2014
Step : 285
M
EA
EI
[kN/m]
[kNm 2/m]
[kN/m 2]
[-]
[kNm/m]
[kN/m]
Pipe Pile
Elastic
1.104E7
1.412E5
6.7
0.20
1E15
1E15
Soldier Pile
Elastic
1.221E7
90290.0
7.9
0.20
1E15
1E15
Page : 1
REPORT
18.04.2014
User:
Title:
13-117-G
Table of Contents
1. Results for phase ............................................................................................................................ 3
2. Results for phase 1 ...................................................................................................................... 7
3. Results for phase 2 .................................................................................................................... 11
4. Results for phase 3 .................................................................................................................... 15
5. Results for phase 4 .................................................................................................................... 19
6. Results for phase 5 .................................................................................................................... 23
7. Results for phase 6 .................................................................................................................... 27
8. Results for phase 7 .................................................................................................................... 31
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
#N/A
Job No.:
By:
Section 5-5
Chkd:
Date:
18-04-14
Plan
t
Y
D x
H-Section
1. Section Properties
Try Section :
with :
203 x 203 x 86 UC
with :
0.65
406.4 mm
Grade 43
Hot Rolled
and
Size OK
Sx
1572000 mm3
Sy
1572000 mm3
Thickness
Ix
= 244800000 mm
Area of Section
Ag
12500 mm2
Iy
= 244800000 mm4
97.80 kg/m
Zx
1205000 mm3
Design Strength
py
Zy
1205000 mm
Depth of Section
222.3 mm
Sx
979000 mm3
Width of Section
208.8 mm
10 mm
4
275 N/mm2
H-Section
Plastic Modulus (Y-Axis)
Sy
456000 mm3
Area of Section
Ag
11000 mm2
86.00
Ac
106264 mm2
260.00
1.104E+07
kN/m
EIx/m = (205000 x 1000) x ((244800000 + 94600000) / 10^12) / 0.65 + (22200 x 1000) x (999654572 / 10^12) / 0.65 =
1.412E+05
kNm2/m
6.698
kN/m/m
Ix
Iy
Zx
851000 mm3
Zy
299000 mm3
Di
94600000 mm
31200000 mm
205000.00
kg/m
MPa
386.4 mm
4
Ix
= 999654572 mm
MPa
22200.00
kg/m
Pipe Pile (Sec 5), Pipe Pile Design (12 Apr 2014)
#N/A
Job No.:
By:
Section 5-5
Chkd:
Date:
18-04-14
115.00
0.00
kNm/m
kNm/m
40.00
kN/m
115.00
kN/m
Load Factor
1.4
Mx
104.7
36.4
kN per pile
My
0.0
Axial Force
Fc
104.7
kN per pile
3. Section Classification
(Table 7.2)
CLASS
e = [275 / py]1/2
= 1.0
D/t = 40.6
Class of Section
50 e2
<
(Compact)
Compact Section
(Clause 8.4.6)
d/t =
40.6
<
70e
70.0
Therefore,
(Clause 8.2.1)
7500 mm2
Shear Area
Av
Shear Capacity
Vc
= pyAv/(3)^0.5
1191 kN
36.4 kN
<
Vc =
0.6Vc =
714 kN
>
(Eqn. 8.1)
1191 kN
Check Shear OK
Low Shear
Major Axis
p y Sx
Mcx
p y Sx
432 kNm
398 kNm
(Clause 8.2.2)
and
>
1.2pyZx
1.2pyZx =
398 kNm
Mx =
104.7 kNm
Mx
Mcx
My
Mcy
(Clause 8.9.1)
104.7
3437.5
=
0.03
0.29
<
104.7
397.7
+
0.26
0.0
397.7
0.00
Pipe Pile (Sec 5), Pipe Pile Design (12 Apr 2014)
Cross-section Capacity OK
#N/A
Job No.:
By:
Chkd:
Date:
18-04-14
hw
3.50
406.40
0.65
pw
= 3.5 x 9.81
34.3
kPa
ps
55.1
kPa
= 1.4 x 89.4
125.1
kPa
Load Factor
mm
Retained Height
hs
3.50
m
hs (i)
hs (ii)
1.4
hw
soil pressure water pressure
s x hs (i) + s - wx hs (ii)
Design Moment
= 125.1 x 0.65^2 / 8
6.6
kNm/m
Design Shear
= 125.1 x 0.65 / 2
40.7
kN/m
Minimum width
243.60
mm
Thickness of slab
406.4
mm
Concrete grade
fcu
30
N/mm2
Cover
c1
45
mm
Cover (Side)
c2
45
mm
16
mm
100
w x hw
2. Section Properties
mm c/c
2 nos
402 mm2
As prov =
fy
= h - c1 - 0.5
2
= M / (bd fcu)
460
N/mm
353.4 mm
6.6 x 10^6
243.6 x 353.4^2 x 30
=
<
K' =
0.156
Not Required
0.0072
z
z
350.5 mm
335.73 mm
(Eqn 6.10)
>
0.95d =
335.73 mm
As req = M / (0.87 fy z)
(Eqn 6.12)
6.6 x 10^6
49.1 mm2
<
402.1 mm2
As prov =
O.K.
vc
0.537 N/mm2
m =
1.25
100As/bd =
0.467
<
O.K.
(400/d)1/4 =
(fcu/25)1/3 =
1.031
>
0.67
O.K.
where
1.063
= V / (b d)
(Eqn 6.35)
<
0.473 N/mm2
1.0
vc
<
=
0.8fcu =
4.38 or
0.537 N/mm
Not Required
7.0 N/mm2
O.K.