You are on page 1of 39

ANALISA HARGA SATUAN PEKERJAAN

DINAS TATA KOTA - KOTA BANDUNG


URAIAN

NO.

KOEF.

SAT.

HARGA SATUAN

JUMLAH

PEKERJAAN PERSIAPAN
1 m2

Pembersihan Lokasi

Pekerja

0.0500

hr

55.000.00

2.750.00

Mandor

0.0100

hr

70.000.00

700.00

1 bh
Papan nama proyek
Multipleks 122 x 244, 9 mm
Cat kayu/besi
Kaso kayu meranti
Penulisan
Ongkos pasang

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

3.450.00

DIBULATKAN

3.450.00

0.5000
1.1000
0.0280
1.0000
1.0000

lbr
kg
m3
ls
ls

103.360.00
25.840.00
2.876.860.00
56.000.00
32.000.00

51.680.00
28.424.00
80.552.08
56.000.00
32.000.00

JUMLAH

248.656.08

DIBULATKAN

248.656.00

1 m2
Direksikeet (lantai plesteran)
Pasir pasang
0.2500
Pasir beton
0.0517
Batu bata merah
25.0000
Semen PC 50 kg
0.2500
Kayu kaso meranti
0.0300
Triplek 122 x 244 x 4 mm
1.0000
Engsel pintu uk 3 "
0.1667
Asbes semen gelombang 250x92 x 0. 5 cm
0.5000
Kaca polos 5 mm
0.2917
Rangka teralis nako
0.2917
Paku segala ukuran ( rata-rata)
0.5000
Kunci gembok kecil
0.0834
Pekerja
0.4000
Tukang batu
0.0834
Tukang kayu
0.3340
Mandor
0.0200

1 m1
1
2
3
4
5
6

JUMLAH

m3
m3
bh
zak
m3
lbr
bh
lbr
m2
bh
kg
bh
hr
hr
hr
hr

150.000.00
150.000.00
700.00
60.000.00
2.876.860.00
50.000.00
25.080.00
40.130.00
102.600.00
9.120.00
15.000.00
10.260.00
48.000.00
55.000.00
55.000.00
70.000.00

37.500.00
7.755.00
17.500.00
15.000.00
86.305.80
50.000.00
4.180.84
20.065.00
29.928.42
2.660.30
7.500.00
855.68
19.200.00
4.587.00
18.370.00
1.400.00

JUMLAH

322.808.04

DIBULATKAN

322.808.00

Pengukuran & pemasangan bouwplank

Kayu Kaso terentang 5/7-400 cm


Kayu Papan terentang 2/20- 400 cm
Paku segala ukuran
Pekerja
Tukang Kayu
Mandor

0.0040
0.0060
0.0200
0.0500
0.0500
0.0050

m3
m3
kg
hr
hr
hr
JUMLAH

1.197.100.00
1.197.100.00
15.000.00
55.000.00
55.000.00
70.000.00

4.788.40
7.182.60
300.00
2.750.00
2.750.00
350.00
18.121.00

DIBULATKAN
1 m1
1
2
3
4
5
6
7
8
9
10

Pagar Pengaman Proyek

Pasir Beton
Batu kali
Semen PC ( 50 kg )
Kaso Meranti Jambi Basah uk. 5 x 10 x 400 cm
Seng Gelombang BJLS 28 (90x180) cm
Paku Kayu Segala uk.
Pekerja
Tukang Batu
Tukang Kayu
Mandor

1 m1
1
2
3
4
5

18.121.00

0.0012
0.0048
0.0170
0.0360
1.4300
0.0200
0.3000
0.3750
0.1500
0.0150

m
m
zak
m
lbr
kg
hr
hr
hr
hr

150.000.00
160.000.00
60.000.00
2.876.860.00
40.660.00
15.000.00
55.000.00
55.000.00
55.000.00
70.000.00

180.00
768.00
1.020.00
103.566.96
58.143.80
300.00
16.500.00
20.625.00
8.250.00
1.050.00

JUMLAH

210.403.76

DIBULATKAN

210.403.00

Pagar BRC tinggi 90 cm

BRC t = 0.9 m 6
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

0.4340
0.0420
0.0420
0.0040
0.0020

lbr
hr
hr
hr
hr

167.210.00
55.000.00
55.000.00
55.000.00
70.000.00

72.569.14
2.310.00
2.310.00
220.00
140.00

JUMLAH

77.549.14

DIBULATKAN

77.549.00

PEKERJAAN TANAH
1 m3
1
2
3

Pekerja
Mandor
Alat bantu

1 m3
1
2
3

1
2
3

2.200.00
280.00
420.00
2.900.00

DIBULATKAN

2.900.00

Galian Tanah Biasa Kedalaman 1 m


hr
hr
set

55.000.00
70.000.00
700.00

41.250.00
1.750.00
420.00

JUMLAH

43.420.00

DIBULATKAN

43.420.00

Galian Tanah Biasa Kedalaman 1 m - 2 m


m3
hr
set

55.000.00
70.000.00
700.00

49.500.00
2.275.00
420.00

JUMLAH

52.195.00

DIBULATKAN

52.195.00

Galian Tanah Biasa Kedalaman 2 m - 3 m


0.9350
0.0730
0.6000

55.000.00
70.000.00
700.00

JUMLAH

0.9000
0.0325
0.6000

Pekerja
Mandor
Alat bantu

1 m3

hr
hr
set

0.7500
0.0250
0.6000

Pekerja
Mandor
Alat bantu

1 m3

Perataan Tanah
0.0400
0.0040
0.6000

Pekerja
Mandor
Alat bantu

1 m3
1
2
3

hr
hr
set

55.000.00
70.000.00
700.00

51.425.00
5.110.00
420.00

JUMLAH

56.955.00

DIBULATKAN

56.955.00

Galian Tanah Biasa Kedalaman 3 m - 4 m

1
2
3

Pekerja
Mandor
Alat bantu

1 m3
1
2
3
4

1
2
3

1.2000
0.0500
0.6000

Pekerja
Mandor
Alat bantu

DIBULATKAN

58.700.00

hr
hr
jam
hr

55.000.00
70.000.00
211.400.00
700.00

11.000.00
140.00
21.140.00
210.00

JUMLAH

32.490.00

DIBULATKAN

32.490.00

hr
hr
set

55.000.00
70.000.00
700.00

53.075.00
2.450.00
420.00

JUMLAH

55.945.00

DIBULATKAN

55.945.00

hr
hr
set

55.000.00
70.000.00
700.00

107.800.00
2.261.00
420.00

JUMLAH

110.481.00

DIBULATKAN

110.481.00

hr
hr
set

55.000.00
70.000.00
700.00

53.625.00
2.275.00
420.00

JUMLAH

56.320.00

DIBULATKAN

56.320.00

hr
hr
set

55.000.00
70.000.00
700.00

66.000.00
3.500.00
420.00

JUMLAH

69.920.00

DIBULATKAN

69.920.00

Angkutan Galian Jarak Max. 30 m


0.2480
0.0080
0.6000

58.700.00

Galian Tanah Sumuran Kedalaman Max. 10 m

Pekerja
Mandor
Alat bantu

1 m3
1
2
3

0.9750
0.0325
0.6000

JUMLAH

Galian Tanah Lumpur

Pekerja
Mandor
Alat bantu

1 m3
1
2
3

1.9600
0.0323
0.6000

51.700.00
6.580.00
420.00

Galian Tanah Berbatu

Pekerja
Mandor
Alat bantu

1 m3

0.2000
0.0020
0.1000
0.3000

0.9650
0.0350
0.6000

55.000.00
70.000.00
700.00

Galian Tanah Keras

Pekerja
Mandor
Alat bantu

1 m3
1
2
3

hr
hr
set

Galian tanah kedalaman 1 - 5 m dengan alat besar

Pekerja
Mandor
Alat bantu

1 m3
1
2
3

Pekerja
Mandor
Excavator kap. 80 - 120 HP
Alat bantu

1 m3
1
2
3

0.9400
0.0940
0.6000

hr
hr
set

55.000.00
70.000.00
700.00

13.640.00
560.00
420.00

JUMLAH

14.620.00

DIBULATKAN

14.620.00

Urugan Kembali Galian Tanah


0.3000
0.0100
0.6000

hr
hr
set

55.000.00
70.000.00
700.00

16.500.00
700.00
420.00

JUMLAH

17.620.00

DIBULATKAN

17.620.00

1 m3
1
2
3
4
5

1.2000
0.1240
0.0040
0.1000
0.3000

1.2000
0.1500
0.0050
0.1500
0.3000

Sirtu
Pekerja
Mandor
Alat bantu

50.000.00
55.000.00
70.000.00
43.000.00
700.00

JUMLAH

101.710.00

DIBULATKAN

101.710.00

m3
hr
hr
jam
set

50.000.00
55.000.00
70.000.00
313.200.00
700.00

98.630.00

DIBULATKAN

98.630.00

m3
hr
hr
jam
set

50.000.00
55.000.00
70.000.00
313.200.00
700.00

1
2
3
4

Pekerja
Mandor
Stamper
Alat bantu

JUMLAH

115.790.00

DIBULATKAN

115.790.00

m3
hr
hr
set

100.000.00
55.000.00
70.000.00
700.00

0.3000
0.0050
0.9000
0.6000

120.000.00
16.500.00
700.00
420.00

JUMLAH

137.620.00

DIBULATKAN

137.620.00

m3
hr
hr
set

140.000.00
55.000.00
70.000.00
700.00

168.000.00
27.500.00
1.400.00
420.00
197.320.00
197.320.00

Pemadatan Tanah ( tiap 20 cm ) dengan stamper

PEKERJAAN PONDASI
1 m3

60.000.00
8.250.00
350.00
46.980.00
210.00

Urugan Sirtu
1.2000
0.5000
0.0200
0.6000

60.000.00
6.820.00
280.00
31.320.00
210.00

JUMLAH

JUMLAH
DIBULATKAN
1 m3

60.000.00
6.820.00
280.00
34.400.00
210.00

Urugan pasir bawah lantai & pondasi


1.2000
0.3000
0.0100
0.6000

m3
hr
hr
jam
set

Urugan tanah bahan dari luar pakai alat besar ( tiap 20 cm) tanah berbatu

Pasir Urug
Pekerja
Mandor
Alat bantu

1 m3
1
2
3
4

1.2000
0.1240
0.0040
0.8000
0.3000

Urugan Tanah bahan dari luar pakai alat besar ( tiap 20 cm ) tanah biasa

Tanah Urug
Pekerja
Mandor
Buldozer kap. 100 - 150 HP
Alat bantu

1 m3
1
2
3
4

Tanah Urug
Pekerja
Mandor
Buldozer kap. 100 - 150 HP
Alat bantu

1 m3
1
2
3
4
5

Urugan Tanah bahan dari luar dipadatkan dg stamper tiap 20 cm (tanah biasa)

Tanah Urug
Pekerja
Mandor
Stamper, 5 HP, Kap. 0.17 ton
Alat bantu

1 m3
1
2
3
4
5

Lantai kerja, mutu fc = 7.4 MPa (K.100)

hr
hr
jam
set

55.000.00
70.000.00
43.000.00
700.00

16.500.00
350.00
38.700.00
420.00

JUMLAH

55.970.00

DIBULATKAN

55.970.00

1
2
3
4
5
6
7
8

Pasir beton
Split pecah mesin 2/3
Semen PC ( 50 kg )
Pekerja
Tukang batu
Kepala Tukang
Mandor
Sewa molen

1 m3
1
2
3
4
5
6
7

Pasir Pasang
Batu Kali
Semen PC ( 50 kg )
Pekerja
Tukang Batu
Mandor
Alat Bantu

144.410.00
164.000.00
54.000.00
55.000.00
52.000.00
56.000.00
70.000.00
43.000.00

89.534.20
121.360.00
266.760.00
90.750.00
13.000.00
1.400.00
5.600.00
17.200.00

JUMLAH

605.604.20

DIBULATKAN

605.604.00

m3
m3
zak
hr
hr
hr
set

144.410.00
140.000.00
54.000.00
55.000.00
52.000.00
70.000.00
700.00

62.096.30
168.000.00
280.800.00
90.750.00
30.030.00
3.465.00
1.400.00

JUMLAH

636.541.30

DIBULATKAN

636.541.00

Pas.Pondasi batu kali 1 : 3


0.4560
1.2000
4.0000
1.6500
0.5775
0.0495
2.0000

m3
m3
zak
hr
hr
hr
set

144.410.00
140.000.00
54.000.00
55.000.00
52.000.00
70.000.00
700.00

65.850.96
168.000.00
216.000.00
90.750.00
30.030.00
3.465.00
1.400.00

JUMLAH

575.495.96

DIBULATKAN

575.495.00

Pas.Pondasi batu kali 1 : 4

Pasir Pasang
Batu Kali
Semen PC ( 50 kg )
Pekerja
Tukang Batu
Mandor
Alat Bantu

1 m3
1
2
3
4
5
6
7

0.4300
1.2000
5.2000
1.6500
0.5775
0.0495
2.0000

Pasir Pasang
Batu Kali
Semen PC ( 50 kg )
Pekerja
Tukang Batu
Mandor
Alat Bantu

1 m3
1
2
3
4
5
6
7

m3
m3
zak
hr
hr
hr
hr
jam

Pas.Pondasi batu kali 1 : 2

Pasir Pasang
Batu Kali
Semen PC ( 50 kg )
Pekerja
Tukang Batu
Mandor
Alat Bantu

1 m3
1
2
3
4
5
6
7

0.6200
0.7400
4.9400
1.6500
0.2500
0.0250
0.0800
0.4000

0.3910
1.2000
3.5280
1.6500
0.8000
0.2000
2.0000

m3
m3
zak
hr
hr
hr
set

144.410.00
140.000.00
54.000.00
55.000.00
52.000.00
70.000.00
700.00

56.464.31
168.000.00
190.512.00
90.750.00
41.600.00
14.000.00
1.400.00

JUMLAH

562.726.31

DIBULATKAN

562.726.00

Pas.Pondasi batu kali 1 : 5


0.5600
1.2000
2.8640
1.6500
0.5775
0.0495
2.0000

m3
m3
zak
hr
hr
hr
set
JUMLAH

144.410.00
140.000.00
54.000.00
55.000.00
52.000.00
70.000.00
700.00

80.869.60
168.000.00
154.656.00
90.750.00
30.030.00
3.465.00
1.400.00
529.170.60

DIBULATKAN
1 m3
1
2
3
4

1.2000
1.1240
0.0560
2.0000

m3
hr
hr
set

140.000.00
55.000.00
70.000.00
700.00

168.000.00
61.820.00
3.920.00
1.400.00

JUMLAH

235.140.00

DIBULATKAN

235.140.00

Pas. Cerucuk Dolken sedalam 3 m jarak tiap 50 cm

Dolken 8-10 x 350-400 cm


Pekerja
Tukang Kayu
Mandor

1 m2
1
2
3
4

Pas.Batu kosong

Batu Kali
Pekerja
Mandor
Alat Bantu

1 m2
1
2
3
4

529.170.00

4.0000
0.7500
0.2625
2.0000

btg
hr
hr
hr

20.520.00
55.000.00
52.000.00
70.000.00

82.080.00
41.250.00
13.650.00
140.000.00

JUMLAH

276.980.00

DIBULATKAN

276.980.00

Pas. Cerucuk Dolken sedalam 3 m jarak tiap 50 cm

Dolken 8-10 x 350-400 cm


Pekerja
Tukang Kayu
Mandor

4.0000
0.7500
0.2625
2.0000

btg
hr
hr
hr

20.520.00
55.000.00
52.000.00
70.000.00

82.080.00
41.250.00
13.650.00
140.000.00

JUMLAH

276.980.00

DIBULATKAN

276.980.00

PEKERJAAN BETON
1 m3
1
2
3
4
5
6
7

0.5070
0.7160
5.0000
1.8000
0.4750
0.2858
2.5000

Pasir beton
Split pecah mesin 2/3
Semen PC ( 50 kg )
Pekerja

m3
m3
zak
hr
hr
hr
set

144.410.00
164.000.00
54.000.00
55.000.00
52.000.00
70.000.00
700.00

73.215.87
117.424.00
270.000.00
99.000.00
24.700.00
20.006.00
1.750.00

JUMLAH

606.095.87

DIBULATKAN

606.095.00

Cor beton K.175 ( manual )

Pasir beton
Split pecah mesin 2/3
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

1 m3
1
2
3
4

Cor beton K.125 ( manual )

Pasir beton
Split pecah mesin 2/3
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

1 m3
1
2
3
4
5
6
7

0.5070
0.7160
9.0000
1.8000
0.4858
0.2608
2.5000

m3
m3
zak
hr
hr
hr
set

144.410.00
164.000.00
54.000.00
55.000.00
52.000.00
70.000.00
700.00

73.215.87
117.424.00
486.000.00
99.000.00
25.261.60
18.256.00
1.750.00

JUMLAH

820.907.47

DIBULATKAN

820.907.00

Cor beton K.225 ( manual )


0.5070
0.7160
11.0000
1.8000

m3
m3
zak
hr

144.410.00
164.000.00
54.000.00
55.000.00

73.215.87
117.424.00
594.000.00
99.000.00

5
6
7

Tukang batu
Mandor
Alat bantu

1 m3
1
2
3
4
5
6
7

Beton readymix K.250


Pekerja
Tukang batu
Mandor
Concrete vibrator
Alat bantu

1 m3
1
2
3
4
5

Beton readymix K.225


Pekerja
Tukang batu
Mandor
Concrete vibrator
Alat bantu

1 m3
1
2
3
4
5
6

Beton readymix K.125


Pekerja
Tukang batu
Mandor
Concrete vibrator
Alat bantu

1 m3
1
2
3
4
5
6

Pasir beton
Split pecah mesin 2/3
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

1 m3
1
2
3
4
5
6

0.2608
0.5858
2.5000

Beton readymix K.300


Pekerja
Tukang batu
Mandor
Concrete vibrator

hr
hr
set

52.000.00
70.000.00
700.00

13.561.60
41.006.00
1.750.00

JUMLAH

939.957.47

DIBULATKAN

939.957.00

Cor beton K.250 ( manual )


0.4000
0.7400
11.8000
1.8000
0.2620
0.6270
2.5000

m3
m3
zak
hr
hr
hr
set

144.410.00
164.000.00
54.000.00
55.000.00
52.000.00
70.000.00
700.00

57.764.00
121.360.00
637.200.00
99.000.00
13.624.00
43.890.00
1.750.00

JUMLAH

974.588.00

DIBULATKAN

974.588.00

Cor beton K.125 dengan readymix


1.0000
0.5508
0.1377
0.0688
0.4819
2.5000

m3
hr
hr
hr
jam
set

402.830.00
55.000.00
52.000.00
70.000.00
39.500.00
700.00

402.830.00
30.294.00
7.160.40
4.816.00
19.035.05
1.750.00

JUMLAH

465.885.45

DIBULATKAN

465.885.00

Cor beton K.225 dengan readymix


1.0000
0.6885
0.1377
0.0688
0.4819
2.5000

m3
hr
hr
hr
jam
set

620.000.00
55.000.00
55.000.00
70.000.00
39.500.00
700.00

620.000.00
37.867.50
7.573.50
4.816.00
19.035.05
1.750.00

JUMLAH

691.042.05

DIBULATKAN

691.042.00

Cor beton K.250 dengan readymix


1.0000
0.6885
0.1377
0.0688
0.4819
2.5000

m3
hr
hr
hr
jam
set

550.000.00
55.000.00
55.000.00
70.000.00
39.500.00
700.00

550.000.00
37.867.50
7.573.50
4.816.00
19.035.05
1.750.00

JUMLAH

621.042.05

DIBULATKAN

621.042.00

Cor beton K.300 dengan readymix


1.0000
0.6885
0.1377
0.0688
0.4819

m3
hr
hr
hr
jam

532.040.00
55.000.00
55.000.00
70.000.00
42.000.00

532.040.00
37.867.50
7.573.50
4.816.00
20.239.80

Alat bantu

1 m3
1
2
3
4
5
6

1.0000
0.6885
0.1377
0.0688
0.4819
2.5000

JUMLAH

604.286.80

DIBULATKAN

604.286.00

m3
hr
hr
hr
jam
set

650.000.00
55.000.00
55.000.00
70.000.00
42.000.00
700.00

650.000.00
37.867.50
7.573.50
4.816.00
20.239.80
1.750.00

JUMLAH

722.246.80

DIBULATKAN

722.246.00

m3
hr
hr
hr
jam
set

700.000.00
55.000.00
55.000.00
70.000.00
42.000.00
700.00

700.000.00
37.867.50
7.573.50
4.816.00
20.239.80
1.750.00

JUMLAH

772.246.80

DIBULATKAN

772.246.00

kg
kg
hr
hr
hr
set

11.400.00
8.000.00
55.000.00
55.000.00
70.000.00
700.00

228.00
8.800.00
825.00
275.00
350.00
1.750.00

JUMLAH

12.228.00

DIBULATKAN

12.228.00

Pembesian ( besi ulir )


0.0200
1.1000
0.0150
0.0050
0.0050
2.5000

1.750.00

Pembesian ( besi polos )


0.0200
1.1000
0.0150
0.0050
0.0050
2.5000

700.00

Cor beton K.400 dengan readymix

Kawat beton
Besi beton ulir
Pekerja
Tukang besi
Mandor
Alat bantu

1 m2
1
2
3
4
5
6
7

1.0000
0.6885
0.1377
0.0688
0.4819
2.5000

Kawat beton
Besi beton polos
Pekerja
Tukang besi
Mandor
Alat bantu

1 kg
1
2
3
4
5
6

set

Cor beton K.350 dengan readymix

Beton readymix K.400


Pekerja
Tukang batu
Mandor
Concrete vibrator
Alat bantu

1 kg
1
2
3
4
5
6

Beton readymix K.350


Pekerja
Tukang batu
Mandor
Concrete vibrator
Alat bantu

1 m3
1
2
3
4
5
6

2.5000

kg
kg
hr
hr
hr
set

11.400.00
9.000.00
55.000.00
55.000.00
70.000.00
700.00

228.00
9.900.00
825.00
275.00
350.00
1.750.00

JUMLAH

13.328.00

DIBULATKAN

13.328.00

Bekisting dengan papan + bongkaran dan penyiraman

Kayu Papan terentang 2/20-400 cm


Kayu Kaso terentang 5/7-400 cm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

0.0240
0.0280
0.2500
0.1650
0.3940
0.0270
2.5000

m3
m3
kg
hr
hr
hr
set
JUMLAH

1.197.100.00
1.197.100.00
15.000.00
55.000.00
55.000.00
70.000.00
700.00

28.730.40
33.518.80
3.750.00
9.075.00
21.670.00
1.890.00
1.750.00
100.384.20

DIBULATKAN
1 m2
1
2
3
4
5
6
7

m3
lbr
kg
bh
hr
hr
set

1.197.100.00
103.360.00
15.000.00
55.000.00
55.000.00
70.000.00
700.00

33.518.80
36.176.00
3.750.00
9.075.00
21.670.00
1.890.00
1.750.00

JUMLAH

107.829.80

DIBULATKAN

107.829.00

0.2520
3.1500
2.2500
1.4850
3.5440
0.2430
2.5000

m3
lbr
kg
hr
hr
hr
set

1.197.100.00
103.360.00
15.000.00
55.000.00
55.000.00
70.000.00
700.00

301.669.20
325.584.00
33.750.00
81.675.00
194.920.00
17.010.00
1.750.00

JUMLAH

956.358.20

DIBULATKAN

956.358.00

Bekisting balok beton struktur


0.1870
2.3500
1.6680
1.1010
2.6260
0.1800
2.5000

m3
lbr
kg
hr
hr
hr
set

1.197.100.00
103.360.00
15.000.00
55.000.00
55.000.00
70.000.00
700.00

223.857.70
242.896.00
25.020.00
60.555.00
144.430.00
12.600.00
1.750.00

JUMLAH

711.108.70

DIBULATKAN

711.108.00

Bekisting lantai beton

Kayu Kaso terentang 5/7-400 cm


Triplex 9 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

1 m2
1
2
3
4
5
6

0.0280
0.3500
0.2500
0.1650
0.3940
0.0270
2.5000

Bekisting kolom beton struktur

Kayu Kaso terentang 5/7-400 cm


Triplex 9 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

1 m3
1
2
3
4
5
6
7

Kayu Kaso terentang 5/7-400 cm


Triplex 9 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

1 m3
1
2
3
4
5
6
7

Bekisting dengan triplex 9 mm + bongkaran dan penyiraman

Kayu Kaso terentang 5/7-400 cm


Triplex 9 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

1 m3
1
2
3
4
5
6
7

100.384.00

0.2320
2.9050
2.0750
1.3700
3.2685
0.2245
2.5000

m3
lbr
kg
hr
hr
hr
set

1.197.100.00
103.360.00
15.000.00
55.000.00
55.000.00
70.000.00
700.00

277.727.20
300.260.80
31.125.00
75.350.00
179.767.50
15.715.00
1.750.00

JUMLAH

881.695.50

DIBULATKAN

881.695.00

Perancah kayu / stoot werk - tinggi s/d 2 m

Kayu Kaso terentang 5/7-400 cm


Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

0.0608
0.3000
0.6000
0.4200
0.0300
2.5000

m3
kg
hr
hr
hr
set

1.197.100.00
15.000.00
55.000.00
55.000.00
70.000.00
700.00

72.783.68
4.500.00
33.000.00
23.100.00
2.100.00
1.750.00

1 m2
1
2
3
4
5
6

m3
kg
hr
hr
hr
set

1.197.100.00
15.000.00
55.000.00
55.000.00
70.000.00
700.00

101.873.21
6.300.00
46.200.00
32.340.00
2.940.00
2.450.00

JUMLAH

192.103.21

DIBULATKAN

192.103.00

0.1094
0.5400
1.0800
0.7560
0.0540
4.5000

m3
kg
hr
hr
hr
set

1.197.100.00
15.000.00
55.000.00
55.000.00
70.000.00
700.00

130.962.74
8.100.00
59.400.00
41.580.00
3.780.00
3.150.00

JUMLAH

246.972.74

DIBULATKAN

246.972.00

0.1398
0.6900
1.3800
0.9660
0.0690
5.7500

m3
kg
hr
hr
hr
set

1.197.100.00
15.000.00
55.000.00
55.000.00
70.000.00
700.00

167.354.58
10.350.00
75.900.00
53.130.00
4.830.00
4.025.00

JUMLAH

315.589.58

DIBULATKAN

315.589.00

Balok beton praktis K.175


1.0000
120.0000
5.0000
4.2000

m3
kg
m2
set

820.907.00
12.228.00
100.384.00
700.00

820.907.00
1.467.360.00
501.920.00
2.940.00

JUMLAH

2.793.127.00

DIBULATKAN

2.793.127.00

Kolom beton praktis K.175

Adukan beton K.175 ( konvensional )


Pembesian besi polos
Bekisting dengan papan
Alat bantu

1 m3
1
2
3

137.233.00

Perancah kayu / stoot werk - tinggi s/d 5 m

Adukan beton K.175 ( konvensional )


Pembesian besi polos
Bekisting dengan papan
Alat bantu

1 m3
1
2
3
4

DIBULATKAN

Perancah kayu / stoot werk - tinggi s/d 4 m

Kayu Kaso terentang 5/7-400 cm


Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

1 m3
1
2
3
4

0.0851
0.4200
0.8400
0.5880
0.0420
3.5000

Kayu Kaso terentang 5/7-400 cm


Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

1 m2
1
2
3
4
5
6

137.233.68

Perancah kayu / stoot werk - tinggi s/d 3 m

Kayu Kaso terentang 5/7-400 cm


Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

1 m2
1
2
3
4
5
6

JUMLAH

1.0000
156.8622
5.0000
4.2000

m3
kg
m2
set

820.907.00
12.228.00
100.384.00
700.00

820.907.00
1.918.111.25
501.920.00
2.940.00

JUMLAH

3.243.878.25

DIBULATKAN

3.243.878.00

Pondasi beton setapak K.225

Adukan beton K.225 ( konvensional )


Pembesian besi polos
Bekisting triplek 9 mm

1.0000
160.0000
2.6670

m3
kg
m2
JUMLAH

939.957.00
12.228.00
107.829.00

939.957.00
1.956.480.00
287.579.94
3.184.016.94

DIBULATKAN
1 m3
1
2
3

JUMLAH

3.594.734.71

DIBULATKAN

3.594.734.00

1.0000
162.5000
1.0000

m3
kg
m3

939.957.00
12.228.00
711.108.00

939.957.00
1.987.050.00
711.108.00

JUMLAH

3.638.115.00

DIBULATKAN

3.638.115.00

1.0000
213.0000
1.0000

m3
kg
m3

691.042.00
12.228.00
930.903.00

691.042.00
2.604.564.00
930.903.00

JUMLAH

4.226.509.00

DIBULATKAN

4.226.509.00

1.0000
187.1111
1.0000

m3
kg
m3

820.907.00
12.228.00
711.108.00

820.907.00
2.287.994.67
711.108.00

JUMLAH

3.820.009.67

DIBULATKAN

3.820.009.00

1.0000
259.5556
1.0000

m3
kg
m3

691.042.00
12.228.00
930.903.00

691.042.00
3.173.845.33
930.903.00

JUMLAH

4.795.790.33

DIBULATKAN

4.795.790.00

Kolom beton 30/30 K.225 ( K2)


1.0000
189.3333
1.0000

m3
kg
m3

691.042.00
12.228.00
930.903.00

691.042.00
2.315.168.00
930.903.00

JUMLAH

3.937.113.00

DIBULATKAN

3.937.113.00

Kolom beton 25/25 K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi polos
Bekisting kolom

1 m3
1
2
3

939.957.00
1.943.669.71
711.108.00

Kolom beton 30/30 K-225 ( K1 )

Adukan beton K.225 ( ready - mix )


Pembesian besi polos
Bekisting kolom

1 m3
1
2
3

939.957.00
12.228.00
711.108.00

Sloof beton 15/20 K.175

Adukan beton K-225 (ready-mixl)


Pembesian
Bekisting Kolom

1 m3
1
2
3

m3
kg
m3

Kolom beton 30/40 K-225 ( K1 )

Adukan beton K.175 ( konvensional )


Pembesian besi polos
Bekisting balok struktur

1 m3
1
2
3

1.0000
158.9524
1.0000

Sloof beton 20/40 K.225 ( SL2 )

Adukan beton K-225 (ready-mixl)


Pembesian
Bekisting Kolom

1 m3
1
2
3

Adukan beton K.225 ( konvensional )


Pembesian besi polos
Bekisting balok struktur

1 m3
1
2
3

Sloof beton 20/35 K-225 ( SL1 )

Adukan beton K-225 (Konvensional)


Pembesian
Bekisting balok struktur

1 m3
1
2
3

3.184.016.00

1.0000
155.0000
1.0000

m3
kg
m2

691.042.00
12.228.00
930.903.00

691.042.00
1.895.340.00
930.903.00

JUMLAH

3.517.285.00

DIBULATKAN

3.517.285.00

Kolom beton 15/30 K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi polos
Bekisting kolom

1.0000
170.0000
1.0000

m3
kg
m3
JUMLAH

691.042.00
12.228.00
930.903.00

691.042.00
2.078.760.00
930.903.00
3.700.705.00

DIBULATKAN
1 m3
1
2
3
4

691.042.00
1.883.112.00
493.944.00
711.108.00

JUMLAH

3.779.206.00

DIBULATKAN

3.779.206.00

1.0000
181.3600
1.6675
1.0000

m3
kg
m2
m3

691.042.00
12.228.00
246.972.00
711.108.00

691.042.00
2.217.670.08
411.825.81
711.108.00

JUMLAH

4.031.645.89

DIBULATKAN

4.031.645.00

1.0000
170.0000
2.2200
1.0000

m3
kg
m2
m3

691.042.00
12.228.00
246.972.00
711.108.00

691.042.00
2.078.760.00
548.277.84
711.108.00

JUMLAH

4.029.187.84

DIBULATKAN

4.029.187.00

1.0000
170.0000
2.8575
1.0000

m3
kg
m2
m3

691.042.00
12.228.00
246.972.00
711.108.00

691.042.00
2.078.760.00
705.722.49
711.108.00

JUMLAH

4.186.632.49

DIBULATKAN

4.186.632.00

Balok beton 20/40 K-225 ( B2 )


1.0000
162.5000
1.6675
1.0000

m3
kg
m2
m3

691.042.00
12.228.00
246.972.00
711.108.00

691.042.00
1.987.050.00
411.825.81
711.108.00

JUMLAH

3.801.025.81

DIBULATKAN

3.801.025.00

Balok beton 20/30 K-225 ( B3 )

Adukan beton K-225 (ready-mixl)


Pembesian
Perancah kayu / stoot werk - tinggi s/d 4 m
Bekisting Balok

1 m3
1
2
3
4

691.042.00
12.228.00
246.972.00
711.108.00

Balok beton 25/35 K.225

Adukan beton K-225 (ready-mixl)


Pembesian
Perancah kayu / stoot werk - tinggi s/d 4 m
Bekisting balok

1 m3
1
2
3
4

m3
kg
m2
m3

Balok beton 25/45 K-225

Adukan beton K.225 ( ready - mix )


Pembesian besi polos
Perancah kayu / stoot werk - tinggi s / d 4 m
Bekisting balok

1 m3
1
2
3
4

1.0000
154.0000
2.0000
1.0000

Balok beton 25/50 K.225 ( B1 )

Adukan beton K-225 (ready-mixl)


Pembesian
Perancah kayu / stoot werk - tinggi s/d 4 m
Bekisting Balok

1 m3
1
2
3
4

Adukan beton K.225 ( ready - mix )


Pembesian besi polos
Perancah kayu / stoot werk - tinggi s / d 4 m
Bekisting balok

1 m3
1
2
3
4

Balok beton 30/50 K-225

Adukan beton K-225 (ready-mixl)


Pembesian
Perancah kayu / stoot werk - tinggi s/d 4 m
Bekisting Balok

1 m3
1
2
3
4

3.700.705.00

1.0000
180.5556
1.6675
1.0000

m3
kg
m2
m3

691.042.00
12.228.00
246.972.00
711.108.00

691.042.00
2.207.833.33
411.825.81
711.108.00

JUMLAH

4.021.809.14

DIBULATKAN

4.021.809.00

Balok beton 15/30 K.225 ( B4 )

Adukan beton K.225 ( ready - mix )


Pembesian besi polos
Perancah kayu / stoot werk - tinggi s / d 4 m
Bekisting balok

1.0000
199.1111
1.6675
1.0000

m3
kg
m2
m3

691.042.00
12.228.00
246.972.00
711.108.00

691.042.00
2.434.730.67
411.825.81
711.108.00

1 m3
1
2
3
4

1.0000
105.0000
6.2475
1.0000

1.0000
100.0000
1.0000
1.0000

1.0000
75.0000
1.0000
1.0000

1.0000
0.8818
51.0000

Pas.Batu bata, t = 1 / 2 bata ad. 1 : 2

Pasir pasang
Bata merah
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0380
75.0000
0.4700
0.3600
0.1875
0.0155
4.0000

1 m2
Pasir pasang

m3
kg
m2
m3

691.042.00
12.228.00
246.972.00
711.108.00

691.042.00
1.467.360.00
411.578.84
711.108.00

JUMLAH

3.281.088.84

DIBULATKAN

3.281.088.00

m3
kg
m2
m3

691.042.00
12.228.00
246.972.00
881.695.00

691.042.00
1.283.940.00
1.542.957.57
881.695.00

JUMLAH

4.399.634.57

DIBULATKAN

4.399.634.00

m3
kg
m2
m3

691.042.00
12.228.00
246.972.00
711.108.00

691.042.00
1.222.800.00
246.972.00
711.108.00

JUMLAH

2.871.922.00

DIBULATKAN

2.871.922.00

m3
kg
m2
m3

691.042.00
12.228.00
246.972.00
881.695.00

691.042.00
917.100.00
246.972.00
881.695.00

JUMLAH

2.736.809.00

DIBULATKAN

2.736.809.00

Beton slab, T=10cm, + wiremesh M- 8

Adukan beton K.225 ( ready - mix )


Wiremesh M - 8
Pembesian besi polos

1 m2
1
2
3
4
5
6
7

1.0000
120.0000
1.6665
1.0000

Beton Plat Canopy atas jendela t = 10 cm - K.225

Adukan beton K-225 (ready-mixl)


Pembesian
Perancah kayu / stoot werk - tinggi s/d 4 m
Bekisting pelat lantai

1 m3
1
2
3

4.248.706.00

Plat listplank beton K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi polos
Perancah kayu / stoot werk - tinggi s / d 4 m
Bekisting balok

1 m3
1
2
3
4

DIBULATKAN

Plat lantai & tangga beton K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi polos
Perancah kayu / stoot werk - tinggi s / d 4 m
Bekisting plat lantai

1 m3
1
2
3
4

4.248.706.48

Balok beton 15/60 K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi polos
Perancah kayu / stoot werk - tinggi s / d 4 m
Bekisting balok

1 m3
1
2
3
4

JUMLAH

m3
lbr
kg

691.042.00
323.020.00
12.228.00

691.042.00
284.850.09
623.628.00

JUMLAH

1.599.520.09

DIBULATKAN

1.599.520.00

m3
bh
zak
hr
hr
hr
set

144.410.00
400.00
54.000.00
55.000.00
55.000.00
70.000.00
700.00

5.487.58
30.000.00
25.380.00
19.800.00
10.312.50
1.085.00
2.800.00

JUMLAH

94.865.08

DIBULATKAN

94.865.00

Pas.Batu bata, t = 1 / 2 bata ad. 1 : 3


0.0430

m3

144.410.00

6.209.63

2
3
4
5
6
7

Bata merah
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

1 m2
1
2
3
4
5
6
7

Pas.Batu bata, t = 1 / 2 bata ad. 1 : 4

Pasir pasang
Bata merah
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0460
75.0000
0.2900
0.3600
0.1875
0.0155
4.0000

1 m2
1
2
3
4
5
6
7

75.0000
0.3600
0.3600
0.1875
0.0155
4.0000

Pas.Batu bata, t = 1 / 2 bata ad. 1 : 5

Pasir pasang
Bata merah
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0480
75.0000
0.2400
0.3600
0.1875
0.0155
4.0000

bh
zak
hr
hr
hr
set

400.00
54.000.00
55.000.00
55.000.00
70.000.00
700.00

JUMLAH

89.647.13

DIBULATKAN

89.647.00

m3
bh
zak
hr
hr
hr
set

144.410.00
400.00
54.000.00
55.000.00
55.000.00
70.000.00
700.00

1
2
3
4
5
6
7

86.300.36

DIBULATKAN

86.300.00

m3
bh
zak
hr
hr
hr
set

144.410.00
400.00
54.000.00
55.000.00
55.000.00
70.000.00
700.00

0.0130
13.0000
0.1570
0.2900
0.1500
0.0300
2.0000

83.889.18
83.889.00

m3
bh
zak
hr
hr
hr
set

144.410.00
7.300.00
54.000.00
55.000.00
55.000.00
70.000.00
700.00

1.877.33
94.900.00
8.478.00
15.950.00
8.250.00
2.100.00
1.400.00

JUMLAH

132.955.33

DIBULATKAN

132.955.00

Pas.Batako beton ad. 1 : 3

Pasir pasang
Batako beton 20 / 40
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

1 m2

6.931.68
30.000.00
12.960.00
19.800.00
10.312.50
1.085.00
2.800.00

Pas.Batako beton ad. 1 : 2

Pasir pasang
Batako beton 20 / 40
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

1 m2
1
2
3
4
5
6
7

6.642.86
30.000.00
15.660.00
19.800.00
10.312.50
1.085.00
2.800.00

JUMLAH

JUMLAH
DIBULATKAN
1 m2

30.000.00
19.440.00
19.800.00
10.312.50
1.085.00
2.800.00

0.0140
13.0000
0.1000
0.2900
0.1500
0.0300
2.0000

Pas.Batako beton ad. 1 : 4

m3
bh
zak
hr
hr
hr
set

144.410.00
7.300.00
54.000.00
55.000.00
55.000.00
70.000.00
700.00

2.021.74
94.900.00
5.400.00
15.950.00
8.250.00
2.100.00
1.400.00

JUMLAH

130.021.74

DIBULATKAN

130.021.00

1
2
3
4
5
6
7

Pasir pasang
Batako beton 20 / 40
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

1 m2
1
2
3
4
5
6
7

Pasir pasang
Batako beton 20 / 40
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

1 m2
1
2
3
4
5
6
7

Pasir pasang
Batako beton 20 / 40
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

1 m2
1
2
3
4
5
6

Pasir pasang
Batako beton 20 / 40
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

1 m2
1
2
3
4
5
6
7

Pasir pasang
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0150
13.0000
0.1000
0.2900
0.1500
0.0300
2.0000

m3
bh
zak
hr
hr
hr
set

144.410.00
7.300.00
54.000.00
55.000.00
55.000.00
70.000.00
700.00

2.166.15
94.900.00
5.400.00
15.950.00
8.250.00
2.100.00
1.400.00

JUMLAH

130.166.15

DIBULATKAN

130.166.00

Pas.Batako beton ad. 1 : 5


0.0160
13.0000
0.0800
0.2900
0.1500
0.0300
2.0000

m3
bh
zak
hr
hr
hr
set

144.410.00
7.300.00
54.000.00
55.000.00
55.000.00
70.000.00
700.00

2.310.56
94.900.00
4.320.00
15.950.00
8.250.00
2.100.00
1.400.00

JUMLAH

129.230.56

DIBULATKAN

129.230.00

Pas. Bata Ringan (Silicon) beton ad. 1 : 3


0.0070
8.3300
0.1000
0.2000
0.1500
0.0300
2.0000

m3
bh
zak
hr
hr
hr
set

144.410.00
7.300.00
54.000.00
55.000.00
55.000.00
70.000.00
700.00

1.010.87
60.809.00
5.400.00
11.000.00
8.250.00
2.100.00
1.400.00

JUMLAH

89.969.87

DIBULATKAN

89.969.00

Pas. Bata Ringan (Silicon) beton ad. 1 : 5


0.0060
8.3300
0.0800
0.2000
0.1500
0.0300
2.0000

m3
bh
zak
hr
hr
hr
set

144.410.00
7.300.00
54.000.00
55.000.00
55.000.00
70.000.00
700.00

866.46
60.809.00
4.320.00
11.000.00
8.250.00
2.100.00
1.400.00

JUMLAH

88.745.46

DIBULATKAN

88.745.00

Plesteran & acian tebal 1,5 cm ad. 1 : 2


0.0180
0.2130
0.3000
0.1575
0.0115
2.0000

m3
zak
hr
hr
hr
set

144.410.00
54.000.00
55.000.00
55.000.00
70.000.00
700.00

2.599.38
11.502.00
16.500.00
8.662.50
805.00
1.400.00

JUMLAH

41.468.88

DIBULATKAN

41.468.00

1 m2
1
2
3
4
5
6

144.410.00
54.000.00
55.000.00
55.000.00
70.000.00
700.00

3.032.61
10.368.00
16.500.00
8.662.50
805.00
1.400.00

JUMLAH

40.768.11

DIBULATKAN

40.768.00

m3
zak
hr
hr
hr
set

144.410.00
54.000.00
55.000.00
55.000.00
70.000.00
700.00

3.321.43
8.478.00
16.500.00
8.662.50
805.00
1.400.00

JUMLAH

39.166.93

DIBULATKAN

39.166.00

Plesteran & acian tebal 1,5 cm ad. 1 : 5


0.0240
0.1240
0.3000
0.1575
0.0115
2.0000

m3
zak
hr
hr
hr
set

144.410.00
54.000.00
55.000.00
55.000.00
70.000.00
700.00

3.465.84
6.696.00
16.500.00
8.662.50
805.00
1.400.00

JUMLAH

37.529.34

DIBULATKAN

37.529.00

Pek.Acian
0.0800
0.1430
0.1123
0.0063
2.0000

zak
hr
hr
hr
set

54.000.00
55.000.00
55.000.00
70.000.00
700.00

4.320.00
7.865.00
6.176.50
441.00
1.400.00

JUMLAH

20.202.50

DIBULATKAN

20.202.00

Pasang Dinding Rooster / Terawang, Natural, uk. 12x11x24 cm, Ad. 1Pc : 4Ps

Rooster
Pasir pasang
Semen PC ( 50 kg )
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

1 m2
1
2

0.0230
0.1570
0.3000
0.1575
0.0115
2.0000

Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

1 m2
1
2
3
4
5
6
7

m3
zak
hr
hr
hr
set

Plesteran & acian tebal 1,5 cm ad. 1 : 4

Pasir pasang
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

1 m2
1
2
3
4
5

0.0210
0.1920
0.3000
0.1575
0.0115
2.0000

Pasir pasang
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

1 m2
1
2
3
4
5
6

Plesteran & acian tebal 1,5 cm ad. 1 : 3

Pasir pasang
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

1 m2
1
2
3
4
5
6

36.0000
0.0350
0.2560
0.3000
0.1000
0.0100
0.0150

bh
m3
zak
hr
hr
hr
hr

4.600.00
144.410.00
54.000.00
55.000.00
55.000.00
56.000.00
70.000.00

165.600.00
5.054.35
13.824.00
16.500.00
5.500.00
560.00
1.050.00

JUMLAH

208.088.35

DIBULATKAN

208.088.00

Pas. Dinding glass block uk. 20x20x10 cm , ad. 1 PC : 4 psr

Glass Block 20 x 20 (Kedawung)


Pasir pasang

25.0000
0.0350

bh
m3

31.000.00
144.410.00

775.000.00
5.054.35

3
4
5
6
7

Semen PC ( 50 kg )
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

1 m2
1
2
3
4
5
6
7

0.2560
0.3000
0.1000
0.0100
0.0150

zak
hr
hr
hr
hr

54.000.00
55.000.00
55.000.00
56.000.00
70.000.00

13.824.00
16.500.00
5.500.00
560.00
1.050.00

JUMLAH

817.488.35

DIBULATKAN

817.488.00

Pasang Dinding Batu Tempel Palimanan Kuning, 20 x 20 cm Texture Kasar

Batu Tempel Palimanan


Pasir pasang
Semen PC ( 50 kg )
Pekerja
Tukang batu
Kepala Tukang Batu
Mandor

1.0500
0.0350
0.2350
0.6200
0.3500
0.0350
0.0300

m2
m3
zak
hr
hr
hr
hr

60.800.00
144.410.00
54.000.00
55.000.00
55.000.00
56.000.00
70.000.00

63.840.00
5.054.35
12.690.00
34.100.00
19.250.00
1.960.00
2.100.00

JUMLAH

138.994.35

DIBULATKAN

138.994.00

PEKERJAAN ATAP
1 m3
1
2
3
4
5
6

Kayu meranti
Paku 8 - 12

1.1000
3.0000
15.0000
5.0000
15.7500
1.0000

m3
kg
kg
hr
hr
hr

4.408.400.00
13.680.00
7.600.00
55.000.00
55.000.00
70.000.00

4.849.240.00
41.040.00
114.000.00
275.000.00
866.250.00
70.000.00

JUMLAH

6.215.530.00

DIBULATKAN

6.215.530.00

Kuda - kuda kayu kamper banjar


1.1000
3.0000
15.0000
5.0000
15.7500
1.0000

m3
kg
kg
hr
hr
hr

4.408.400.00
13.680.00
7.600.00
55.000.00
55.000.00
70.000.00

4.849.240.00
41.040.00
114.000.00
275.000.00
866.250.00
70.000.00

JUMLAH

6.215.530.00

DIBULATKAN

6.215.530.00

Kuda - kuda kayu meranti

Kayu meranti
Paku 8 - 12
Besi pengikat kuda - kuda
Pekerja
Tukang kayu
Mandor

1 m2
1
2

Kayu balok kamper banjar


Paku 8 - 12
Besi pengikat kuda - kuda
Pekerja
Tukang kayu
Mandor

1 m3
1
2
3
4
5
6

Kuda - kuda kayu kamper kruing

Kayu balok kamper kruing


Paku 8 - 12
Besi pengikat kuda - kuda
Pekerja
Tukang kayu
Mandor

1 m3
1
2
3
4
5
6

1.1000
3.0000
15.0000
5.0000
15.7500
1.0000

m3
kg
kg
hr
hr
hr

2.876.860.00
13.680.00
7.600.00
55.000.00
55.000.00
70.000.00

3.164.546.00
41.040.00
114.000.00
275.000.00
866.250.00
70.000.00

JUMLAH

4.530.836.00

DIBULATKAN

4.530.836.00

Rangka atap ( kaso 5/7 dan reng 3/4 ) kayu meranti


0.0180
0.1500

m3
kg

2.876.860.00
13.680.00

51.783.48
2.052.00

3
4
5

Pekerja
Tukang kayu
Mandor

1 m'
1
2
3
4
5

JUMLAH

65.885.48

DIBULATKAN

65.885.00

0.0150
0.8000
0.2800
0.5600
0.0720

m3
kg
hr
hr
hr

4.651.620.00
13.680.00
55.000.00
55.000.00
70.000.00

69.774.30
10.944.00
15.400.00
30.800.00
5.040.00

JUMLAH

131.958.30

DIBULATKAN

131.958.00

0.0100
0.0500
0.1430
0.2850
0.0360

m3
kg
hr
hr
hr

4.651.620.00
13.680.00
55.000.00
55.000.00
70.000.00

46.516.20
684.00
7.865.00
15.675.00
2.520.00

JUMLAH

73.260.20

DIBULATKAN

73.260.00

18.0000
0.1500
0.0790
0.0120

bh
hr
hr
hr

3.040.00
55.000.00
55.000.00
70.000.00

54.720.00
8.250.00
4.345.00
840.00

JUMLAH

68.155.00

DIBULATKAN

68.155.00

Karpusan genteng morando glasuur


0.0320
0.2200
3.5000
0.3000
0.1575
0.0225

m3
zak
bh
hr
hr
hr

144.410.00
54.000.00
5.700.00
55.000.00
55.000.00
70.000.00

4.621.12
11.880.00
19.950.00
16.500.00
8.662.50
1.575.00

JUMLAH

63.188.62

DIBULATKAN

63.188.00

Atap genteng beton (polos)

Genteng beton polos


Pekerja
Tukang kayu
Mandor

1 m'
1
2
3

5.500.00
5.500.00
1.050.00

Atap genteng morando glasuur

Pasir pasang
Semen PC ( 50 kg )
Genteng bubungan / nok
Pekerja
Tukang batu
Mandor

1 m2
1
2
3
4

55.000.00
55.000.00
70.000.00

Listplank 3 / 30 kayu kamper banjar

Genteng morando Glazur


Pekerja
Tukang kayu
Mandor

1 m'
1
2
3
4
5
6

hr
hr
hr

Listplank 3 / 30 + 3 / 15 kayu kamper banjar

Papan kayu kamper banjar


Paku 8 - 12
Pekerja
Tukang kayu
Mandor

1 m2
1
2
3
4

Papan kayu kamper banjar


Paku 8 - 12
Pekerja
Tukang kayu
Mandor

1 m'
1
2
3
4
5

0.1000
0.1000
0.0150

18.0000
0.1500
0.0790
0.0120

bh
hr
hr
hr

3.800.00
55.000.00
55.000.00
70.000.00

68.400.00
8.250.00
4.345.00
840.00

JUMLAH

81.835.00

DIBULATKAN

81.835.00

Karpusan genteng beton

Pasir pasang
Semen PC ( 50 kg )
Genteng bubungan / nok

0.0320
0.2200
3.5000

m3
zak
bh

144.410.00
54.000.00
5.240.00

4.621.12
11.880.00
18.340.00

4
5
6

Pekerja
Tukang batu
Mandor

1 m2
1
2
3
4
5
6

Zinkcchromate
Besi siku ex. DN SII
Pekerja
Tukang besi
Mandor
Erection

1 kg
1
2
3
4
5
6

Zinkcchromate
Besi WF ex. DN SII
Pekerja
Tukang besi
Mandor
Erection

1 kg
1
2
3
4
5
6

Asbes Nok Stel


Paku Kayu Segala uk.
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

1 kg
1
2
3
4
5
6

Zinkcchromate
Gording besi
Pekerja
Tukang besi
Mandor
Erection

hr
hr
hr

55.000.00
55.000.00
70.000.00

16.500.00
8.662.50
1.575.00

JUMLAH

61.578.62

DIBULATKAN

61.578.00

Pasang atap asbes gelombang 5 mm

Asbes Gelombang 5 mm (180x108)cm


Paku asbes / kg
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

1 m1
1
2
3
4
5
6

0.3000
0.1575
0.0225

0.9000
0.1200
0.1400
0.0750
0.0080
0.0080

lbr
kg
hr
hr
hr
hr

40.280.00
13.680.00
55.000.00
55.000.00
56.000.00
70.000.00

36.252.00
1.641.60
7.700.00
4.125.00
448.00
560.00

JUMLAH

50.726.60

DIBULATKAN

50.726.00

Pasang bubungan/nok stel 1.05 m


2.1000
6.0000
0.0840
0.1250
0.0130
0.0040

lbr
kg
hr
hr
hr
hr

15.730.00
13.680.00
55.000.00
55.000.00
56.000.00
70.000.00

33.033.00
82.080.00
4.620.00
6.875.00
728.00
280.00

JUMLAH

127.616.00

DIBULATKAN

127.616.00

Konstruksi baja H - beam / WF ( termasuk plat simpul,las & zinkchromate )


0.0400
1.0500
0.0600
0.0045
0.0025
1.0000

m2
kg
hr
hr
hr
kg

760.00
11.020.00
55.000.00
55.000.00
70.000.00
800.00

30.40
11.571.00
3.300.00
247.50
175.00
800.00

JUMLAH

16.123.90

DIBULATKAN

16.123.00

Konstruksi besi siku ( termasuk plat simpul,las & zinkchromate )


0.0400
1.0500
0.0600
0.0045
0.0025
1.0000

m2
kg
hr
hr
hr
kg

760.00
11.400.00
55.000.00
55.000.00
70.000.00
800.00

30.40
11.970.00
3.300.00
247.50
175.00
800.00

JUMLAH

16.522.90

DIBULATKAN

16.522.00

Konstruksi gording besi ( termasuk plat simpul,las & zinkchromate )


0.0400
1.0200
0.0600
0.0045
0.0025
1.0000

m2
kg
hr
hr
hr
kg

760.00
11.020.00
55.000.00
55.000.00
70.000.00
800.00

30.40
11.240.40
3.300.00
247.50
175.00
800.00

1 m2
1
2
3
4

15.793.00

m2
hr
hr
hr

14.440.00
55.000.00
55.000.00
70.000.00

15.162.00
1.815.00
1.815.00
350.00

JUMLAH

19.142.00

DIBULATKAN

19.142.00

0.0096
0.5000
0.0150
0.0500
0.1200
0.0120

m3
m'
kg
hr
hr
hr

2.622.230.00
25.760.00
13.680.00
55.000.00
55.000.00
70.000.00

25.173.41
12.880.00
205.20
2.750.00
6.600.00
840.00

JUMLAH

48.448.61

DIBULATKAN

48.448.00

Pasangan Atap Zincalume + Glasswall+Alumunium Foil + Roofmesh

Atap Zincalume
Glasswall
Alumunium Foil
Roofmesh
Paku Pengikat Atap metal/zincalume
Sealent
Pekerja
Tukang Besi
Mandor

1 m'
1
2
3
4
5
6

DIBULATKAN

Talang datar / jurai seng tebal 0.3 mm

Papan kayu meranti Oven


Plat seng lebar 90 cm, tebal 0.30 mm
Paku
Pekerja
Tukang kayu
Mandor

1 m2
1
2
3
4
5
6
7
8
9

1.0500
0.0330
0.0330
0.0050

15.793.30

Alumunium foil

Alumunium foil
Pekerja
Tukang kayu
Mandor

1 m'
1
2
3
4
5
6

JUMLAH

1.0000
1.0000
1.0500
1.0000
0.1750
0.0650
0.0695
0.1225
0.0067

m2
m2
m2
m2
kg
kg
hr
hr
hr

112.110.00
11.400.00
19.142.00
13.300.00
13.680.00
20.440.00
55.000.00
55.000.00
70.000.00

112.110.00
11.400.00
20.099.10
13.300.00
2.394.00
1.328.60
3.822.50
6.737.50
469.00

JUMLAH

171.660.70

DIBULATKAN

171.660.00

Pasangan Nok Zincalume + Glasswall+Alumunium Foil + Roofmesh

Atap Zincalume
Paku Pengikat Atap metal/zincalume
Sealent
Pekerja
Tukang Besi
Mandor

0.3500
0.1550
0.0250
0.0693
0.1213
0.0067

m2
kg
kg
hr
hr
hr

112.110.00
13.680.00
20.440.00
55.000.00
55.000.00
70.000.00

39.238.50
2.120.40
511.00
3.811.50
6.671.50
469.00

JUMLAH

52.821.90

DIBULATKAN

52.821.00

PEKERJAAN KAYU
1 m3
1
2
3
4
5
6

Kusen kayu kamper samarinda

Kayu balok kamper samarinda Oven


Paku
Angkur
Pekerja
Tukang kayu
Mandor

1.1000
3.0000
10.5600
7.2000
25.2000
1.5600

m3
kg
kg
hr
hr
hr
JUMLAH

5.875.330.00
13.680.00
7.600.00
55.000.00
55.000.00
70.000.00

6.462.863.00
41.040.00
80.256.00
396.000.00
1.386.000.00
109.200.00
8.475.359.00

DIBULATKAN
1 m3
1
2
3
4
5
6

m3
kg
kg
hr
hr
hr

5.875.330.00
13.680.00
7.600.00
55.000.00
55.000.00
70.000.00

6.462.863.00
41.040.00
80.256.00
396.000.00
1.386.000.00
109.200.00

JUMLAH

8.475.359.00

DIBULATKAN

8.475.359.00

1.1000
3.0000
10.5600
7.2000
25.2000
1.5600

m3
kg
kg
hr
hr
hr

4.408.400.00
13.680.00
7.600.00
55.000.00
55.000.00
70.000.00

4.849.240.00
41.040.00
80.256.00
396.000.00
1.386.000.00
109.200.00

JUMLAH

6.861.736.00

DIBULATKAN

6.861.736.00

Kusen kayu meranti


1.1000
3.0000
10.5600
7.2000
25.2000
1.5600

m3
kg
kg
hr
hr
hr

2.876.860.00
13.680.00
7.600.00
55.000.00
55.000.00
70.000.00

3.164.546.00
41.040.00
80.256.00
396.000.00
1.386.000.00
109.200.00

JUMLAH

5.177.042.00

DIBULATKAN

5.177.042.00

Daun pintu double teakwood

Rangka papan kamper banjar


Teakwood 4 mm ukuran pintu
Lem putih
Paku triplek
Pekerja
Tukang kayu
Mandor

1 m2
1
2
3
4
5
6
7
8

1.1000
3.0000
10.5600
7.2000
25.2000
1.5600

Kusen kayu kamper kruing

Kayu balok meranti


Paku
Angkur
Pekerja
Tukang kayu
Mandor

1 m2
1
2
3
4
5
6
7

Kayu balok kamper kruing


Paku
Angkur
Pekerja
Tukang kayu
Mandor

1 m3
1
2
3
4
5
6

Kusen kayu kamper banjar

Kayu balok kamper banjar


Paku
Angkur
Pekerja
Tukang kayu
Mandor

1 m3
1
2
3
4
5
6

8.475.359.00

0.0400
1.0000
0.3000
0.0300
0.4800
1.6000
0.1840

m3
lbr
kg
kg
hr
hr
hr

4.408.400.00
75.200.00
12.540.00
13.680.00
55.000.00
55.000.00
70.000.00

176.336.00
75.200.00
3.762.00
410.40
26.400.00
88.000.00
12.880.00

JUMLAH

382.988.40

DIBULATKAN

382.988.00

Daun pintu double teakwood lapis formika ( untuk KM/WC )

Rangka papan kamper banjar


Teakwood 4 mm ukuran pintu
Formika
Lem putih
Paku triplek
Pekerja
Tukang kayu
Mandor

0.0400
1.0000
0.5000
0.8000
0.0300
0.4800
1.6000
0.1840

m3
lbr
lbr
kg
kg
hr
hr
hr
JUMLAH

4.408.400.00
75.200.00
66.700.00
12.540.00
13.680.00
55.000.00
55.000.00
70.000.00

176.336.00
75.200.00
33.350.00
10.032.00
410.40
26.400.00
88.000.00
12.880.00
422.608.40

DIBULATKAN
1 m2
1
2
3
4
5
6
7

4.408.400.00
12.540.00
13.680.00
102.600.00
55.000.00
55.000.00
70.000.00

132.252.00
5.016.00
410.40
92.340.00
44.000.00
110.000.00
16.800.00

JUMLAH

400.818.40

DIBULATKAN

400.818.00

0.0300
0.4000
0.0300
0.9000
0.8000
2.0000
0.2400

m3
kg
kg
m2
hr
hr
hr

4.408.400.00
12.540.00
13.680.00
106.100.00
55.000.00
55.000.00
70.000.00

132.252.00
5.016.00
410.40
95.490.00
44.000.00
110.000.00
16.800.00

JUMLAH

403.968.40

DIBULATKAN

403.968.00

0.0300
0.4000
0.0300
0.9000
0.8000
2.0000
0.2400

m3
kg
kg
m2
hr
hr
hr

4.408.400.00
12.540.00
13.680.00
144.030.00
55.000.00
55.000.00
70.000.00

132.252.00
5.016.00
410.40
129.627.00
44.000.00
110.000.00
16.800.00

JUMLAH

438.105.40

DIBULATKAN

438.105.00

Daun pintu panel kayu samarinda


0.0440
0.4000
1.2150
2.4300
0.2590

m3
kg
hr
hr
hr

5.738.520.00
12.540.00
55.000.00
55.000.00
70.000.00

252.494.88
5.016.00
66.825.00
133.650.00
18.130.00

JUMLAH

476.115.88

DIBULATKAN

476.115.00

Daun pintu panel kayu banjar

Rangka papan kamper banjar


Lem putih
Pekerja
Tukang kayu
Mandor

1 m2

m3
kg
kg
m2
hr
hr
hr

Daun pintu kaca es

Rangka papan kamper samarinda Oven


Lem putih
Pekerja
Tukang kayu
Mandor

1 m2
1
2
3
4
5

0.0300
0.4000
0.0300
0.9000
0.8000
2.0000
0.2400

Daun pintu kaca rayben

Rangka papan kamper banjar


Lem putih
Paku
Kaca es 5 mm
Pekerja
Tukang kayu
Mandor

1 m2
1
2
3
4
5

Rangka papan kamper banjar


Lem putih
Paku
Kaca rayben 5 mm
Pekerja
Tukang kayu
Mandor

1 m2
1
2
3
4
5
6
7

Daun pintu kaca polos

Rangka papan kamper banjar


Lem putih
Paku
Kaca polos 5 mm
Pekerja
Tukang kayu
Mandor

1 m2
1
2
3
4
5
6
7

422.608.00

0.0440
0.4000
1.2150
2.4300
0.2590

Daun pintu panel kayu meranti

m3
kg
hr
hr
hr

4.408.400.00
12.540.00
55.000.00
55.000.00
70.000.00

193.969.60
5.016.00
66.825.00
133.650.00
18.130.00

JUMLAH

417.590.60

DIBULATKAN

417.590.00

1
2
3
4
5

Rangka papan kamper meranti


Lem putih
Pekerja
Tukang kayu
Mandor

1 m2
1
2
3
4
5

m3
kg
hr
hr
hr

2.876.860.00
12.540.00
55.000.00
55.000.00
70.000.00

126.581.84
5.016.00
66.825.00
133.650.00
18.130.00

JUMLAH

350.202.84

DIBULATKAN

350.202.00

Daun pintu / jendela krepyak ( jalusi ) kamper samarinda

Rangka papan kamper samarinda


Lem putih
Pekerja
Tukang kayu
Mandor

1 m2
1
2
3
4
5

0.0440
0.4000
1.2150
2.4300
0.2590

0.0420
0.2000
1.0000
3.0000
0.3500

m3
kg
hr
hr
hr

5.738.520.00
12.540.00
55.000.00
55.000.00
70.000.00

241.017.84
2.508.00
55.000.00
165.000.00
24.500.00

JUMLAH

488.025.84

DIBULATKAN

488.025.00

Daun pintu / jendela krepyak ( jalusi ) kamper banjar

Rangka papan kamper banjar


Lem putih
Pekerja
Tukang kayu
Mandor

0.0420
0.2000
1.0000
3.0000
0.3500

m3
kg
hr
hr
hr

4.408.400.00
12.540.00
55.000.00
55.000.00
70.000.00

185.152.80
2.508.00
55.000.00
165.000.00
24.500.00

JUMLAH

432.160.80

DIBULATKAN

432.160.00

PEKERJAAN LANTAI
1 m2
1
2
3
4
5
6
7

Rabat beton 7 cm + plester dan acian

Pasir pasang
Pasir beton
Kerikil / split
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor

0.0030
0.0330
0.0650
0.2760
0.1150
0.0120
0.0060

1 m2
1
2
3
4
5
6
7
8

Pasir pasang
Semen PC ( 50 kg )

144.410.00
144.410.00
164.000.00
54.000.00
55.000.00
55.000.00
70.000.00

433.23
4.765.53
10.660.00
14.904.00
6.325.00
660.00
420.00

JUMLAH

38.167.76

DIBULATKAN

38.167.00

Lantai keramik 20 x 20 ad.1 : 3

Pasir pasang
Semen PC ( 50 kg )
Semen warna ( cor nat )
Keramik 20 x 20 standar Kw 1
Pekerja
Tukang batu
Mandor
Alat bantu

1 m2
1
2

m3
m3
m3
zak
hr
hr
hr

0.0300
0.0337
0.0125
1.0500
0.2816
0.1320
0.0203
0.6000

m3
zak
kg
m2
hr
hr
hr
set

144.410.00
54.000.00
10.600.00
40.050.00
55.000.00
55.000.00
70.000.00
700.00

4.332.30
1.819.80
132.50
42.052.50
15.488.00
7.260.00
1.421.00
420.00

JUMLAH

72.926.10

DIBULATKAN

72.926.00

Lantai keramik 30 x 30 ad.1 : 3


0.0300
0.0337

m3
zak

144.410.00
54.000.00

4.332.30
1.819.80

3
4
5
6
7
8

Semen warna ( cor nat )


Keramik 30 x 30 standar 40 x 40
Pekerja
Tukang batu
Mandor
Alat bantu

1 m2
1
2
3
4
5
6
7
8

Pasir pasang
Semen PC ( 50 kg )
Plint keramik standar
Semen warna ( cor nat )
Pekerja
Tukang batu
Mandor

10.600.00
33.820.00
55.000.00
55.000.00
70.000.00
700.00

132.50
35.511.00
15.488.00
7.260.00
1.421.00
420.00

JUMLAH

66.384.60

DIBULATKAN

66.384.00

m3
zak
kg
m2
hr
hr
hr
set

144.410.00
54.000.00
10.600.00
42.940.00
55.000.00
55.000.00
70.000.00
700.00

4.332.30
1.819.80
132.50
45.087.00
15.488.00
7.260.00
1.421.00
420.00

JUMLAH

75.960.60

DIBULATKAN

75.960.00

Keramik dinding 20 x 20
0.0380
0.0340
0.0125
1.0500
0.2620
0.2760
0.0263
0.6000

m3
zak
kg
m2
hr
hr
hr
set

144.410.00
54.000.00
10.600.00
40.050.00
55.000.00
55.000.00
70.000.00
700.00

5.487.58
1.836.00
132.50
42.052.50
14.410.00
15.180.00
1.841.00
420.00

JUMLAH

81.359.58

DIBULATKAN

81.359.00

Keramik dinding 20x25

Pasir pasang
Semen PC ( 50 kg )
Semen warna ( cor nat )
Keramik 20/25 Kw 1
Pekerja
Tukang batu
Mandor
Alat bantu

1 m1
1
2
3
4
5
6
7

0.0300
0.0337
0.0125
1.0500
0.2816
0.1320
0.0203
0.6000

Pasir pasang
Semen PC ( 50 kg )
Semen warna ( cor nat )
Keramik 20 x 20 standar
Pekerja
Tukang batu
Mandor
Alat bantu

1 m2
1
2
3
4
5
6
7
8

kg
m2
hr
hr
hr
set

Lantai keramik 40 x 40 ad.1 : 3

Pasir pasang
Semen PC ( 50 kg )
Semen warna ( cor nat )
Keramik 40 x 40 standar
Pekerja
Tukang batu
Mandor
Alat bantu

1 m2
1
2
3
4
5
6
7
8

0.0125
1.0500
0.2816
0.1320
0.0203
0.6000

0.0380
0.0340
0.0125
1.0500
0.2620
0.2760
0.0263
0.6000

m3
zak
kg
m2
hr
hr
hr
set

144.410.00
54.000.00
10.600.00
39.140.00
55.000.00
55.000.00
70.000.00
700.00

5.487.58
1.836.00
132.50
41.097.00
14.410.00
15.180.00
1.841.00
420.00

JUMLAH

80.404.08

DIBULATKAN

80.404.00

Plint keramik standar


0.0030
0.0353
0.1100
0.0500
0.4000
0.1300
0.0260

m3
zak
m2
kg
hr
hr
hr

144.410.00
54.000.00
5.850.00
10.600.00
55.000.00
55.000.00
70.000.00

433.23
1.906.20
643.50
530.00
22.000.00
7.150.00
1.820.00

Alat bantu

1 m1
1
2
3
4
5
6

set

700.00

420.00

JUMLAH

34.902.93

DIBULATKAN

34.902.00

Plint kayu standar


0.0016
0.1000
0.4000
0.1300
0.0260
0.6000

m3
kg
hr
hr
hr
set

4.408.400.00
18.000.00
55.000.00
55.000.00
70.000.00
700.00

7.053.44
1.800.00
22.000.00
7.150.00
1.820.00
420.00

JUMLAH

40.243.44

DIBULATKAN

40.243.00

Plint keramik 10x20 dinding Kamar mandi

Pasir pasang
Semen PC ( 50 kg )
Plint keramik standar
Semen warna ( cor nat )
Pekerja
Tukang batu
Mandor
Alat bantu

1 m'
1
2
3
4
5
6
7
8

Rangka papan kamper banjar


Paku segala ukuran
Pekerja
Tukang kayu
Mandor
Alat bantu

1 m'
1
2
3
4
5
6
7
8

0.6000

0.0030
0.0353
5.0000
0.0500
0.0400
0.0130
0.0026
0.0600

m3
zak
bh
kg
hr
hr
hr
set

144.410.00
54.000.00
5.850.00
10.600.00
55.000.00
55.000.00
70.000.00
700.00

433.23
1.906.20
29.250.00
530.00
2.200.00
715.00
182.00
42.00

JUMLAH

35.258.43

DIBULATKAN

35.258.00

Border 7x20 / Plint keramik dinding Kamar mandi

Pasir pasang
Semen PC ( 50 kg )
Border Keramik Dinding 7/20
Semen warna ( cor nat )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0030
0.0353
1.0000
0.0500
0.0400
0.0130
0.0026
0.0600

m3
zak
m'
kg
hr
hr
hr
set

144.410.00
54.000.00
31.350.00
10.600.00
55.000.00
55.000.00
70.000.00
700.00

433.23
1.906.20
31.350.00
530.00
2.200.00
715.00
182.00
42.00

JUMLAH

37.358.43

DIBULATKAN

37.358.00

PEKERJAAN PLAFOND
1 m2
1
2
3
4
5
6
7
8
9
10
11
12

Hollow 20X40X0,7 mm
Hollow 40X40X0,7 mm
Wall Angle
Suspention Road 4 mm
Paku Riffet
Gypsumboard 9 mm
Drywall Screw
Cornice Adhesive
Catton Tape
Tukang
Pekerja
Mandor

Rangka plafond gird 60 x 60 cm ( Rangka Hollow )


0.4500
0.2250
0.2400
0.9750
0.0180
0.4320
0.0400
0.0340
0.0520
0.3980
0.3740
0.0700

btg
btg
btg
unit
dos
lbr
dos
zak
roll
hr
hr
hr
JUMLAH

29.000.00
17.100.00
15.200.00
12.160.00
18.240.00
40.280.00
57.000.00
64.600.00
10.030.00
55.000.00
55.000.00
70.000.00

13.050.00
3.847.50
3.648.00
11.856.00
328.32
17.400.96
2.280.00
2.196.40
521.56
21.890.00
20.570.00
4.900.00
102.488.74

DIBULATKAN
1 m2
1
2
3
4
5
6
7
8
9
10
11
12

Kayu meranti
Gypsum 9 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

1 m2
1
2
3

Kayu meranti
Triplek 4 mm
Paku

0.0080
0.1400
0.1700
0.2800
0.0370
0.6000

29.000.00
17.100.00
15.200.00
12.160.00
18.240.00
152.010.00
57.000.00
64.600.00
10.030.00
55.000.00
55.000.00
70.000.00

13.050.00
3.847.50
3.648.00
11.856.00
328.32
65.668.32
2.280.00
2.196.40
521.56
21.890.00
20.570.00
4.900.00

JUMLAH

150.756.10

DIBULATKAN

150.756.00

m3
kg
hr
hr
hr
set

4.408.400.00
18.000.00
55.000.00
55.000.00
70.000.00
700.00

35.267.20
2.520.00
9.350.00
15.400.00
2.590.00
420.00

JUMLAH

65.547.20

DIBULATKAN

65.547.00

Plafond asbes 5 mm + rangka kayu meranti


0.0080
1.0250
0.1750
0.2200
0.3500
0.0460
1.0000

m3
lbr
kg
hr
hr
hr
set

2.876.860.00
21.430.00
18.000.00
55.000.00
55.000.00
70.000.00
700.00

23.014.88
21.965.75
3.150.00
12.100.00
19.250.00
3.220.00
700.00

JUMLAH

83.400.63

DIBULATKAN

83.400.00

Plafond gysum 9 mm + rangka kayu meranti


0.0080
0.5800
0.1750
0.2200
0.3500
0.0460
1.0000

btg
btg
btg
unit
dos
lbr
dos
zak
roll
hr
hr
hr

Rangka plafond gird 50 x 100 cm ( kayu kamper banjar )

Kayu meranti
Plat asbes semen 100 x 100 cm, t = 6 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

1 m2
1
2
3
4
5
6
7

0.4500
0.2250
0.2400
0.9750
0.0180
0.4320
0.0400
0.0340
0.0520
0.3980
0.3740
0.0700

Kayu kamper banjar Oven


Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

1 m2
1
2
3
4
5
6
7

Rangka plafond gird 60 x 60 cm ( Rangka Hollow )

Hollow 20X40X0,7 mm
Hollow 40X40X0,7 mm
Wall Angle
Suspention Road 4 mm
Paku Riffet
GRC Board t=6 mm
Drywall Screw
Cornice Adhesive
Catton Tape
Tukang
Pekerja
Mandor

1 m2
1
2
3
4
5
6

102.488.00

m3
lbr
kg
hr
hr
hr
set

2.876.860.00
40.280.00
18.000.00
55.000.00
55.000.00
70.000.00
700.00

23.014.88
23.362.40
3.150.00
12.100.00
19.250.00
3.220.00
700.00

JUMLAH

84.797.28

DIBULATKAN

84.797.00

Plafond triplek 4 mm + rangka kayu meranti


0.0080
0.3750
0.1750

m3
lbr
kg

2.876.860.00
75.200.00
18.000.00

23.014.88
28.200.00
3.150.00

4
5
6
7

Pekerja
Tukang kayu
Mandor
Alat bantu

1 m2
1
2
3
4
5
6
7

hr
hr
hr
set

89.634.88

DIBULATKAN

89.634.00

m3
lbr
kg
hr
hr
hr
set

2.876.860.00
40.280.00
18.000.00
55.000.00
55.000.00
70.000.00
700.00

23.014.88
15.105.00
3.150.00
12.100.00
19.250.00
3.220.00
700.00

JUMLAH

76.539.88

DIBULATKAN

76.539.00

Plafond GRC + rangka kayu meranti


0.0080
0.5800
0.1750
0.2200
0.3500
0.0460
1.0000

12.100.00
19.250.00
3.220.00
700.00

JUMLAH

0.0080
0.3750
0.1750
0.2200
0.3500
0.0460
1.0000

55.000.00
55.000.00
70.000.00
700.00

Plafond asbes 5 mm + rangka kayu meranti

Kayu meranti
GRC Board
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

1 m1
1
2
3
4
5
6

Kayu meranti
Asbes 5 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

1 m2
1
2
3
4
5
6
7

0.2200
0.3500
0.0460
1.0000

m3
lbr
kg
hr
hr
hr
set

2.876.860.00
152.010.00
18.000.00
55.000.00
55.000.00
70.000.00
700.00

23.014.88
88.165.80
3.150.00
12.100.00
19.250.00
3.220.00
700.00

JUMLAH

149.600.68

DIBULATKAN

149.600.00

List Plafond Kayu Kamper Samarinda 5 cm

List Profil Kamper 5 cm


Paku
Pekerja
Tukang kayu
Kepala Tukang Kayu
Mandor

1.1000
0.0100
0.0500
0.0500
0.0050
0.0030

m1
kg
hr
hr
hr
hr

12.160.00
18.000.00
55.000.00
55.000.00
56.000.00
70.000.00

13.376.00
180.00
2.750.00
2.750.00
280.00
210.00

JUMLAH

19.546.00

DIBULATKAN

19.546.00

PEKERJAAN CAT
1 m2
1
2
3
4
5
6

Cat dinding dalam ( ICI )

Cat setara ICI - interior


Roll cat + bak
Plamur / dempul tembok
Ampelas
Tukang cat
Mandor

1 m2
1
2

Cat setara jotun


Roll cat + bak

0.2800
0.0100
0.1600
0.5000
0.2950
0.0250

kg
bh
kg
lbr
hr
hr

29.300.00
16.300.00
12.380.00
2.600.00
65.000.00
80.000.00

8.204.00
163.00
1.980.80
1.300.00
19.175.00
2.000.00

JUMLAH

32.822.80

DIBULATKAN

32.822.00

Cat dinding dalam ( Jotun )


0.2800
0.0100

kg
bh

19.900.00
16.300.00

5.572.00
163.00

3
4
5
6

Plamur / dempul tembok


Ampelas
Tukang cat
Mandor

1 m2
1
2
3
4
5
6

JUMLAH

30.190.80

DIBULATKAN

30.190.00

0.2800
0.0100
0.1600
0.5000
0.2950
0.0250

kg
bh
kg
lbr
hr
hr

47.100.00
16.300.00
12.380.00
2.600.00
65.000.00
80.000.00

13.188.00
163.00
1.980.80
1.300.00
19.175.00
2.000.00

JUMLAH

37.806.80

DIBULATKAN

37.806.00

0.2800
0.0100
0.1600
0.5000
0.2950
0.0250

kg
bh
kg
lbr
hr
hr

16.500.00
16.300.00
12.380.00
2.600.00
65.000.00
80.000.00

4.620.00
163.00
1.980.80
1.300.00
19.175.00
2.000.00

JUMLAH

29.238.80

DIBULATKAN

29.238.00

0.2800
0.0100
0.1600
0.5000
0.2950
0.0250

kg
bh
kg
lbr
hr
hr

12.900.00
16.300.00
12.380.00
2.600.00
65.000.00
80.000.00

3.612.00
163.00
1.980.80
1.300.00
19.175.00
2.000.00

JUMLAH

28.230.80

DIBULATKAN

28.230.00

Cat plafond setara ICI

Cat setara ICI


Roll cat + bak
Plamur / dempul tembok
Ampelas
Tukang cat
Mandor

1 m2
1
2
3
4
5

1.980.80
1.300.00
19.175.00
2.000.00

Cat dinding dengan Metrolith

Cat setara Metrolith


Roll cat + bak
Plamur / dempul tembok
Ampelas
Tukang cat
Mandor

1 m2
1
2
3
4
5
6

12.380.00
2.600.00
65.000.00
80.000.00

Cat dinding dengan Vinilex

Cat setara Vinilex


Roll cat + bak
Plamur / dempul tembok
Ampelas
Tukang cat
Mandor

1 m2
1
2
3
4
5
6

kg
lbr
hr
hr

Cat dinding luar dengan ( ICI Weathershield )

Cat setara ICI Weathershield )


Roll cat + bak
Plamur / dempul tembok
Ampelas
Tukang cat
Mandor

1 m2
1
2
3
4
5
6

0.1600
0.5000
0.2950
0.0250

0.3000
0.0500
0.0450
0.2000
0.3150
0.0250

kg
bh
kg
lbr
hr
hr

29.300.00
16.300.00
12.380.00
2.600.00
65.000.00
80.000.00

8.790.00
815.00
557.10
520.00
20.475.00
2.000.00

JUMLAH

33.157.10

DIBULATKAN

33.157.00

Cat plafond setara Jotun

Cat setara jotun


Roll cat + bak
Plamur / dempul tembok
Ampelas
Tukang cat

0.3000
0.0500
0.0450
0.2000
0.3150

kg
bh
kg
lbr
hr

19.900.00
16.300.00
12.380.00
2.600.00
65.000.00

5.970.00
815.00
557.10
520.00
20.475.00

Mandor

1 m2
1
2
3
4
5
6
7

hr

80.000.00

2.000.00

JUMLAH

30.337.10

DIBULATKAN

30.337.00

Cat besi memakai kuas

Cat besi / kayu setara F - Talit


Kuas 3"
Minyak cat / thiner
Meni besi
Ampelas
Tukang cat
Mandor

1 m2
1
2
3
4
5
6
7
8

0.0250

0.2000
0.0500
0.1500
0.1675
0.4000
0.3150
0.0250

kg
bh
lt
kg
lbr
hr
hr

38.700.00
12.920.00
12.540.00
19.760.00
4.560.00
65.000.00
80.000.00

7.740.00
646.00
1.881.00
3.309.80
1.824.00
20.475.00
2.000.00

JUMLAH

37.875.80

DIBULATKAN

37.875.00

Cat kayu memakai kuas

Cat besi / kayu setara F - Talit


Kuas 3"
Plamir kayu
Meni kayu
Ampelas
Minyak cat / thiner
Tukang cat
Mandor

0.2000
0.0500
0.0630
0.1670
0.4000
0.1500
0.3150
0.0250

kg
bh
kg
kg
lbr
lt
hr
hr

38.700.00
12.920.00
12.380.00
20.140.00
2.600.00
12.540.00
65.000.00
80.000.00

7.740.00
646.00
779.94
3.363.38
1.040.00
1.881.00
20.475.00
2.000.00

JUMLAH

37.925.32

DIBULATKAN

37.925.00

PEKERJAAN SANITER
1 unit
1
2
3
4
5
6

0.1500
0.1000
1.0000
0.3000
0.2500
0.1800

Floor drain kuningan


Pekerja
Tukang batu
Mandor

m3
zak
bh
hr
hr
hr

144.410.00
54.000.00
222.390.00
55.000.00
55.000.00
70.000.00

21.661.50
5.400.00
222.390.00
16.500.00
13.750.00
12.600.00

JUMLAH

292.301.50

DIBULATKAN

292.301.00

Bak air fiber glass kap. 200 ltr

Pasir pasang
Semen PC ( 50 kg )
Bak air fiber glass kap. 200 ltr
Pekerja
Tukang batu
Mandor

1 bh
1
2
3
4

Closet jongkok standar

Pasir pasang
Semen PC ( 50 kg )
Closet jongkok standar
Pekerja
Tukang batu
Mandor

1 unit
1
2
3
4
5
6

0.1500
0.1000
1.0000
0.3000
0.2500
0.1800

m3
zak
bh
hr
hr
hr

144.410.00
54.000.00
248.540.00
55.000.00
55.000.00
70.000.00

21.661.50
5.400.00
248.540.00
16.500.00
13.750.00
12.600.00

JUMLAH

318.451.50

DIBULATKAN

318.451.00

Floor drain
1.0000
0.0100
0.1000
0.0050

bh
hr
hr
hr

25.460.00
55.000.00
55.000.00
70.000.00

25.460.00
550.00
5.500.00
350.00

1 bh
1
2
3
4
5
6

1.0000
40.0000
16.0000
6.0000
2.0000
1.0000

31.860.00

bh
roll
tube
hr
hr
hr

91.960.00
2.280.00
6.840.00
55.000.00
55.000.00
70.000.00

bh
m'
m'
bh
bh
ls

91.960.00
57.00
855.00
550.00
5.500.00
350.00
99.272.00
99.272.00

2.299.200.00
5.850.00
34.480.00
20.980.00
50.580.00
1.200.000.00

2.299.200.00
234.000.00
551.680.00
125.880.00
101.160.00
1.200.000.00

JUMLAH

4.511.920.00

DIBULATKAN

4.511.920.00

Water tower rangka besi siku


175.0000
0.7665
2.5000
3.0000
3.0000
0.3000

kg
m3
hr
hr
hr
hr

16.522.00
820.907.00
55.000.00
55.000.00
55.000.00
70.000.00

2.891.350.00
629.225.22
137.500.00
165.000.00
165.000.00
21.000.00

JUMLAH

4.009.075.22

DIBULATKAN

4.009.075.00

Tangki air kapasitas 1 m3

Tangki air kapasitas 1 m3


Pekerja
Tukang batu
Mandor

1 unit
1
2
3
4
5
6
7
8
9
10
11
12

DIBULATKAN

JUMLAH
DIBULATKAN
Pompa air jet pump + Instalasi dan pengeboran

Konstruksi besi siku


Pondasi beton tapak K. 175
Pekerja
Tukang besi
Tukang batu
Mandor

1 bh
1
2
3
4

1.0000
0.0250
0.1250
0.0100
0.1000
0.0050

Pompa air jet pump


Pipa PVC 1 "
Pipa PVC 4 "
Bocht LL-D 1" (lokal)
Water moer
Ongkos pengeboran

1 unit
1
2
3
4
5
6

31.860.00

Kran air 1/2"

Kran air 1/2 ex toto


Seal tape
Lem pipa PVC
Pekerja
Tukang batu
Mandor

1 unit
1
2
3
4
5
6

JUMLAH

1.0000
0.1000
0.2500
0.0250

bh
hr
hr
hr

1.320.990.00
55.000.00
55.000.00
70.000.00

1.320.990.00
5.500.00
13.750.00
1.750.00

JUMLAH

1.341.990.00

DIBULATKAN

1.341.990.00

Septictank & Rembesan + Instalasi

Pas batu bata, t = 1/2 bata ad 1 : 2


Pasir urug unt rembesan
Koral beton unt. rembesan
Plesteran dan acian trasraam ad. 1 : 3
Plat beton penutup t = 12 cm (beton site mix K. 175)
Besi beton polos
Pipa PVC 1 "
Pipa porous 4 "
Ijuk
Pekerja
Tukang batu
Mandor

12.5000
0.3000
1.5080
11.3400
0.3600
47.4000
0.5000
3.0000
30.0000
2.5000
3.0000
0.0500

m2
m3
m3
m2
m3
kg
m'
m'
ikt
hr
hr
hr

86.300.00
100.000.00
133.800.00
40.768.00
820.907.00
12.228.00
5.850.00
34.480.00
6.840.00
55.000.00
55.000.00
70.000.00

1.078.750.00
30.000.00
201.770.40
462.309.12
295.526.52
579.607.20
2.925.00
103.440.00
205.200.00
137.500.00
165.000.00
3.500.00

JUMLAH

3.265.528.24

DIBULATKAN

3.265.528.00

PEKERJAAN ASESORIS
1 bh
1
2
3
4

1 bh
1
2
3
4

DIBULATKAN

37.640.00

bh
hr
hr
hr

25.080.00
55.000.00
55.000.00
70.000.00

25.080.00
550.00
5.500.00
350.00

JUMLAH

31.480.00

DIBULATKAN

31.480.00

Pasang hak angin


bh
hr
hr
hr

11.170.00
55.000.00
55.000.00
70.000.00

11.170.00
550.00
5.500.00
350.00

JUMLAH

17.570.00

DIBULATKAN

17.570.00

Pasang slot jendela


1.0000
0.0100
0.1000
0.0050

28.040.00
825.00
8.250.00
525.00
37.640.00

1.0000
0.0100
0.1000
0.0050

28.040.00
55.000.00
55.000.00
70.000.00

JUMLAH

1.0000
0.0100
0.1000
0.0050

Kabel NYM 3x2.5 mm


Klem kabel
Pipa PVC AW 1/2"
Pembantu Instalator
Instalator
Mandor

1 Titik

bh
hr
hr
hr

Pasang Engsel jendela

bh
hr
hr
hr

17.480.00
55.000.00
55.000.00
70.000.00

17.480.00
550.00
5.500.00
350.00

JUMLAH

23.880.00

DIBULATKAN

23.880.00

Pasang kunci double slaag (SOLID)

Kunci double slaag (SOLID)


Pekerja
Tukang kayu
Mandor

1 Titik
1
2
3
4
5
6

Slot jendela
Pekerja
Tukang kayu
Mandor

1 bh
1
2
3
4

1.0000
0.0150
0.1500
0.0075

Hak angin
Pekerja
Tukang kayu
Mandor

1 bh
1
2
3
4

Pasang Engsel pintu nilon 4"

Engsel nilon 3"


Pekerja
Tukang kayu
Mandor

1 bh
1
2
3
4

Engsel nilon 4"


Pekerja
Tukang kayu
Mandor

1.0000
0.0500
0.2500
0.0100

bh
hr
hr
hr

202.630.00
55.000.00
55.000.00
70.000.00

202.630.00
2.750.00
13.750.00
700.00

JUMLAH

219.830.00

DIBULATKAN

219.830.00

Instalasi Lampu (kabel NYM 3x2,5 mm)


5.0000
1.0000
2.0000
0.3715
0.1050
0.0050

m
dus
m
hr
hr
hr

11.020.00
2.410.00
5.850.00
56.000.00
64.000.00
70.000.00

55.100.00
2.410.00
11.700.00
20.804.00
6.720.00
350.00

JUMLAH

97.084.00

DIBULATKAN

97.084.00

Instalasi Saklar/Stop Kontak (kabel NYM 3x2,5 mm)

1
2
3
4
5
6

Kabel NYM 3x2.5 mm


Klem kabel
Pipa PVC AW 1/2"
Pembantu Instalator
Instalator
Mandor

1 Bh
1
2
3
4

1.0000
0.2500
0.1500
0.0050

1.0000
0.2500
0.1500
0.0050

1.0000
0.3132
0.1045
0.0050
0.3000

97.084.00

DIBULATKAN

97.084.00

bh
hr
hr
hr

13.300.00
56.000.00
64.000.00
70.000.00

13.300.00
14.000.00
9.600.00
350.00

JUMLAH

37.250.00

DIBULATKAN

37.250.00

bh
hr
hr
hr

16.990.00
56.000.00
64.000.00
70.000.00

16.990.00
14.000.00
9.600.00
350.00

JUMLAH

40.940.00

DIBULATKAN

40.940.00

bh
hr
hr
hr

14.060.00
56.000.00
64.000.00
70.000.00

14.060.00
14.000.00
9.600.00
350.00

JUMLAH

38.010.00

DIBULATKAN

38.010.00

bh
hr
hr
hr
set

136.810.00
48.000.00
64.000.00
70.000.00
700.00

136.810.00
15.033.60
6.688.00
350.00
210.00

JUMLAH

159.091.60

DIBULATKAN

159.091.00

Lampu SL 18 watt setara philips (inbouw) termasuk bahan komplit


1.0000
1.0000
0.3132
0.1045
0.0050
0.3000

PEKERJAAN SARANA LUAR


-

JUMLAH

Lampu TL 2 x 18 watt setara philips (inbouw) termasuk bahan komplit

Lampu SL 18 watt, komplit philips


Fitting keramik
Pekerja
Tukang listrik
Mandor
Alat bantu

1 m'

55.100.00
2.410.00
11.700.00
20.804.00
6.720.00
350.00

Pasang Stop Kontak

Lampu TL 2 x 18 watt, armatur, komplit philips


Pekerja
Tukang listrik
Mandor
Alat bantu

1 Bh
1
2
3
4
5
6

11.020.00
2.410.00
5.850.00
56.000.00
64.000.00
70.000.00

Pasang Saklar Ganda

Stop Kontak
Pembantu Instalator
Instalator
Mandor

1 Bh
1
2
3
4
5

1.0000
0.2500
0.1500
0.0050

Saklar ganda
Pembantu Instalator
Instalator
Mandor

1 Bh
1
2
3
4

m
dus
m
hr
hr
hr

Pasang Saklar Tunggal

Saklar tunggal
Pembantu Instalator
Instalator
Mandor

1 Bh
1
2
3
4

5.0000
1.0000
2.0000
0.3715
0.1050
0.0050

Saluran buis beton 1/2 dia. 20 cm

bh
bh
hr
hr
hr
set

36.570.00
23.240.00
48.000.00
64.000.00
70.000.00
700.00

36.570.00
23.240.00
15.033.60
6.688.00
350.00
210.00

JUMLAH

82.091.60

DIBULATKAN

82.091.00

1
2
3
4
5
6
7

Buis beton 1/2 dia. 20 cm


Pasir urug
Pasir pasang
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor

1 m2
1
2
3
4
5

1.0250
0.0250
0.1500
0.0500
0.0030

Galian tanah pondasi


Pasir beton
Batu pecah 3/4

29.058.75
12.000.00
7.798.14
1.458.00
3.600.00
2.600.00
875.00

JUMLAH

57.389.89

DIBULATKAN

57.389.00

m2
m3
hr
hr
hr

43.000.00
144.410.00
48.000.00
52.000.00
70.000.00

44.075.00
3.610.25
7.200.00
2.600.00
210.00

JUMLAH

57.695.25

DIBULATKAN

57.695.00

m2
m3
hr
hr
hr

49.800.00
144.410.00
48.000.00
52.000.00
70.000.00

51.045.00
3.610.25
7.200.00
2.600.00
210.00

JUMLAH

64.665.25

DIBULATKAN

64.665.00

Kanstin abu - abu 10.20.40 - K.175


1.0000
0.0100
0.0500
0.0175
0.00875

m2
m3
hr
hr
hr

26.400.00
606.095.00
48.000.00
52.000.00
70.000.00

26.400.00
6.060.95
2.400.00
910.00
612.50

JUMLAH

36.383.45

DIBULATKAN

36.383.00

Pagar beton precat t = 2.00 m

Galian tanah pondasi


0.1200
Pasir beton
0.0150
Batu pecah 3/4
0.0290
Semen
0.2250
Tinggi pagar 5 panel/ 2 m, panjang kolom 3 m, mutu beton
1.0000
K225
Pekerja
0.6000
Tukang batu
0.3500
Mandor
0.0350

1 m'
1
2
3

28.350.00
100.000.00
144.410.00
54.000.00
48.000.00
52.000.00
70.000.00

Paving block t = 8 cm

Kanstin abu - abu 10.20.40 - K.175


Adukan
Pekerja
Tukang batu
Mandor

1 m'
1
2
3
4
5
6
7
8

1.0250
0.0250
0.1500
0.0500
0.0030

Paving block t = 8 cm K.250


Pasir beton
Pekerja
Tukang batu
Mandor

1 m'
1
2
3
4
5

m'
m3
m3
zak
hr
hr
hr

Paving block t = 6 cm

Paving block t = 6 cm K.250


Pasir pasang
Pekerja
Tukang batu
Mandor

1 m2
1
2
3
4
5

1.0250
0.1200
0.0540
0.0270
0.0750
0.0500
0.0125

m3
m3
m3
zak
m
hr
hr
hr

43.420.00
144.410.00
164.000.00
54.000.00
167.970.00
48.000.00
52.000.00
70.000.00

5.210.40
2.166.15
4.756.00
12.150.00
167.970.00
28.800.00
18.200.00
2.450.00

JUMLAH

241.702.55

DIBULATKAN

241.702.00

Pagar beton precat t = 2.40 m


0.1200
0.0150
0.0290

m3
m3
m3

43.420.00
144.410.00
164.000.00

5.210.40
2.166.15
4.756.00

4
5
6
7
8

Semen
0.2250
Tinggi pagar 6 panel/ 2.4 m, pjang kolom 3.5 m, mutu beton
1.0000
K225
Pekerja
0.6000
Tukang batu
0.3500
Mandor
0.0350

1 m'
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Catur kayu kamper


Hand Ralling
Melamin
Dyna Bolt
Pekerja
Tukang
Mandor
Alat bantu

12.150.00
197.610.00
28.800.00
18.200.00
2.450.00

JUMLAH

271.342.55

DIBULATKAN

271.342.00

0.1000
0.0250
0.1875
0.0300
0.0354
0.0167
0.5000
1.5200
1.0000
1.5200
9.8000
2.2200
4.8333
7.0000
1.0000
1.0000

m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
kg
kg
kg
bh
ls
ls

43.420.00
17.620.00
529.170.00
3.820.009.00
3.263.329.00
3.263.329.00
83.889.00
37.529.00
133.424.00
32.822.00
12.228.00
12.228.00
11.400.00
5.700.00
44.000.00
8.000.00

4.342.00
440.50
99.219.38
114.600.27
115.576.24
54.388.82
41.944.50
57.044.08
133.424.00
49.889.44
119.834.40
27.146.16
55.100.00
39.900.00
44.000.00
8.000.00

JUMLAH

964.849.78

DIBULATKAN

964.849.00

Pas.Pintu Pagar Tralis Besi

Besi Beton Polos dia..16


Besi Beton Polos dia..10
Besi Galvanis dia. 2"
Tombak Beton
Pengelasan & Pengecetan
Roda Pagar
Kunci Pagar
Rel Besi
Ongkos pasang Pagar Besi

1 m'
1
2
3
4
5
6
7
8

54.000.00
197.610.00
48.000.00
52.000.00
70.000.00

Pas.Pagar Tralis Besi

Galian Tanah Pondasi


Urugan Tanah Kembali
Pas. Batu Kali 1 : 5
Sloof beton 15/20 K.175
Kolom beton 25/25 K.225
Kepala pagar dengan beton K.225
Pas.Batu bata 1 : 5
Plester + Acian
Pas. Batu Tempel
Pengecetan Kolom
Besi Beton Polos dia..16
Besi Beton Polos dia..10
Besi siku L.40.40.4
Tombak Beton
Pengelasan & Pengecetan
Ongkos pasang Pagar Besi

1 m'
1
2
3
4
5
6
7
8
9

zak
m
hr
hr
hr

18.0000
4.9950
4.5000
54.0000
1.0000
0.7500
0.2500
1.3000
1.0000

kg
kg
m1
bh
ls
bh
bh
kg
ls

12.228.00
12.228.00
45.600.00
5.700.00
44.000.00
11.400.00
38.000.00
7.600.00
8.000.00

220.104.00
61.078.86
205.200.00
307.800.00
44.000.00
8.550.00
9.500.00
9.880.00
8.000.00

JUMLAH

874.112.86

DIBULATKAN

874.112.00

Ralling Tangga Kayu


4.0000
1.1000
0.2000
6.0000
0.3550
0.8875
0.0533
1.0000

bh
m'
m2
bh
hr
hr
hr
set

38.000.00
22.990.00
6.680.00
4.180.00
48.000.00
52.000.00
70.000.00
700.00

152.000.00
25.289.00
1.336.00
25.080.00
17.040.00
46.150.00
3.727.50
700.00

JUMLAH

271.322.50

DIBULATKAN

271.322.00

PEKERJAAN PARTISI
1 M2 Rangka partisi besi hollow, modul 60X60 CM
1
2
3
4
5

Hollow 40X40X0,7 mm
Paku Riffet
Tukang
Pekerja
Mandor

1.1000
6.0000
0.2260
0.2160
0.0250

btg
bj
org/hr
org/hr
org/hr

17.100.00
1.000.00
48.000.00
52.000.00
70.000.00

18.810.00
6.000.00
10.848.00
11.232.00
1.750.00

JUMLAH

48.640.00

DIBULATKAN

48.600.00

1 M2 Partisi gypsumboard 9 MM
1
2
3
4
5
6
7

Gypsumboard 9 mm
Drywall Screw
Cornice Adhesive
Catton Tape
Tukang
Pekerja
Mandor

0.4320
0.0400
0.0340
0.0520
0.1220
0.1080
0.0250

lbr
dos
zak
roll
org/hr
org/hr
org/hr

40.280.00
57.000.00
64.600.00
10.030.00
48.000.00
52.000.00
70.000.00

17.400.96
2.280.00
2.196.40
521.56
5.856.00
5.616.00
1.750.00

JUMLAH

35.620.92

DIBULATKAN

35.600.00

1 M2 Mengerjakan dinding kisi-kisi / sunshading besi hollow


1
2
3
4
5

Besi holllow 40X40x1,8 mm


Besi holllow 40X20x1,8 mm
Aksesories dan perlengkapan
Upah potong besi
Upah las dan pasang

0.5000
4.0000
0.2500
1.0000
1.0000

btg
btg
hrg
m2
m2

60.800.00
41.800.00
51.300.00
4.000.00
4.000.00

30.400.00
167.200.00
12.825.00
4.000.00
4.000.00

JUMLAH

218.425.00

DIBULATKAN

218.400.00

Mengerjakan dinding partisi type - PR1


1
2
3
4
5
6

Rangka hollow 4/4


Gypsumboard 9 mm
Papan kayu 3X10 cm
List profil kayu 2X4 cm
Plint kayu 1,5/10
Paku

2.0720
4.1440
1.4800
2.9600
5.9200
0.1000

m2
m2
m'
m'
m'
kg

48.600.00
45.000.00
19.000.00
12.160.00
17.100.00
13.680.00

100.699.20
186.480.00
28.120.00
35.993.60
101.232.00
1.368.00

JUMLAH

453.892.80

DIBULATKAN

453.800.00

Mengerjakan dinding partisi type - PR2


1
2
3
4
5
6

Rangka hollow 4/4


Gypsumboard 9 mm
Papan kayu 3X10 cm
List profil kayu 2X4 cm
Plint kayu 1,5/10
Paku

3.4300
6.8600
2.4500
4.9000
9.8000
0.1500

m2
m2
m'
m'
m'
kg

48.600.00
45.000.00
19.000.00
12.160.00
17.100.00
13.680.00

166.698.00
308.700.00
46.550.00
59.584.00
167.580.00
2.052.00

JUMLAH

751.164.00

DIBULATKAN

751.100.00

Mengerjakan dinding partisi type - PR3


1
2

Rangka hollow 4/4


Gypsumboard 9 mm

6.6920
13.3840

m2
m2

48.600.00
45.000.00

325.231.20
602.280.00

3
4
5
6

Papan kayu 3X10 cm


List profil kayu 2X4 cm
Plint kayu 1,5/10
Paku

Mengerjakan dinding partisi type - PR4

1
2
3
4
5
6

Rangka hollow 4/4


Gypsumboard 9 mm
Papan kayu 3X10 cm
List profil kayu 2X4 cm
Plint kayu 1,5/10
Paku

Mengerjakan dinding partisi type - PR5

1
2
3
4
5
6

Rangka hollow 4/4


Gypsumboard 9 mm
Papan kayu 3X10 cm
List profil kayu 2X4 cm
Plint kayu 1,5/10
Paku

Mengerjakan dinding partisi type - PR6

1
2
3
4
5
6

Rangka hollow 4/4


Gypsumboard 9 mm
Papan kayu 3X10 cm
List profil kayu 2X4 cm
Plint kayu 1,5/10
Paku

Mengerjakan dinding partisi type - PR7 / PR7a

1
2
3
4
5
6

Rangka hollow 4/4


Gypsumboard 9 mm
Papan kayu 3X10 cm
List profil kayu 2X4 cm
Plint kayu 1,5/10
Paku

Mengerjakan dinding partisi type - PR8

1
2
3
4

Rangka hollow 4/4


Gypsumboard 9 mm
Plint kayu 1,5/10
Paku

4.7800
9.5600
19.1200
0.2500

4.4800
8.9600
3.2000
6.4000
12.8000
0.2000

3.2620
6.5240
2.3300
4.6600
9.3200
0.1500

5.1520
10.3040
3.6800
7.3600
14.7200
0.2000

3.5420
7.0840
2.5300
5.0600
10.1200
0.1500

10.9760
21.9520
6.8600
0.3000

m'
m'
m'
kg

19.000.00
12.160.00
17.100.00
13.680.00

90.820.00
116.249.60
326.952.00
3.420.00

JUMLAH

1.464.952.80

DIBULATKAN

1.464.900.00

m2
m2
m'
m'
m'
kg

48.600.00
45.000.00
19.000.00
12.160.00
17.100.00
13.680.00

217.728.00
403.200.00
60.800.00
77.824.00
218.880.00
2.736.00

JUMLAH

981.168.00

DIBULATKAN

981.100.00

m2
m2
m'
m'
m'
kg

48.600.00
45.000.00
19.000.00
12.160.00
17.100.00
13.680.00

158.533.20
293.580.00
44.270.00
56.665.60
159.372.00
2.052.00

JUMLAH

714.472.80

DIBULATKAN

714.400.00

m2
m2
m'
m'
m'
kg

48.600.00
45.000.00
19.000.00
12.160.00
17.100.00
13.680.00

250.387.20
463.680.00
69.920.00
89.497.60
251.712.00
2.736.00

JUMLAH

1.127.932.80

DIBULATKAN

1.127.900.00

m2
m2
m'
m'
m'
kg

48.600.00
45.000.00
19.000.00
12.160.00
17.100.00
13.680.00

172.141.20
318.780.00
48.070.00
61.529.60
173.052.00
2.052.00

JUMLAH

775.624.80

DIBULATKAN

775.600.00

m2
m2
m'
kg
JUMLAH

48.600.00
45.000.00
17.100.00
13.680.00

533.433.60
987.840.00
117.306.00
4.104.00
1.642.683.60

DIBULATKAN
`

Mengerjakan dinding partisi type - PR9

1
2
3
4

Rangka hollow 4/4


Gypsumboard 9 mm
Plint kayu 1,5/10
Paku

4.3520
8.7040
2.7200
0.2000

m2
m2
m'
kg

1.642.600.00
48.600.00
45.000.00
17.100.00
13.680.00

211.507.20
391.680.00
46.512.00
2.736.00

JUMLAH

652.435.20

DIBULATKAN

652.400.00

1 UNIT PK
No

Vol
8.30
2.00
1.00
2.00
18.64
1.00

Sat
m2
Set
Set
Psg
m1
Unit

Harga
850.000.00
2.150.000.00
2.350.000.00
350.000.00
60.000.00
750.000.00
Jumlah
Dibulatkan

Jumlah Harga
7.055.000.00
4.300.000.00
2.350.000.00
700.000.00
1.118.400.00
750.000.00
16.273.400.00
16.273.400.00

1 UNIT P1
1 Kusen kayu kamper samarinda
2 Daun pintu panel kayu samarinda
3 Pas. Double Multipleks 6 mm + Teakwood
4 Pasang Engsel pintu nilon 4"
5 Pasang kunci standar (SOLID)
6 Handle Stailess Steel (Decksen)
7 Kaca Es 5mm

0.04
1.71
0.20
3.00
1.00
2.00
0.17

m3
m2
m2
Bh
Bh
Bh
m2

8.475.359.00
476.115.00
382.988.00
28.040.00
202.630.00
275.000.00
144.030.00
Jumlah
Dibulatkan

375.034.64
814.156.65
76.597.60
84.120.00
202.630.00
550.000.00
24.485.10
2.127.023.99
2.127.000.00

1 UNIT P2
1 Kusen kayu kamper samarinda
2 Daun pintu panel kayu samarinda
3 Pas. Double Multipleks 6 mm + Teakwood
4 Pasang Engsel pintu nilon 4"
5 Pasang kunci standar (SOLID)
6 Handle Stailess Steel (Decksen)
7 Kaca Es 5mm

0.04
1.50
0.20
3.00
1.00
2.00
0.17

m3
m2
m2
Bh
Bh
Bh
m2

8.475.359.00
476.115.00
382.988.00
28.040.00
202.630.00
275.000.00
144.030.00
Jumlah
Dibulatkan

375.034.64
714.172.50
76.597.60
84.120.00
202.630.00
550.000.00
24.485.10
2.027.039.84
2.027.000.00

1 UNIT P6
1 Kusen kayu kamper samarinda
2 Daun pintu panel kayu samarinda
3 Pas. Double Multipleks 6 mm + Teakwood
4 Pasang Engsel pintu nilon 4"
5 Pasang Engsel jendela nilon 3"
6 Handle Stailess Steel (Decksen)
6 GRENDEL TANAM
7 Kaca Es 5mm

0.10
1.71
0.75
3.00
2.00
1.65

m3
m2
m2
Bh
Bh
Bh
set
m2

8.475.359.00
476.115.00
382.988.00
28.040.00
25.080.00
275.000.00
44.230.00
144.030.00
Jumlah
Dibulatkan

847.535.90
814.156.65
287.241.00
84.120.00
550.000.00
237.649.50
2.820.703.05
2.820.700.00

1
2
3
4
5
6

Uraian
Pintu Kaca+kaca Frameless Tempered 12mm
Floor Hings, Ex. Dexon
Pasang Fitch Fitting Komplit, Ex. Dexon
Handle Stainless
pasang "u" aluminium
Upah kerja + pasang

1 UNIT P4
1 Pintu PVC
2 Upah Pasang

1.00
1.51

Bh
m2

266.020.00
13.301.00
Jumlah
Dibulatkan

266.020.00
20.084.51
286.104.51
286.100.00

1 UNIT P3
1 Kusen kayu kamper samarinda
2 Daun pintu panel kayu samarinda
3 Pas. Double Multipleks 6 mm + Teakwood
4 Pasang Engsel pintu nilon 4"
5 Pasang Engsel jendela nilon 3"
6 Pasang kunci standar (SOLID)
7 Handle Stailess Steel (Decksen)
8 Kaca Es 5mm

0.03
1.30
3.00
1.00
2.00
0.12

m3
m2
m2
Bh
Bh
Ps
Bh
m2

8.475.359.00
476.115.00
382.988.00
28.040.00
25.080.00
202.630.00
275.000.00
144.030.00
Jumlah
Dibulatkan

286.043.37
618.949.50
84.120.00
202.630.00
550.000.00
17.283.60
1.759.026.47
1.759.000.00

1 UNIT JENDELA J2
1 Kusen Alumunium warna ukuran 4" x 1 3/4"
2 Pasangan kaca polos, t= 8 mm
3 Fisher
4 Upah potong kaca
5 Upah pasang + aksesories

13.00
3.60
12.00
3.60
1.00

m'
m2
bh
m2
Unit

88.540.00
109.440.00
500.00
5.000.00
75.000.00
Jumlah
Dibulatkan

1.151.020.00
393.984.00
6.000.00
18.000.00
75.000.00
1.644.004.00
1.644.000.00

1 UNIT JENDELA J5
1 Kusen Alumunium warna ukuran 4" x 1 3/4"
2 Pasangan kaca polos, t= 5 mm
3 Fisher
4 Upah potong kaca
5 Upah pasang + aksesories

5.40
0.98
6.00
0.98
1.00

m'
m2
bh
m2
Unit

88.540.00
102.600.00
500.00
5.000.00
75.000.00
Jumlah
Dibulatkan

478.116.00
100.548.00
3.000.00
4.900.00
75.000.00
661.564.00
661.500.00

1 UNIT JENDELA J1
1 Kusen Alumunium warna ukuran 4" x 1 3/4"
2 Bingkai jendela aluminium
3 Pasangan kaca polos, t= 5 mm
4 Engsel jendela casemen 16"
5 Karet dan silent
6 Fisher
7 ramp buncis
8 Upah potong kaca
9 Upah pasang + aksesories

4.40
4.00
0.65
1.00
4.00
4.00
1.00
0.65
1.00

m'
m'
m2
set
m'
bh
bh
m2
Unit

88.540.00
109.520.00
102.600.00
39.520.00
1.920.00
500.00
15.000.00
5.000.00
75.000.00
Jumlah
Dibulatkan

389.576.00
438.080.00
66.690.00
39.520.00
7.680.00
2.000.00
15.000.00
3.250.00
75.000.00
1.036.796.00
1.036.700.00

1 UNIT JENDELA J6/J6a


1 Kusen Alumunium warna ukuran 4" x 1 3/4"
2 Pasangan kaca polos, t= 8 mm
3 Fisher
4 Upah potong kaca

9.10
2.88
10.00
2.25

m'
m2
bh
m2

88.540.00
109.440.00
500.00
5.000.00

805.714.00
315.187.20
5.000.00
11.250.00

Upah pasang + aksesories

1.00

Unit

75.000.00
Jumlah
Dibulatkan

75.000.00
1.212.151.20
1.212.100.00

1 UNIT JENDELA J3
1 Kaca Es 5mm
2 pasangan "u" aluminium
3 Upah kerja
4 Upah potong kaca

0.35
3.36
1.00
0.35

m2
m'
Unit
m2

144.030.00
60.000.00
75.000.00
5.000.00
Jumlah
Dibulatkan

50.410.50
201.600.00
75.000.00
1.750.00
328.760.50
328.700.00

1 UNIT JENDELA J4
1 Kusen Alumunium warna ukuran 4" x 1 3/4"
3 Kaca Es 5mm
6 Upah potong kaca
7 Upah pasang + aksesories

2.20
0.30
0.30
1.00

m'
m2
m2
Unit

88.540.00
144.030.00
5.000.00
75.000.00
Jumlah
Dibulatkan

194.788.00
43.209.00
1.500.00
75.000.00
314.497.00
314.400.00

1 UNIT JENDELA J4a


1 pasangan "u" aluminium
3 Kaca Es 5mm
6 Upah potong kaca
7 Upah pasang + aksesories

2.00
0.26
0.26
1.00

m'
m2
m2
Unit

60.000.00
144.030.00
5.000.00
75.000.00
Jumlah
Dibulatkan

120.000.00
37.447.80
1.300.00
75.000.00
233.747.80
233.700.00

1 M2 Mengerjakan dinding kisi-kisi / sunshading besi hollow


1 Besi holllow 40X40x1,8 mm
2 Besi holllow 40X20x1,8 mm
3 Aksesories dan perlengkapan
4 Upah Potong besi
5 Upah Las dan Pasang

0.50
4.00
0.25
1.00
1.00

m'
m2
m2
m2
m2

60.800.00
41.800.00
300.000.00
4.000.00
4.000.00
Jumlah
Dibulatkan

30.400.00
167.200.00
75.000.00
4.000.00
4.000.00
280.600.00
280.600.00

Pek. Kosen Pintu besi R. pompa (Type P5)


Termasuk Pengadaan bahan dan pemasangan, lengkap unit set,
sesuai gambar untuk itu, dengan rincian & spesifikasi sbb. :
- Kosen dari besi Canal CNP-10, finish cat
4.50
- Pintu dbl plat & tralis besi, rangka hollow 40.40.2
1.26
- Finishing cat duco kosen besi
0.90
- Finishing cat pintu
2.52
- Engsel dari engsel bubut
3.00
- Handle, Lockcase & Cylinder Cisa, khusus pintu besi.
1.00

m'
m2
m2
m2
bh
unit

175.000.00
525.000.00
85.000.00
37.925.00
100.000.00
800.000.00

787.500.00
661.500.00
76.500.00
95.571.00
300.000.00
800.000.00

Jumlah
Dibulatkan

2.721.071.00
2.721.000.00

You might also like