TOTAL LINDSEY OIL REFINERY CENTRALISED CONTROL ROOM UPGRADE


PROJECT.
Utilities Electrical Monitoring and Control System.
! "#$% %&#$.
'(e )ro*ect )ro+ides ,or monitoring and control o, t(e electrical distri-.tion system
com)rising o, remote circ.it -rea/er o)eration0 electrical load s(edding and t1o si2
Mega1att steam t.r-ine generators at 3indsey oil 4e,inery. '(is is ac(ie+ed .sing t1o
'45C67 'S8999 'ri)le Mod.lar 4ed.ndant :igital Control Systems.
System one )ro+ides control ,or o, one t.r-ine and (al, o, t(e EMCS ,.nctionality and
system t1o )ro+ides control ,or t(e ot(er t.r-ine and t(e remainder o, t(e EMCS system.
; SC;:; system .sing <onder1are 5n'o.c( ,rom 5n+ensys 1as de+elo)ed 1it( t1o
6)erator stations0 one sit.ated in t(e Utilities control room local to t(e e=.i)ment and
one sit.ated remotely in t(e ne1 centralised control room. '(ese stations ena-le control
o, t(e com)lete system ,rom eit(er location.
:5CS 5ntertrade 3td 1(ere s.-contractors to t(e )ro*ects main contractor 'ricone2 U>
?5n+ensys@ and 1(ere gi+en t(e res)onsi-ility to )ro+ide t(e so,t1are ,or a 'ricon
'S8999 controller0 t1o <onder1are 5n'o.c( Scada systems and onsite commissioning o,
t(e generator control a))lication. ; co)y o, t(e ,.nctional design s)eci,ication re,erence
May A99A B 4e+isionC D 1as )ro+ided ,or coding.
'(e 1or/ 1as carried o.t d.ring t(e )eriod o, E.ne A99A to Fe-r.ary A998 -y a team o,
Engineers ,rom :5CS 5ntertrade 3td in a )ro,essional manner and t(e )ro*ect
s)eci,ication 1as coded s.ccess,.lly. :.e to t(e (ig(ly com)le2 nat.re o, t(e control
systems t(e )ro*ect o+erran t(e sc(ed.le -.t at all times t(e :5CS team 1(ere a+aila-le
to ans1er =.estions and .sed all a+aila-le reso.rces to sol+e all t(e iss.es t(at arose
-eca.se o, t(ese com)lications0 t(.s /ee)ing t(e )ro*ect o+err.n do1n to a minim.m.
:.ring t(e site commissioning o, t(e t.r-ines t(ey )ro+ided e2cellent site s.))ort and
t(is allo1ed t(e t.r-ines to -e -ac/ online on sc(ed.le.
'(e com)lete system (as no1 -eing commissioned and (as )ro+ided relia-le control ,or
t(e last eig(t mont(s.
G8
t(
o, ;.g.st A99D.
Martin Manc(ester
Control H Io1er Manager
3indsay 6il 4e,inery 3td.