- Calculate the Critical path(s), Floats, Resources of network acticities (Res.
of critical activities should not be disturbed)
- Carryout the res. levelling technique with proper sequence (usually from the end) - Calculate the Revised schedule of all the activities Example : WBS Task Description Qty Unit Duration Resources 1 2 3 4 5 6 7 8 9 10 11 12 Code A Construction of.. A.1 Substructure works A.1.1 Excavation works 500 Cum 10 dys
A.2 Superstructure works A.2.1 Columns 50 Cum 8 dys
Back to Abstract RESOURCE LEVELLING Barchart (for assumed time scale)