- Calculate the Critical path(s), Floats, Resources of network acticities (Res.

of critical activities should not be disturbed)


- Carryout the res. levelling technique with proper sequence (usually from the end)
- Calculate the Revised schedule of all the activities
Example :
WBS Task Description Qty Unit Duration Resources
1 2 3 4 5 6 7 8 9 10 11 12
Code
A Construction of..
A.1 Substructure works
A.1.1 Excavation works 500 Cum 10 dys

A.2 Superstructure works
A.2.1 Columns 50 Cum 8 dys

Back to Abstract
RESOURCE LEVELLING
Barchart (for assumed time scale)