You are on page 1of 1

Check lIst No SH / IR - 03 R 0

AIL - MMN
Report No
Date
Cover/Bung - Inspection Report
Released by AIL - MMN
Vendor Name : - Drawing No / Rev : -

Material Code : - Item Description : -


Qty : - DC Ref / Date : -

Drg dimension Actual Dimension (All dimensions are in mm/inches)


Sl.No Inspection Characteristics Tolerance Remarks
in mm / inch MPI nos MPI nos MPI nos MPI nos MPI nos
01 OD
02 Rear O.D
03 Spigot diameter
04 Spigot Height
05 Pressure screw thread
06 Counter bore dia
07 Counter bore depth.
08 Drill dia
09 PCD
10 No of holes
11 Visual

100 % Inspection at supplier end & report sampling qty to be sent with every supply
Conformance Report Ref -
Qty identification : Green paint / Marked suitably
Note :
1, Gauge No / Sl.no of the gauge & due date for calibration to be recorded
2, All machined surfaces to be oiled & deburred.
3, Threaded areas to be properly protected

Material / Spec : - GRN Lot Ref / date:


Heat No : - TC Ref Date:
MPI NO / RT No of Lot:

Supplier Audit Remarks


Qty Qty to be Qty
Qty Supplied
accepted reworked Rejected

Inspected By Checked By: AIL - MMN

You might also like