NTPC Limited Unit 4 - TG Desk

Log
Site Name : NTPC
Dadri-Coal
Log Ref::20140901A262
Date:2014/09/01 Shift : 07:00:00 --
14:00:00
Group: A Name : Abhinav Kumar (
101569)
UNIT-4 TG DESK ENGINEERS LOG BOOK


Parameters Beginning End
Load MW
203.92 198.31
Reactive Power MVAR
-0.35 -30.20
CEP Discharge Pr kg/cm
2

21.53 21.35
Condensate flow kg/cm
2
535
560
DEA LEVEL mm
System.__ComObject System.__ComObject
DEA PR.(Ksc)
5.55 5.57
FW FLOW (T/Hr.)
619.63 612.50
HPH-6 O/L Temp
o
C 241 243
THROTTLE PR kg/cm
2
138 135
1st STAGE PR. kg/cm
2
124.60 120.70
Condenser Vacuum mm
693.69 683.81
MOP Discharge pr kg/cm
2
9.6 9.7
LUB OIL PR kg/cm
2
3.31 3.3
TRIP OIL PR kg/cm
2
8.63 8.63
TUR DIFF EXPN HP
-0.63 -0.62
TUR DIFF EXPN IP
4.78 4.78
TUR DIFF EXPN LP
10.54 10.54
AXIAL SHIFT
-0.11 -0.11
http://10.0.50.27/eslcoal/logbook.aspx
1 of 6 9/1/2014 2:39 PM
TUR ABS EXPN HP
24.97 24.97
TUR ABS EXPN IP
10.21 10.21
TG Bearing
Temp
o
C
1/2 70 76 70 76
3/4 90 83 90 83
5/6 79 59 78 59
TG Pedestal Bearing
vibration micron
1/2 6 11 8 12
3/4 9 8 10 8
5/6 16 7 16 8
TG shaft vibration
micron
1/2 19 92 17 101
3/4 56 46 56 45
TG SPEED (RPM)
3016.80 3016.80
GRID FREQ (Hz)
50.31 50.21
STATOR CURRENT Amps 7200 7200
ROTOR CURRENT Amps 1700 1800
STATOR VOLTAGE (volts) 16.5 16.5
ROTOR VOLTAGE (volts) 200 230
GEN WND. TEMP
o
C 61 65
GEN ROTOR TEMP
o
C 83 90
POWER FACTOR 0.99 0.99
GT WND TEMP
o
C 107.8 104
ST.WT. FLOW (T/Hr) 29 29
ST.WT. COND.(~mho/cm) .19 0.20
H2 PR. kg/cm
2
3.38 3.36
H2 PURITY % 97.27 97.23
SEAL OIL / H2 DP (Ksc) 1.55 1.50
http://10.0.50.27/eslcoal/logbook.aspx
2 of 6 9/1/2014 2:39 PM
Hot gas temp.
o
C 51 54
Cold gas temp.
o
C 36 35
EXPANSION TANK LEVEL -- ----
BUS VOLTAGE (KV) 220 220
ECW header pressure(Ksc) 5.46 5.50
Gland/Leak Steam Controller Position 40 40
Transformers
GT Bank / Fans 5B 5B
OT
o
C 47
50
WT
o
C 59
62/62
ST Bank / Fans
OT
o
C
WT
o
C
UAT - A Bank / Fans 4F 4F
OT
o
C 49 51
WT
o
C 45 46
UAT - B Bank / Fans
4F
4F
OT
o
C 49
51
WT
o
C 54 58
HT Bus voltage kV 6.5
LT Bus voltage V
435

DCDB V 220
240
Chargers STATUS
A B
http://10.0.50.27/eslcoal/logbook.aspx
3 of 6 9/1/2014 2:39 PM
DC Main Volts/Amps
410/239/7.7 412/240/5.2
ATRS+ Volts/Amps
410/30/51
410/29/49
ATRS- Volts/Amps
430/28/15
430/28/7
FSSS Volts/Amps
430/28/51
430/29/17
DDCMIS Volts/Amps
410/28/20
415/28/22

Shift end Status:

MOT level +50
DOT level 33
LOT level -
Duplex filter i/s B
% Chocking 20
MOT centrifuge running hours 2
Hydrogen pressure ksc 3.31
Hydrogen purity % 97.29
Hydrogen consumption 0
Hydrogen stock 4
CO2 stock 20


DAY END PARTICULARS:


Day End Reading Difference
Generation 502.208 1.447
http://10.0.50.27/eslcoal/logbook.aspx
4 of 6 9/1/2014 2:39 PM
APC
UT A 49076
0.093
UT B 24104
DM Water 907991 14

OTHER INFORMATION:

Any Oil / Water / Air Leakage in the area:

PROTECTION BYPASSED:



ACTIVITIES CARRIED OUT DURING SHIFT:




PENDING PTWS:




Shift Begin Parameters From PI Noted : 14:53
Shift End Parameters From PI Noted : 21:16
NTPC Limited Unit 4 - TG Desk
Log
Site Name : NTPC
Dadri-Coal
Log Ref::20140831B262
http://10.0.50.27/eslcoal/logbook.aspx
5 of 6 9/1/2014 2:39 PM
Date:2014/08/31 Shift : 14:00:00 --
22:00:00
Group: B Close By Name : AKHIL JAIN (
102971)
Shift Begin Parameters From PI Noted : 06:43
Shift End Parameters From PI Noted : 06:50
NTPC Limited Unit 4 - TG Desk
Log
Site Name : NTPC
Dadri-Coal
Log Ref::20140831C262
Date:2014/08/31 Shift : 22:00:00 --
07:00:00
Group: C Close By Name : Rajesh Kumar (
101527)
http://10.0.50.27/eslcoal/logbook.aspx
6 of 6 9/1/2014 2:39 PM