Quantity Calculation

Sl. No.

Description

Unit

Nos.

Quantity

Remarks

1 Excavation
Total excavation
2 Footing
Column footing

cum

16

10

1.5

240.00

cum

1.5

225.00

cum

0.1

15.00

cum

1.5

1.2

50

540.00

cum
cum

2
2

8
14.5

0.3
0.3

0.45
0.45

2.16
3.92
6.08

cum
cum
cum
cum

18
18
8
8

14.5
8
14.5
8

0.45
0.45
0.35
0.35

0.75
0.75
0.5
0.5

2.45
1.35
1.27
0.70

Total

3 PCC
Column footing

4 Columns

1500x1200

5 Plinth Beam_M35
300x450
300x450
6 Beam
450x750
450x750
350x500
400*700

Total

5.77

7 Slab_35
300 thick slab

cum

14.5

Total

0.3

139.20
139.20

8 Roof Steel
STAAD Take off for main roof
UA 90X90X6
TUB25025016.0
UA150X150X18

34.25
143.5
41.06
---------------TOTAL
=

2.789
162.046
32.3

197.135 kN

Yst 310 grade for purlin


15% for connection
Total

kN
kN
kN

162.046
24.3069
186.3529

E350
15% for connection
Total

kN
kN
kN

35.089
5.26335
40.35235

Area of roof considered (12X16), so kg/sqm

9 Roof sheeting
Main Roof

118.075651 kg/sqm

Sqm

192.00

0.2

38.40

10 Reinforcement
Foundation @ 120kg/cum

MT

225.00

0.12

27.00

Column @ 250kg/cum

MT

540.00

0.25

135.00

Plinth Beam @ 150kg/cum

MT

6.08

0.15

0.91

Beams @ 200 kg/cum

MT

5.77

0.2

1.15

Slab @ 80kg/cum

MT

139.20

0.08

11.14

Total

175.20