Sl. No.
Description
Unit
Nos.
Quantity
Remarks
1 Excavation
Total excavation
2 Footing
Column footing
cum
16
10
1.5
240.00
cum
1.5
225.00
cum
0.1
15.00
cum
1.5
1.2
50
540.00
cum
cum
2
2
8
14.5
0.3
0.3
0.45
0.45
2.16
3.92
6.08
cum
cum
cum
cum
18
18
8
8
14.5
8
14.5
8
0.45
0.45
0.35
0.35
0.75
0.75
0.5
0.5
2.45
1.35
1.27
0.70
Total
3 PCC
Column footing
4 Columns
1500x1200
5 Plinth Beam_M35
300x450
300x450
6 Beam
450x750
450x750
350x500
400*700
Total
5.77
7 Slab_35
300 thick slab
cum
14.5
Total
0.3
139.20
139.20
8 Roof Steel
STAAD Take off for main roof
UA 90X90X6
TUB25025016.0
UA150X150X18
34.25
143.5
41.06
---------------TOTAL
=
2.789
162.046
32.3
197.135 kN
kN
kN
kN
162.046
24.3069
186.3529
E350
15% for connection
Total
kN
kN
kN
35.089
5.26335
40.35235
9 Roof sheeting
Main Roof
118.075651 kg/sqm
Sqm
192.00
0.2
38.40
10 Reinforcement
Foundation @ 120kg/cum
MT
225.00
0.12
27.00
Column @ 250kg/cum
MT
540.00
0.25
135.00
MT
6.08
0.15
0.91
MT
5.77
0.2
1.15
Slab @ 80kg/cum
MT
139.20
0.08
11.14
Total
175.20