Proyecto:
Ubicacin: Callao
item
01.00.00
TRABAJOS PRELIMINARES
01.01.00
glb
1.00
01.02.00
m2
169.37
01.03.00
m2
169.37
01.04.00
glb
1.00
01.05.00
CONSTRUCCIONES PROVISIONALES
01.06.01
m2
18.00
01.07.01
CERCO PERIMTRICO
ml
60.00
und
metrado
02.00.00
ESTRUCTURA METALICA
02.01.00
kg
10,281.70
02.02.00
m2
169.37
02.03.00
m2
159.07
02.04.00
m3
9.72
02.05.00
kg
360.00
03.00.00
OBRAS CIVILES
DEMOLICIONES
03.01.00
03.01.01
m3
9.62
03.01.02
m3
8.70
03.01.03
m2
72.00
03.02.00
03.02.01
m2
91.00
03.02.02
m2
59.00
03.02.03
m2
152.00
04.00.00
MOVIMIENTO DE TIERRAS
04.01.00
04.01.01
04.02.00
04.02.01
05.00.00
CONCRETO SIMPLE
05.01.00
m3
49.31
m3
532.50
m2
28.17
m2
200.00
m3
1.10
m3
2.91
CONCRETO 1:6(C:H)+25%P.M
m3
0.49
m2
4.72
05.01.01
05.02.00
FALSO PISO
05.02.01
05.03.00
05.03.01
05.05.00
05.05.01
05.05.00
05.05.01
05.05.02
06.00.00
CONCRETO ARMADO
06.01.00
ZAPATAS
06.01.01
m3
17.27
06.01.02
kg
1,036.20
06.01.03
m2
48.27
06.02.00
COLUMNAS
06.02.01
m3
0.68
06.02.02
kg
136.00
06.02.03
m2
12.17
06.02.04
TARRAJEO DE COLUMNAS
m2
12.17
06.03.00
PLACAS
06.03.01
m3
53.03
06.03.02
kg
4,242.40
06.03.03
m2
182.90
06.03.04
TARRAJEO DE PLACAS
m2
182.90
06.04.00
VIGAS
06.04.01
m3
2.75
06.04.02
kg
371.25
06.04.03
m2
25.00
06.04.04
TARRAJEO DE VIGAS
m2
25.00
06.05.00
ALBAILERIA
06.05.01
m2
63.50
07.00.00
SEGURIDAD
07.01.00
SCTR, PENSION,
glb
1.00
kit
15.00
glb
1.00
07.02.00
07.03.00
PLANILLA DE METRADOS
DESCRIPCION
Cant.
UBICACIN
perimetrales
perimetrales
tabiques internos
tabiques internos
tabiques internos
TOTAL GENERAL
1.29
6.130
2.35
10.390
1.40
4.20
0.56
9.50
26.80
4.16
PLANILLA DE METRADOS
PARTIDA: CIMENTACION DE MUROS
DESCRIPCION
Item
CONCRETO
Cant.
DIMENSION (M2)
Area
UBICACIN
1.00
CIMENTACION DE MUROS
PLACA MEDIANERA
1
11.10
3.60
2.30
3.75
Z1
Z-col circ.
Z2
TOTAL GENERAL
Factor de Desperdicio
TOTAL
PLANILLA DE METRADOS
PARTIDA: DEMOLICION
DESCRIPCION
Item
CONCRETO
Cant.
UBICACIN
DIMENSION (M2)
Area
1.00
DEMOLICION CIMENTACION
CIMENTACION
1.00
16.04
1
1
1
1
0.19
0.60
0.08
0.08
0.08
3.49
COLUMNA
COLUMNA
COLUMNA
COLUMNA
1
2
3
4
VIGAS
1.00
MUROS
TOTAL GENERAL
Factor de Desperdicio
TOTAL
MINKA
ESKOS MINKA
Costo unit
Costo total
total
11,638.09
1,500.00
1,500.00
3.50
592.80
5.00
846.85
3,000.00
3,000.00
66.58
1,198.44
75.00
4,500.00
149,624.49
10.00
102,817.00
140.00
23,711.80
115.00
18,293.05
331.00
3,218.64
4.40
1,584.00
14,097.93
277.87
2,673.11
368.75
3,208.13
22.76
1,638.72
27.78
2,527.98
30.00
1,770.00
15.00
2,280.00
14,499.40
48.26
2,379.70
-
22.76
12,119.70
6,966.18
21.22
597.77
-
26.00
5,200.00
-
278.80
306.68
-
190.58
554.59
-
277.83
136.14
36.23
171.01
70,882.01
260.00
4,490.20
4.00
4,144.80
42.00
2,027.34
-
414.79
282.06
4.04
549.44
51.54
627.24
25.42
309.36
-
414.79
21,996.31
4.04
17,139.30
51.54
9,426.67
25.42
4,649.32
-
331.40
911.35
4.70
1,744.88
59.45
1,486.25
43.90
1,097.50
3,303.91
52.03
3,303.91
5,025.00
900.00
900.00
225.00
3,375.00
750.00
750.00
40,905.89
276,037.01
COSTO DIRECTO
GASTOS GENERALES 6.5%
UTILIDADES 9%
17,942.41
24,843.33
SUBTOTAL
318,822.74
TOTAL +1.18%
55,750.63
376,210.83
TOTAL
(M3)
ENCOFRADO
(M2)
AREA (m2)
PERIMETRO (m)
0.465
5.340
0.800
1.03
1.88
0.758
10.400
1.60
3.12
0.40
0.40
0.40
0.00
0.00
0.00
0.50
1.60
0.20
9.85
27.00
3.56
0.00
0.00
0.00
H (m)
0.800
2.91
4.72
PLANILLA DE METRADOS
ACION DE MUROS
CONCRETO
DIMENSION (M2)
Perim.
TOTAL
(M3)
16.77
SOLADO
ENCOFRADO
TOTAL
(M2)
TOTAL
(M2)
27.95
46.87
40.61
0.60
6.66
11.10
24.37
7.80
0.60
6.48
10.80
14.04
6.10
0.60
1.38
2.30
3.66
8.00
0.60
2.25
3.75
4.80
16.77
de Desperdicio
1.03
17.27
PLANILLA DE METRADOS
CONCRETO
DIMENSION (M2)
Perim.
TOTAL
(M3)
27.95
1.03
28.79
46.87
1.03
48.27
9.62
0.60
9.62
8.70
6.50
6.50
3.40
3.40
1.24
3.90
0.27
0.27
37.79
3.02
22.69
6.50
22.69
9.62
de Desperdicio
1.03
9.91
ANTERIOR
316,942.89
20,601.29
28,524.86
366,069.04
431,961.47
TABIQUERIA
CONCRETO
(M3)
0.186
0.303
0
0
0
0.49