SR NO MCQ's of BCEE

u1
The irregation engineering may be defined as
u1 Irrigation is necessary in an area
u1 the term used for major or important roads of country is
u1 A road connecting two towns is called a
u1 A good sleeper should be such that
u1 A scale of 1: 1000 means
u1 A map having scale 1cm = 400m will have R. F. of
u1 If scale of a map is 1cm = 50 m, a side of building admeasuring 40m will appear as a line .. cm long on map
u1 While working whole to part, generally the area is divided into as first step.
u1 For locating a point near a survey line it is essential to measure at least . From the survey line.
u1 If we measure one distance and one angle of a point with respect to a survey line, definitely wit5h respect to the line
u1 Maps always shows . angles and distances.
u1 For preparing map of an are . Measurements are not required
u1 By working whole to part, is prevented
u1 Outputs of surveying are
u1 Corrected horizontal angles and are used to prepere maps.
u1 map is actually graphical presentation of projected on horizontal plane
u1 Scale such as 1 cm= 250 km upto 1cm = 500 km is generally adopted for maps
u1 Mineral resources and rock types are shown on .. Maps
u1 Cadastral map typically includes .
u1 National park, bird sancturies, etc are shown in .. Maps
u1 maps can be used to identify rocks, minerals, earthquake zones, stone quarries, etc
u1 Different types of ecosystems and biodiversity can be studied from .. Maps.
u1 rainfall, wind, temperature and such zones are shown on .. Maps.
u1 Town planning can be assisted by maps
u1 Contours and main features such as water bodies, forests, hills, etc. are found in .. Maps
u1 For planning and execution of mega- project such as Konkan railways, type of map must be mainly used.
u1 Tourists can use maps for visiting new places in town
u1 A scale such as 1cm = 50 m is used for maps
u1 for defence, positoning of bunkers and check posts, .. Maps are used.
u1 Drawing with a scale such as 1 cm= 1m is called as
u1 If surveying is not done whole to part, accumulation of error leads to ..
u1 Identify the incorrect type of map (irrelevant in engineering)
u1 Major grawback of modern methods and electronic equipment is
u1 Minimum angle that can be measured by digital thedolite is .
u1 Digital thedolite is not used for . Out of following
u1 out of following, .. Is not a part of digital thedolite
u1 Optical plummet is used for the digital thedolite over the instrument station
u1 In triangulation work, . Is used for measuring interior angles very accurately
u1 While measuring angles with digital thedolite, thedolite is mounted (fixed) on a ..
u1 Digital theodolite can be used as a level by ..
u1 Total station is a combination of ..
u1 All X, Y, and Z co- ordinates of a station can be obtained by using
u1 Missing line measurement is possible with
u1 Distance measurements, angle measurements and .. Measurements are possible by using station. Hence surveying and levelling are integrated.
u1 Rotary laser mounted on tripod is used for .
u1 For alignment, checking verticality and horizontality very accuratly, . Can be used at construction sites.
u1 For safe navigation even at night times, . Can be used
u1 For rapid survey, . Can be used to obtain co-ordinates of station.
u1 Vertical navigation, locating a station exactly possible by using
u1 Data stored in digital theodolite or total station can be used for ..
u1 Different types of data and maps can be retrieved very fast using .
u1 For relectronic measurement of distance is required at the remote or slave station.
u1 Based on the measurement range, E. D. M. are of .. Types
u1 Different types of foundation are:
u1 The part of structure below ground level is called as:
u1 Foundation Engineering makes use of the knowledge of behaviour of the soil obtained from geo=technical engineering and determines:
u1 One of the application of foundation engineering is:
u1 Foundation of building structure is designed to serve the following purposes:
u1 A branch or basic area of civil engineering which deals with water supply, diposal of waste water generated from domestic and industrial use and environmental pollution control is known as:
u1 One of the application of environmental engineering is:
u1 One of the use of environmental engineering is:
u1 Branch of environmental engineering which deals with the treatment of domestic and industrial waste water is known as:
u1 The water supply and treatment of water supply comes under the part of:
u1 Waste water in the big cities is carried away by network of pipelines called as:
u1 The part of the environmental engineering which deals with the air pollution, sound pollution, thermal pollution and water pollution etc.
u1 Presence in outdoor atmosphere, of one or more contaminants, such as dust, fumes, gases, mist, smoke, odour or vapour in quantities with characteristics and such duration as to be injurious to human, plant, or animal life or to property or which reasonably interferes with the comfertable enjoyment of life is known as:
u1 Unwanted sound is called:
u1 A branch or basic area of civil engineering which deals with the measurement of items of construction and multiplies it by the present market rate so as to know the probable cost of the construction is known as:
u1 A procedure or mathematical method of working out the probable cost of construction based upon the measurement of various items of the construction work is known as:
u1 A detailed estimates is prepared in________ stages.
u1 One of the type of estimate is :
u1 The cost of each item of construction work is determined in a format called as:
u1 One of the application of quantity surveying is:
u1 Branch of quantity surveying which deals with the assessing the present fair value of aproperty is known
u1 One of the necessity of valuation is:
u1 One of the type of value is:
u1 The value of dismantled materials of a property at the end of its utility period is known as:
u1 The value at the end of utility period without being dismantled is known as:
u1 The value or amount of property, which may be obtained at any time from the open market is known as:
u1 The value or amount mentioned in the account book at the time of purchase and can be obtained on deduction done by depreciation is known as:
u1 Scrap value is about ________ of its total cost of construction
u1 The branch of basic area of civil engineering which deals with the study of zones of probable seismic intensity upon the different area so that any preventive care can be taken against eartquake is known as :
u1 The branch of civil engineering which deals with development, design,construction & maintainance of roadways,railways,airways and waterways is known as -----------------.
u1 The distance between inner face of two parallel rails is known as---------.
u1 which of the following gauge is not used in india as railway gauge?
u1 In case of broad gauge the distance between inner faces of two parallel rail is ----------.
u1 in case ofNarrow gauge the distance between inner faces of two parallel rail is ----------.
u1 In case ofmeter gauge the distance between inner faces of two parallel rail is ----------.
u1 The capital cities of the various states are connected to each other by
u1 which type of road connect district place to taluka place?
u1 which type of road connect taluka place to village?
u1 road connecting district places in state is known as --------.
u1 which type of material is used in construction of expressway?
u1 The road pavement can not change their shape without rupture are known as --------.
u1 The road pavement which can change their shape without rupture are known as:
u1 the common example of rigid pavement is
u1 One of the application of transportation engineering is------------
u1 The necessity of road is
u1 The branch which deals with the study of soil, its behaviour and application as an engineering material is known as...
u1 The branch which deals with the study of different types of foundations, design, construction of foundation is known asis known as...
u1 The portion of structure constructed below the ground is known as.
u1 A phenomenon in which a part of the inicident electromagnetic radiation passes through matter is known as..
u1 The function of foundation is
u1 The application of geotechnical engineering is
u1 the branch which deals with the study of water supply,waste water & different types of pollution is known as
u1 Drinking water is supplied to domestic purpose.
u1 The branch which deals with determination of approximate cost of construction before construction is known as
u1 The branch which deals with determination of the present fair value of the property is known as
u1 The necessity of valuation of property is .
u1 The value of property mentioned in the account book at the time of purchase and can be obtained on deduction is known as ..
u1 The value of property which may be obtained at any time is known as.
u1 The branch of civil engineering which deals with the study of zones of probable seismic intensity in the different areas is known as
u1 Seismic map of india has been prepared by which department
u1 The point on the earth's surface where we feel earthquake is known as.
u1 for a dam project folowing is not relevent
u1 erection of transmission towers is not a part of ---------- project
u1 expressway is generally said to be most economical if
u1 which is the correct sequence
u1 in 21 st century--------- is of great significance for the developing country like india for fast economic and social unliftment.
u1 for best possible efficient completion of a mega project, there must be ----------- aproach followed by all agencies and persons.
u1 for foundation selection and design ------- is very essential
u1 catchment and commad are a studies are a part of ----------- project
u1 good infrasrtucture gives gives boost to-------- of the rigion or area
u1 The branch of basic area of civil engineering which deals with the study of zones of probable seismic intensity upon the different area so that any preventive care can be taken against eartquake is known as :
u1 Earthquakes are produced by sudden release of tremendous amounts of energy within the earth by a sudden movement at a point called :
u1 The point on the surface of the earth directly above the hypocentre is called:
u1 An earthquake map of India has been prepared by the __________ Department showing zones liable to severe, moderate and minor earthquakes.
u1 There is vertical and horizontal wave like motion of the ground in case of earthquakes. The most destructive force in the horizontal direction because:
u1 Which is one of the preventive care that is taken against eartquake:
u1 Branch or basic area of civil engineering which deals with the provision of good infrastructural facilities which help for the rapid growth of a particular areais known as:
u1 ______ provides the infrastructural facilities at many places in Maharashtra by which there is a fast development and growth of areas.
u1 Remote sencingnis a modern technique of _____________ .
u1 Remote sencing in surveying uses a sensor system that transfers and receives the energy in the form of :
u1 Remote sencing is used to collect the information about :
u1 ___________mainly deals with the planning aspects and sitting of industries in such a way that the natural resources are conserved and utilized in the best possible manner.
u1 Town planning is an integral aspect of _________ of an area
u1 Town planning helps to reduce illegal construction in the area by formation ________ rules for specific area
u1 As per new government policies, government is promoting the development of townships and _________ in various states
u1 One of the need of automation in construction industry is :
u1 One of the example of automation in construction industry is:
u1 Following are automatic machine use in construction of road
u1 __________ is an example of automation in material movement.
u1 The ___________ pick it up, swings and places at the required height.
u1 At large projects e. g. Dams and tunnel construction, automation has happened in the use of earth moving equipments, thus _________ ton dumpers are common taking away large excavation debris.
u1 In _______ construction, two manholes are dug at two places and then a tunnel is bored below the surface, without disturbing the surface.
u1 Sites can be surveyed with the use of modern instruments such _______ having a PC connectivity and softwre.
u1 Instrument__________ measures the profile of a structure, say, inside of tunnel and records the measurements on a CD. Then the instrument gives an engineering drawing of the tunnel profile.
u1 Branch or discipline coming under the basic areas in civil engineering is :
u1 Civil engineering is perhaps the only branch of engineering which is closely associated with two of the three basic human needs of :
u1 Civil engineering finds out probable cost of the project by ________
u1 These days, especially for big projects like expressways, water treatment plants, sewage treatment plants etc. the responsibility of maintenance also entrusted to ____________.
u1 The civil engineer has to select proper site for construction of dam across a _________.
u1 _________ area is that area of ground from where, all the rainfall falling on that area gets conveyed and stored at one point.
u1 The total amount of water that can be stored in the reservoir is ________
u1 Hydraulic design of adjoining structures such as spillway, energy dissipator, canals is also carried out by
u1 if the dam is to be constructed for generation of hydro-electrical power the planning, designing and construction of power plant is a joint responsibility of :
u1 The most ______ alignment shall be selected.
u1 Design of electrically operated trains is carried out by:
u1 Design of signaling system is carried out by:
u1 Fabrication, maintenance of construction equipments, design & manufacture of buses, trains is carried out by :
u1 One of the following adverse condition faced by civil engineer in constrction is :
u1 In _________ vertical measurement or level or elevations of relative positions of points are found out and then contour maps can be prepared so as to know the ground profile of earth surface.
u1 ________ maps can be prepared which gives the correct idea of the ground profile
u1 Horizontal distance can be found out with the help of __________
u1 Carrying out the survey on lakes, rivers, nala and sea to study the bed profile. This is known as _________
u1 _________ instrument is used for levelling.
u1 _________ are used for aerial photography.
u1 Carrying survey in city areas as to locate details like open area, streets, buildings, water supply and sewer line etc. This is known as :
u1 Most advance method of surveying:
u1 The part of super structure existing between the ground level and floor level is known as :
u1 Construction engineer basically is concerned with two parts as follows:
u1 In construction engineering, building structures are of three types as follows:
u1 One name of type of road based upon material used for construction.
u1 One name of type of road based upon function and location.
u1 One of the factor for site selection of factory building is :
u1 One of the factor for site selection of residential building is :
u1 One of the use of environmental engineering is:
u1 One of the use of Geotechnical engineering is
u1 One of the use of structural engineering is :
u1 One of the use of foundation engineering is
u1 One of the differnce between estimation and valuation of building is :
u1 One of the difference between Flexible pavement and Rigid pavement :
u1 Road constructed by using cement concrete is known as :
u1 Cement concrete road is :
u1 Bituminous road is :
u1 Ballast means:
u1 Following are three gauges used in indian railway
u1 Parts of railway track are
u1 One of the difference between railway & roadway:
u1 The road having their surface consisting of clean, crushed aggregates mechanically interlocked by rolling and bound together with filler material and water laid on a prepared base course is called:
u1 The road having its wearing surface consisting of clean, crushed aggregates mechanically interlocked by rolling and bound together with filler material and water laid on a prepared base course is called :
u1 The road having its foundation and wearing surface consisting of one or two compacted layers of an ordinary soil is known as :
u1 The position occupied by the centre line of road in plan is called:
u1 The rolled steel section laid end to end in two parallel lines over sleepers to form a railway track are known as :
u1 The members laid transversely under the rails for supporting and fixing them to the gauge distance apart are known as:
u1 Indian railways are divided into ______ Zones for convenience of operation and maintenance.
u1 An__________ is a procedure or mathematical method of working out the probable cost of construction based upon the measurement of various items of the construction work as :
u1 One of the example of interdisciplinary approach in engineering:
u1 In construction of expressway design of software is done by:
u1 The role of civil engineer in construction of building:
u1 Role of civil engineer in construction of dams:
u1 Role of civil engineer in construction of expressway:
A
The process of artificially supping water to soil for raising crops
where there is a scanty rain fall
country road
country road
the rails can be easily fixed & taken out from the sleeper without moving them
only 0.1 % ares is plotted
(1 : 400)
0.8
large triangles
perpendicular distance
two points are
inclined
horizontal
accumulation of errors
plans
horizontal distances
mam-made objects
city
archeological
land and property boundaries
environmental
geological
Forest
forest
Forest
topographical
archeological
topographical
archeological
military
city map
wrong angular measurements
Cadastral map
requirement of power source
1'
distance measurement
optical plummet
starting
E.D.M.
stand
adusting vertical angle to zero
mechanical and electronic theodolite
laser
surveying
vertical
parallel line
E. D. M.
G. P. S.
E. D. M.
total station
area measurement
G. P. S.
reflector with prisms
2
Wall foundation, Shallow foundation, Deep foundation
Wall
Cube rate analysis
Design of proper foundation
Settlement of structure should be uniform throught the area of foundation
Structural engineering
To treat and supply of water
To determine detailed estimate
Water supply
Sanitary engineering
Network of pipes
Sanitary engineering
Water pollution
Noise
Surveying
Quantity surveying
One
Cube rate estimate
Revised estimate
Probable cost of the work Before construction
Quantity surveying
Design of proper foundation
Salvage value
Scrap value
Scrap value
Scrap value
Scrap value
10%
Foundation engineering
Irrigation engineering
track
medium gauge
1 m
1 m
1 m
cement concrete road
major district road
major district road
major district road
cement concrete
tar pavement
tar pavement
cement concrete road
Useful in planning new towns in better way
Quick and easy transport
Foundation engineering
Foundation engineering
Base
Transmission
To increase load of structure
determination of water quality
Foundation engineering
before treatment
Quantity surveying
levelling
for fixing boundries of property
Salvage value
Salvage value
earthquake engineering
geological
hypocenter
electrical engineering
dam
width of road is minimum
surveying , preparing plans and sections,estimation,design
infrastructure devolopement
automation
environment engineering
expressway
economy
Foundation engineering
Hypocentre
Hypocentre
Meteorological
Vertical motion is much greater than horizontal motions
The maximum foundation pressure under dead and live load combined with Seismic forces shall not exceed by 10 % of the normal safe bearing pressure
Highway engineering
MIDC
Landscaping
Infrared Rays
Agriculture, forestry, archeology environment, water resources management, transportation etc.
Surveying
Infrastructural development
Economic control
Social economic zones
Increase in project speed
Increase in project speed
Tower crane
Tower crane
Tower crane
25 or 30
Trench less
Laser level
Laser level
Irrigation engineering
Shelter and food
Surveying
Mechanical Engineer
Lake
Catchment area
Area capacity
Irrigation engineer
Civil, chemical & mechanical engineer
Sraight
Electrical & mechanical engineer
Electronic & electrical engineer
Civil engineer
construction of structures in coastal areas across the valley or on problematic soil
Surveying
Contour map
Optical square
Topographical survey
Chain
Airplane or helicopter
Chain survey
Remote sensing
Lintel
Materials for construction and construction processes
Framed, load bearing and composite structure
WBM
Earthen road
Site selection for factory should be away from care residential zone
It should br developed plot with roads, electricity and water
Pollution control
For designing the earthen dam
Rehabilitation of old structure
Design of shallow foundation
Estimation gives the approximate cost of the construction and valuation gives the presentnvalue of property already constructed
Flexible pavement can change their shape to some extent without rupture where as rigid pavement cannot
Earth road
Flexible road
Flexible road
Sleeper
Narrow, Meter, broad gauge
Rail & sleeper
Road is suitable for any ditance whereas railway is suitable for long distance
Earth road
Earth road
Earth road
Road alignment
Sleepers
Sleepers
Nine
Estimate
Power generation project
Civil Engineer
Finding the foundation details
Catchment area studies
Maintenance of construction equipment
B C
a science of planning and designing an efficient and
economic irrigation system
The engineering of controlling & harnessing the
various natural sources of water of water,by the
constuction of dams,canals and finally
distributing the water to the agricultural fields .
where the rain fall is not uniform where commercial crops requires more water
urban road highway
urban road highway
it can be provide sufficient bearing area for the rail tit can provide sufficient effective bearing area on the balast
area is enlarged thousand times are is plotted thousand times
(1: 4000) (1 : 40000)
1.25 0.5
very samll triangles rectangles
two angles and one distance two angles
one point is one triangle is
oblique horizontal
oblique horizontal
division of errors total instrumental error
maps correct horizontal measurements
plans modern instruments
natural features angles and lines
geological forest
topographic cadastral
topographical features environmental details
cadastral forest
geographical topographicAL
cadastral geographical
weather cadastral
weather topographical
city forest
forest topographicAL
city archeological
topographical forest
archeological city
cadastral map plan
wrong distance measurements bad shaped triangles in triangulation
city map geological map
more time required difficult repairs
1" 15'
measuring angles of elevation neasuring angles of depression
levelling head tracing arm
centering levelling
optical plummet laser
tripoid platform
adusting horizontal angle to zero rotating telescaope slowly about vertical axis
digital thedolite and digital planimeter E.D.M. and electronic digital theodolite
digital theodolite digital planimeter
total station electronic digital theodolite
area map
centar lines laser levelling
G. P. S. Total station
E. D. M. Digital theodolite
total station G. P. S.
G. P. S. Digital theodolite
calculation digital mapping
total station Digital theodolite
reflector with mirrors receiver with special glasses
3 4
Structure foundation, shallow foundation, deep foundation Building foundation, shallow foundation, deep foundatio
Column Foundation
Proper type of foundation Proof consultancy
Classification of soil Rehabilitation of old structures
Basic concepts and index properties of soils can be studied Design of structural element
Environmental engineering Geotechnical engineering
To determine bearing capacity of soil It helps for assessing the capability of subgrade of road
To control pollution and protect human life To determine the capacity of reservoir
Sanitary engineering Quantity Surveying
Quantity Surveying Irrigation engineering
Water mains Sewer
Environmental pollution Water supply
Noise pollution Air pollution
Green house effect Acid rain
Quantity Surveying Advance surveying
Estimate Design
Two Three
Square rate estimate Circle rate estimate
Supplementary estimate Abstract sheet
Intensity of stresses on soil strata at different depths underneath Failure analysis of collapsed structure
Estimation Valuation
Buying and selling the property Water supply
Stand value Gate value
Salvage value Market Value
Salvage value Market Value
Salvage value Market Value
Salvage value Market Value
20% 30%
Geotechnical engineering Earthquake engineering
Structural engineering Transportation engineering
ballast sleeper
Narrow gauge Broad gauge
1.676 m 1.678 m
0.675 m 0.762 m
0.999 m 1.100 m
national higway state highway
state highway other disrtict road
state highway other disrtict road
state highway other disrtict road
bitumen tar
flexible pavement earthen pavement
flexible pavement earthen pavement
water bound macadam road Tar road
Geological formations over vast areas can be studied Remote areas and rural areas become accessible and communicable
Improving irrigation in country useful planing of cities
irrigation Engineering Structural engineering
irrigation Engineering Stuctural Engineering
Foundation Super Structure
Scattering Reflection
To increase settlement of structure to increase stability of structure
determination of pollution determination of cost
irrigation Engineering environmental engineering
after treatment from well
surveying costing
Surveying costing
for construction on property buying and selling of property
scrap value Market Value
scrap value Market Value
Geotechnical engineering foundation engineering
irrigation Engineering Surveying
epicenter seismic center
biomedical engineering mechanical engineering
expressway for remote areas Construction Engineering
it is construction on B.O.T. basis. amount of earthwork is cutting and filling is nearly equal.
surveying ,design, preparing plans and sections,estimation, estimation,surveying , preparing plans and sections,design
town planning expressway
environment awareness interdisciplinary
Super structure subsoil exploration
high rise buildings railways
independence land-uses
Geotechnical engineering Earthquake engineering
Epicentre Centre
Epicentre Centre
Survey Irrigation
Vertical motion and horizontal motion are zero Horizontal motion are much greater than the vertical wave motions
An earthquake map of India has been prepared by the meteorological department showing zones liable to severe, moderate and minor earthquakes Seismic forces vary rapidly with time. Therefore, they impose a dynamic loading on building.
Irrigation engineering Infrastructural development
KIDC CIDC
Surveying Irrigation
Electromagnetic waves U.V. rays
Innovative processes and elements for their contemporary normal building procedures. To determine the capacity of soil
quantity Surveying Town planning
Economic development Road development
Development control Road Control
Spot economic zones Special economic zones
Ready mix concrete Provision of a proper drainage system
Ready mix concrete Provision of a proper drainage system
Asphalt mixer and asphalt pavers Total station
Asphalt mixer and asphalt pavers Total station
Asphalt mixer and asphalt pavers Total station
5 or 10 15 or 20
trench earth work
Profilo meter Auto level
Profilo meter Auto level
Water Land
Shelter and road Food and road
Testing Estimation
Electrical Engineer Computer engineer
Stream River
Topography contour
Lake capacity Pound capacity
Hydraulic engineer Environmental engineer
Civil, electrical and production engineer Civil, electrical and mechanical engineer
Techno economical Cheaper in construction
Civil & mechanical engineer Civil & electrical engineer
Electronics & Civil engineer Civil & electrical engineer
Electrical Engineer Mechanical engineer
communication between different trains in fabrication of construction equipment
Levelling Estimation
area map Site map
Line ranger Chain
Land survey Hydrographic Survey
Ranging rod Dumpy level
Total station EDM
Compass survey City survey
Aerial photography Hydrological surveying
sill plinth
Material for construction and surveying Surveying & construction processes
Brick, stone & composite structure Wood, plastic & load bearing structure
NH SH
Water bound macadam road cement concrete road
Site selection for factory should be near from care residential zone It should not be accessible
It should not be located in residential zone It should in polluted area
Population control Signal control
For design of building For laying of railway track
Treatment of water Surveying of land
Design of building Design of roof
Estimation gives the cost of the property and valuation gives value of construction Estimation gives quantity of construction and value of construction
Flexible pavement thickness is less than rigid pavement Flexible pavement is more stiff then rigid pavement
Bituminous road Cement concret road
Rigid road WBM road
Rigid road WBM road
Rail Gauge
Half meter, wide, narrow gauge Narrow, wide & broad gauge
Rail & saddle Sleeper & wood
Road maintenance cost is more , railway maintenance cost is less Road load carrying capacity is more than railway
WBM road cement concrete road
WBM road cement concrete road
WBM road cement concrete road
Curve Gradient
Rails Gauge
Rails Gauge
ten Five
Survey Construction
Survey Construction of wall
Computer engineer Mechanical engineer
Design of turbines Maintenance of construction equipment
Design of turbines Hydraulic & geotechnical insruments
Design software Design of cross-section
D ANS
All the above
D
All the above D
none of these C
none of these A
All the above D
field area is reduced by 1/1000 D
(1 : 400000) C
0.4 A
square A
two distances and one angle C
two triangles are B
vertical C
vertical D
personal error A
vertical measurements C
graph papers A
portion of Earth's surface D
district C
geological D
climate zone A
climatic C
SEISMIC A
environmental D
environmental B
city D
archeological A
geological C
cadastral A
city D
forest A
geological map C
incorrect map D
wall map D
harmful radiations A
15" B
measuring horizontal angle A
telescope C
placing B
digital thedolite D
robot B
focussing accurately A
digital planimeter and E.D.M. D
total station D
digital planimeter B
plan A
centering C
Laser instruments D
total station A
digital planimeter C
E. D. M. B
estimation C
G. I. S. D
collector with prisms A
many B
Column foundation, shallow foundation, deep foundation A
Plinth C
Plinth area estimate B
Design of gates to control flood water A
Determining the capacity of reservoir A
Irrigation engineering B
Failure analysis of collapsed structure A
Rehabilitation of old structure B
Irrigation engineering B
Environmental engineering D
Cement pipes C
Environmental engineering B
Land pollution C
Ozone depletion A
GIS B
Trial pit B
Four B
Line rate estimate A
Construction sheet C
To know the safe bearing capacity A
Surveying C
Sanitary engineering B
Insurance A
Book value A
Book value B
Book value C
Book value D
40% A
Soil Mechanics C
Environmental engineering C
gauge D
meter gauge A
1.687 m B
0.767 m C
1.010 m A
tar road B
village road A
village road C
village road B
asphalt A
rigid pavement D
rigid pavement B
Earthen road A
Floods can be monitored and flood damage can be accessed C
Rehabilitation of people A
Geotechnical Engineering D
Geotechnical engineering A
Plinth B
Transition A
to increase base of structure C
determination of soil propertiesD
ground water engineering C
from dam B
valuation A
valuation D
for insurance of property C
Book value D
Book value C
Environmental engineering A
meteorological D
earthquake center B
agricultural engineering D
infrastructure devolopmentC
tar top is used with gentle slope C
design,estimation, preparing plans and sections,surveying , A
dam A
open C
layout C
dam(irrigation) D
power A
Soil Mechanics C
Seimic centre A
Seimic centre B
Geotechnical A
Horizontal and vertical motions are equal. C
During an earthquake, the ground may move horizontally in any direction and up and down, shifting the building foundation correspondingly. A
Surveying C
DIDC A
Town planning B
Magnetic waves B
Probable cost of the work before construction A
Environmental engineering C
Automation development B
Automation control B
Speed economic zones C
Cube rate estimate A
Cube rate estimate B
Laser level B
Laser level A
Laser level A
1 or 5 A
Excavation A
EDM B
EDM B
Road A
Food and waterway A
Structural design C
Civil engineer D
Spring C
Surveying area A
Reservoir capacity D
Geotechnical engineer A
Civil, chemical and production engineer C
Easy in construction B
Civil & electrpnic engineer A
Civil & mechanical engineer A
Electronic engineer C
in design of signaling system A
Quantity surveying B
Survey A
Dumpy level C
Aerial survey C
Line ranger C
Digital planimeter A
Aerial survey C
Chain Surveying A
skirting C
Surveying & estimation A
Mud, framed & composite structure A
MDR A
National highway D
Raw material required should not be in vicinity A
It should be near industrial zoneA
Vehicle control A
Pollution control A
Rehabilitation of people A
R.C.C. Design A
Estimation gives value of construction & valuation gives approximate cost of construction A
Flexible pavement does not take the shape of surface soil as that of rigid pavement A
WBM C
Strong road B
Strong road A
Crushed stones & metal D
Meter, short & broad gauge A
Sleeper & gauge A
Road is not suitable for all type of traffic as railway A
Bituminous road D
Bituminous road B
Bituminous road A
Super elevation A
Ballast B
Ballast A
Two A
Laying A
Construction of root A
Electronic engineer B
Expressway construction A
Mass rapid transit system A
Designing layout of underground internet cables, telephone lines C
SR NO MCQ's of BCEE
u2 The lowest part of the structure which transmits the load to the soil is known as
u2 The foundation in buliding is provided to
u2 The failure of the foundation of building is due to
u2 The ability of subsoil to support the load of the structure without yielding is known as
u2 The minimum load which will cause failure of a foundation is called as
u2 A scale of 1: 1000 means
u2 A map having scale 1cm = 400m will have R. F. of
u2 If scale of a map is 1cm = 50 m, a side of building admeasuring 40m will appear as a line .. cm long on map
u2 While working whole to part, generally the area is divided into as first step.
u2 For locating a point near a survey line it is essential to measure at least . From the survey line.
u2 If we measure one distance and one angle of a point with respect to a survey line, definitely wit5h respect to the line
u2 Maps always shows . angles and distances.
u2 For preparing map of an are . Measurements are not required
u2 By working whole to part, is prevented
u2 Outputs of surveying are
u2 Corrected horizontal angles and are used to prepere maps.
u2 map is actually graphical presentation of projected on horizontal plane
u2 Scale such as 1 cm= 250 km upto 1cm = 500 km is generally adopted for maps
u2 Mineral resources and rock types are shown on .. Maps
u2 Cadastral map typically includes .
u2 National park, bird sancturies, etc are shown in .. Maps
u2 maps can be used to identify rocks, minerals, earthquake zones, stone quarries, etc
u2 Different types of ecosystems and biodiversity can be studied from .. Maps.
u2 rainfall, wind, temperature and such zones are shown on .. Maps.
u2 Town planning can be assisted by maps
u2 Contours and main features such as water bodies, forests, hills, etc. are found in .. Maps
u2 For planning and execution of mega- project such as Konkan railways, type of map must be mainly used.
u2 Tourists can use maps for visiting new places in town
u2 A scale such as 1cm = 50 m is used for maps
u2 for defence, positoning of bunkers and check posts, .. Maps are used.
u2 Drawing with a scale such as 1 cm= 1m is called as
u2 If surveying is not done whole to part, accumulation of error leads to ..
u2 Identify the incorrect type of map (irrelevant in engineering)
u2 Major grawback of modern methods and electronic equipment is
u2 Minimum angle that can be measured by digital thedolite is .
u2 Digital thedolite is not used for . Out of following
u2 out of following, .. Is not a part of digital thedolite
u2 Optical plummet is used for the digital thedolite over the instrument station
u2 In triangulation work, . Is used for measuring interior angles very accurately
u2 While measuring angles with digital thedolite, thedolite is mounted (fixed) on a ..
u2 Digital theodolite can be used as a level by ..
u2 Total station is a combination of ..
u2 All X, Y, and Z co- ordinates of a station can be obtained by using
u2 Missing line measurement is possible with
u2 Distance measurements, angle measurements and .. Measurements are possible by using station. Hence surveying and levelling are integrated.
u2 Rotary laser mounted on tripod is used for .
u2 For alignment, checking verticality and horizontality very accuratly, . Can be used at construction sites.
u2 For safe navigation even at night times, . Can be used
u2 For rapid survey, . Can be used to obtain co-ordinates of station.
u2 Vertical navigation, locating a station exactly possible by using
u2 Data stored in digital theodolite or total station can be used for ..
u2 Different types of data and maps can be retrieved very fast using .
u2 For relectronic measurement of distance is required at the remote or slave station.
u2 Based on the measurement range, E. D. M. are of .. Types
u2 The function of aggregate s in concrete is to serve as
u2 The rate of hydration is . Proportion to the generation of heat
u2 Low heat is used in .. Structures
u2 The cement, widely used in retaining wall is
u2 Blast furnance slag cement is used for
u2 Blast furnace slag cement concrete require time for shuttering and curing
u2 Blast furnance slag cement
u2 Which of the following cements is expected to have the highest compressive strength after 3 days?
u2 The fineness of cement is measured in terms of
u2 The aggregate which pass through 75 mm IS sieve and entirely retain on 4.75 mm IS sieve is known as
u2 The maximum particle size of coarse aggregate is
u2 The maximum particle size of fine aggregate is
u2 The minimum particle size of fine aggregate is
u2 Bulking of sand is
u2 In reinforced cement concrete stuctures, the steel reinforcement consists of
u2 Cement is homogeneous and well propartioned mixture of lime stone and
u2 In construction following of which material is used as binding material
u2 Cement is the . product obtained by burning and crushing of lime stone and clay
u2 Surface area of cement in cm
2
per gram is known as
u2 For ordinary Portland cement, 7 days compressive strength should be greater than
u2 Due to presence of lime and magnesium oxide, expansion of cement takes place as it comes in contact with water. This property of cement is known as
u2 Initial setting time of cement should not be less than
u2 Final setting time of cement is about
u2 The phenomenon by which the plastic cement paste changes into hard mass is known as
u2 When cement is thrown into a bucket of water it should . For sometime
u2 If one's hand is plunged into a bag of cement he should feel
u2 The cement may be trusted,if the cement is found in the form of powder
u2 One of the use of cement is..
u2 The shape of 1
st
class bricks are.
u2 Absoption of water by weight in case of 1
st
class brick is.
u2 Absorption of water by weight in case of 2
nd
class brick is
u2 Absorption of water by weight in case of 3
rd
class brick is
u2 Compressive strenght of 1st class brick should be
u2 Compressive strength of 2 nd class brick should be
u2 which of the following is not directly related to foundation
u2 SBC of the soil can be obtained by
u2 foundation is also termed as substructure because ------
u2 meaning of differential settlement of foundation is----------
u2 when distance between columns is small , ----------------- is prefferable
u2 shallow foundations are used for-----------
u2 by grouting or chemical treatments ----------------- can be improved
u2 a pile foundation that transmits the loads through its lower end resting on hard strata is called---------------
u2 footings provided separately for RCC columns are called --------------------
u2 which of the following is type of the deep foundations.
u2 foundations for tall buildings are designed for--------------------
u2 Tor steel bars are available in two grades namely---------------
u2 The steel used are reinforcement in R.C.C. is known as---------.
u2 Mild steel bars are designated as ------- due to yield strength of 250 N/mm2
u2 Steel is an alloy of iron & carbon,containing carbon from -----------
u2
The part of superstructure existing between the ground level and floor level is known
as:
u2 One of the need of automation in construction industry is
u2 Is an example of an automation in material movement
u2
Settelment of structure should be uniform throughout the area of foundation
u2
Different type of foundations are:
u2 The part of the building above the ground level:
u2 Intermediate form between cast iron & wrought iron is known as .
u2 colour of which class of brick is uniform red?
u2 The size of modular brick as per Indian standards is
u2
For construction of building and architectural coposition following of which building
materal is economically used
u2 Which bricks are used as road metal and as agfregate in road constuction?
u2 The class of bricks used in construction of load bearing wall is
u2
The class of bricks used in construction of steel furnances, cement kiln,acid plants is
u2 Igneous rock, sedimentary rock and Metamorphic rock are classified as
u2 Stratified rock, Unstratified rock and Laminated rock are classified as
u2 soft rock,medium rock and hard rock are classified as
u2 The rocks which are formed due to cooling of molten lava are known as
u2
The rocks that are formed by denudation and deposition of existing rocks because of
the weathering action are known as
u2
The rocks that have undergone considerable changes in their constitution, i.e. in their
shape, stucture and sometimes even in mineral composition is known as
u2 One of the example of Igneous rock is
u2 One of the example of sedimentary rock is
One of the example of metamorphic rock is
u2 basalt ,granite and dolerite are some examples of -------
u2 sandstone, lime stone and gravel are some examples of----------
u2 Marble ,gneiss & slate are some examples of ----------
u2
Rock which do not have strata and can not be easily split into thin slab and their
structure may be crystaline or granular are classified as
u2
Rock which show a layered structure in their natural environment & posses planes of
stratification and can be easily split up along these planes are classified as --------
u2 Rock have silicaas their main constitutent & they are hard, durable and not affected by weathering agents ars called as------
u2
Rocks have clay or alumina as their main constituent and they are hard, dense and
compact and cannot withstand shocks are called as------
u2
Rocks have calcium carbomate as their main constituent and durability of these rocks
depends upon the atmospheric constituents as they are acted upon by hydrochloric
acid are called as-----
u2
The rock extremely suitable for ornamental and superior type of building
work,monumental structure is-----
u2
the rock which is used for bridge abutment and pier, flooring,kitchen platform,steps etc
is------
u2 the sand passing through I.S. sieve of size 4.75 mm is known as-----
u2 the sandretain on I.S. sieve of size 4.75 mm is known as-----
u2 sand obtained from pits,river beds, shore, sea bed is classified as-----
u2 sand obtained from crushing stone is classified as-----
u2 Depending on the fineness, the sand is classified in to ------ groups
u2
sand prevents excessive -------- of cement paste thereby avoiding cracks during setting.
u2 which of the following is not a purpose of the automation?
u2 the term -------- is not related to automation in civil engineering projects
u2 number of students in collegr fall under --------- on the superstructure
u2 the term sill is related to --------- of a building.
u2
R.M.C. is carried in --------- upto the site and pumped through the special concrete
pumps.
u2
the structure which provided general cleanliness and safety against rainwater as well as
against serpants, rodents, etc is termed as-----
u2 full form of DPC is
u2 wind load considered is given as-------- for superstructures.
A B
Super Structure Plinth
Distribute the load over a large area increase overall stability of the structure
Withdrawl of subsoil moisture unequal settlement of soil
Bearing value of soil bearing power of soil
Ulimate tensile strength nominal strength
only 0.1 % ares is plotted area is enlarged thousand times
(1 : 400) (1: 4000)
0.8 1.25
large triangles very samll triangles
perpendicular distance two angles and one distance
two points are one point is
inclined oblique
horizontal oblique
accumulation of errors division of errors
plans maps
horizontal distances plans
mam-made objects natural features
city geological
archeological topographic
land and property boundaries topographical features
environmental cadastral
geological geographical
Forest cadastral
forest weather
Forest weather
topographical city
archeological forest
topographical city
archeological topographical
military archeological
city map cadastral map
wrong angular measurements wrong distance measurements
Cadastral map city map
requirement of power source more time required
1' 1"
distance measurement measuring angles of elevation
optical plummet levelling head
starting centering
E.D.M. optical plummet
stand tripoid
adusting vertical angle to zero adusting horizontal angle to zero
mechanical and electronic theodolite digital thedolite and digital planimeter
laser digital theodolite
surveying total station
vertical area
parallel line centar lines
E. D. M. G. P. S.
G. P. S. E. D. M.
E. D. M. total station
total station G. P. S.
area measurement calculation
G. P. S. total station
reflector with prisms reflector with mirrors
2 3
binding material filler
Directly Inversely
thin thick
Rapid hardening cement low heat cement
Dams bridge abutment
less more
Develops low heat of hydration has less early strength
Ordinary Portland cament rapid hardening cement
percentage wt. retained on IS sieve number 9 Surface area in cm
2
per gram oc the cement
cyclopen aggregate coarse aggregate
45 mm 55 mm
2.5 mm 4.75 mm
0.0075 mm 0.075 mm
Compacting of sand segregating sand of particular size
deformed bars cold twisted bars
calcium clay
cement sand
Hard strong
fineness fitness
12 N/mm
2
32 N/mm
2
Strength Fineness
30 min 30 sec
14 to 16 hrs 1 to 2 days
compressive strength soundness
Sink Hard
warm hot
Impervious Impalpable
Construction of earthen dam Reinforcement in RCC
Sharp straight edges and plin rectangular face Sharp straight edges and rough rectangular faces
Less than 30 % Less than 25 %
Less than 30 % Less than 25 %
Less than 30 % Less than 25 %
> than 10.5 N/mm
2
> than 7 N/mm
2
> than 10.5 N/mm
3
> than 7 N/mm
3
footing B.C. of the soil
multiplying UBC and fos deviding UBC and FOS
it is not as important as structure it is the part below the structure
different structures have different settlements settlements are different than the IS codes
deep foundation isolated footing
small loads on the structure and good bearing capacity less depth large loads on the structure and good bearing capacity greater depth
B.C .of the soil settlement of the foundation
bearing capacity of the pile end bearing pile
grillage foundation strip footings
grillage foundation stap footing
dead loads and seismic loads wind loads
Fe 250 & Fe 500 Fe 250 & Fe 415
Mild steel High tensile steel
Fe 415 Fe 250
0.25 to 1.25 % 0.5 to 1.5%
Lintel Sill
Increase in project speed Readymix concrete
Tower crane Asphalt mixer
Basic concept and index properties of
soil can be studied.
Determining the capacity of reservoir.
Wall foundation, shallow foundation,
deep foundation
Structure foundation, Shallow foundation, deep foundation
Sub-structure Super structure
Ferrous Copper
1
st
class 2
nd
class
20cmX 10cmX 10cm 19cmX 10cmX 10cm
prestress concrete
brick
1st class Fire brick
Clay and Zhama 1st class and 2nd class
Clay and Zhama 2nd class and 2nd class
geological physical
geological physical
Geological physical
Igneous rock sedimentary rock
Igneous rock sedimentary rock
Igneous rock sedimentary rock
Granite Marble
Granite Marble
Granite Marble
ignious rock sedimentary rock
ignious rock sedimentary rock
ignious rock sedimentary rock
unstratified rocks laminated rocks
unstratified rocks laminated rocks
siliceous rocks argillaceous rocks
siliceous rocks argillaceous rocks
siliceous rocks argillaceous rocks
Granite Marble
Granite Marble
coarse sand mediun sand
coarse sand mediun sand
coarse sand mediun sand
coarse sand artificial sand
four three
shrinkage swelling
reduced risk to human lives machine imports
Tower crane remotely controlled robots
dead loads impact load
soil foundation
steel drums plastic tanks
foundation plinth
damp proof construction damp oroof course
k.v2 W.(/g)
C D
Foundation Basement
Transmit load to the bearing surface at uniform rate All of the above
lateral escape of supporting material All of the above
bearing capacity of soil any one of these
Ultimate bearing power Ultimate compressive strength
are is plotted thousand times field area is reduced by 1/1000
(1 : 40000) (1 : 400000)
0.5 0.4
rectangles square
two angles two distances and one angle
one triangle is two triangles are
horizontal vertical
horizontal vertical
total instrumental error personal error
correct horizontal measurements vertical measurements
modern instruments graph papers
angles and lines portion of Earth's surface
forest district
cadastral geological
environmental details climate zone
forest climatic
topographicAL SEISMIC
geographical environmental
cadastral environmental
topographical city
forest archeological
topographicAL geological
archeological cadastral
forest city
city forest
plan geological map
bad shaped triangles in triangulation incorrect map
geological map wall map
difficult repairs harmful radiations
15' 15"
neasuring angles of depression measuring horizontal angle
tracing arm telescope
levelling placing
laser digital thedolite
platform robot
rotating telescaope slowly about vertical axis focussing accurately
E.D.M. and electronic digital theodolite digital planimeter and E.D.M.
digital planimeter total station
electronic digital theodolite digital planimeter
map plan
laser levelling centering
Total station Laser instruments
Digital theodolite total station
G. P. S. digital planimeter
Digital theodolite E. D. M.
digital mapping estimation
Digital theodolite G. I. S.
receiver with special glasses collector with prisms
4 many
catalyst all of these
Both of these None of these
medium All of these
Sulphate resisting cement Oedinary portland cement
retaining walls all of these
all of these none of these
Both of these none of these
High alumina cement sulphate resisting cement
either of these None of these
fine aggregate all-in-aggregate
65 mm 75 mm
5.85 mm 6.5 mm
0.75 mm 0.95 mm
increase in volume of sand due to presence of moisture upto certain extent none of these
mild steel and medium tensile steel bars all of these
soil silicate
brick steel
Artificial Natural
setting Soundness
42 N/mm
2
22 N/mm
2
Soundness Setting
300 sec 10 min
4 to 7 days 3 to 6 hrs
setting time finess
smooth float
cool sticky
Immersed Ingredient
Manufacturing of bricks Manufacturing of tiles
Blunt straight edges and plain rectangular faces Distorted round edges and plain rectangular faces
Less than 20 % Less than 22 %
Less than 20 % Less than 22 %
Less than 20 % Less than 22 %
> Than 5 N/mm
2
> than 3.5 N/mm
2
> Than 5 N/mm
3
> than 3.5 N/mm
3
DPC Differential settlement
Addition of UBC and FOS subtracting FOS from UBC
it is the part below the ground level it is the minor part of the structure
settlement are difficult to control different foundations of the same structure settle by different amounts.
combined footing strip footing
small building and good bearing capacity large depth small building andvery poor bearing capacity less depth
foundation design strenght of the foundation
reaction pile friction pile
isolated column footing strap footing
pile foundation raft foundation
dead loads and wind loads eccentric loads
Ts 250 & Ts 500 Fe 415 & Fe 500
Tor steel Hard steel
Fe 500 Ms 250
0.75 to 1.75% 0.85 to 1.95%
Plinth Skirting
Provision of a proper drainage system Cube rate estimate
Total station Leser level
Design of structural element All of the above
Building foundation, Shallow foundation, deep foundation
Column foundation, Shallow
foundation, deep foundation
Composite structure Road structure
Steel Aluminium
clay Zhama
19cmX 9cmX 9cm 20cmX 9cmX 9cm
steel RCC
Zhama Clay
Fire bricks prestress bricks
Fire bricks prestress bricks
geographical chemical
geographical chemical
geographical chemical
metamorphic rock stratified rock
metamorphic rock stratified rock
metamorphic rock stratified rock
Lime stone Gneiss
Lime stone Gneiss
Lime stone Gneiss
metamorphic rock stratified rock
metamorphic rock stratified rock
metamorphic rock stratified rock
crystalline rocks stratified rock
crystalline rocks stratified rock
calcareous rocks laminated rocks
calcareous rocks laminated rocks
calcareous rocks laminated rocks
Lime stone Gneiss
Lime stone Gneiss
fine sand soft sand
fine sand soft sand
fine sand natural sand
fine sand natural sand
two zero
soundness volume
fast completion of works better quality of work
using R.M.C. for multistoreyed buildings R.C.C. for beams
varying load live load
window roof
slowly rotating drums dumpers
steel window brick wall
development protect center damp protectede coarse
k.v3 W.(/g)2
ANS
C
D
D
D
C
D
C
A
A
C
B
C
D
A
C
A
D
C
D
A
C
A
D
B
D
A
C
A
D
A
C
D
D
A
B
A
C
B
D
B
A
D
D
B
A
C
D
A
C
B
C
D
A
B
B
A
B
B
D
B
C
C
C
B
D
B
B
C
D
B
A
C
A
D
C
A
D
C
A
C
B
D
A
C
D
B
A
B
C
D
C
A
A
B
C
C
A
D
C
B
A
C
B
A
A
A
B
C
A
C
B
C
B
C
A
B
D
A
B
C
A
C
B
A
B
C
A
D
A
B
C
B
A
C
A
D
B
C
A
B
D
D
C
C
B
B
A